Fig.6.7
Column ID Size (mm) Up to Ground floor Up to 1st Floor 2nd floor to Eve
NOTE:
1. The transverse reinforcement in the column should be 8mm ф, 4- legged @ 100mm c/c at below and
above the face of the beam for a distance of 0.8m.
2. The spacing of 8mm ф, 4- legged transverse reinforcement should be @ 100mm c/c in lap zone.
3. Other detailing is as per structural drawings sheet.
8.2 BEAM OUTPUT:
Design Parameters: Concrete Grade: M20
Steel Grade: Fe 500
Clear Cover: 30 mm
Beams Rebars at Support Rebars at mid span
Top Bottom Top Bottom
Plinth Beam 3-16mm dia. Bars 3-16mm dia. Bars 3-16mm dia. Bars 3-16mm dia. Bars
(250x300mm) (TH) (TH)
First Floor Beam
MB (250x425mm) along 3-20mm dia. Bars 3-20mm dia. Bars 3-20mm dia. Bars 3-20mm dia. Bars
Grid 1, 2 & 3 (TH) +2-16mm (EX) (TH)
MB (250x425mm) along 3-16mm dia. Bars 3-16mm dia. Bars 3-16mm dia. Bars 3-16mm dia. Bars
Grid A, B, C & D (TH) +2-16mm (EX) (TH)
SB (250x355mm) 2-16mm dia. Bars 3-20mm dia. Bars 2-16mm dia. Bars 3-20mm dia. Bars
(TH) (TH)
MB (250x425mm) along 3-16mm dia. Bars 3-16mm dia. Bars 3-16mm dia. Bars 3-16mm dia. Bars
Grid A, B, C & D (TH) (TH)
SB (250x355mm) 2-16mm dia. Bars 3-16mm dia. Bars 2-16mm dia. Bars 3-16mm dia. Bars
(TH) (TH)
Stair Cover
MB (250x425mm) 2-16mm dia. Bars 2-16mm dia. Bars 2-16mm dia. Bars 2-16mm dia. Bars
(TH) (TH)
SB (250x355mm) 2-16mm dia. Bars 2-16mm dia. Bars 2-16mm dia. Bars 2-16mm dia. Bars
(TH) (TH)
Vertical Stirrups 8mm dia. Vertical Stirrups @ 100mm c/c 8mm dia. Vertical Stirrups @ 150mm c/c
upto L/4 from end of support upto midspan
NOTE:
At Grid 2-2, between Grid B-B & C-C, provide bottom reinforcement in two layers.
1. The shear reinforcement in the L/4 of beam span measured from supports face should be 8mm ф
provided @ 100mm c/c and can be placed @ 150mm c/c in remaining span.
2. The shear reinforcement in the main beam in which secondary beams are tied should be 8mm ф
provided @ 75mm c/c throughout.
3.The shear reinforcement in the lapping zone should be also provided @ 150mm c/c
4.The shear reinforcement in the circular beam should be provided @ 100mm c/c
8.3 FOOTING OUTPUT