Professional Documents
Culture Documents
File:
Author:
Location: 1, Jl. Sultan Agung No.65b, RT.1/RW.8, Kuningan, Ps. Manggis, Kecamatan
Setiabudi, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12970, Indonesia (6°12.5'S,
106°50.7'E)
Notes:
System Architecture 3
Cost Summary 4
Cash Flow 5
Electrical Summary 6
Generator: Generic 250kW Fuel Cell (Natural Gas) 7
Fuel Summary 8
PV: Generic flat plate PV 9
Hydrogen Tank: Hydrogen Tank 10
Schematic
Annualized Costs
Name Capital Operating Replacement Salvage Resource Total
Generic
250kW Fuel
Cell $58,016 $25,285 $43,087 -$5,461 $118.02 $121,045
Generic flat
plate PV $6,935 $358.63 $0.00 $0.00 $0.00 $7,294
System $64,951 $25,644 $43,087 -$5,461 $118.02 $128,339
Production Summary
Component Production (kWh/yr) Percent
Generic flat plate PV 60,787 97.0
Generic 250kW Fuel Cell 1,873 2.99
Total 62,661 100
Consumption Summary
Component Consumption (kWh/yr) Percent
AC Primary Load 0 0
DC Primary Load 4,109 100
Deferrable Load 0 0
Total 4,109 100
Emissions
Pollutant Quantity Unit
Carbon Dioxide 763 kg/yr
Carbon Monoxide 0.0787 kg/yr
Unburned Hydrocarbons 0 kg/yr
Particulate Matter 0 kg/yr
Sulfur Dioxide 0 kg/yr
Nitrogen Oxides 0.00787 kg/yr
Properties
Quantity Value Units
Hydrogen storage capacity 100 kg
Energy storage capacity 3,333 kWh
Tank autonomy 7,106 hr
Statistics
Quantity Value Units
Content at beginning of year 10.0 kg
Content at end of year 10.0 kg