Professional Documents
Culture Documents
Page 1
Sec. 1
SECTION 1 -TRANSPORTS, RENTALS AND PERSONNEL CHARGES
1.19 COMPRESSOR
400 cu.ft/min., per job........................................................................................ 520.00
Page 2
Sec. 1
Page 1
Sec. 2
C Per each reserve cementing unit used, per job .......................... Same as Ref. N° 2.2A
D Reserve cementing unit, per 8 hours or fraction, per unit ............................. 2,015.00
Page 2
Sec. 2
Page 3
Sec. 2
2.8 DENSIMETER
Per job ................................................................................................................ 673.40
Page 4
Sec. 2
Page 1
Sec. 3
SECTION 3 - FRACTURING SERVICES
Q* P
HHP =
40.80
In wells where the fracturing job is performed in more than one stage
and/or in sub-stages, the HHP amount will be corresponding to the
stage or sub-stage of highest Horsepower.
Page 2
Sec. 3
Ref. N° DESCRIPTION PRICE (US $)
3.9 BLENDER
First 8 hours ........................................................................................ 2,860.00
Each additional hour or fraction.......................................................... 286.00
3.16 FRAC VALVES AND CONNECTIONS LEFT AT WELL AFTER THE JOB
Page 1
Sec. 4
SECTION 4 - ACIDIZING AND CHEMICAL SERVICES
Page 1
Sec. 5
SECTION 5 - BULK MATERIAL SERVICES
Page 1
Sec. 6
SECTION 6 – TESTING TOOL SERVICES
6.2 TRANSPORT
Delivery charge – larger than 1 ½ Ton per mile .................................................... 3.77
6.4 STAND BY
Time in excess of 3 hours prior to start of job and in excess
of 3 hours after completion of job, per hour ........................................................ 45.50
DEPTH (US $)
Each 1000' or fraction
below 15000' add ....... 104.00
B Each additional hour or fraction .......................................................................... 52.00
C A charge will be made for all well packers damaged during a job,
according to current sales price.
D Additional packer assembly, used on successful lest or misrun......................... 455.00
Page 3
Sec. 6
Page 1
Sec. 7
SECTION 7 – SPECIAL TOOL SERVICES
7.3 STAND BY
Time in excess of 3 hours prior to start of job and in excess
of 3 hours after completion of job, per hour ........................................................ 58.50
Page 3
Sec. 7
Page 4
Sec. 7
B After first 5 days, on the same job and well, per month or fraction per tool:
Thru 7" (US $) 9 5/8" (US $) 13 3/8" (US $)
Packer 1,482.00 2,288.00 2,288.00
Retrievable bridge plug 1,235.00 1,573.00 1,573.00
ALL TOOLS REMAIN THE PROPERTY OF BJ SERVICES INTERNATIONAL S.A.
C OPERATOR’S SERVICE CHARGE for retrieving or resetting retrievable tool.
after retrievable tools have been left in hole at customer’s request and
BJ Services operator is required to retrieve or reset tool .
Each 16 hours or fraction until job is completed, plus round trip
mileage charge ............................................................................................. 637.00
Personnel charge for picking-up and / or delivering tool per hour or
fraction plus mileage, base camp to location .................................................. 52.00
Page 5
Sec. 7
Page 1
Sec. 8
SECTION 8 - CHEMICAL PRODUCTS AND MATERIALS
8.5 RETARDERS
A R-5 lbs………………………………………………………. 2.87
B R-3B lbs……………………………………………………….. 4.42
C R-21L gls……………………………………………………….. 24.05
D R-10L gls…………………………………………………… P.A.R.
Page 2
Sec. 8
8.10 EXTENDERS
A Bentonite, lbs ………………………………………………………… 0.65
B Fly Ash, lbs ………………………………………………………… P.A.R.
C Rafaelita, lbs ………………………………………………………… P.A.R.
Page 3
Sec. 8
Page 4
Sec. 8
8.20 BASKET
For OD Casing
A 4 1/2" ......................................................................................... P.A.R.
B 5 1/2" ......................................................................................... P.A.R.
C 7" .......................................................................................... P.A.R.
D 9 5/8" ......................................................................................... P.A.R.
E 13 3/8" ....................................................................... ............... P.A.R.
8.21 CENTRALIZERS
For OD Casing
A 4 1/2" .......................................................................................... P.A.R.
B 5 1/2" .......................................................................................... P.A.R.
C 7" .......................................................................................... P.A.R.
D 9 5/8" .......................................................................................... P.A.R.
E 13 3/8" .................................................................................... .. P.A.R.
8.31 BUFFERS
A BF-3, lbs ........................................................................................... 2.47
B BF-10L, gls ........................................................................................... 13.91
C BF-9L, gls …………………………………………………………… 14.98
8.32 FLUID RECOVERY
A Flow back 20, gl..........................................................................................33.68
B Flow back 30, gl..........................................................................................39.44
Page 6
Sec. 8
Page 7
Sec. 8
8.41 DIVERTERS
A Ball sealers 7/8", s.g.: 0.9, ea ................................................................... 7.51
B Divert II Benzoic Acid, lbs ....................................................................... 3.19
8.42 SURFACTANTS
8.48 ANTI-SLUDGE
A AS-3, gls .......................................................................................... 44.46
B NE-32LB (AS-32), gls ............................................................................ 52.00
Page 8
Sec. 8
Page 9
Sec. 8
8.55 ACIDS
A Acetic, gls ............................................................................................ 20.61
B Benzoic, lbs ............................................................................................ 3.19
C Boric, lbs ............................................................................................ 3.32
D Formic, gls ............................................................................................ 24.57
E Sulfamic, lbs ............................................................................................ 2.34
SECTION 9
MATERIALS IN CONSIGNMENT
Material will be imported under consignment and prices quoted FOB Houston.
Petro-Tech will pay the duties for custom inspection, transportation and taxes to Talara – Perú.
Page 1
Sec. 9
CEMENTING CHEMICALS
MATERIAL IN CONSIGNMENT
Page 2
Sec. 9
FRACTURING & STIMULATION CHEMICALS
MATERIAL IN CONSIGNMENT
Page 4
Sec. 9
FLOATING EQUIPMENT, BRIDGE & SQUEEZE PLUGS
MATERIAL IN CONSIGNMENT