Professional Documents
Culture Documents
NU STAR CEBU
(TOWER 1)
Cebu Southroad Properties, Cebu City, Philippines
May 12, 2020
TABLE OF CONTENTS
Sheet No. 1
I. DESIGN CRITERIA
V. ANALYSIS OF TRANSOM
A. Analysis of Intermediate Transom @ Hotspot..................... V.A Transom 1/7 - 7/7
B. Analysis of Stackjoint Transom @ Hotspot........................... V.B Stack Joint 1/14 - 14/14
C. Analysis of Stackjoint Element @ Hotspot............................V.C Stack Head 1/4 - 4/4
NU STAR CEBU
Cebu Southroad Properties, Cebu City, Philippines
TABLE OF CONTENTS
Sheet No. 2
IX. APPENDICES
A. ENGINEERING DATA
ADM: Table 3.3-1
ADM: Table 2-22
ADM: Table 2-24
ASTM E 1300: Table 1 to Table 4
ASTM E 1300: Table 5 to Table 6
ASTM E 1300: APPENDIXES, X2
ASTM E 1300: APPENDIXES, X9
ASTM E 1300: APPENDIXES, X8
AAM TIR A9-91: Table 11
B. STAAD INPUT
STAAD Input for Mullion Analysis….......................................................... Page 1/1
STAAD Input for Operable Frame Analysis…....................................... Page 1/1
NU STAR CEBU
Cebu Southroad Properties, Cebu City, Philippines
I. DESIGN CRITERIA
NU STAR CEBU
1.0 REFERENCES
2.3 WIND
2.3.1 RWDI WIND TUNNEL TEST REPORT
NU STAR CEBU
Cebu Southroad Properties, Cebu City, Philippines
3.3 ANCHOR BOLT - Grade 8.8 Carbon Steel
- Electro-Galvanized
NU STAR CEBU
Cebu Southroad Properties, Cebu City, Philippines
II. RWDI WIND TUNNEL TEST REPORT (TOWER 1)
NU STAR CEBU
A1
3.25
SURFACE A1
2.75
PP T.APX.
LVL 27
3.25
LVL 26
4.25
LVL 25
LVL 24
LVL 23
LVL 22
LVL 21
LVL 20
LVL 19
SEE TOWER 1 - ELEVATION 2
LVL 18 4.25
LVL 17
LVL 16
LVL 15
LVL 14
LVL 13
LVL 12
LVL 11
LVL 10
LVL 9
LVL 8 5.25
LVL 7
3.75
LVL 6
LVL 5
7.25 4.25
8.25 7.25
3.25
TOWER 1 - ELEVATION 1
0 10 25m
Recommended Wind Loads for Cladding Design (kPa) Drawn by: SSU Figure: 4
Peak Net Negative Pressures
(Negative External Pressure with Positive Internal Pressure Where Applicable) Approx. Scale: 1:600
300-Year Design Wind Speed = 267 km/h, Importance Factor = 1.0
Cebu Integrated Resort - Cebu, Philippines Project #1900907 Date Revised: Aug. 13, 2019
Note:
The wind loads presented are the ASCE 7-10 ultimate state wind
loads multiplied by 0.6 for Allowable Stress Design and are to be
applied to the building's cladding system in the same manner as
would wind loads calculated by code analytical methods. For Load
2 and Resistance Factor Design applications, the wind loading
presented needs to be divided by 0.6. B1
T1
3.25
3.75
3.25
SURFACE B1
3.25
PP T.APX. 4.25 3.75 3.25
LVL 27 3.25
3.75
LVL 26
LVL 25
2.75
LVL 24
LVL 23
3.75
LVL 22
LVL 21
LVL 20
2.75
LVL 19
SEE TOWER 1 - ELEVATION 3
4.25
LVL 18
SEE TOWER 1 - ELEVATION 1
LVL 17
LVL 16
LVL 15
LVL 14
LVL 13
LVL 12
3.25
LVL 11
LVL 10
LVL 9
LVL 8 2.75
3.75
LVL 7
LVL 6
LVL 5
TOWER 1 - ELEVATION 2
0 10 25m
Recommended Wind Loads for Cladding Design (kPa) Drawn by: SSU Figure: 5
Peak Net Negative Pressures
(Negative External Pressure with Positive Internal Pressure Where Applicable) Approx. Scale: 1:600
300-Year Design Wind Speed = 267 km/h, Importance Factor = 1.0
Cebu Integrated Resort - Cebu, Philippines Project #1900907 Date Revised: Aug. 13, 2019
Note:
The wind loads presented are the ASCE 7-10 ultimate state wind loads multiplied by C3
0.6 for Allowable Stress Design and are to be applied to the building's cladding C1
system in the same manner as would wind loads calculated by code analytical
methods. For Load and Resistance Factor Design applications, the wind loading
T1
presented needs to be divided by 0.6. C2
C
Key Plan
3.25 3.25
SURFACE C1
SURFACE C2
PP T.APX.
4.25
3.25 LVL 27
LVL 26
5.25 LVL 25
4.25
LVL 24
LVL 23
LVL 22
4.75
3.75
LVL 21
4.75
LVL 20
LVL 19
LVL 18
LVL 17
3.25 LVL 16
LVL 14
LVL 13
LVL 12
5.25 LVL 11
4.75
LVL 10
LVL 9
LVL 8
3.75 LVL 7
LVL 6
LVL 5
SURFACE C3
0 10 25m
Recommended Wind Loads for Cladding Design (kPa) Drawn by: SSU Figure: 6
Peak Net Negative Pressures
(Negative External Pressure with Positive Internal Pressure Where Applicable) Approx. Scale: 1:600
300-Year Design Wind Speed = 267 km/h, Importance Factor = 1.0
Cebu Integrated Resort - Cebu, Philippines Project #1900907 Date Revised: Aug. 13, 2019
Note:
The wind loads presented are the ASCE 7-10 ultimate state wind
loads multiplied by 0.6 for Allowable Stress Design and are to be
applied to the building's cladding system in the same manner as
would wind loads calculated by code analytical methods. For Load
and Resistance Factor Design applications, the wind loading D1
T1 presented needs to be divided by 0.6.
4
D2 D3
D4
3.75
2.75
3.25 3.25
SURFACE D4
SURFACE D1 3.25
SURFACE D3
SURFACE D2
4.25
3.75 4.25
PP T.APX.
3.25 6.75 4.25 3.25
LVL 27 3.25 4.75
LVL 26 4.25
3.75
3.25
LVL 25
LVL 24 5.25
4.25 5.75 4.25
LVL 23
LVL 22
LVL 21
4.75
LVL 20
LVL 19 3.75
LVL 18 3.25 3.75
LVL 17
6.25
LVL 16
3.25
LVL 15
LVL 14 4.25
LVL 13
5.75
LVL 12
6.75
LVL 11
5.25
LVL 10
LVL 9
LVL 8 4.25
6.25 4.25
3.75
LVL 7
LVL 6
4.75
5.75
LVL 5
4.25
TOWER 1 - ELEVATION 4
0 10 25m
Recommended Wind Loads for Cladding Design (kPa) Drawn by: SSU Figure: 7
Peak Net Negative Pressures
(Negative External Pressure with Positive Internal Pressure Where Applicable) Approx. Scale: 1:600
300-Year Design Wind Speed = 267 km/h, Importance Factor = 1.0
Cebu Integrated Resort - Cebu, Philippines Project #1900907 Date Revised: Aug. 13, 2019
Note:
1 The wind loads presented are the ASCE 7-10 ultimate state wind loads
multiplied by 0.6 for Allowable Stress Design and are to be applied to the
building's cladding system in the same manner as would wind loads
calculated by code analytical methods. For Load and Resistance Factor Design
T1 applications, the wind loading presented needs to be divided by 0.6.
A1
2.75
SURFACE A1
3.25
PP T.APX.
LVL 27
LVL 26
2.75
LVL 25
LVL 24
LVL 23
LVL 22
LVL 21
LVL 20
LVL 19
2.75
SEE TOWER 1 - ELEVATION 2
LVL 18
LVL 17
LVL 16
LVL 15
LVL 14
LVL 13
LVL 12
LVL 11
LVL 10
LVL 9
LVL 8 3.25
2.75
LVL 7
LVL 6
LVL 5
2.75
SEE PODIUM ELEVATION
TOWER 1 - ELEVATION 1
0 10 25m
Recommended Wind Loads for Cladding Design (kPa) Drawn by: SSU Figure: 8
Peak Net Positive Pressures
(Positive External Pressure with Negative Internal Pressure Where Applicable) Approx. Scale: 1:600
300-Year Design Wind Speed = 267 km/h, Importance Factor = 1.0
Cebu Integrated Resort - Cebu, Philippines Project #1900907 Date Revised: Aug. 13, 2019
Note:
The wind loads presented are the ASCE 7-10 ultimate state wind
loads multiplied by 0.6 for Allowable Stress Design and are to be
applied to the building's cladding system in the same manner as
would wind loads calculated by code analytical methods. For Load
2 and Resistance Factor Design applications, the wind loading
presented needs to be divided by 0.6. B1
T1
2.75
SURFACE B1
PP T.APX.
LVL 27
LVL 26 2.75
LVL 25
LVL 24
LVL 23
LVL 22
LVL 21
LVL 20
LVL 19
SEE TOWER 1 - ELEVATION 3
LVL 18 2.75
SEE TOWER 1 - ELEVATION 1
LVL 17
LVL 16
LVL 15
LVL 14
LVL 13
LVL 12
LVL 11
LVL 10
LVL 9
LVL 8 2.75
LVL 7
LVL 6
LVL 5
TOWER 1 - ELEVATION 2
0 10 25m
Recommended Wind Loads for Cladding Design (kPa) Drawn by: SSU Figure: 9
Peak Net Positive Pressures
(Positive External Pressure with Negative Internal Pressure Where Applicable) Approx. Scale: 1:600
300-Year Design Wind Speed = 267 km/h, Importance Factor = 1.0
Cebu Integrated Resort - Cebu, Philippines Project #1900907 Date Revised: Aug. 13, 2019
Note:
The wind loads presented are the ASCE 7-10 ultimate state wind loads multiplied by C3
0.6 for Allowable Stress Design and are to be applied to the building's cladding C1
system in the same manner as would wind loads calculated by code analytical
methods. For Load and Resistance Factor Design applications, the wind loading
T1
presented needs to be divided by 0.6. C2
C
Key Plan
2.75
SURFACE C1
2.75
SURFACE C2
2.75 PP T.APX.
3.25 LVL 27
LVL 26
LVL 25
LVL 23
LVL 22
LVL 21
LVL 20
LVL 19
LVL 18
LVL 17
LVL 16
3.25
SEE TOWER 1 - ELEVATION 2
LVL 15
LVL 14
LVL 13
LVL 12
LVL 11
LVL 10
LVL 9
LVL 7
LVL 6
LVL 5
SURFACE C3
0 10 25m
Recommended Wind Loads for Cladding Design (kPa) Drawn by: SSU Figure: 10
Peak Net Positive Pressures
(Positive External Pressure with Negative Internal Pressure Where Applicable) Approx. Scale: 1:600
300-Year Design Wind Speed = 267 km/h, Importance Factor = 1.0
Cebu Integrated Resort - Cebu, Philippines Project #1900907 Date Revised: Aug. 13, 2019
III. ANALYSIS OF GLASS
NU STAR CEBU
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
GLASS
BEING
I. DESIGN PARAMETERS:
III.A1 Glass 1/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 2.4mH Outer Vision Glass (8mmHS + 12mmAS + 8mmFT) considering -6.75kPa
Date: May 11, 2020
• FIG.2.1 : ASTM E1300-04 FIG.A1.7 : Non Factored Load Chart (upper chart) for
8mm Glass with Four Sides Simply Supported.
1.9
III.A1 Glass 2/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 2.4mH Outer Vision Glass (8mmHS + 12mmAS + 8mmFT) considering -6.75kPa
Date: May 11, 2020
2 3
ASTM X2.2 r0 = 0.553 – 3.83 ( a/b) +1.11 ( a/b ) – 0.0969 (a/b )
= -3.15
2 3
ASTM X2.3 r1 = - 2.29 + 5.83 ( a/b ) - 2. 17 ( a/b ) + 0.2067 (a/b )
= 2.33
2 3
ASTM X2.4 r2 = 1.485 – 1.908 ( a/b) +0.815 ( a/b ) – 0.0822 (a/b )
= 0.18
2 4
ASTM X2.5 x = ln{ln [ q (ab) / E t ]}
= 1.61
ASTM X2.1 δmax = t1 exp ( ro + r1 x + r2 x2 )
= 23.37 mm
Since δmax < δallow Therefore, glass is SAFE on deflection at full design load.
2 3
ASTM X2.2 r0 = 0.553 – 3.83 (a/b) + 1.11 (a/b) – 0.0969 (a/b)
= -3.15
2 3
ASTM X2.3 r1 = - 2.29 + 5.83 (a/b) - 2. 17 (a/b) + 0.2067 (a/b)
= 2.33
2 3
ASTM X2.4 r2 = 1.485 – 1.908 (a/b) + 0.815 (a/b) – 0.0822 (a/b)
= 0.18
ASTM X2.5 x = ln{ln [ q1 (ab) 2 / E t 4]}
= 1.46
ASTM X2.1 δmax/2 = t1 exp (ro + r1 x + r2 x2)
= 15.19 mm
Since δmax/2 < δallow/2 Therefore, glass is SAFE on deflection at half design load.
III.A1 Glass 3/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 2.4mH Inner Vision Glass Lite (8mmHS + 12mmAS + 8mmFT)
Date: May 11, 2020
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
GLASS
BEING
NOTE: The inner glass lite was analyzed using STAAD Software Analysis considering the application of 890N impact load.
The load share wind pressure of -3.38kPa will be considered in the analysis of inner glass lite. Please see Page III.A1 Glass 3/3.
I. DESIGN PARAMETERS:
Neg. Design Wind Pressure, -q = 3.38 kPa Refer to Page III.A1 Glass 3/3.
Impact Live Load, LL = 890.00 N
Glass Type = IGU
Long Dimension, a = 2400.00 mm
Short Dimension, b = 1500.00 mm
Glass Treatment :
Glass Lite 1 = Heat Strengthened
Glass Lite 2 = Fully Tempered
Thickness of Glass, tg
Glass Lite 1, t1 = 8.00 mm
Glass Lite 2, t2 = 8.00 mm
Area of Glass, A = axb
2
= 3600000.00 mm
Modulus of Elasticity, E = 71700000.00 kPa
3
Unit Weight of Glass, Ug = 24525.00 N/m
III.A2 Glass 1/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 2.4mH Inner Vision Glass Lite (8mmHS + 12mmAS + 8mmFT)
Date: May 11, 2020
σact.
Stress Ratio = = 0.77 < 1.00
σallow
III.A2 Glass 2/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 2.4mH Inner Vision Glass Lite (8mmHS + 12mmAS + 8mmFT)
Date: May 11, 2020
III.A2 Glass 3/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 2.4mH Inner Vision Glass Lite (8mmHS + 12mmAS + 8mmFT)
Date: May 11, 2020
III.A2 Glass 4/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 1.3mH Spandrel Glass (8mmHS + 12mmAS + 8mmHS) @ -6.75kPa Hotspot
Date: May 11, 2020
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
GLASS
BEING
ANALYZED
I. DESIGN PARAMETERS:
III.B1 Glass 1/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 1.3mH Spandrel Glass (8mmHS + 12mmAS + 8mmHS) @ -6.75kPa Hotspot
Date: May 11, 2020
• FIG.2.1 : ASTM E1300-04 FIG.A1.7 : Non Factored Load Chart (upper chart) for
8mm Glass with Four Sides Simply Supported.
3.1
III.B1 Glass 2/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 1.3mH Spandrel Glass (8mmHS + 12mmAS + 8mmHS) @ -6.75kPa Hotspot
Date: May 11, 2020
2 3
ASTM X2.2 r0 = 0.553 – 3.83 ( a/b) +1.11 ( a/b ) – 0.0969 (a/b )
= -2.56
2 3
ASTM X2.3 r1 = - 2.29 + 5.83 ( a/b ) - 2. 17 ( a/b ) + 0.2067 (a/b )
= 1.87
2 3
ASTM X2.4 r2 = 1.485 – 1.908 ( a/b) +0.815 ( a/b ) – 0.0822 (a/b )
= 0.24
2 4
ASTM X2.5 x = ln{ln [ q (ab) / E t ]}
= 1.33
2
ASTM X2.1 δmax = t1 exp ( ro + r1 x + r2 x )
= 11.35 mm
Since δmax < δallow Therefore, glass is SAFE on deflection at full design load.
2 3
ASTM X2.2 r0 = 0.553 – 3.83 (a/b) + 1.11 (a/b) – 0.0969 (a/b)
= -2.56
2 3
ASTM X2.3 r1 = - 2.29 + 5.83 (a/b) - 2. 17 (a/b) + 0.2067 (a/b)
= 1.87
2 3
ASTM X2.4 r2 = 1.485 – 1.908 (a/b) + 0.815 (a/b) – 0.0822 (a/b)
= 0.24
2 4
ASTM X2.5 x = ln{ln [ q1 (ab) / E t ]}
= 1.13
ASTM X2.1 δmax/2 = t1 exp (ro + r1 x + r2 x2)
= 6.89 mm
Since δmax/2 < δallow/2 Therefore, glass is SAFE on deflection at half design load.
III.B1 Glass 3/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.5mW X 1.3mH Spandrel Glass (8mmHS + 12mmAS + 8mmHS) @ -6.75kPa Hotspot
Date: May 11, 2020
III.B1 Glass 4/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.533mW X 2.4mH Outer Vision Glass (8mmHS + 12mmAS + 8mmFT) @ -6.75kPa Hotspot
Date: May 11, 2020
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
GLASS
BEING
I. DESIGN PARAMETERS:
III.C1 Glass 1/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.533mW X 2.4mH Outer Vision Glass (8mmHS + 12mmAS + 8mmFT) @ -6.75kPa Hotspot
Date: May 11, 2020
• FIG.2.1 : ASTM E1300-04 FIG.A1.7 : Non Factored Load Chart (upper chart) for
8mm Glass with Four Sides Simply Supported.
1.8
III.C1 Glass 2/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.533mW X 2.4mH Outer Vision Glass (8mmHS + 12mmAS + 8mmFT) @ -6.75kPa Hotspot
Date: May 11, 2020
2 3
ASTM X2.2 r0 = 0.553 – 3.83 ( a/b) +1.11 ( a/b ) – 0.0969 (a/b )
= -3.11
2 3
ASTM X2.3 r1 = - 2.29 + 5.83 ( a/b ) - 2. 17 ( a/b ) + 0.2067 (a/b )
= 2.31
2 3
ASTM X2.4 r2 = 1.485 – 1.908 ( a/b) +0.815 ( a/b ) – 0.0822 (a/b )
= 0.18
2 4
ASTM X2.5 x = ln{ln [ q (ab) / E t ]}
= 1.62
ASTM X2.1 δmax = t1 exp ( ro + r1 x + r2 x2 )
= 24.03 mm
Since δmax < δallow Therefore, glass is SAFE on deflection at full design load.
2 3
ASTM X2.2 r0 = 0.553 – 3.83 (a/b) + 1.11 (a/b) – 0.0969 (a/b)
= -3.11
2 3
ASTM X2.3 r1 = - 2.29 + 5.83 (a/b) - 2. 17 (a/b) + 0.2067 (a/b)
= 2.31
2 3
ASTM X2.4 r2 = 1.485 – 1.908 (a/b) + 0.815 (a/b) – 0.0822 (a/b)
= 0.18
2 4
ASTM X2.5 x = ln{ln [ q1 (ab) / E t ]}
= 1.47
ASTM X2.1 δmax/2 = t1 exp (ro + r1 x + r2 x2)
= 15.73 mm
Since δmax/2 < δallow/2 Therefore, glass is SAFE on deflection at half design load.
III.C1 Glass 3/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.533mW X 2.4mH Inner Vision Glass Lite (8mmHS + 12mmAS + 8mmFT)
Date: May 11, 2020
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
GLASS
BEING
NOTE: The inner glass lite was analyzed using STAAD Software Analysis considering the application of 890N impact load.
The load share wind pressure of -3.38kPa will be considered in the analysis of inner glass lite. Please see Page III.C1 Glass 3/3.
I. DESIGN PARAMETERS:
Neg. Design Wind Pressure, -q = 3.38 kPa Refer to Page III.C1 Glass 3/3.
Impact Live Load, LL = 890.00 N
Glass Type = IGU
Long Dimension, a = 2400.00 mm
Short Dimension, b = 1533.00 mm
Glass Treatment :
Glass Lite 1 = Heat Strengthened
Glass Lite 2 = Fully Tempered
Thickness of Glass, tg
Glass Lite 1, t1 = 8.00 mm
Glass Lite 2, t2 = 8.00 mm
Area of Glass, A = axb
2
= 3679200.00 mm
Modulus of Elasticity, E = 71700000.00 kPa
3
Unit Weight of Glass, Ug = 24525.00 N/m
III.C2 Glass 1/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.533mW X 2.4mH Inner Vision Glass Lite (8mmHS + 12mmAS + 8mmFT)
Date: May 11, 2020
σact.
Stress Ratio = = 0.80 < 1.00
σallow
III.C2 Glass 2/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.533mW X 2.4mH Inner Vision Glass Lite (8mmHS + 12mmAS + 8mmFT)
Date: May 11, 2020
III.C2 Glass 3/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of 1.533mW X 2.4mH Inner Vision Glass Lite (8mmHS + 12mmAS + 8mmFT)
Date: May 11, 2020
III.C2 Glass 4/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sealant Bite @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
GLASS
BEING
I. DESIGN PARAMETERS:
III.D1 Sealant 1/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sealant Bite @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Sealant Adaptor
Structural Sealant
Secondary Sealant
III.D1 Sealant 2/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sealant Bite @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Mc > Me SAFE
III.D1 Sealant 3/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sealant Bite @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
GLASS
BEING
I. DESIGN PARAMETERS:
III.D2 Sealant 1/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sealant Bite @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
Structural Sealant
Secondary Sealant
III.D2 Sealant 2/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sealant Bite @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
Mc > Me SAFE
III.D2 Sealant 3/3
IV. ANALYSIS OF MULLION
NU STAR CEBU
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
TRIBUTARY WIDTH
TRIBUTARY
WIDTH
I. DESIGN PARAMETERS:
IV.A Mullion 1/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
• FIGURE 2.1 :
IV.A Mullion 2/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
• FIGURE 2.2 :
IV.A Mullion 3/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
t1 = 4 mm
t2 = 3 mm
a = 40 mm
b = 50.7 mm
J1 = 2 t1 t2 ( a - t1 )2 ( b - t2 )2
2 2
( a t1 + b t2 - t1 - t2 )
4
J1 = 249583.148 mm
TABLE 2.1 : Torsional Constant for Open Parts ( Refer Figure 2.1 )
no. length of thickness of length over Torsional Constant
item of items element element thickness b/t < 10 b/t > 10
3
n b t b/t n(1/3-0.2t/b)bt nbt3/3
Jm = J1 + J2
= 251969.98 mm4
t1 = 4 mm
t2 = 3 mm
a = 40 mm
b = 50.7 mm
J1 = 2 t1 t2 ( a - t1 )2 ( b - t2 )2
( a t1 + b t2 - t12 - t22 )
4
J1 = 249583.148 mm
IV.A Mullion 4/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
TABLE 2.1 : Torsional Constant for Open Parts ( Refer Figure 2.2 )
no. length of thickness of length over Torsional Constant
item of items element element thickness b/t < 10 b/t > 10
n b t b/t n(1/3-0.2t/b)bt3 nbt3/3
1 1 42 4 10.500 0 896.000
2 1 123.3 3 41.100 0 1109.700
Jf = J1 + J2
= 251588.85 mm4
IV.A Mullion 5/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
IV.A Mullion 6/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
IV.A Mullion 7/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Modular Ratio:
n = Es x Ea - 1
= 2.874
Moment of Inertia Along X-axis (Load Share of Male Steel Insert 1):
Ix-Lms1 = n ( Ix-ms1 )
= 6487785.44 mm4
Transfer Moment of Inertia Along X-axis (Composite Male Steel Insert 2):
Ix-Tms1 = n ( Ix-ms2 + Ams2 yms2a2 )
= 3167857.80 mm4
Transfer Moment of Inertia Along X-axis (Composite Female Steel Insert 2):
Ix-Tfs1 = n ( Ix-fs2 + Afs2 yfs2a2 )
4
= 2611675.65 mm
Moment of Inertia Along Y-axis (Load Share of Male Steel Insert 1):
Iy-Lms1 = n ( Iy-ms1 )
= 222036.07 mm4
Transfer Moment of Inertia Along Y-axis (Composite Male Steel Insert 2):
Iy-Tms1 = n ( Iy-ms2 + Ams2 xms2a2 )
= 65735.69 mm4
Transfer Moment of Inertia Along Y-axis (Composite Female Steel Insert 2):
Iy-Tfs1 = n ( Iy-fs2 + Afs2 xfs2a2 )
= 131760.49 mm4
IV.A Mullion 8/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
IV.A Mullion 9/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
IV.A Mullion 10/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fb-m < Fb-m Therefore, male mullion is SAFE on bending stress.
IV.A Mullion 11/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
IV.A Mullion 12/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fb-f < Fb-f Therefore, female mullion is SAFE on bending stress.
Total Axial Dead load, RDL = 1.1 (Wglass + Wmullion + Wtransom + Wms )
= 3292.23 N
Since fa-m < Fa-m Therefore, male mullion is SAFE on axial compressive stress.
IV.A Mullion 13/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fa-f < Fa-f Therefore, female mullion is SAFE on axial compressive stress.
fb-m fa-m
+ = 0.75
Fb-m Fa-m
fb-f fa-f
+ = 0.89
Fb-f Fa-f
IV.A Mullion 14/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
IV.A Mullion 15/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
TRIBUTARY WIDTH
TRIBUTARY WIDTH
I. DESIGN PARAMETERS:
IV.B Mullion 1/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
• FIGURE 2.1 :
IV.B Mullion 2/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
• FIGURE 2.2 :
IV.B Mullion 3/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
t1 = 4 mm
t2 = 3 mm
a = 40 mm
b = 50.7 mm
J1 = 2 t1 t2 ( a - t1 )2 ( b - t2 )2
2 2
( a t1 + b t2 - t1 - t2 )
4
J1 = 249583.148 mm
TABLE 2.1 : Torsional Constant for Open Parts ( Refer Figure 2.1 )
no. length of thickness of length over Torsional Constant
item of items element element thickness b/t < 10 b/t > 10
3
n b t b/t n(1/3-0.2t/b)bt nbt3/3
Jm = J1 + J2
= 251969.98 mm4
t1 = 4 mm
t2 = 3 mm
a = 40 mm
b = 50.7 mm
J1 = 2 t1 t2 ( a - t1 )2 ( b - t2 )2
( a t1 + b t2 - t12 - t22 )
4
J1 = 249583.148 mm
IV.B Mullion 4/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
TABLE 2.1 : Torsional Constant for Open Parts ( Refer Figure 2.2 )
no. length of thickness of length over Torsional Constant
item of items element element thickness b/t < 10 b/t > 10
n b t b/t n(1/3-0.2t/b)bt3 nbt3/3
1 1 42 4 10.500 0 896.000
2 1 123.3 3 41.100 0 1109.700
Jf = J1 + J2
= 251588.85 mm4
IV.B Mullion 5/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
IV.B Mullion 6/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
IV.B Mullion 7/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
Modular Ratio:
n = Es x Ea - 1
= 2.874
Transfer Moment of Inertia Along X-axis (Composite Male Steel Insert 2):
2
Ix-Tms1 = n ( Ix-ms2 + Ams2 yms2a )
= 3167857.80 mm4
Transfer Moment of Inertia Along X-axis (Composite Female Steel Insert 2):
2
Ix-Tfs1 = n ( Ix-fs2 + Afs2 yfs2a )
= 2611675.65 mm4
Transfer Moment of Inertia Along Y-axis (Composite Male Steel Insert 2):
Iy-Tms1 = n ( Iy-ms2 + Ams2 xms2a2 )
4
= 65735.69 mm
Transfer Moment of Inertia Along Y-axis (Composite Female Steel Insert 2):
Iy-Tfs1 = n ( Iy-fs2 + Afs2 xfs2a2 )
= 131760.49 mm4
IV.B Mullion 8/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
IV.B Mullion 9/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
IV.B Mullion 10/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
Since fb-m < Fb-m Therefore, male mullion is SAFE on bending stress.
IV.B Mullion 11/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
IV.B Mullion 12/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
Since fb-f < Fb-f Therefore, female mullion is SAFE on bending stress.
Total Axial Dead load, RDL = 1.1 (Wglass + Wmullion + Wtransom + Wms )
= 2881.20 N
Since fa-m < Fa-m Therefore, male mullion is SAFE on axial compressive stress.
IV.B Mullion 13/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
Since fa-f < Fa-f Therefore, female mullion is SAFE on axial compressive stress.
fb-m fa-m
+ = 0.74
Fb-m Fa-m
fb-f fa-f
+ = 0.88
Fb-f Fa-f
IV.B Mullion 14/15
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Height Intermediate Mullion @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
IV.B Mullion 15/15
V. ANALYSIS OF TRANSOM
NU STAR CEBU
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
th1
th2
I. DESIGN PARAMETERS:
V.A Transom 1/7
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Intermediate Transom @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
• FIGURE 2.1 :
V.A Transom 2/7
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Intermediate Transom @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
t1 = 3 mm
t2 = 3 mm
a = 100 mm
b = 186 mm
2 2
J1 = 2 t1 t2 ( a - t1 ) ( b - t2 )
2 2
( a t1 + b t2 - t1 - t2 )
4
J1 = 6752100.021 mm
Since δallow < δmax Therefore, transom is SAFE on deflection normal to glass.
V.A Transom 3/7
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Intermediate Transom @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
V.A Transom 4/7
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Intermediate Transom @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fbx < Fbx Therefore, transom is SAFE for bending stress normal to glass.
Pg a (3Lb2 - 4a )
2
Maximum Deflection , δmax = 5 WDL Lb4
+
384 Ea Itx 24 Ea Itx
= 0.07 mm
Since δmax < δallow Therefore, transom is SAFE on deflection parallel to glass.
V.A Transom 5/7
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Intermediate Transom @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fby < Fby Therefore, transom is SAFE on bending stress parallel to glass.
V.A Transom 6/7
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Intermediate Transom @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fsx < Fsx Therefore, transom is SAFE on Shearing Stress Normal to Glass.
Since fsy < Fsy Therefore, transom is SAFE on shearing stress parallel to glass.
XII. CHECK UNDER COMBINED BENDING AND SHEAR STRESS RATIO (CSR):
2 2
fby fbx fsy fsx
+ + + = 0.30
Fby Fbx Fsy2 Fsx2
V.A Transom 7/7
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
• FIG.1.1 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
th1
th2
I. DESIGN PARAMETERS:
V.B Stack Joint 1/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
• FIG.2.1 :
V.B Stack Joint 2/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
• FIG.2.2 :
t1 = 3 mm
t2 = 3 mm
a = 45.2 mm
b = 98 mm
J1 = 2 t1 t2 ( a - t1 )2 ( b - t2 )2
( a t1 + b t2 - t12 - t22 )
4
J1 = 702860.685 mm
TABLE 2.1 : Torsional Constant for Open Parts ( Refer Figure 2.1 )
no. length of thickness of length over Torsional Constant
item of items element element thickness b/t < 10 b/t > 10
n b t b/t n(1/3-0.2t/b)bt3 3
nbt /3
Js-s = J1 + J2
= 704107.19 mm4
V.B Stack Joint 3/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
t1 = 3 mm
t2 = 3 mm
a = 35.1 mm
b = 171 mm
J1 = 2 t1 t2 ( a - t1 )2 ( b - t2 )2
( a t1 + b t2 - t12 - t22 )
4
J1 = 872032.739 mm
Js-h = J1 + J2
= 875324.76 mm4
V.B Stack Joint 4/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
2
Maximum Design Moment, Mmax ( y - y ) = WWL Lb
(@ end of transom) 8
= 1901812.50 N-mm
Since δmax < δallow Therefore, stack joint is SAFE on deflection normal to glass.
V.B Stack Joint 5/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Slenderness, S = 2 Lb Scxs-s
1/2
( Iys-s Js-s )
= 86.06
Lower Slenderness Limit, S1 = 130.00
Upper Slenderness Limit, S2 = 2400.00
> S < S2
Lateral Buckling Check, Fb1 = 15.00 ksi
= 103.43 MPa
Since fby < Fby Therefore, stack sill is SAFE on bending stress normal to glass.
V.B Stack Joint 6/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Slenderness, S = 2 Lb Scxs-h
½
(Iys-h Js-h)
= 97.06
Lower Slenderness Limit, S1 = 130.00
Upper Slenderness Limit, S2 = 2400.00
S1 > S < S2
V.B Stack Joint 7/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fby < Fby Therefore, stack head is SAFE on bending stress normal to glass.
V.B Stack Joint 8/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
2
Maximum Design Moment, Mmax ( x - x ) = WDL s-s Lb + Pg a
( for Uniform Load & Two equidistant Point Load ) 8
= 66114.76 N-mm
Since δmax < δallow Therefore, stack sill is SAFE on deflection parallel to glass.
Since δmax < δallow Therefore, stack head is SAFE on deflection parallel to glass.
V.B Stack Joint 9/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fbx < Fbx Therefore, stack sill is SAFE on bending Stress parallel to glass.
V.B Stack Joint 10/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fbx < Fbx Therefore, stack head is SAFE on bending stress parallel to glass.
V.B Stack Joint 11/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fsy < Fsy Therefore, stack sill is SAFE on shear stress normal to glass.
Since fsx < Fsx Therefore, stack sill is SAFE on shear stress parallel to glass.
V.B Stack Joint 12/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fsy < Fsy Therefore, stack head is SAFE on shear stress normal to glass.
Since fsx < Fsx Therefore, stack head is SAFE on shear stress parallel to glass.
V.B Stack Joint 13/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
XIII. CHECK UNDER COMBINED BENDING AND SHEAR STRESS RATIO (CSR):
2 2
fby fbx fsy fsx
+ + 2 + 2 = 0.13
Fby Fbx Fsy Fsx
V.B Stack Joint 14/14
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint Element @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
I. DESIGN PARAMETERS:
V.C Stack Head 1/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint Element @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
-RWL
Inner Sleeve
x x
ΣMo = 0
Maximum Design Moment, Mmax = 51.7 (-RWL)
= 909920.00 Nmm
V.C Stack Head 2/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint Element @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
fb fv2
+ = 0.87
Fb Fv2
Since fb < Fb Therefore, leg of stack head transom SAFE on bending Sstress.
V.C Stack Head 3/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Stack Joint Element @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
Since fv < Fv Therefore, leg of stack head transom is SAFE on shear stress.
fb fv2
+ = 0.90
Fb Fv2
Since CSR < 1.00 Therefore, leg of stack head transom is ADEQUATE.
V.C Stack Head 4/4
VI. ANALYSIS OF TRANSOM TO MULLION CONNECTION
NU STAR CEBU
Pg
T1
T2
I. DESIGN PARAMETERS:
2
Total Area of Screws, ATOTAL = 6.00 mm
VI.A Screw 1/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Intermediate Transom
Date: May 11, 2020
IV. CHECK ALLOWABLE SHEAR & BEARING AS PER ALUMINUM DESIGN MANUAL:
4.2 Clause 5.4.3.1 Allowable Shear for member in contact with the screw head
4.3 Clause 5.4.3.2 Allowable Shear for member not in contact with the screw head
VI.A Screw 2/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Intermediate Transom
Date: May 11, 2020
4.5 ADM Table 2-24 Sec 3.4.6 : Bearing on flat surfaces, 6063 – T6
nPU
No. 12 X 38L
PHSTS
T1 + T2 + Pg + RDL
VI.A Screw 3/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Intermediate Transom
Date: May 11, 2020
VI.A Screw 4/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Intermediate Transom
Date: May 11, 2020
2 2
Vmax Pu
2 + 2 = 0.14
Vallow Pallow
VI.A Screw 5/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Sill Stack Joint
Date: May 11, 2020
Pg
T1
I. DESIGN PARAMETERS:
Equivalent Uniformly Dist. Wind Load, WWL = 7762.500 N/m V.B Stack Joint 5/14
Self Weight of Transom & Accessories, WDL = 49.131 N/m V.B Stack Joint 8/14
Tributary Height of Bottom Panel, th2 = 650.00 mm V.B Stack Joint 1/14
2
Total Area of Screws, ATOTAL = 5.00 mm
VI.B Screw 1/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Sill Stack Joint
Date: May 11, 2020
IV. CHECK ALLOWABLE SHEAR & BEARING AS PER ALUMINUM DESIGN MANUAL:
4.2 Clause 5.4.3.1 Allowable Shear for member in contact with the screw head
4.3 Clause 5.4.3.2 Allowable Shear for member not in contact with the screw head
VI.B Screw 2/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Sill Stack Joint
Date: May 11, 2020
4.5 ADM Table 2-24 Sec 3.4.6 : Bearing on flat surfaces, 6063 – T6
No. 12 X 38L
PHSTS nPU
T1 + Pg + RDL
VI.B Screw 3/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Sill Stack Joint
Date: May 11, 2020
VI.B Screw 4/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Sill Stack Joint
Date: May 11, 2020
2 2
Vmax Pu
2 + 2 = 0.12
Vallow Pallow
VI.B Screw 5/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Head Stack Joint
Date: May 11, 2020
T2
I. DESIGN PARAMETERS:
Equivalent Uniformly Dist. Wind Load, WWL = 7762.500 N/m V.B Stack Joint 5/14
Self Weight of Stack Head & Accessories, WDL = 49.131 N/m V.B Stack Joint 8/14
Tributary Height of Bottom Panel, th2 = 650.00 mm V.B Stack Joint 1/14
2
Total Area of Screws, ATOTAL = 6.00 mm
VI.C Screw 1 / 5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Head Stack Joint
Date: May 11, 2020
IV. CHECK ALLOWABLE SHEAR & BEARING AS PER ALUMINUM DESIGN MANUAL:
4.2 Clause 5.4.3.1 Allowable Shear for member in contact with the screw head
4.3 Clause 5.4.3.2 Allowable Shear for member not in contact with the screw head
VI.C Screw 2 / 5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Head Stack Joint
Date: May 11, 2020
4.5 ADM Table 2-24 Sec 3.4.6 : Bearing on flat surfaces, 6063 – T6
No. 12 X 38L
PHSTS nPU
T2 + RDL
VI.C Screw 3 / 5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Head Stack Joint
Date: May 11, 2020
VI.C Screw 4 / 5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Screw Connection at Head Stack Joint
Date: May 11, 2020
2 2
Vmax Pu
2 + 2 = 0.12
Vallow Pallow
VI.C Screw 5 / 5
VII. ANALYSIS OF BRACKETS, BOLTS AND ANCHORS
NU STAR CEBU
• FIG. 1.0 : Partial Elevation of Curtain Wall System (Refer to Drawing No. APP-PE01)
TRIBUTARY WIDTH
I. DESIGN PARAMETERS:
VII.A Reaction 1/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Load Reaction at Support
Date: May 11, 2020
VII.A Reaction 2/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Load Reaction at Support
Date: May 11, 2020
VII.A Reaction 3/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Load Reaction at Support
Date: May 11, 2020
VII.A Reaction 4/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
I. Design Parameters
Fig. 1.1: ADM 2005 Allowable Stress for 6061-T6 Alloy & Temper Extrusions
VII.B1 Hook Bracket 1/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
RWL
VII.B1 Hook Bracket 2/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
2
ft fv
+ 2 = 0.08
Ft Fv
Since CSR < 1.00 Therefore, hook bracket is ADEQUATE at section a-a.
HOOK BRACKET
b
RDL
RWL
VII.B1 Hook Bracket 3/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
ft fv2
+ = 0.75
Ft Fv2
Since CSR < 1.00 Therefore, hook bracket is ADEQUATE at section b-b.
VII.B1 Hook Bracket 4/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
c c
RWL
VII.B1 Hook Bracket 5/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
I. Design Parameters
Fig. 1.1: ADM 2005 Allowable Stress for 6061-T6 Alloy & Temper Extrusions
VII.B2 Hook Bracket 1/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
RWL
VII.B2 Hook Bracket 2/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
2
ft fv
+ 2 = 0.06
Ft Fv
Since CSR < 1.00 Therefore, hook bracket is ADEQUATE at section a-a.
HOOK BRACKET
b
RDL
RWL
VII.B2 Hook Bracket 3/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
ft fv2
+ = 0.51
Ft Fv2
Since CSR < 1.00 Therefore, hook bracket is ADEQUATE at section b-b.
VII.B2 Hook Bracket 4/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hook Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
c c
RWL
VII.B2 Hook Bracket 5/5
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Primary Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
I. Design Parameters
Fig. 1.1: ADM 2005 Allowable Stress for 6061-T6 Alloy & Temper Extrusions
VII.C1 Primary Bracket 1/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Primary Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
RDL
a
RWL
a
ΣM o = 0
Design Moment of Primary Bracket at = -45.6 RWL + (66.1+e) RDL
Section a-a, M = 1744736.70 Nmm
VII.C1 Primary Bracket 2/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Primary Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
fb fv2
+ = 0.37
Fb Fv2
Since CSR < 1.00 Therefore, primary bracket is ADEQUATE at section a-a.
RDL b
RWL
VII.C1 Primary Bracket 3/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Primary Bracket @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
ΣM o = 0
Design Moment for Vertical Leg of Primary Bracket, = -44.1RWL + (191.1 + e1) RDL
M = 1265407.95 N-mm
2
fb fv
+ = 0.40
Fb Fv2
Since CSR < 1.00 Therefore, primary bracket is ADEQUATE at section b-b.
VII.C1 Primary Bracket 4/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Primary Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
I. Design Parameters
Fig. 1.1: ADM 2005 Allowable Stress for 6061-T6 Alloy & Temper Extrusions
VII.C2 Primary Bracket 1/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Primary Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
RDL
a
RWL
a
ΣM o = 0
Design Moment of Primary Bracket at = -45.6 RWL + (66.1+e) RDL
Section a-a, M = 1092656.70 Nmm
VII.C2 Primary Bracket 2/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Primary Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
fb fv2
+ = 0.32
Fb Fv2
Since CSR < 1.00 Therefore, primary bracket is ADEQUATE at section a-a.
RDL b
RWL
VII.C2 Primary Bracket 3/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Typical Primary Bracket @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
ΣM o = 0
Design Moment for Vertical Leg of Primary Bracket, = -44.1RWL + (191.1 + e1) RDL
M = 634777.95 N-mm
2
fb fv
+ = 0.28
Fb Fv2
Since CSR < 1.00 Therefore, primary bracket is ADEQUATE at section b-b.
VII.C2 Primary Bracket 4/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Bolts and Screw @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
I. Load Reactions
• FIG. 2.1 : Plan and Section of Connection of Hook Bracket (Refer to Drawing No. CIR-DT03)
RWL
VII.D1 Bolts and Screw 1/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Bolts and Screw @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
• FIG. 3.1 : Plan and Section of Connection of Hook Bracket (Refer to Drawing No. CIR-DT03)
M12 Socket
Head Screw
RDL
Since Ft > ft Therefore, M12 Socket Head Screw is SAFE on tensile strength.
VII.D1 Bolts and Screw 2/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Bolts and Screw @ Hotspot Condition (-6.75kPa)
Date: May 11, 2020
VII.D1 Bolts and Screw 3/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Bolts and Screw @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
I. Load Reactions
• FIG. 2.1 : Plan and Section of Connection of Hook Bracket (Refer to Drawing No. CIR-DT03)
RWL
2 2 1/2
Total Shear Load, Rv = (RWL + RDL )
= 31074.89 N
VII.D2 Bolts and Screw 1/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Bolts and Screw @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
• FIG. 3.1 : Plan and Section of Connection of Hook Bracket (Refer to Drawing No. CIR-DT03)
M12 Socket
Head Screw
RDL
Since Ft > ft Therefore, M12 Socket Head Screw is SAFE on tensile strength.
VII.D2 Bolts and Screw 2/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Bolts and Screw @ Non-Hotspot Condition (-4.25kPa)
Date: May 11, 2020
VII.D2 Bolts and Screw 3/3
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Hotspot (-6.75kPa)
Date: May 11, 2020
• FIG.1.1 :
RDL
RWL
I. Design Parameters
VII.E1 Anchor Bolt 1/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Hotspot (-6.75kPa)
Date: May 11, 2020
Modification Factor for Anchor Group Loaded Eccentrically in Tension (D.6.2.5), ψ ecN < = 1.0
ψ ecN 1
= 2eN
1+
3hef
= 1.00
Modification Factor for Edge Effect Loaded in Tension (D.5.2.5), ψ edN < = 1.0
ψ edN = ed
(0.7 + 0.3 , 1.0) minimum
1.5hef
= 0.76
VII.E1 Anchor Bolt 2/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Hotspot (-6.75kPa)
Date: May 11, 2020
Net Bearing Area of Head Bolt Eqn D-15, Abrg = π/4 (do2-d2)
2
0.93 in
VII.E1 Anchor Bolt 3/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Hotspot (-6.75kPa)
Date: May 11, 2020
Modification Factor for Anchor Group Loaded Eccentrically in Shear (D.6.2.5), ψ ecV < = 1.0
ψ ecV 1
= 2eV
1+
3cal
= 0.96
VII.E1 Anchor Bolt 4/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Hotspot (-6.75kPa)
Date: May 11, 2020
Coefficient for Pry-out Strength, kcp = 1.0 if hef < 2.5" or 63.5mm; 2.0 otherwise
= 2.0
Shear Load
Steel Strength Vsa = 148032.49 0.65 427991.53
Concrete Breakout Vcbg = 238447.93 0.70 742431.46
Pry-out Strength Vcpg = 195983.99 0.70 610215.75
Concrete Capacity
VII.E1 Anchor Bolt 5/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Hotspot (-6.75kPa)
Date: May 11, 2020
= 78150.80 N
= 347614.76 lb
Design Tensile Load Reaction, T = TWL F.S O.F
= 42577.35 N
= 189384.04 lb
V
= 0.18
ɸVsa
T
= 0.04
ɸTsa
V T
+ = 0.22 < 1.2 OKAY
ɸVsa ɸTsa
V
= 0.57
ɸVc
T
= 0.62
ɸNc
V T
+ = 1.19 < 1.2 OKAY
ɸVc ɸTc
VII.E1 Anchor Bolt 6/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Non-Hotspot (-4.25kPa)
Date: May 11, 2020
• FIG.1.1 :
RDL
RWL
I. Design Parameters
VII.E2 Anchor Bolt 1/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Non-Hotspot (-4.25kPa)
Date: May 11, 2020
Modification Factor for Anchor Group Loaded Eccentrically in Tension (D.6.2.5), ψ ecN < = 1.0
ψ ecN 1
= 2eN
1+
3hef
= 1.00
Modification Factor for Edge Effect Loaded in Tension (D.5.2.5), ψ edN < = 1.0
ψ edN = ed
(0.7 + 0.3 , 1.0) minimum
1.5hef
= 0.77
VII.E2 Anchor Bolt 2/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Non-Hotspot (-4.25kPa)
Date: May 11, 2020
Net Bearing Area of Head Bolt Eqn D-15, Abrg = π/4 (do2-d2)
2
0.93 in
VII.E2 Anchor Bolt 3/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Non-Hotspot (-4.25kPa)
Date: May 11, 2020
Modification Factor for Anchor Group Loaded Eccentrically in Shear (D.6.2.5), ψ ecV < = 1.0
ψ ecV 1
= 2eV
1+
3cal
= 0.96
VII.E2 Anchor Bolt 4/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Non-Hotspot (-4.25kPa)
Date: May 11, 2020
Coefficient for Pry-out Strength, kcp = 1.0 if hef < 2.5" or 63.5mm; 2.0 otherwise
= 2.0
Shear Load
Steel Strength Vsa = 88819.49 0.65 256794.92
Concrete Breakout Vcbg = 166170.30 0.70 517387.84
Pry-out Strength Vcpg = 148991.96 0.70 463901.38
Concrete Capacity
VII.E2 Anchor Bolt 5/6
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Anchor Bolt at Non-Hotspot (-4.25kPa)
Date: May 11, 2020
= 53426.10 N
= 237639.29 lb
Design Tensile Load Reaction, T = TWL F.S O.F
= 27306.21 N
= 121458.01 lb
V
= 0.21
ɸVsa
T
= 0.02
ɸTsa
V T
+ = 0.23 < 1.2 OKAY
ɸVsa ɸTsa
V
= 0.51
ɸVc
T
= 0.52
ɸNc
V T
+ = 1.04 < 1.2 OKAY
ɸVc ɸTc
VII.E2 Anchor Bolt 6/6
VIII. ANALYSIS OF OPERABLE WINDOW AND
COMPONENTS
NU STAR CEBU
I. DESIGN PARAMETERS:
VIII.A Sash Frame 1/8
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sash Frame @ Hotspot (6.75kPa)
Date: May 11, 2020
• FIGURE 2.1 :
t1 = 3.00 mm
t2 = 3.00 mm
a = 49.00 mm
b = 12.30 mm
J1 = 2 t1 t2 ( a - t1 )2 ( b - t2 )2
( a t1 + b t2 - t12 - t22 )
4
J1 = 19856.728 mm
VIII.A Sash Frame 2/8
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sash Frame @ Hotspot (6.75kPa)
Date: May 11, 2020
TABLE 2.1 : Torsional Constant for Open Parts ( Refer Figure 2.1 )
no. length of thickness of length over Torsional Constant
item of items element element thickness b/t < 10 b/t > 10
3 3
n b t b/t n(1/3-0.2t/b)bt nbt /3
Jsf = J1 + J2
= 20103.40 mm4
Modular Ratio:
-1
n = Es x Ea
= 2.874
VIII.A Sash Frame 3/8
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sash Frame @ Hotspot (6.75kPa)
Date: May 11, 2020
VIII.A Sash Frame 4/8
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sash Frame @ Hotspot (6.75kPa)
Date: May 11, 2020
Lu
Allowable Deflection, dallow =
175
= 3.43 mm
ADM Table 2-24 Sec. 3.4.2 Tension in Beam "Ft" ( Extreme Fiber , Net Section )
Slenderness, S = Lb
ry-sf
= 54.470
Lower Slenderness Limit, S1 = 22.00
Upper Slenderness Limit, S2 = 94.00
S1 < S < S2
VIII.A Sash Frame 5/8
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sash Frame @ Hotspot (6.75kPa)
Date: May 11, 2020
2 Lb Sc
Slenderness, S =
√Ix J
= 101.63
Lower Slenderness Limit, S1 = 130.00
Upper Slenderness Limit, S2 = 2400.00
S1 > S < S2
fb < Fb SAFE
VIII.A Sash Frame 6/8
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sash Frame @ Hotspot (6.75kPa)
Date: May 11, 2020
Total Axial Dead load, RDL = 1.1 (Wglass + Wver-sash + Whor-sash + Wsf)
= 2719.33 N
ADM Table 2-24 Sec. 3.4.7 Compression in column " Fa1" ( Axial Gross Section )
(compression in column, axial : all column)
Slenderness, S = k Lb
r
= 54.47
Lower Slenderness Limit, S1 = 0.00
Upper Slenderness limit, S2 = 78.00
S1 < S < S2
ADM Table 2-24 Sec. 3.4.9 Compression in Column Elements " Fa2" ( Gross Section )
(compression in column elements, gross section : flat elements supported on both edge)
fa < Fa SAFE
VIII.A Sash Frame 7/8
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Sash Frame @ Hotspot (6.75kPa)
Date: May 11, 2020
fa fb
+ = 0.38 < 1.00 SAFE
Fa Fb
VIII.A Sash Frame 8/8
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hinge Connections
Date: May 11, 2020
I. DESIGN PARAMETERS:
• FIG.2.0 : Friction Bar Hinge Connections at Mullion and Vertical Sash Frame
Reference Drawing Details
SASH FRAME
BAR HINGE
#10 SCREW
II. CHECK ALLOWABLE SHEAR & BEARING AS PER ALUMINUM DESIGN MANUAL
2.2 Clause 5.4.3.1 Allowable Shear for member in contact with the screw head
VIII.B Hinge 1/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hinge Connections
Date: May 11, 2020
2.3 Clause 5.4.3.2 Allowable Shear for member not in contact with the screw head
2.5 ADM Table 2-24 Sec 3.4.6 : Bearing on flat surfaces, 6063 – T6
Fp > fp SAFE
VIII.B Hinge 2/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hinge Connections
Date: May 11, 2020
Vmax2 Pu
+ = 0.09 < 1
Vallow2 Pallow
VIII.B Hinge 3/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Hinge Connections
Date: May 11, 2020
VIII.B Hinge 4/4
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Analysis of Lock Points
Date: May 11, 2020
I. DESIGN PARAMETERS:
VIII.C Lock Points 1/1
IX. APPENDICES
NU STAR CEBU
NU STAR CEBU
NU STAR CEBU
MEMBER
_HIGHSPAN 11 12 16 19
_TYPICAL 8 TO 10 15 17 18
JOINT
ISOTROPIC ALUMINUM
E 68947.6
POISSON 0.33
DENSITY 2.66018e-005
ALPHA 2.3e-005
DAMP 0.03
CONSTANTS
MEMBER RELEASE
9 11 12 START FX MY MZ
SUPPORTS
STAAD INPUT FOR OPERABLE FRAME MEMBER PROPERTY AMERICAN
ISOTROPIC CONCRETE
E 21718.5
POISSON 0.17
DENSITY 2.35616e-005
ALPHA 1e-005
DAMP 0.05
TYPE CONCRETE
ISOTROPIC ALUMINUM
E 68947.6
POISSON 0.33
DENSITY 2.66018e-005
ALPHA 2.3e-005
DAMP 0.03