Project Name: NU STAR CEBU

Location: Cebu Southroad Properties, Cebu City, Philippines


Item: Summary (Costing Purposes - For Internal Use Only)
Date: 11-May-20

SUMMARY OF STEEL INSERTS

Hotspot Condition Non-Hotspot Condition

Male Steel Stiffener Male Steel Stiffener


120MM X 30MM X 8MM THK. CHANNEL 120MM X 30MM X 8MM THK. CHANNEL STEEL
STEEL INSERT INSERT
38MM X 25MM X 5MM THK. CHANNEL 38MM X 25MM X 5MM THK. CHANNEL STEEL
High Span High Span Floor
STEEL INSERT INSERT
Floor @
Female Steel Stiffener @ -4.25kPa
5.75kPa
100MM X 30MM X 8MM THK. CHANNEL
STEEL INSERT No Female Steel Stiffener
38MM X 25MM X 5MM THK. CHANNEL
STEEL INSERT
Male Steel Stiffener Male Steel Stiffener
120MM X 30MM X 8MM THK. CHANNEL
STEEL INSERT 38MM X 25MM X 5MM THK. CHANNEL STEEL
38MM X 25MM X 5MM THK. CHANNEL INSERT
Typical
STEEL INSERT Typical Floor
Floor @
Female Steel Stiffener Female Steel Stiffener @ -4.25kPa
6.75kPa

38MM X 25MM X 5MM THK. CHANNEL 38MM X 25MM X 5MM THK. CHANNEL STEEL
STEEL INSERT INSERT

SUMMARY OF PRIMARY/SECONDARY BRACKETS


Hotspot Condition Non-Hotspot Condition

High Span Primary Bracket @ Lower Support Primary Bracket @ Lower Support
High Span Floor
Floor @
300mm long 300mm long @ -4.25kPa
5.75kPa
High Span Primary Bracket @ Upper Support Primary Bracket @ Upper Support
High Span Floor
Floor @
300mm long 300mm long @ -4.25kPa
5.75kPa
High Span Secondary Bracket @ Upper Support Secondary Bracket @ Upper Support
High Span Floor
Floor @
300mm long 300mm long @ -4.25kPa
5.75kPa
Typical Primary Bracket Primary Bracket
Typical Floor
Floor @
550mm long 400mm long @ -4.25kPa
6.75kPa

NOTES:
Changes in drawings.

(a) Change size of hexagonal head machine bolt (hook bracket to mullion connection) from M10 to
M12.
(b) Change leg thickness of gutter sleeve from 4mm thick to 6.5mm thick.

Original Design Proposed Design

Summary 1/2
Project Name: NU STAR CEBU
Location: Cebu Southroad Properties, Cebu City, Philippines
Item: Summary (Costing Purposes - For Internal Use Only)
Date: 11-May-20

Changes in drawings.

(c) Please counter-check detail tagging at Partial Elevation.


(d) Please counter-check CIR-DT03, conflict with the partial section.

Additional in drawings.

(a) Provide sealant adaptor for hotspot area only (-5.75kPa to -6.75kPa).