Ref. N° DESCRIPTION PRICE (US $)

1.14 MILEAGE CHARGES


Mileage will be charged per unit, from the nearest base of operations
to the well location as follows:
A Pumping units, per mile (one way)......................................................................... 5.85
B Blenders, per mile (one way).................................................................................. 5.85
C Bulk transport units, per mile (one way)................................................................ 5.85
D Pick-Up operators, per mile (round trip)................................................................ 1.82

1.15 CISTERN CHARGE.


Cistern charge for 5,000 gls. or less (additional to mileage)
A First 08 hours....................................................................................................... 455.00
B Each additional hour or fraction ......................................................................... 67.60
Mileage will be charged from BJ Services International S.A. base of
operations, to the place of fluid utilization.

1.16 TANK RENTAL, 50 m3 or more


Each one, per job (additional to mileage) .......................................................... 832.00

1.17 PNEUMATIC SILOS RENTAL


A Silo, 500 cu.ft. or less, per job ........................................................................... 162.50
(plus transport according to Ref. Nº 5.2 B)
B Silo, more than 500 cu.ft. up to 1500 cu.ft., per job .......................................... 390.00
(plus transport according to Ref. Nº 5.2 B)

1.18 SILOS AND TANKS LEFT IN WELL AFTER THE JOB


After first 24 hours of job finished.
Each one, per day.................................................................................................. 71.50

1.19 COMPRESSOR
400 cu.ft/min., per job........................................................................................ 520.00

1.20 BULK CEMENT TRANSPORT UNIT RENTAL


 When is used with services of
BJ Services International S.A ........................................................... No charge
 On the contrary, per job ......................................................................... 910.00

Page 2
Sec. 1

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Ref. N° DESCRIPTION PRICE (US $)

1.21 SAND DUMP RENTAL


 When is used with services of
BJ Services International S.A ................................................................. 325.00
 On the contrary, per job ......................................................................... 780.00

1.22 PERSONNEL CHARGES (Minimum 8 Hours)


 Engineer, per hour or fraction .................................................................. 39.00
 Supervisor, per hour or fraction ............................................................... 39.00
 Operator, per hour or fraction .................................................................. 25.00
 Helper , per hour or fraction .................................................................... 19.50
 Labor, per hour or fraction………………………………………………. 13.00

1.23 STAND BY CHARGE


 Equipment on location waiting time per day or fraction …………... 1,000.00

Page 1
Sec. 2

SECTION 2 - CEMENTING SERVICES

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Ref. N° DESCRIPTION PRICE (US $)

2.1 MILEAGE CHARGES


Same as Ref. Nº 1.14

2.2 CEMENTING THROUGH CASING


A First 08 hours.
0' - 300'.................................................................................................. 1,664.00
301' - 1500'..............................................................................................1,664.00 plus
$ 0.90 per ft over 300'
1501' - 4000'................................................................................................... 2,743.00
4001' - 5000'............................................................................................. 2,743.00 plus
$ 9.10 per 100 ft or fraction over 4000'
5001' - 7000'............................................................................................ 2,834.00 plus
$ 17.55 per 100 ft or fraction over 5000'
7001' - 9000'............................................................................................ 3,185.00 plus
$ 35.75 per 100 ft or fraction over 7000'
9001' - 11000'........................................................................................... 3,900.00 plus
$ 117.00 per 100 ft or fraction over 9000'
11001' - 13000'......................................................................................... 6,240.00 plus
$ 149.50 per 100 ft or fraction over 11000'
13001' - 15000'........................................................................................ 9,230.00 plus
$ 195.00 per 100 ft or fraction over 13000'
Over 15000'........................................................................................... 13,130..00 plus
$ 286.00 per 100 ft or fraction over 15000'
B Each additional hour or fraction .................................................. 10% of basic charge

C Per each reserve cementing unit used, per job .......................... Same as Ref. N° 2.2A

D Reserve cementing unit, per 8 hours or fraction, per unit ............................. 2,015.00

2.3 MULTIPLE STAGES CEMENTING


A First stage .......................................................................... Same as Ref. N° 2.2A-2.2B
B Additional stages, continuous or intermittent through
multiple stages device, per equipment ........................................................... 2,015.00

2.4 CEMENTING THROUGH PRODUCTION TUBING OR DRILL PIPE


(The depth charge is calculated from the deepest circulation point).
A Abandonment plugs, mud or cement plug positioning,
per balance, per plug ................................................................. Same as Ref. N° 2.2A

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Page 2
Sec. 2

Ref. N° DESCRIPTION PRICE (US $)

B Cementing liners or short casings ..................................... Same as Ref. N° 2.2A-2.2B


C Squeezing cement or other materials (except oil) in open
hole or through perforations or casing losses.
The depth charge is calculated from the deepest perforation
or loss:
0' - 5000'.................................................................................................... 2,834.00
5001' - 7000'............................................................................................ 2,834.00 plus
$ 52.00 per 100 ft or fraction over 5000'
7001' - 9000'............................................................................................ 3,874.00 plus
$ 91.00 per 100 ft or fraction over 7000'
9001' - 11000' .......................................................................................... 5,694.00 plus
$ 130.00 per 100 ft or fraction over 9000'
11001 - 13000'......................................................................................... 8,294.00 plus
$ 169.00 per 100 ft or fraction over 11000'
13001' - 15000'...................................................................................... 11,674.00 plus
$ 221.00 per 100 ft or fraction over 13000'
Over 15000'............................................................................................ 16,094.00 plus
$ 377.00 per 100 ft or fraction over 15000'

2.5 MISCELLANEOUS SERVICES


A Pumping of Diesel/Bentonite...................................................... Same as Ref. N° 2.2A
B Pumping of cement or mud, pills, wash of pieces or blend of
cement or other materials and pump it without pressure, on surface.
 First 4 hours or fraction ........................................................................ 1279.20
 Each additional hour or fraction ............................................................ 179.40
C Test pipes over easels.
 First 4 hours or fraction ...................................................................... 2,015.00
 Each additional hour or fraction ......................................................... 201.50
D Pumping with pressure like: stuck pipes, killing wells, circulation,
pumping oil, testing pipelines or aqueducts.
 0 - 5000 psi, first 4 hours or fraction ................................................. 2,015.00
Each additional hour or fraction ......................................................... 392.60
 5000 - 7000 psi, first 4 hours or fraction ........................................... 3,364.40
Each additional hour or fraction ......................................................... 605.80
 7000 - 10000 psi, first 4 hours or fraction .......................................... 5,068.70
Each additional hour or fraction ......................................................... 910.00
 Over 10000 psi, first 4 hours or fraction ............................................. 5,691.40
Each additional hour or fraction ...................................................... 1,215.50

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Page 3
Sec. 2

Ref. N° DESCRIPTION PRICE (US $)

2.5 MISCELLANEOUS SERVICES (Cont.)


E Pumping oil to formation........................................................ (See fracturing services)
F Premixing additives in liquids:
 Products supplied by BJ Services International S.A.
in excess of 1000 gls., per gallon................................................................ 0.14
 Products not supplied by BJ Services International S.A.,
per gallon..................................................................................................... 0.22

2.6 CEMENT TESTS


Laboratory tests for cement or additives when are not part of the
Service provided by BJ Services International S.A., per cement mix ............... 292.50

2.7 SPECIAL EQUIPMENTS AND CHARGES


A CENFTRIFUGAL PUMP
 First 08 hours ......................................................................................... 156.00
 Each additional hour or fraction .............................................................. 31.20
B FILTRATION UNIT for water based fluids (Pecco's Filter)
Each one, per job ................................................................................................ 280.80
(Filter elements will be invoiced in addition, according
to reference from Materials and Products section)
C FLOW METER, per job .................................................................................... 218.40
Prices not published in this list, will be determined by Area Manager

2.8 DENSIMETER
Per job ................................................................................................................ 673.40

2.9 CEMENT HEADS


 18” , per job ............................................................................................ 585.00
 13 3/8” , per job ..................................................................................... 481.00
 9 5/8” , per job ....................................................................................... 351.00
 5 ½” , per job .......................................................................................... 234.00

2.10 CANCELLED JOB CHARGE


When arriving to location the job is canceled for conditions
beyond our control, a charge will be applied for each unit,
in excess of the first 3 hours:
A Per each unit, per hour ....................................................................................... 135.20
B Minimum charge, per unit .................................................................................. 404.30

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Page 4
Sec. 2

Ref. N° DESCRIPTION PRICE (US $)

2.11 P.S.M. or RECIRCULATING SLURRY MIXER


 First 08 hours or fraction ........................................................................ 553.80
 Each additional hour or fraction ............................................................ 54.60

2.12 SQUEEZE MANIFOLD


Per job ................................................................................................................ 546.00

2.13 PUMPING UNIT WITH RECIRCULATING SYSTEM


Per job ............................................................................................................. 1,066.00

2.14 FLEXIBLE HIGH PRESSURE HOSE


100 ft length, per job........................................................................................ 1,430.00

2.15 MONITOR 3600, 3305 OR EQUIVALENT


Per job ................................................................................................................ 546.00

2.16 MARTIN DECKER PRESSURE RECORDER


Per job ................................................................................................................ 256.10

Page 1

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Sec. 3
SECTION 3 - FRACTURING SERVICES

Ref. N° DESCRIPTION PRICE (US $)

3.1 MILEAGE CHARGES


Same as Ref. Nº 1.14

3.2 HYDRAULIC HORSEPOWER


 First 8 hours, per well, per HHP ............................................................... 6.18
 Each additional hour or fraction, per HHP................................................ 0.81

The amount of HHP is calculed as follow:

Q* P
HHP =
40.80

Where: Q: Injection rate (bpm).


P: Surface pressure (psi).

In wells where the fracturing job is performed in more than one stage
and/or in sub-stages, the HHP amount will be corresponding to the
stage or sub-stage of highest Horsepower.

3.3 RESERVE HORSEPOWER


Per HHP of reserve at well, will be charged:
 First 8 hours , per HHP............................................................................... 2.47
 Each additional hour or fraction, per HHP................................................. 0.25

3.4 PUMPING CHARGE


A. By all volume of no inflammability fluids pumped to the well, per gallon . 0.16
B. By all volume of inflammability fluids pumped to the well, per gallon ...... 0.25

3.5 CORROSIVE FLUIDS PUMPING CHARGE


By all volume of corrosive fluids pumped to the well, per gallon ........................ 0.31

Page 2
Sec. 3
Ref. N° DESCRIPTION PRICE (US $)

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

3.6 CANCELLED JOB CHARGE


When arriving to location the job is canceled for conditions
beyond our control, a charge will be applied for each unit,
in excess of the first 3 hours:
A Per each unit, per hour ...................................................................................... 135.20
B Minimum charge, per unit ................................................................................. 404.30

3.7 EXCESS PRESSURE CHARGE


Over 8000 psi, add 55% to the hydraulic horsepower charge.

3.8 PUMPING OF PROPPANT AGENTS


 20/40 to 12/20 mesh ......................................................................... No charge
 Greater than 12/20 mesh or special proppant agent, per pound ........... 0.22
 Proppant agents no provide by BJ, per -pound...................................... 0.06

3.9 BLENDER
 First 8 hours ........................................................................................ 2,860.00
 Each additional hour or fraction.......................................................... 286.00

3.10 VOLUME CHARGE


For each gallon of fluid mixed or pumped with the blender ........................... 0.13

3.11 MIXING CHARGE


 When is required to mix fluids before to start the job,
per gallon of total fluid mixed ................................................................. 0.13
 Maximum charge per job........................................................................... 6,500.00

3.12 BALL INJECTOR


Per job .............................................................................................................. 794.30
3.13 MARTIN DECKER PRESSURE RECORDER
Per job .............................................................................................................. 256.10

3.14 FRACTURING HEAD


Per job .............................................................................................................. 449.80
3.15 FRAC VALVE
5000 psi work - 10000 psi test, I.D. 4" x 5 1/2"
8rd. Thread casing, per job ................................................................................ 780.00
Page 3
Sec. 3

Ref. N° DESCRIPTION PRICE (US $)

3.16 FRAC VALVES AND CONNECTIONS LEFT AT WELL AFTER THE JOB

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Charges for valves and connections left at well at customer request


for more than 24 hours after the job completion, will be as follows:
A 4" valve for casing, per day ............................................................................... 325.00
B 3" valve for tubing, per day ............................................................................... 156.00
C Reductions 4 1/2" - 5 1/2", per day .................................................................... 45.50
D Reductions 2 7/8" - 3 1/2", per day .................................................................... 23.40
E Fracturing head, per day .................................................................................. 109.20

3.17 PERFORATING FRAC VALVE


 Per job .................................................................................................... 280.80
 After first 24 hours of job finished left at well at
customer request, per day or fraction ....................................................... 93.60

3.18 OTHER SPECIAL EQUIPMENTS AND INSTRUMENTS


A COMPUTARIZED MONITORING SYSTEM OR FRAC VAN:
 First 8 hours, per well ......................................................................... 1,300.00
 Each additional hour or fraction ......................................................... 195.00
(Canceled job charge, according to Ref. Nº 3.6)
B MONITOR 3600, 3305 or equivalent, per job.................................................... 546.00
C NUCLEAR DENSIMETER, per job.................................................................. 624.00

3.19 FLEXIBLE HIGH PRESSURE HOSE


 100 ft length, per job............................................................................ 1,430.00
 50 ft length, per job .......................................................................... 1,040.00

3.20 MONITORING SERVICE REPORT


 First original...................................................................................... No charge
 Additional reports, each one .................................................................... 65.00

3.21 LABORATORY TESTS REPORT


Normally these reports are provided to the customer free of charge
(first original), if BJ Services is involved in previous or post jobs
with the results of such tests. In any other case, the charge per test
per well, is the charge specified for additional reports (Ref. 3.21.B).
A First original.................................................................................................. No charge
B Additional rep-rts, each one ................................................................................. 65.00

Page 1
Sec. 4
SECTION 4 - ACIDIZING AND CHEMICAL SERVICES

Ref. N° DESCRIPTION PRICE (US $)

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

4.1 MILEAGE CHARGES


Same as Ref. Nº 1.14

4.2 ACID PUMPING UNIT


A Single pump:
 First 8 hours, per well ......................................................................... 1,820.00
 Each additional hour or fraction ......................................................... 273.00

4.3 EXCESS PRESSURE CHARGE – OVER 5000 PSI


A 5001 - 7000 psi, add 15% to the basic pumping charge
B 7001 - 10000 psi, add 25% to the basic pumping charge
C Over 10000 psi, add 55% to the basic pumping charge

4.4 VOLUME CHARGE


A By all volume of acid pumped, per gallon ........................................................... 0.31
B By all volume of non corrosive fluids pumped, per gallon ................................. 0.13

4.5 PUMPING OF MATERIALS PROVIDED BY THE CUSTOMER


For all materials provided by the customer, that normally are
provided by BJ Services International S.A., a charge will be
applied, in addition to the other charges applied in this price list.
Per gallon pumped ................................................................................................. 2.21

4.6 STORAGE AND HANDLING OF CUSTOMER MATERIALS


For storage of customer’s acid at the BJ Services International S.A.
plant, a charge will be applied for all the acid passed trough the plant.
Per gallon pumped ................................................................................................. 0.65

4.7 ACID SOLUTION TRANSPORT


from BJ Services International S.A. base to the acid delivery
place, plus the mileage.
A If BJ Services International S.A., perform the pumping job
 For the first 6 hours or fraction .................................................................... 975.00
 For additional hour or fraction ..................................................................... 162.50
B When BJ Services International S.A. not perform the
pumping job, the prices of Ref. Nº 4.7A will be increased
in 50%.
Page 2
Sec. 4

Ref. N° DESCRIPTION PRICE (US $)

4.7 ACID SOLUTION TRANSPORT (Cont.)

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

C When the acid is not used in the 24 hours period


(or the time that assure a perfect inhibition with the
corrosion inhibitor used), due to customer problems,
the acid will be disposed and charged the total cost
of the acid and transport.

4.8 CANCELLED JOB CHARGE


When arriving to location the job is canceled for conditions
beyond our control, a charge will be applied for each unit,
in excess of the first 3 hours:
A Per each unit, per hour ...................................................................................... 135.20
B Minimum charge, per unit ................................................................................. 404.30

4.9 FLEXIBLE HIGH PRESSURE HOSE


100 ft length, per job........................................................................................ 1,430.00

4.10 MONITOR 3600, 3305 OR EQUIVALENT


Per job ................................................................................................................ 546.00

4.11 MARTIN DECKER PRESSURE RECORDER


Per job ................................................................................................................ 256.10

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Page 1
Sec. 5
SECTION 5 - BULK MATERIAL SERVICES

Ref. N° DESCRIPTION PRICE (US $)

5.1 SERVICE CHARGES


A Handling, per cubic ft (cement, bentonite, puzzolan or barite)............................ 2.47
B Handling and dumping bulk sand, per cubic ft .................................................... 1.30
C Blending of materials, per cubic ft........................................................................ 0.91
D Blending of materials with chemicals not supplied by
BJ Services International S.A., per cubic ft.......................................................... 2.21
E Passing of materials, per cubic ft ........................................................................... 1.35

5.2 TRANSPORT CHARGES


A Transport of bulk sand, cement or dry additives, per ton per mile ..................... 0.91
B Transport of silos, per unit per mile (round trip) ................................................. 4.29
C Transport of packaged material, units 1 1/2 tons or less,
per mile (round trip) ............................................................................................. 2.21
D Transport of packaged material, units over 1 1/2 tons,
per mile (round trip) ............................................................................................ 4.68
E Minimum transport charge, each 2 hours or fraction .......................................... 130.00
F Material required by the customer (sand or cement), not used
at location and returned to BJ Services International S.A. plant,
per ton per mile ................................................................................................... 1.17
G Transport of non corrosive fluids in 120 bbls cistern capacity
(without pump).
 Per trip, per bbl, per mile ........................................................................ 0.39
 Minimum charge per trip......................................................................... 201.50

5.3 RESERVE UNITS CHARGE


For bulk transport units in excess of 3 hours prior to start
the job and in excess of 3 hours after the job is finished,
per hour, per unit ................................................................................................ 107.90

Page 1

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Sec. 6
SECTION 6 – TESTING TOOL SERVICES

Ref. N° DESCRIPTION PRICE (US $)

6.1 MILEAGE CHARGE


For each mile, from the nearest base of operation,
one way per unit ..................................................................................................... 1.56

6.2 TRANSPORT
Delivery charge – larger than 1 ½ Ton per mile .................................................... 3.77

6.3 CANCELED JOB CHARGE


If job not run due to circumstances beyond our control,
round trip mileage base camp to well will be charged in
addition to personnel charges.

6.4 STAND BY
Time in excess of 3 hours prior to start of job and in excess
of 3 hours after completion of job, per hour ........................................................ 45.50

6.5 OPEN HOLE TEST


To quote.
6.6 CASING PACKER TEST
A First 8 hours or fraction , calculated from time tools are
lowered through rotary table until returned.
DEPTH (US $)
0' – 3000' 1,209.00
3001' – 4000' 1,313.00
4001' – 5000' 1,404.00
5001' – 6000' 1,508.00
6001' – 7000' 1,599.00
7001' – 8000' 1,690.00
8001' – 9000' 1,794.00
9001' – 10000' 1,930.50
10001' – 11000' 2,054.00
11001' – 12000' 2,164.50
12001' – 13000' 2,359.50
13001' – 14000' 2,470.00
14001' – 15000' 2,541.50
Page 2
Sec. 6

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Ref. N° DESCRIPTION PRICE (US $)

DEPTH (US $)
Each 1000' or fraction
below 15000' add ....... 104.00
B Each additional hour or fraction .......................................................................... 52.00
C A charge will be made for all well packers damaged during a job,
according to current sales price.
D Additional packer assembly, used on successful lest or misrun......................... 455.00

6.7 MISRUN SERVICE CHARGE


Misrun due to conditions beyond our control, plus round
trip mileage base camp to well ........................................................................... 728.00

6.8 RUNNING OF JAR


A Rental of BJ Services Bowen Jar, per job .......................................................... 702.00
B Rental of Jar for fishing, coring, etc. 8 hours or fraction
Beginning from time it leaves BJ Services camp until return ........................... 793.00

6.9 SAFETY JOINT RENTAL


All sizes per run ................................................................................................ 124.85

6.10 MECHANICAL PRESSURE LOG (AMERADA TYPE)


A First unit....................................................................................................... No charge
B Each additional gauge ....................................................................................... 479.02

6.11 FORMATION TESTING SERVICE REPORTS


A A maximum of 5 copies will be furnished for each test................................ No charge
B Over 5 copies on original request, each ............................................................... 57.33

6.12 MISCELLANEOUS TOOLS


A Multiflow Open/Close tool,
 Per run ................................................................................................. To quote
 Per additional day when tool is immobilized after job, per day ......... To quote
B Additional Multiflow Open/Close Chamber, per run ..................................... To quote
C Surface analyzer, when our Multiflow is used, per job .................................. To quote
D Hydraulic Opened Valve, per run ................................................................... To quote
E Control Head 10000 psi, each 24 hours or fraction ........................................ To quote

Page 3
Sec. 6

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Ref. N° DESCRIPTION PRICE (US $)

6.13 DATA ADQUISITION


A Memory Recorders.......................................................................................... To quote
B Batteries
 Alcaline type, each battery.................................................................. To quote
 Lithium type, each battery .................................................................. To quote
 Silver Oxide type, each battery ........................................................... To quote
C Shock Absorber .............................................................................................. To quote

6.14 SURFACE TEST EQUIPMENT


A Supervisor ....................................................................................................... To quote
B Operator .......................................................................................................... To quote
C Choke Manifold, 10000 psi ............................................................................ To quote
D 2 Pen Pressure Recorder.................................................................................. 273.00
E Ph meter .......................................................................................................... To quote
* Personnel charges will be also considered for rig-up and rig-down.

Page 1
Sec. 7
SECTION 7 – SPECIAL TOOL SERVICES

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Ref. N° DESCRIPTION PRICE (US $)

7.1 MILEAGE CHARGE


For each mile, from the nearest base of operation,
one way per unit ..................................................................................................... 1.56

7.2 CANCELED JOB CHARGE


If job not run due to circumstances beyond our control,
round trip mileage base camp to well will be charged in
addition to personnel charges.

7.3 STAND BY
Time in excess of 3 hours prior to start of job and in excess
of 3 hours after completion of job, per hour ........................................................ 58.50

7.4 MISRUN SERVICE CHARGE


Misrun due to conditions beyond our control, plus round
trip mileage base camp to well ........................................................................... 559.00

7.5 RETRIEVABLE, TEST AND SQUEEZE PACKER


Price determined by size and depth packer set.
A First 8 hours or fraction, initial job:
DEPTH Thru 7" (US $) 9 5/8" (US $) 13 3/8" (US $)
0' - 4000' 1,430.00 1,781.00 2,522.00
4001' - 5000' 1,456.00 1,794.00 2,561.00
5001' - 6000' 1,495.00 1,826.50 2,600.00
6001' - 7000' 1,534.00 1,852.50 2,652.00
7001' - 8000' 1,566.50 1,878.50 2,697.50
8001' - 9000' 1,612.00 1,911.00 2,743.00
9001' - 10000' 1,638.00 1,950.00 2,801.50
10001' - 11000' 1,690.00 1,976.00 2,853.50
11001' - 12000' 1,722.50 1,976.00 2,912.00
12001' - 13000' 1,761.50 2,034.50 2,957.50
13001' - 14000' 1,787.50 2,067.00 3,003.00
14001' - 15000' 1,833.00 2,099.50 3,029.00
Each 1000' or fraction
below 15000' 37.70 40.30 49.40
add .......
Page 2
Sec. 7

Ref. N° DESCRIPTION PRICE (US $)

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

B Each additional zone on same run in well any depth on same


service call (This charge applies when tool is moved to another
zone for any purpose).......................................................................................... 331.50
C Additional 8 hours or fraction until completion of job....................................... 370.50

7.6 RETRIEVABLE BRIDGE PLUG – WHEN RUN SEPARATELY


A First 8 hours or fraction, initial job:
(Except when used to test or repair surface equipment only)
DEPTH Thru 7" (US $) 9 5/8" (US $) 13 3/8" (US $)
0' - 4000' 1,423.50 1,716.00 2,496.00
4001' - 5000' 1,456.00 1,742.00 2,522.00
5001' - 6000' 1,599.00 1,885.00 2,717.00
6001' - 7000' 1,638.00 1,924.00 2,762.50
7001' - 8000' 1,670.50 1,950.00 2,782.00
8001' - 9000' 1,722.50 1,976.00 2,808.00
9001' - 10000' 1,748.50 2,008.50 2,834.00
10001' - 11000' 1,794.00 2,047.50 2,873.00
11001' - 12000' 1,839.50 2,073.50 2,905.50
12001' - 13000' 1,878.50 2,106.00 2,938.00
13001' - 14000' 1,904.50 2,138.50 2,977.00
14001' - 15000' 1,956.50 2,171.00 3,016.00
Each 1000' or fraction
below 15000' 45.50 48.10 57.20
add .......
B Each additional zone on same run in well any depth on same
service call (This charge applies when tool is moved to another
zone for any purpose).......................................................................................... 331.50
C Additional 8 hours or fraction until completion of job....................................... 377.00

7.7 RETRIEVABLE BRIDGE PLUG – WHEN RUN WHIT BJ SERVICES PACKER


IN TANDEM
Price determined by size and depth RBP set.
A First 8 hours or fraction, initial job:
(Except when used to test or repair surface equipment only)

Page 3
Sec. 7

Ref. N° DESCRIPTION PRICE (US $)

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

DEPTH Thru 7" (US $) 9 5/8" (US $) 13 3/8" (US $)


0' - 4000' 994.50 1,384.50 2,171.00
4001' - 5000' 1,033.50 1,417.00 2,197.00
5001' - 6000' 1,085.50 1,651.00 2,548.00
6001' - 7000' 1,254.50 1,690.00 2,580.50
7001' - 8000' 1,287.00 1,722.50 2,613.00
8001' - 9000' 1,332.50 1,742.00 2,639.00
9001' – 10000' 1,371.50 1,787.50 2,665.00
10001' – 11000' 1,410.50 1,820.00 2,710.50
11001' – 12000' 1,449.50 1,846.00 2,743.00
12001' - 13000' 1,482.00 1,885.00 2,782.00
13001' - 14000' 1,527.50 1,917.50 2,808.00
14001' - 15000' 1,573.00 1,950.00 2,860.00
Each 1000' or fraction
below 15000' 45.50 48.10 57.20
add .......
B Each additional zone on same run in well any depth on same
service call (This charge applies when tool is moved to another
zone for any purpose).......................................................................................... 331.50
C Additional 8 hours or fraction until completion of job....................................... 331.50

7.7 RETRIEVABLE BRIDGE PLUG – WHEN USED TO TEST OR REPAIR


SURFACE EQUIPMENT ONLY
A First 8 hours or fraction .................................................................................. 1,417.00
B Each additional hour or fraction ..................................................................... 58.50

7.9 RENTAL OF TOOLS LEFT IN HOLE AT CUSTOMER REQUEST


After completion of job, when customer desires to leave tool in
hole for any purpose, and BJ Services personnel are not required
to remain on job, rental charges shall be as follows:
A First 5 days per tool:
Thru 7" (US $) 9 5/8" (US $) 13 3/8" (US $)
Packer 637.00 786.50 1,072.50
Retrievable bridge plug 533.00 676.00 1,028.50

Page 4
Sec. 7

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Ref. N° DESCRIPTION PRICE (US $)

B After first 5 days, on the same job and well, per month or fraction per tool:
Thru 7" (US $) 9 5/8" (US $) 13 3/8" (US $)
Packer 1,482.00 2,288.00 2,288.00
Retrievable bridge plug 1,235.00 1,573.00 1,573.00
ALL TOOLS REMAIN THE PROPERTY OF BJ SERVICES INTERNATIONAL S.A.
C OPERATOR’S SERVICE CHARGE for retrieving or resetting retrievable tool.
after retrievable tools have been left in hole at customer’s request and
BJ Services operator is required to retrieve or reset tool .
 Each 16 hours or fraction until job is completed, plus round trip
mileage charge ............................................................................................. 637.00
 Personnel charge for picking-up and / or delivering tool per hour or
fraction plus mileage, base camp to location .................................................. 52.00

7.10 MISCEANEOUS EQUIPMENT


A CIRCULATION VALVE, per 8 hours or fraction ..............................................435.50
B FLUID CONTROL VALVE, per job ..................................................................500.50
C TUBING TESTER, per job ..................................................................................455.00
D STRAEDDLE PACKER
 4 ¼”, 5 ½” and 7”, per job ................................................See prices Arrow Packer
E TREE SAVER TOOL (To be used only with BJ SERVICES)
 On rental, per job ...................................................................................... 3,640.00
 For each day, per tool left in hole at customer request ............................. 468.00
 Additional operator is required ................................................................. 637.00

7.11 DRILLABLE PLUG AND CEMENT RETAINER


A SETTING TOOL, for run, set or cement Mercury Cement Retainer
 Each 8 hours or fraction ............................................................................... 494.00
 Per each day, per tool left in the well at customer’s request........................ 49.40
B SNAP LANCH (Tubing stinger)
 Per job .......................................................................................................... 325.00
 Per each day, per tool left in well at customer’s request.............................. 32.50
C WIRELINE ADAPTER KIT
 Per job .......................................................................................................... 195.00
 Per each day, per tool left in well at customer’s request.............................. 19.50

Page 5
Sec. 7

Ref. N° DESCRIPTION PRICE (US $)

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

7.18 HIGH PRESSURE SQUEEZE MANIFOLD


 Per 8 hours or fraction .................................................................................. 507.00
 Per each day, per tool left in the well at customer’s request........................ 50.70

Page 1
Sec. 8
SECTION 8 - CHEMICAL PRODUCTS AND MATERIALS

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

Ref. N° DESCRIPTION PRICE (US $)

8.1 CEMENT ACCELERATORS


A A-5 Sodium Chloride, lbs ...................................................... P.A.R.
B A-7L Calcium Chloride, gls ………......................................... .P.A.R.
8.2 ANTI-FOAM
A FP-21L gls ………………………………………………………. P.A.R.
B FP-9LS gls ……………………………………………………… P.A.R.
8.3 WASHERS , SPACERS and PREFLUSH
A MCS Spacer, gls ……………………………………………….. 3.12
B Mud Sweep Spacer, gls ………………………………………………. .1.37
C BJ-CHECK-FLO SS…………………………………………………… P.A.R
D NOW FLUSH SC, gls ………………………………………………..... P.A.R
E SUPERSWEEP, lbs ………………………………………………….. P.A.R

8.4 FLUID LOSS CONTROL


A FL-33 lbs………………………………………………………. 37.18
B FL-33L gls………………………………………………………. 60.84
C BA-59 lbs.................................................................................... 12.48
D FL-54 lbs……………………………………………………… 12.97
E FL-66L gal……………………………………………………. 44.35

8.5 RETARDERS
A R-5 lbs………………………………………………………. 2.87
B R-3B lbs……………………………………………………….. 4.42
C R-21L gls……………………………………………………….. 24.05
D R-10L gls…………………………………………………… P.A.R.

8.6 BONDING / GAS CONTROL


A EC-1 lbs....................................................................................... 4.91
B BA-58L gls.................................................................................... P.A.R.
C EC-2 lbs................................................................................................ P.A.R.

8.7 FREE WATER CONTROL


A FWC-10S lbs………………………………………………………. P.A.R
B SB-100 lbs..................................................................................... P.A.R

Page 2
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

8.8 STRENGTH RETROGRESSION


A S-8 Silica Flour, sand mesh < 200, lbs..................................... 0.27
B S-8C Sand mesh 80 – 140, lbs .................................................. 0.35

8.9 LOSS CIRCULATION


A Gilsonite, lbs ........................................................................................... 0.88
B BJ Fiber ………………………………………………………………… P.A.R

8.10 EXTENDERS
A Bentonite, lbs ………………………………………………………… 0.65
B Fly Ash, lbs ………………………………………………………… P.A.R.
C Rafaelita, lbs ………………………………………………………… P.A.R.

8.11 WEIGHTING MATERIALS


A Barite, lbs ……………………………………………………………….. 0.65
B Hematite, lbs …………………………………………………………… 0.65

8.12 SPECIAL CEMENTS


A Cement "H", sxs………………………………………………………… P.A.R.
B Magne-Plus Cement, 55 lbs sx …………………………………………...49.40
C Ultra Fine Cement, sxs …………………………………………………. 78.52
D Cement “H”, sxs ........................................................................... P.A.R.
B Liquid Stone .................................................................................... P.A.R.
C Puzzolánico ........................................................................................ P.A.R.

8.13E SPECIAL ADDITIVES


A BJ THIXO……………………………………….…………………..… P.A.R.

Page 3
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

8.14 CEMENT PLUG (TOP OR BOTTOM)

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

A 4 1/2" ......................................................................................... P.A.R.


B 5 1/2" ......................................................................................... P.A.R.
C 7" ......................................................................................... P.A.R.
D 9 5/8" ......................................................................................... P.A.R.
E 13 3/8" .......................................................................................... P.A.R.

8.15 GUIDE SHOE 8rd Thd


A 4 1/2" 8RD LTC..................................................................................... P.A.R.
B 5 1/2" 8RD LTC..................................................................................... P.A.R.
C 7" 8RD LTC ......................................................................................... P.A.R.
D 9 5/8" 8RD LTC...................................................................................... P.A.R.
E 13 3/8" 8RD LTC.................................................................................... P.A.R.

8.16 FLOAT SHOE 8rd Thd


A 4 1/2" 8 RD LTC………………………………………………………. P.A.R
B 5 1/2" 8 RD LTC................................................................................... P.A.R.
C 7" 8 RD LTC……………………………………………………… P.A.R
D 9 5/8" 8 RD LTC ................................................................................... P.A.R.
E 13 3/8" 8RD LTC ................................................................................... P.A.R.

8.17 DIFFERENTIAL FILL UP COLLAR 8rd Thd


A 4 1/2" ………………………………………………………….. P.A.R
B 5 1/2" ………………………………………………………….. P.A.R
C 7" ………………………………………………………….. P.A.R
D 9 5/8" ………………………………………………………….. P.A.R
E 13 3/8" ………………………………………………………….. P.A.R
8.18 FLOAT COLLAR 8rd Thd
A 4 1/2" ………………………………………………………….. P.A.R
B 5 1/2" ………………………………………………………….. P.A.R
C 7" ………………………………………………………….. P.A.R
D 9 5/8" ………………………………………………………….. P.A.R
E 13 3/8" .......................................................................................... P.A.R

Page 4
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

8.19 TWO STAGE COLLAR


8rd Thd with plugs and free-fall opening device.

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

A 4 1/2" ......................................................................................... P.A.R.


B 5 1/2" ......................................................................................... P.A.R.
C 7" ......................................................................................... P.A.R.
D 9 5/8" ......................................................................................... P.A.R.

8.20 BASKET
For OD Casing
A 4 1/2" ......................................................................................... P.A.R.
B 5 1/2" ......................................................................................... P.A.R.
C 7" .......................................................................................... P.A.R.
D 9 5/8" ......................................................................................... P.A.R.
E 13 3/8" ....................................................................... ............... P.A.R.

8.21 CENTRALIZERS
For OD Casing
A 4 1/2" .......................................................................................... P.A.R.
B 5 1/2" .......................................................................................... P.A.R.
C 7" .......................................................................................... P.A.R.
D 9 5/8" .......................................................................................... P.A.R.
E 13 3/8" .................................................................................... .. P.A.R.

8.22 DRILLABLE PLUGS (BJ PYTHON OR SIMILAR)


For OD Casing
A 4 1/2" ......................................................................................... P.A.R.
B 5" ......................................................................................... P.A.R.
C 5 1/2" ......................................................................................... P.A.R.
D 7" ......................................................................................... P.A.R.
E 9 5/8" ......................................................................................... P.A.R.

8.23 INSERT FILL UP VALVE


For OD Casing
A 5 1/2" …………………………………………………………. P.A.R.
B 7" …………………………………………………………. P.A.R.
C 9 5/8" …………………………………………………………. P.A.R.
D 13 3/8" …………………………………………………………. P.A.R.
Page 5
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

8.24 MECHANICAL LINER HANGER


For OD Casing
A 4 1/2" ......................................................................................... P.A.R.

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

B 5 1/2" .......................................................................................... P.A.R.


C 7" .......................................................................................... P.A.R.
D 9 5/8" .......................................................................................... P.A.R.

8.25 HYDRAULIC LINER HANGER


For OD Casing
A 4 1/2" .......................................................................................... P.A.R.
B 5 1/2" .......................................................................................... P.A.R.
C 7" .......................................................................................... P.A.R.
D 9 5/8" .......................................................................................... P.A.R.
E 13 3/8" ....................................................................... ................ P.A.R.

8.26 INFLATABLE PACKER ………………………………………………... P.A.R.


8.27 GELLANTS FOR WATER
A GW-28, lbs ........................................................................................... 20.15
B GW-32, lbs .......................................................................................... 10.66

8.28 GELLANTS FOR ACID


A AG-26, lbs ........................................................................................... 21.97
B AG-56L, lbs ........................................................................................... 52.13

8.29 GELLANTS FOR OILS


A GO-63, gls ........................................................................................... 52.65

8.30 FRICTION REDUCER FOR OIL


A FRO-18, gls ........................................................................................... 57.98

8.31 BUFFERS
A BF-3, lbs ........................................................................................... 2.47
B BF-10L, gls ........................................................................................... 13.91
C BF-9L, gls …………………………………………………………… 14.98
8.32 FLUID RECOVERY
A Flow back 20, gl..........................................................................................33.68
B Flow back 30, gl..........................................................................................39.44
Page 6
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

8.33 CROSSLINKERS FOR WATER BASE GELS


F XLW-30, gls ........................................................................................... 45.89
H XLW-33, lbs ........................................................................................... 5.46
I XLW-41, gls ......................................................................................... 127.92

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

J XLW-49, gls ...........................................................................................158.60

8.34 CROSSLINKERS FOR ACID BASE GELS


A XLA-2, gls ........................................................................................... 63.70

8.35 ACTIVATORS FOR OIL BASE GELS


A XLO-3 , gls ......................................................................................... 72.80
B XLO-4 , gls ......................................................................................... 72.80

8.36 BREAKERS FOR WATER BASE GELS


A GBW-7, lbs ......................................................................................... 5.07
B GBW-9, lbs ......................................................................................... 31.40
C GBW-13C, gls......................................................................................... 337.74
D GBW-16C, gls......................................................................................... 186.94
E GBW-26C, gls......................................................................................... 226.20
F Ultra Perm CRB, lbs............................................................................... 76.70

8.37 BREAKERS FOR ACID BASE GELS


A GBA-2, lbs ......................................................................................... 10.79

8.38 CATALYZERS FOR BREAKER


A BC-2, gls ........................................................................................... 71.50
B BC-31,gls …………………………………………………………… 15.64

8.39 GEL STABILIZER


A GS-1A , lbs ........................................................................................... 3.38

8.40 FLUID LOSS ADDITIVES


A Adomite Aqua, lbs ............................................................................. 9.23
B FLC-5, lbs ............................................................................... 2.99
C FLC-41/Adomite Regain, lbs ................................................................... 3.90

Page 7
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

8.41 DIVERTERS
A Ball sealers 7/8", s.g.: 0.9, ea ................................................................... 7.51
B Divert II Benzoic Acid, lbs ....................................................................... 3.19

8.42 SURFACTANTS

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

A NE-10, gls ........................................................................................... 54.86


C NE-18, gls ........................................................................................... 51.35
D NE-20, gls ........................................................................................... 40.95
E NE-22, gls ........................................................................................... 56.55

8.43 SURFACE TENSION REDUCERS


A INFLO-45, gls............................................................................................ 31.02
B INFLO-50, gls........................................................................................... 54.94

8.44 MUTUAL SOLVENTS


A US-2, gls ............................................................................................ 41.73

8.45 CLAY CONTROL


A Clatrol-3, gls ............................................................................... 29.25
B Clatrol-5, gls ............................................................................... 45.50
C Clatrol-6, gls ............................................................................... 39.00
D Clay Master-FSC, gls ............................................................................... 63.70
E Clay Mix, gls ................................................................................P.O.R.

8.46 FINES SUSPENDING


A MMR-2, gls ..................................................................................... 52.00
B LT-21, gls .......................................................................................... 28.21
C SA-2, gls .............................................................................. P.O.R

8.47 FINES STABILIZER


A FSA-1, gls .......................................................................................... 424.06

8.48 ANTI-SLUDGE
A AS-3, gls .......................................................................................... 44.46
B NE-32LB (AS-32), gls ............................................................................ 52.00

Page 8
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

8.49 FOAMERS FOR WATER, BRINES OR ACIDS


A FAW-16, gls .......................................................................................... 68.90
B FAW-18W, gls......................................................................................... 62.14

8.50 FOAMERS FOR OIL

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

A FAO-25, gls .......................................................................................... 295.10

8.51 BACTERICIDES, BIOCIDES


A Adomall, gls .......................................................................................... 54.60
B X-Cide 207, lbs .................................................................................. 47.19
C X-Cide 102, gls ................................................................................... P.A.R
D FRAC-CIDE 3, gls.................................................................................... P.A.R

8.52 CORROSION INHIBITORS


A CI-15, gls ............................................................................................ 56.94
B CI-25, gls ............................................................................................ 66.30
C CI-30, gls ............................................................................................ 99.84
D CI-11, gls ............................................................................................ 53.50

8.53 INTENSIFIERS FOR CORROSION INHIBITORS


A Hy - Temp 382, gls.................................................................................... 56.55
B Hy - Temp 400, gls.................................................................................. 123.63

8.54 IRON CONTROL


A Ferrotrol-110, lbs ...................................................................................... 5.33
B Ferrotrol-200, lbs ...................................................................................... 16.64
C Ferrotrol-300L, gls..................................................................................... 21.71
D Ferrotrol-700, lbs ..................................................................................... 10.40
E Ferrotrol-800, lbs ....................................................................................... 4.16
F Ferrotrol-800L, gls .................................................................................... 27.43
G Ferrotrol-810, lbs .................................................................................... 12.22
H Ferrotrol-900, lbs ...................................................................................... 14.95
I Ferrotrol-900L, gls .................................................................................... 30.55
J Ferrotrol-1000, lbs..................................................................................... 18.85

Page 9
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

8.55 ACIDS
A Acetic, gls ............................................................................................ 20.61
B Benzoic, lbs ............................................................................................ 3.19
C Boric, lbs ............................................................................................ 3.32
D Formic, gls ............................................................................................ 24.57
E Sulfamic, lbs ............................................................................................ 2.34

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

8.56 ACID RETARDERS


A SLA-48, gls ........................................................................................... 49.40

8.57 ACID NEUTRALIZERS


A Caustic Soda 50%, gls ................................................................................ 3.12
B Caustic Soda, lbs ........................................................................................ 2.08
C Soda Ash, lbs .............................................................................................. 0.78
D Sodium Bicarbonate, lbs............................................................................. 2.47

8.58 SULFIDE INHIBITOR


A HS-2, gls ........................................................................................... 55.64

8.59 SCALE INHIBITORS


A Scaletrol - 4, gls........................................................................................ 38.35
B Scaletrol - 9, gls........................................................................................ 35.10
C Scaletrol - 8, gls........................................................................................ 53.43
D P-1500, gls ................................................................................................ P.A.R
E SALTROL-2, gls ................................................................................... P.A.R.
F SCALETROL-11, gls................................................................................ P.A.R
G GYPSOL-2, gls .........................................................................................P.A.R

8.60 PARAFFIN DISPERSANTS


A Paravan 23, gls ......................................................................................... 29.71

8.61 PARAFFIN INHIBITORS


A Paratrol 24, gls ........................................................................................ 39.00
8.62 ALCOHOLS / SOLVENTS
A Isopropyl Alcohol, gls .............................................................................. 15.11
B Methanol, gls ............................................................................................ 9.49
C Toluene, gls ......................................................................................... 12.35
Page 10
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

8.63 WATER CONTROL


A Aquatrol-1, gls ......................................................................................... 18.59
B SAF Mark III, gls...................................................................................... 72.02
C MA-1, gls ................................................................................................ 87.45

8.64 FRAC SAND

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

U.S.A origin, 100 lbs/sx.


A 12/20 mesh ............................................................................................ 22.30
C 16/30 mesh ............................................................................................ 22.30

8.65 SPECIAL FRAC SANDS


U.S.A origin, 100 lbs/sx.
A 100 mesh .......................................................................................... 35.10
B Zirprop 20/40 ......................................................................................... 132.60

USA origin, 50 lbs/sx.


C Bauxite ................................................................................................... 75.14
D Carbo-Prop .............................................................................................. 69.81
E Carbo-Lite ............................................................................................... 62.66
USA origin, Lbs
F Lite-Prop 1.25, 14/30 Mesh.................................................................... 1.25
G Lite-Prop 1.75, 20/40 Mesh ……………………………………………. 1.25

8.66 FILTER ELEMENTS


A Pecco´s type, ea........................................................................................ 84.50

8.67 LOCAL PRODUCTS


A Sodium Borate (Borax), lbs ............................................................. P.A.R.
B Potassium Carbonate, lbs .............................................................. P.A.R.
C Sodium Acetate, lbs .............................................................. P.A.R.
D Sodium Hypochlorite, gls ............................................................... P.A.R.
E ABF (Ammonium Bifluoride), lbs ....................................................... P.A.R.
F Cement Pacasmayo "A", 94 lbs/sx .......................................................... P.A.R.
G National Bentonite,100 lbs/sx ................................................................. P.A.R.
H National Barite,100 lbs/sx .................................................................. P.A.R.
Page 11
Sec. 8

Ref. N° DESCRIPTION PRICE (US $)

I SODIUM CHLORIDE , lbs ................................................................. P.A.R.


J CALCIUM CHLORIDE, lbs ................................................................... P.A.R.
K POTASSIUM CHLORIDE, lbs............................................................... P.A.R.
L CEMENT “G” OR SIMILAR..............................................................................
P.A.R.
LL XYLENE,gls ......................................................................................... P.A.R .
M TOLUENE, gls ....................................................................................... P.A.R.
N NATIONAL SAND 12/20 .................................................................. P.A.R.
O NATIONAL SAND 16/30 .................................................................... P.A.R .

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

P NATIONAL SAND 30/40...................................................................... P.A.R.


Q HCl 33%,gls ............................................................................................. 3..34.

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

SECTION 9

MATERIALS IN CONSIGNMENT
Material will be imported under consignment and prices quoted FOB Houston.
Petro-Tech will pay the duties for custom inspection, transportation and taxes to Talara – Perú.

Page 1
Sec. 9
CEMENTING CHEMICALS
MATERIAL IN CONSIGNMENT

Ref. N° BJ P/N DESCRIPTION FOB PRICE


(US$ / Unit)

9.C01 100275 A-2, TIXOTROPIC ADDITIVE , lbs ....................................... 0.86


9.C02 100273 A-3L, SODIUM SILICATE, gls ............................................... 3.83
9.C03 100112 A-7P, CALCIUM CHLORIDE, lbs .......................................... 0.43
9.C04 424250 AG-26, GELLING AGENT FOR SPACER, lbs ....................... 11.26

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

9.C05 499695 BA-10, GAS MIGRATION CONTROL, lbs ............................ 4.99


9.C06 488074 BA-56, GAS MIGRATION CONTROL, lbs ............................ 5.76
9.C07 488058 BA-58, GAS MIGRATION CONTROL, lbs ............................ 2.09
9.C08 488013 CD-32, DISPERSANT, lbs ........................................................ 4.81
9.C09 100093 CEMENT (USA) CLASS “H”, sxs............................................. 12.00
9.C10 488167 FL-25, FLUID LOSS CONTROL, lbs ...................................... 7.23
9.C11 488015 FL-52, FLUID LOSS CONTROL, lbs ..................................... 14.44
9.C12 488073 FL-62, FLUID LOSS CONTROL, lbs ...................................... 4.11
9.C13 488019 FP-6L, NON FOAM, gls ............................................................ 30.31
9.C14 488097 SS-2 (MCS-A), gls .................................................................... 31.24
9.C15 100283 R-3, RETARDER, lbs ................................................................ 1.31
9.C16 100198 S-400, SURFACTANT, gls ....................................................... 17.21
9.C17 100323 SAPP, DISPERSANT FOR WASHER, lbs .............................. 2.31
9.C18 488250 ULTRA PERM CRB-LT, lbs ..................................................... 20.07
9.C19 488263 AQUACON, gls ........................................................................ 29.72
9.C20 499865 CD-33, lbs .................................................................................. 4.98

Page 2
Sec. 9
FRACTURING & STIMULATION CHEMICALS
MATERIAL IN CONSIGNMENT

Ref. N° BJ P/N DESCRIPTION FOB PRICE


(US$ / Unit)

9.S01 100142 ABF, AMMONIUM BIFLUORIDE, lbs ................................... 2.44


9.S02 100114 A-9, POTASSIUM CHLORIDE, lbs ......................................... 0.34
9.S03 100113 AMMONIUM CHLORIDE, lbs ................................................ 0.73
9.S04 425225 AQUATROL I, gls ................................................................... 14.27
9.S05 100071 BALLS PERF PAC (SODIUM ACETATE), 7/8”, 1.3 Sp.Gr, ea...2.08

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

9.S06 100130 BF-1, BUFFER, lbs .................................................................... 1.39


9.S07 488007 BF-7L, BUFFER, gls ................................................................. 6.75
9.S08 488247 BIOSEALERS, WATER SOLUBLE BALLS, ea ..................... 3.28
9.S09 499779 CI-14, CORROSION INHIBITOR FOR ACID, gls .................. 29.44
9.S10 488137 CLAY TReaT-3C, KCL SUBSTITUTE, gls.............................. 23.65
9.S11 499808 CLAYMASTER 5C, CLAY STABILIZER, gls ....................... 40.40
9.S12 100090 FERROTROL-300, IRON CONTROL, lbs ............................... 2.24
9.S13 488108 GBW-12CD, BREAKER, SPECIFIC ENZYME G, gls........ 1,251.85
9.S14 100175 GBW-5, BREAKER, lbs ........................................................... 4.97
9.S15 488159 GO-64, GELLING AGENT - OIL, gls .................................... 52.64
9.S16 488003 GW-27, GELLING AGENT – WATER, lbs ............................ 3.06
9.S17 488079 GW-32, GELLING AGENT – WATER, ................................. 6.29
9.S18 488141 HV-ACID, HF SUBSTITUTE, gls ........................................... 49.99
9.S19 488021 INFLO-100 (INFLO 102), SURFACTANT, gls ...................... 34.50
9.S20 488040 INFLO-150, SURFACTANT, gls ............................................ 21.13
9.S21 488209 MA-1,VISCOELASTIC SURFACTANT, gls ........................... 59.86
9.S22 488252 MAGNACIDE-575, BACTERICIDE, gls ............................... 191.90
9.S23 499690 NE-110W, ANIONIC SURFACTANT, gls ............................ 21.25
Page 3
Sec. 9
FRACTURING & STIMULATION CHEMICALS (cont.)
MATERIAL IN CONSIGNMENT

Ref. N° BJ P/N DESCRIPTION FOB PRICE


(US$ / Unit)

9.S24 488001 NE-118, NONIOINIC SURFACTANT, gls ............................ 29.24


9.S25 100472 NE-940, NONIONIC SURFACTANT, gls.............................. 22.14
9.S26 499528 OB-1, EMULSIFIER, gls ......................................................... 22.55
9.S27 488153 PARAVAN-25, SOLVENT & DISPERSANT, gls ................. 32.77
9.S28 488164 PSA-1, SUSPENDING AGENT, lbs ........................................ 5.52

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

9.S29 411125 RG-35, BREAKER – OIL, lbs .................................................. 0.93


9.S30 100302 SAND 20/40, sxs ...................................................................... 13.71
9.S31 100140 US-40, MUTUAL SOLVENT, gls ......................................... 11.48
9.S32 488160 XLO-5, ACTIVATOR – OIL, gls ............................................ 32.81
9.S33 488038 XLW-24, CROSSLINKER – WATER, gls ............................. 26.33
9.S34 100105 XYLENE, gls ........................................................................... 10.20
9.S35 488301 GW-3, lbs .................................................................................. 3.83
9.S36 499630 XLW-32, gls ............................................................................. 14.27
9.S37 488071 XLW-4, gls ............................................................................... 21.60
9.S38 488165 PSA-2L, gls .............................................................................. 36.00
9.S39 488289 FERRO-FRE, gls ...................................................................... 16.00
9.S40 HIGH PERM – CRB……………………………………….... 24.04

Page 4
Sec. 9
FLOATING EQUIPMENT, BRIDGE & SQUEEZE PLUGS
MATERIAL IN CONSIGNMENT

Ref. N° BJ P/N DESCRIPTION FOB PRICE


(US$ / Unit)

9.F01 430560 13 3/8” TOP PLUG ................................................................. P.A.R.


9.F02 430760 13 3/8” BOTTOM PLUG ........................................................ P.A.R.
9.F03 13 3/8” INSERT FLOAT VALVE.......................................... P.A.R.
9.F04 13 3/8” INSERT FILL UP FLAPPER VALVE ..................... P.A.R.
9.F05 13 3/8” GUIDE SHOE ............................................................ P.A.R.

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

9.F06 13 3/8” GUIDE BALL ASSY................................................. P.A.R.


9.F07 13 3/8” CENTRALIZERS........................................................ P.A.R
9.F08 430540 9 5/8” TOP PLUG .................................................................... P.A.R
9.F09 430740 9 5/8” BOTTOM PLUG ........................................................... P.A.R
9.F10 9 5/8” FLOAT SHOE ............................................................... P.A.R
9.F11 9 5/8” GUIDE SHOE ................................................................ P.A.R
9.F12 9 5/8” INSERT FILL UP FLAPPER VALVE .......................... P.A.R
9.F13 9 5/8” FLOAT COLLAR ........................................................ P.A.R.
9.F14 9 5/8” DIFFERENTIAL FILL UP FLOAT COLLAR ............. P.A.R
9.F15 9 5/8” CENTRALIZERS ...................................................... P.A.R.
9.F16 430520 5 ½” TOP PLUG ..................................................................... P.A.R
9.F17 430720 5 ½” BOTTOM PLUG .......................................................... P.A.R.
9.F18 5 ½” FLOAT SHOE .................................................................. P.A.R
9.F19 5 ½” GUIDE SHOE ................................................................. P.A.R
9.F20 5 ½” AUTO FILL FLOAT SHOE ........................................... P.A.R
9.F21 5 ½” FLOAT COLLAR ........................................................... P.A.R
9.F22 5 ½” DIFFERENTIAL FILL UP FLOAT COLLAR .............. P.A.R
9.F23 5 ½” CENTRALIZERS .......................................................... P.A.R
Page 5
Sec. 9
FLOATING EQUIPMENT, BRIDGE & SQUEEZE PLUGS (cont.)
MATERIAL IN CONSIGNMENT

Ref. N° BJ P/N DESCRIPTION FOB PRICE


(US$ / Unit)

9.F24 5 ½” SQUEEZE PACKER .................................................... P.A.R.


9.F25 5 ½” BRIDGE PLUG ............................................................... P.A.R

BJ Services International S.A., Sucursal del Perú


PETRO-TECH PRICE LIST ANEXO N°2

BJ Services International S.A., Sucursal del Perú

You might also like