April 8, 2018, wednesday.

It's the first day of our work immersion. I prepared myself and pack up some things that I will be needing
during the work immersion. I arrived at DPWH before 8 in the morning and waited together with the
other immersion students to be given instructions and where sections to assign. I assigned by sir michael
together with the other 7 immersion students to planning and design section.

Construction of flood control structures aling gandara river brgy san miguel(downstream)

We had our orientation with Mrs Ma. Nenitte Y Gomez at admin office

After our orientation we proceed to planning and design section where we are assigned.

We introduce ourselves to them for us to feel comfortable an

April 10 2019 wednesday

Compiled some documents about Flood control project and revetment in different areas

Answering some phone calls and sorting some documents

Observing one personnel Marlon M. Calagos doing the design in sketch up for the renovation of the
planning and design office

April 10 2019

During the third day of our work immersion maam karena instructed us to reproduce or to xerox some
documents.

Transporting some bond papers from one place to another arlene M. Castro

Program of works/budget cost

Program of works of construction of flood controls structures along manguino o creek(upstrem)

Construction of flood control structure along tagnao river(bloodstream)


Construction of flood control structures aling gandara river brgy san miguel(downstream

Construction of flood control structures aling jibatang river(downstream

Construction of flood control structures along limarayon river

Construction of flood control structures aling gandara river brgy casab ahan downstream

Construction of flood control structure aling mag ubay creek

Construction of flood control stucture along hinagbungan river

Construction of flood control structure along Bugtong river

Construction of flood control structures alingsan joaquin creek

Enrico N. Cobacha

The Department of Public Works and Highways functions as the engineering and construction arm of the
Government tasked to continuously develop its technology for the purpose of ensuring the safety of all
infrastructure facilities and securing for all public works and highways the highest efficiency and quality
in construction. DPWH is currently responsible for the planning, design, construction and maintenance
of infrastructure, especially the national highways, flood control and water resources development
system, and other public works in accordance with national development objectives.