MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 32
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
INDEX
S.No. Particulars Page
No.
1.0 EXECUTIVE SUMMARY 37
1.1 SALIENT FEATURES OF THE PROJECT 38
1.2 PROPOSED PLANNING 42
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 43
(i) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT 43
(ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT 44
(iii) NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND/ REGION 44
(iv) DEMAND - SUPPLY GAP 45
(v) EXPORT POSSIBILITY 45
(vi) DOMESTIC/ EXPORT MARKETS 45
(vii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT 46
3.0 PROJECT DESCRIPTION 46
(i) TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS, IF ANY. 46
(ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY AND 47
PROJECT SITE LAYOUT) WITH COORDINATES
(iii) DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, 51
PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS GIVEN INTOSHOULDBE HIGHLIGHTED
(iv) SIZE OR MAGNITUDE OF OPERATION 51
(v) RAW MATERIAL (Quantity and Source), PRODUCT AND MODE OF TRANSPORT 52
(vi) PRODUCT 53
(vii) SOURCE OPTIMIZATION/RECYCLING AND REUSE ENVISAGED IN THE PROJECT 53
(viii) AVAILABILITY OF WATER, ENERGY/ POWER REQUIREMENT AND SOURCE 54
(ix) QUANTITY OF WASTES TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR 61
MANAGEMENT/ DISPOSAL.
4.0 SITE ANALYSIS 62
(i) CONNECTIVITY 62
(ii) LAND FORM, LAND USE AND LAND OWNERSHIP 62
(iii) TOPOGRAPHY (ALONG WITH MAP) 63
DECEMBER’ 2019 33
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
(iv) EXISTING LAND USE PATTERN (AGRICULTURE, NON-AGRICULTURE, FOREST, WATER BODIES 64
(INCLUDING AREA UNDER CRZ)), SHORTEST DISTANCES FROM THE PERIPHERY OF THE
PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO
SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF
NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD BE GIVEN
DECEMBER’ 2019 34
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
PROJECT
9.0 ANALYSIS OF PROPOSAL 73
(i) FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFITS TO THE LOCAL PEOPLE 73
INCLUDING TRIBAL POPULATION, IF ANY, IN THE AREA
10.0 CONCLUSION 81
**********************
DECEMBER’ 2019 35
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Abbreviations
AFR Alternative Fuels and raw Materials
AQC Air Quenching Chamber
AQC Boiler Air Quenching Chamber Boiler
CAGR Compound Annual Growth Rate
CC Composite Cement
CF Silo Continuous Flow Silo
CFBC Circulating Fluidized Bed Combustion
CFBC Circulating Fluidized Bed Combustion
CPP Captive power plant
DG Set Diesel Generator Set
EC Environmental Clearance
ESP Electrostatic Precipitator
FGD Flue Gas Desulphurization
KLD Kilo Liter Per Day
MMTPA Million Metric Ton Per Annum
MoEF&CC Ministry of Environment, Forest and Climate Change
MSW Municipal Solid Waste
MW Mega Watts
NH National Highway
OPC Ordinary Portland Cement
OLBC Over Land Belt Conveyer
PH Pre-Heater
PHC Primary Health Centre
PPC Portland Pozzolana Cement
PSC Portland Slag Cement
RDF Refuse Derived Fuel
RESB Rajasthan State Electricity Board
RWH Rain Water Harvesting
SH State Highway
SNCR Selective Non-Catalytic Reduction
SP Boiler Steam Pre-Heater Boiler
SRPC Sulphate Resisting Portland Cement
STP Sewage Treatment Plant
TG Turbine Generator
ToR Terms of Reference
UCWL Udaipur Cement Works Limited
VRPM Vertical Roller Press Mill
W.E.F. With Effective From
WHRB Waste Heat Recovery Boiler
DECEMBER’ 2019 36
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Udaipur Cement Works Limited (UCWL)Plant is situated at Shripati Nagar P.O. CFA 313022,
Village- Dabok Tehsil – Mavli, District – Udaipur (Raj.)having an existingCement Plant -
Clinker (2.00 Million Metric TonnesPer Annum (MMTPA)), Cement (2.85Million Metric
TonnesPer Annum (MMTPA))along with WHRB (12.0 MW).
The company is now proposing an expansion of Clinker (2.0 Million Metric TonnesPer
Annum (MMTPA) to 5.0 Million Metric TonnesPer Annum (MMTPA)), Cement (2.85 Million
Metric TonnesPer Annum (MMTPA) to 7.0 Million Metric TonnesPer Annum (MMTPA)),
WHRB (12.0 MW to 30.0 MW) and Installation of new CPP(25 MW),looking into the future
market demand. The total land area is 161.87 Ha.For plant, associated facilities and
township.No further land is required for proposed expansion project. The expected capital
investment for the proposed expansion will be approx.Rs.1600 Crores.
DECEMBER’ 2019 37
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Particulars Details
DECEMBER’ 2019 38
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
In case WHR, CPP & Solar Plant operates on lower generation / are
under break down, than state grid (RSEB) power shall be used to
meet out the gap.
DECEMBER’ 2019 39
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Nearest Dispensary and Name Near Village Distance (Km) & Direction
Govt. Hospital (From Lease Boundary)
Medical Facility
JunawasHospital,Junawas 2.35 NW
Schools
The Elite Smart School,Merta 2.00 SW
Others
New EkLingji Temple 1.90 WNW
DECEMBER’ 2019 40
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
*CPP has not been installed as per earlier accorded ECdt. 09/01/2008.
Nearest Forests (Source: All distances are taken with respect to S.O.I. GT Sheet.)
DECEMBER’ 2019 41
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
*Coal Based Captive Power Plant has not been installed as per the earlier accorded EC
vide letter No. J-11011/807/2007-IA II (I) (Dt.09/01/2008). Now the proposed
Installation is of new 25 MW Capacity.
DECEMBER’ 2019 42
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 43
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
(iii) NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY
AND/ORREGION
India is the second largest cement producer after China with installed production capacity
of ~480 million tonnes per annum (MTPA) as of FY19 and accounts for 6.9 per cent of
world’s cement output. But it continues to have the lowest per capita consumption at ~210
kg vs world average of ~575 kg. No wonder, India's cement industry is a vital part of its
economy, providing employment to more than a million people, directly or indirectly. Ever
since it was deregulated in 1982, the Indian cement industry has attracted huge
investments, both from Indian as well as foreign investors.
Cement production grew by 13.3% (337.3 million tonne (MMT) in FY19 compared with
6.3% growth in FY18. This has been the fastest growth in cement production recorded in
DECEMBER’ 2019 44
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
one single year over the last decade. Production grew at a CAGR of 5.6% from 230 MT in
FY12 to 337.3 MT in FY19.
India has a lot of potential for development in the infrastructure and construction sector
and the cement sector is expected to largely benefit from it. Some of the recent major
government initiatives such as development of 98 smart cities are expected to provide a
major boost to the sector.
The broad demand driving segments of cement within construction are housing (~65%),
infrastructure (~25%) and commercial & industrial capital expenditure (~10%).
The Proposed Project by UCWL will ensure the participation in the fulfillment of the Future
need of Cement.
India's cement demand is expected to reach 550-600 million tonnes per annum (MTPA) by
2025. Demand - Supply projection for cement on National and State basis reveals that there
exists animbalance between availability and demand of cement particularly in eastern
region. The cement industry is a pioneer modern manufacturing industry in Rajasthan. On
the demand front, northern India is poised to witness a sizeable spurt in demand, mainly
aided by the government’s “housing for all” scheme. Given the evolving demand-supply
situation, cement prices could come under pressure and it is premature to conclude that the
increase in cement prices in eastern India is sustainable. Under these circumstances to
bridge the gap, M/s. Udaipur Cement Works Limited is proposing an expansion in Clinker
and Cement production capacity.
DECEMBER’ 2019 45
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
INDIRECT EMPLOYMENT
The Vocational Training Camps and Technical Training Campsfor generating skilled
manpower for cement plants will be done to generate potential manpower.
The proposed employee development and welfare activities already envisaged and
proposed under the expansion project aims to engage many people with various jobs
indirectly.
There will be development of externalities viz. local logistics, warehousing etc. as
supporting services.
Increased logistic will increase business opportunity for supporting services i.e.
restaurants for transport vehicle crew, repair and maintenance work shop for vehicle,
vehicle spare parts shop, shops for general& grocery items etc.
Increased manpower will increase business opportunity for living needs items i.e.
grocery shops, vegetables shops, milk vendor, barber, laundry etc.
DECEMBER’ 2019 46
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
cement (2.85MMTPA to 7.0 MMTPA). To cater the requirement of raw material UCWL is
also proposing enhancement of production capacity from its own Captive Limestone Mine-1
&2.
The proposed expansion project is situated at Village - Dabok, Tehsil – Mavli District-
Udaipur, Rajasthan in an area of 161.87 hectare including main plant and residential
township, associated with 17.12 Ha. For Railway Line &Over Land Belt Conveyor for
material transport. The project site falls in Survey of India Toposheet No. 45 H/ 14.
The geographical location with respect to boundary pillars of the proposed expansion
project are:-
Table 3: Geographical Position of the Boundary Pillars
NW NE
Latitude 24°39’39.80”N Latitude 24°39’40.69”N
Longitude 73°52’24.48”E Longitude 73°52’50.07” E
SW SE
Latitude 24°38’43.77”N Latitude 24°39’19.45"N
Longitude 73°52’16.64”E Longitude 73°52’55.67”E
DECEMBER’ 2019 47
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 48
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Toposheet.:
DECEMBER’ 2019 49
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Plant layout.:
DECEMBER’ 2019 50
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 51
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 52
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
(vi) PRODUCT
Table 6: Details of Product
S. Product Existing Proposed Total After
No. (MMTPA) (MMTPA) Expansion
(MMTPA)
1 Cement 2.85 4.15 7.0
(Ordinary Portland Cement (OPC),
Portland Pozzolana Cement (PPC),
Portland Slag Cement (PSC),
Sulphate Resisting Portland Cement
(SRPC) and Composite Cement)
2 Clinker 2.00 3.0 5.0
Power Generation
3 CPP (CFBC) 0* 25 25
4 WHRB 12 18 30
5 Solar Power (MW/Day) 7.6 7.6 15.2
6 DG Set 0.5 2.0 2.5**
Note:
*Coal Based Captive Power Plant has not been installed as per the earlier
accorded EC vide letter No. J-11011/807/2007-IA II (I) (Dt.09/01/2008). Now
the proposed Installation is of new 25 MW Capacity.
DECEMBER’ 2019 53
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
WATER DEMAND
The total water requirement after the proposed expansion will be6130KLD. The detailed
breakup of the same is given below:-
Table 7: Water Demand
Water Demand (KLD)
S. No. Particulars
Existing Total After Expansion
POWER DEMAND
The total power requirement for the proposed expansion is as given below:-
Table 8: Power Demand
Phase Demand (MW) Expected Source
Operational 30 (Existing) RSEB, WHRB, CPP, Solar,
40(Proposed)
70 (Total) (DGSet of 2500 kVA for
Emergency Back-up to meet
requirement during any power
failure/breakdown.)
Note:In case WHR, CPP & Solar Plant operates on lower generation / are under break down, than
state grid (RSEB) power shall be used to meet out the gap.
DECEMBER’ 2019 54
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
MANUFACTURING PROCESS
Process Description of Clinker & Cement Manufacturing Unit
The dry process essentially consists of the following unit operations steps:-
Drilling, Blasting &Crushing of limestone at the mine site.
Transportation of crushed limestone by OLBC from mine site.
Pre-blending of crushed limestone.
Drying – cum-grinding of raw materials.
Homogenization of raw meal in a blending silo.
Grinding of solid fuel and Use of AFR in Co-processing.
Clinkerisation of the raw meal in a rotary kiln with pre-heater and precalcinator.
Grinding, storage and packing of cement.
1Crushing of Limestone
Crushing is the process of reducing boulders of rocks to smaller size (approx. 70 mm size).
UCWL shall have two stage crushing system for limestone –Jaw Crusher as Primary crusher
and Cone Crusher as Secondary Crusher. Crushed lime stone will be transported from mine to
the stock pile at plant through overland belt conveyor.
DECEMBER’ 2019 55
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Reclaimer
Pre-blended limestone shall be extracted in cross sectional way by re-claimer and transported
to the hopper of Vertical Roller Mill.
Additives materials which are minor ingredients for cement manufacturing shall be
purchased from nearby sources i.e. Chittorgarh, HZL Dariba&Gandhinagar etc. The required
materials including limestonewill be fed to vertical roller mill for grinding & proportion shall
be controlled through Weigh Feeders. This proportioning is based on raw mix design done
with the chemical analysis of raw materials.
After grinding fine material will go to Cyclone which collects fine material and air will go to
reverse air bag house. Dust is collected at reverse air bag house and material collected at
cyclone is transported to Controlled Flow Type Blending Silo by mechanical conveying
system. The fine powder produced from Raw Mills is called “Raw Meal”.
Quality of Raw meal is being monitored through X-Ray Analyzer at regular interval.
6 Pre-heater, Pre-calcinator
The raw meal is preheated before it enters into the kiln. The material passes through the
multiplestages pre-heater from top to bottom via pre-calciner before entering the kiln
DECEMBER’ 2019 56
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Pre-calciner has fuel firing arrangement. Calcination is the clinker making process in which
the carbonates from limestone lose their carbon dioxide.Most of the calcination is completed
in this pre-heating section.
The material after pre-calcination in the Calciner enters the Kiln where burning or sintering
takes place at about 1250-1400 degree centigrade in the burning zone of the rotary kiln.
Clinker is formed as a result of burning and the strength giving compounds like C2S and C3S
are formed at this stage.
The hot clinker then falls in the cooler where it is rapidly cooled.The cooling is carried out by
forcing cold air through a bed of material by means of fans in the cooler compartments. Roller
Crusher provided at the end of Cooler make the uniform size of Clinker (approx. 3-mm to 25
mm).
Quality control Laboratory test the Material feed to The Kiln and Clinker Produced at X-Ray
Laboratory during the Pyro Process.
DECEMBER’ 2019 57
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
9 Cement Grinding
Clinker and required additives is being / will be ground in Cement Mill. Further, UCWL will
install Ball Mills / VRPMs for cement grinding .Clinker from clinker silo will go to the Cement
Mill via hoppers through belt conveyor, where it will grind into a fine powder called cement.
Gypsum is added at this stage to control the setting of cement. In case of PPC Fly ash also will
be added.
Cement millwill be equipped with high efficiency separator. For the monitoring of quality
ofcement timer based auto sampler is/will be used.
From Cement mill final product goes to cement silo by mechanical transport system.
DECEMBER’ 2019 58
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 59
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Raw Mill
DECEMBER’ 2019 60
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
WASTE WATER
Cement manufacturing is a dry based process. Hence, no industrial waste water is being
/ will be generated during cement manufacturing process.
Waste water from CPP is being / will be generated and recycled & reused in industrial
cooling purposes after necessary treatment.
No waste water will be disposed-off on ground outside the plant premises. ZLD will be
maintained.
DECEMBER’ 2019 61
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Table 9: Connectivity
S. No. Name Aerial Direction
Distance (Km)
(From Project Boundary)
Nearest Railway Station
1.(a) Khemli Railway Station 4.56 NW
(b) Debari Railway Station 8.0 WSW
Nearest Airport
2 Udaipur-Dabok 4.5 SSE
Nearest Highway
3 NH – 27 3.42 S
(Pindwara in Rajasthan to Allahabad in Uttar
Pradesh)
4. SH – 09 (Dabok in Rajasthan to Kapasan in 0.06 W
Rajasthan)
DECEMBER’ 2019 62
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
LAND USE
Table 10: Land Use of Project Site
LAND OWNERSHIP
The land ownership is as Industrial Land.
DECEMBER’ 2019 63
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
5. Plant Area (Land use) The total land area is 161.87 Ha. For plant, associated
facilities and township.
6. Archaeological Important Place None within 10 km radius
7. Ecological Sensitive Areas No National Park, Wildlife Sanctuary, Biosphere Reserve,
(National Park, Wild Life Protected Forest exists within 10 km radius
Sanctuary, Biosphere reserves,
Tiger Reserve, Elephant
Reserve etc.)
8. Reserved / Protected Forest 1. NaharMagra R.F. 2.0 Km ENE
within 15 km radius 2. Kantia R.F. 7.0 Km SW
3. Bara Mangra R.F. 9.0 Km SW
4. Panwari R.F. 9.0 Km SSW
5. Bhainsra R.F. 10.23 Km W
6. Dhenkli R.F. 10.41 Km W
DECEMBER’ 2019 64
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
9. Water Bodies
1 KhemliTalav 3.10 Km NW
2 SaleraTalai 4.00 Km NE
3 Berach River 5.66 Km S
4 Udaisagar 10.15 Km SW
10. Seismic Zone Zone II
DECEMBER’ 2019 65
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Bags godown
Space has been provided in the packing plant area for the storage of bags.
Parking
Adequate parking space has been/will be provided in the plant premises for the
parking of vehicles.
Residential Area (Non processing area)
Township colony for staff has been developed within the plant premises along with
all the required social amenities. Township colony area will be sufficient for
proposed expansion project.
Storage facilities
Covered storage facilities have been/will be provided for the storage of raw
materials which are detailed below:
DECEMBER’ 2019 66
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
(vii) CLIMATE
The climate of the district is dry except SW monsoon season. The cold season isfrom
December to February and is followed by summer from March to June. Period from mid of
September to end of November constitutes post monsoon season.
Average annual rainfall of the site (UCWL) is 655 mm. Average Maximum Temperature is
recorded 40 deg. C and Average Minimum Temperature is 7 deg. C. Maximum Humidity is
80% and Minimum Humidity is 20%.
DECEMBER’ 2019 67
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
(iii) LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.)
The Land Break-up along with Green belt etc. is given in the table no 10. Accordingly 55 ha area has
already been developed as greenbelt and plantation. Proposed Expansion will be done in the
existing plant premises. No additional land will be acquired.
DECEMBER’ 2019 68
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 69
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 70
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Cement manufacturing is dry based process. Hence, no waste water is being / will be
generated from cement manufacturing process.
Water used for cooling at various stages of cement manufacturing is being / will be
partially evaporated and partially recirculated; hence, no waste water is being / will be
discharged from the process.
Domestic waste water generated from Plant is being / will be treated in STPs and
treated water is being / will be used for greenbelt development/ plantation/Dust
Suppression/Industrial cooling.
Used or Spent oil (Cat 5.1) is being / will be generated and sold to Authorized recycler.
Lead Acid Batteries and E-waste are being/ will be sold to manufacturers/ dealers/
CPCB Authorized Recyclers on buyback basis.
Waste water generated from CPP will be recycled & reused in industrial cooling after
necessary treatment.
Dust collected from Air Pollution Control Equipment is being/ will be totally used back
in the process.
Sludge from Sewage Treatment Plant (STP) is being / will be used as manure for green
belt development.
Solid waste generated from CPP is in the form of ash, will be utilized in cement
manufacturing process.
DECEMBER’ 2019 71
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Note:In case WHR, CPP & Solar Plant operates on lower generation / are under break down, than
state grid (RSEB) power shall be used to meet out the gap.
The Project will start only after obtaining necessary statutory approvals i.e. Environmental
Clearances and all other required clearances. An implementation period for thisplant from
the date of signing/effectiveness of the main equipment supply contract is foreseen for this
project. The gestation period will be approx. 24 months.
DECEMBER’ 2019 72
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Based on the financial analysis considering Internal Rate of Returns on total investment and
Internal Rate of Returns on Equity the project seems to be financially viable.
DECEMBER’ 2019 73
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 74
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Hygiene Kit
DECEMBER’ 2019 75
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Veterinary Camps
Dental Camps
DECEMBER’ 2019 76
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
Women Empowerment
DECEMBER’ 2019 77
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
1. Construction of toilet facility for boys and girls separately at Govt. School, Bajajnagar.
2. Construction of Steel Shed for pilgrim at Dhunimata Temple with can accommodates 1000
people at a time.
3. Provided drinking water facility by installation of water tank and Tap at Manderia
government school as a result 251 children are getting safe drinking water.
4. Construction of 30,000 liters of RCC water Tank at Bicchiawada village of
Majawadapanchayat, which will ensure water availability to 250 Household.
5. Construction of Overhead Tank with Bore well facilities at MeghwalBasti, Village Manderiya
for 56 Households.
6. Construction of water tank at BanjaraBasti which provided access of water to 60
households.
7. Construction of Bridge on Canal Construction of bridge (pathway) over irrigation canals for
300 school going children.
8. Construction of 3 Nos. of Water Tank for cattle.
9. Construction of Overhead Concreate Tank.
10. 10 Nos. of Green Board at Schools
DECEMBER’ 2019 78
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 79
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
DECEMBER’ 2019 80
Proposed Expansion of Integrated Cement Plant-Clinker (2.00 MMTPA to 5.00 MMTPA), Cement (2.85 MMTPA to 7.00
MMTPA), WHRB( 12 MW to 30 MW) and Installation of new 25 MW Captive Thermal Power Plant by M/s. Udaipur Cement
Works Limited at Shripati Nagar, CFA, P.O. -Dabok, Tehsil Mavli, District Udaipur, Rajasthan-313022.
PRE-FEASIBILITY REPORT APPLICANT:UDAIPUR CEMENT WORKS LIMITED
DOCUMENT NO.: EESPL/UCWL/001/EC/Ind./2018-19/112
10.0 CONCLUSION
Udaipur Cement Works Limited is proposing an expansion of Cement, Clinker, WHRB and
Installation of new CPP in the existing manufacturing unit. Clinker from 2.0 MMTPA to 5.0
MMTPA, Cement from 2.85 MMTPA to 7.0 MMTPA, WHRB from 12.0 MW to 30.0 MW and
new CPP of 25 MW will not only contribute to the growth of Indian economy but also
strengthen the local socio-economic values/ status in the area. All the latest and
environment friendly development will be adopted. Moreover, UCWL has already in process
to commission renewable energy from Solar Power to the tune of capacity 7.6 MW/Day.
Further, UCWL will explore possibilities for increasing Solar Power of capacity 7.6 MW/DAY
in addition to present capacity 7.6 MW/Day Solar Power. The unit will adopt all measures
like; pollution control equipment, effective EMP to prevent harm/ damage to the
environment.Adequate green belt is developed which will be further maintained.
*****************
DECEMBER’ 2019 81