DESIGN FOR ECONOMIC SIZE OF PUMPING MAIN Section:- Sump to Adwana H/w

Length of Section(Meter) 4500


From: Sump To Adwana H/w Diameter of Pipe(mm) 1000 O.D. of pipe 1085 mm
Thickness of P1ate(mm) 5
Input Data for Piipe
Width of Excavation(M) 1.985
Depth of Trench(M) 2.335
Dia of Th. Of piipe iin Insiide C.C. C" vallue of Cost of piipe
piipe(mm) (mm) Liiniing iin Gunniitiing pipe (Rs.)
mm. 10.0 Estimates
10.0
1 Water requirement 319 4 10.0 25 130 2850.00
YearD ischarg ei 358 4 10.0 25 130 3692.00
Initial19996.5856 MLD 402 5 10.0 25 130 4658.00
447 5 10.0 25 130 Sr.No. ITEM NO QTYUNIT RATEAMOUNT
intermediate20118.232 MLD 5755.00
501 5 25 130 1
Ultimate202110.29 MLD 7209.00
573 6 25 130 Manufacturiing, Suppllyiing, Loweriing, ll ayiing, & Joiintiing, by
9131.00 welding of M.S pipes of various dia. Febricated from M.S plate of suitable thickness conferming to I.S-2063, Fe-410-Grade B and
pipes manufactured as per I.S 3589-1981,with Inside12.5
mm th.C.M inside lining and25 mm thck out side gunniting & all type of specials as per specifications
Length of Pumpiing main 4500 meter
Statiic head including resiiduall head 4 Design Periiod 46.50 meter 30 Years 80 %
5 Combiined efficiency of Pumpiing set 6 Cost of Pumping Unit Rs.
17000 Per KW
Interest rate
Liife of ellectriicall motor & Pump 9 Energy charges 12 % 1000 mm in side fiiniish dia. 5 mm thick plate 4500 R.M 0.00 0
10 Type of Pipe (M.S., 11 Hours of Pumping 15 Years 2 Excavation upto depth 1.5m as per detail specification
12 Stand by KW 1stt Stage 13 Stand by KW 2nd Stage 5 Rs.per unit In all sorts of Soil & soft murram 100% 13398.75 Cu. Mtr 22 294773
In Soft rock & Hard rock 0% 0.00 Cu. Mtr 94 0
3 Excavation from depth1.5m to 3.0m as per detail specification
3.1 In all sorts of Soil & soft murram 100%
7458.64 Cu. Mtr 26 193925
16 Hours 3.2 In Soft rock & Hard 0.00 Cu. Mtr 98 0
0%
100.00% % 4 Excavation from depth 3.0m to 4.5m as per detail specification
100.00% % In all sorts of Soil & soft murram 100% 0.00 Cu. Mtr 29 0
So1ution In Soft rock & Hard rock 0% 0.00 Cu. Mtr 105 0
5 Providing supplying,fixing valves
1st 15 year 2nd15 years
Butter flly vallve
Discharge at installation MLD 6.5856 8.232 Mld 700 mm dia.PN-1 Butter fly valve
Discharge at the end of 15 years 8.232 10.29 Mld Scour Vallves 1 Nos 132450 132450
Average discharge (MLD) 7.4088 9.261 Mld 16 hrs 250 mm dia. PN-1 type Scour valve
Hours of pumping for discharge at the end of 15 years 16 14.40 Mld Double acting kinetic air valve of 200 mm
Average hours for pumping for average discharge Discharge in pumping hours 14.40 15.44 Mld With isolatiom valve Nos 12400 0
KW required 12.35 2.19 H2 26297.28 KW2 7 Construction of R.C.C valve chambers of various size for variious types of vallves
Annual cost of electrical energy 57572.297794 H2 Butter fly valve chamber of size Size : 3.0 X 2.50 m. 13 Nos 10750 139750
1.75 H1 Scour-valve chamber of size
26297.28 KW1 Size : 2.0 X 2.0 m.
= 46057.838 H1 Double acting kinetic Air valve Shaft in R.C.C M-150 including steel, formwork etc. complete
8 Encasing of pipe in C.C M100 as per spcification & drawings 9 Construction of thrust block in R.C.C M-150 including steel,
Tab1e1 showing ve1ocity and 1oss of head for diff pipe size formwork etc. complete 1 Nos 65000 65000
10 Refilling the pipeline trenches with surplus stuff as per specificati on

Sr no Piipe siize iin Frictional head loss per Velocity in m/sec 1st stage flow 2nd stage flow 0 Nos 43000 0
mm1000 meter
1st stage 2nd stage 1st stage flow 2nd stage Frictional loss Other llossses Total llosses Friictiionall Other llossses Total losses 13 Nos 10000 130000
12.35 2000 861586
15.44 10% 46.5 10% 46.5 431 Cu. Mtr
MLD 9.23 3000 646189
MLD 13.96 (in mt.) of friction loss 4.16 (in mt.) 92.21 (in mt.) of friction loss 6.28 (in mt.) 115.60 215 Cu.mtr
5.27
7.96 41.56 2.37 72.56 62.82 3.58 85.90
1 319 2.99 1.79 2.23
4.53 23.69 1.35 61.32 35.82 2.04 68.90
2 358 1.79 1.42 1.77
2.70 13.47 0.80 55.34 20.37 1.21 59.86 Tota1 of Cu.mtr
16050.54 Transmission Main
3.50 2519849
56177
3 402 1.02 1.13 1.41
1.55 8.04 0.46 51.57 12.15 0.70 54.17
4 447 0.53 0.91 1.14
0.81 4.61 0.24 49.14 6.97 0.36 50.49
5 501 0.72 0.91 2.40 3.62
6 573 0.55 0.69

TABLE 2 SHOWING KILOWATTS REQUIRED AND COST OF PUMP SETS FOR DIFFERENT PIPE

Sr no Piipe siize iin 1st stage flow 2nd stage flow


mm H1 totall Kw requiired Cost of Pump H2 totall Kw requiired Cost of Pump
head lloss wiith stand by( Rs. In head lloss with stand by( Rs.
(in m)thousand)(iin m)In thousand)

1 319 92.21 323.00 5491.01 115.60 506.16 8605


2 358 72.56 254.18 4321.11 85.90 376.13 6394
3 402 61.32 214.80 3651.54 68.90 301.70 5129
4 447 55.34 193.85 3295.39 59.86 262.11 4456
5 501 51.57 180.65 3071.05 54.17 237.18 4032
6 573 49.14 172.12 2926.06 50.49 221.06 3758

TABLE 3 SHOWING COMPARATIVE STATEMENT OF OVER ALL COST STRUCTURE OF PUMPING MAIN FOR DIFF. PIPE SIZES

Sr no Piipe siize iin Total head in (m) Cost of Cost of Annuall costEnergy Totall Cost of Annuall cost of EnergyIniitiiall capiitall Grand totall of
mm Piipelliine of llengthPump
mts. of energycharges capiitalliized cost Pump energy charges iinvestment for capiitalliized
chargescapiitalliized charges capiitalliizedpumpset & cost for years annuall ellectriicall

charges
1st stage 2nd stage 4500 30
1 319 92 116 12825 5491 4247 28926 47242 8605 6655 45326 57095
2 358 73 86 16614 4321 3342 22762 43697 6394 4946 33687 51020
3 402 61 69 20961 3652 2824 19234 43846 5129 3967 27019 9853 49720
4 447 55 60 25898 3295 2549 17361 46554 4456 3446 23470 7323 51656
5 501 52 54 32441 3071 2375 16176 51688 4032 3119 21243 5873 56306
6 573 49 50 41090 2926 2263 15413 59429 3758 2907 19799 5102 63733
4618
4304

Table 3 shows that the most economical size of Main is 402 mm costing Capitalised Rs. 49719671.81
But velocity for 2nd stage of this 1.41 grater than 1.2 Hence provide Adopt 1000 mm dia. Due to difference between 1000 & 1100 mm is minor.

DESIGN FOR ECONOMIC SIZE OF PUMPING MAIN Piipe siize iin mm


t 0
o
C 1

a
t o
80000

60000 57095 63733


51656 56306
40000 51020 49720

200000
319 358 402 447 501 573
Pipe Dia in mm
Rate Ana1ysis of M.S. Pipes for ALL Diameters as per SOR-2001-02

7ate per mt

Area in
Area in sqmtRate of per mt Rate Guniting / Fie1d
Size of sqmt per forper Lining per U1trasonic Hydrau1ic
pipe (in Thickness(m Inside Outside Wt. In Kg mt for U1trasonic Laying & Testing & C Radiograp Cost of
Sr.No mm) m) Lining Guniting per Mt Guniting 1ining Kg sqmt test per M.T. Bare Pipe Guniting Lining Test Tota1 Jointing va1ue Test hy Specia1s Tota1
1 2 3 3 $ $ 5 6 + 8 # 10 11
1 200 $.00 10.00 25.00 22.10 0.+2 0.6# 23.00 200.00 88.00 508.21 1$3.25 138.23 1.#$ +#1.63 6+.20 13.$$ $.$0 6.+6 883.$3
2 250 $.00 10.00 25.00 2+.03 0.8+ 0.85 23.00 200.00 88.00 621.65 1+$.6+ 16#.6$ 2.38 #68.3$ 82.20 16.$$ 5.38 8.2+ 1080.62
3 300 $.00 10.00 25.00 31.#6 1.03 1.01 23.00 200.00 88.00 +35.0# 206.08 201.06 2.81 11$5.0$ #+.20 1#.$$ 6.36 #.+8 12++.82
$ 350 $.00 10.00 25.00 36.8# 1.1# 1.16 23.00 200.00 88.00 8$8.53 23+.50 232.$+ 3.25 1321.+$ 112.20 22.$$ +.3$ 11.2# 1$+5.01
5 $00 5.00 10.00 25.00 52.$0 1.35 1.32 23.00 200.00 88.00 1205.30 2+0.1+ 263.8# $.61 1+$3.#6 12+.50 25.50 8.3$ 16.0$ 1#21.3$
6 $50 5.00 10.00 25.00 58.5+ 1.51 1.$8 23.00 200.00 88.00 13$+.0# 301.58 2#5.30 5.15 1#$#.13 1$2.50 28.50 #.32 1+.#2 21$+.38
+ 500 5.00 10.00 25.00 6$.+3 1.66 1.63 23.00 200.00 88.00 1$88.8# 333.00 326.+2 5.+0 215$.31 15+.50 31.50 10.30 1#.81 23+3.$2
8 550 6.00 10.00 25.00 85.23 1.83 1.+# 23.00 200.00 88.00 1#60.2$ 365.6+ 358.13 +.50 26#1.5$ 1+2.80 3$.56 11.30 26.08 2#36.28
# 600 6.00 10.00 25.00 #2.63 1.## 1.#5 23.00 200.00 88.00 2130.$0 3#+.0# 38#.55 8.15 2#25.18 18+.80 3+.56 12.2# 28.3$ 31#1.1+
10 650 6.00 10.00 25.00 100.02 2.1$ 2.10 23.00 200.00 88.00 2300.55 $28.50 $20.#6 8.80 3158.82 202.80 $0.56 13.2+ 30.61 3$$6.05
11 +00 6.00 10.00 25.00 10+.$2 2.30 2.26 23.00 200.00 88.00 2$+0.+1 $5#.#2 $52.38 #.$5 33#2.$6 21+.80 $3.56 1$.25 32.8+ 3+00.#$
12 +50 6.00 10.00 25.00 11$.82 2.$6 2.$2 23.00 200.00 88.00 26$0.8+ $#1.33 $83.+# 10.10 3626.10 232.80 $6.56 15.23 35.1$ 3#55.82
13 800 6.00 10.00 25.00 122.22 2.61 2.58 23.00 200.00 88.00 2811.03 522.+5 515.21 10.+6 385#.+$ 2$+.80 $#.56 16.21 3+.$0 $210.+1
1$ 850 6.00 10.00 25.00 12#.62 2.++ 2.+3 23.00 200.00 88.00 2#81.1# 55$.16 5$6.62 11.$1 $0#3.38 262.80 52.56 1+.1# 3#.66 $$65.5#
15 #00 +.00 10.00 25.00 160.02 2.#3 2.8# 23.00 200.00 88.00 3680.55 586.83 5+8.0$ 1$.08 $85#.50 2+8.10 55.62 18.1# $8.#+ 5260.38
16 #50 +.00 10.00 25.00 168.66 3.0# 3.05 23.00 200.00 88.00 38+#.0+ 618.25 60#.$5 1$.8$ 5121.61 2#3.10 58.62 1#.1+ 51.61 55$$.11
1+ 1000 +.00 12.50 25.00 1+8.15 3.26 3.22 23.00 200.00 88.00 $0#+.$$ 652.80 6$$.01 15.68 5$0#.#3 30#.60 61.#2 20.25 5$.51 5856.21
18 1050 +.00 12.50 25.00 186.+8 3.$2 3.38 23.00 200.00 88.00 $2#5.#6 68$.22 6+5.$2 16.$$ 56+2.03 32$.60 6$.#2 21.23 5+.15 613#.#$
1# 1100 +.00 12.50 25.00 1#5.$1 3.58 3.53 23.00 200.00 88.00 $$#$.$8 +15.63 +06.8$ 1+.20 5#3$.1$ 33#.60 6+.#2 22.22 5#.80 6$23.6+
20 1150 +.00 12.50 25.00 20$.0$ 3.+$ 3.6# 23.00 200.00 88.00 $6#2.## +$+.05 +38.25 1+.#6 61#6.25 35$.60 +0.#2 23.20 62.$$ 6+0+.$1
21 1200 8.00 12.50 25.00 2$3.25 3.#0 3.85 23.00 200.00 88.00 55#$.8$ ++#.+2 +6#.6+ 21.$1 +165.63 36#.#0 +3.#8 2$.20 +$.$$ ++08.15
22 1250 8.00 12.50 25.00 253.12 $.06 $.01 23.00 200.00 88.00 5821.+2 811.1$ 801.08 22.2+ +$56.21 38$.#0 +6.#8 25.18 ++.$5 8020.+2
23 1300 8.00 12.50 25.00 262.#8 $.21 $.16 23.00 200.00 88.00 60$8.60 8$2.55 832.50 23.1$ ++$6.+# 3##.#0 +#.#8 26.16 80.$+ 8333.30
2$ 1350 8.00 12.50 25.00 2+2.85 $.3+ $.32 23.00 200.00 88.00 62+5.$8 8+3.#+ 863.#1 2$.01 803+.3+ $1$.#0 82.#8 2+.1$ 83.$# 86$5.88
25 1$00 8.00 12.50 25.00 282.+1 $.53 $.$8 23.00 200.00 88.00 6502.36 #05.38 8#5.33 2$.88 832+.#$ $2#.#0 85.#8 28.12 86.51 8#58.$5
26 1$50 8.00 12.50 25.00 2#2.58 $.68 $.63 23.00 200.00 88.00 6+2#.23 #36.80 #26.+$ 25.+5 8618.52 $$$.#0 88.#8 2#.10 8#.53 #2+1.03
2+ 1500 8.00 12.50 $0.00 302.$$ $.8$ $.+# 23.00 200.00 88.00 6#56.11 #68.21 #58.16 26.61 8#0#.10 $5#.#0 #1.#8 30.0# #2.55 #583.61
28 1550 8.00 12.50 $0.00 312.30 5.00 $.#5 23.00 200.00 88.00 +182.## ###.63 #8#.5+ 2+.$8 #1##.6+ $+$.#0 #$.#8 31.0+ #5.5+ #8#6.1#
2# 1600 10.00 12.50 $0.00 $03.20 5.1+ 5.10 23.00 200.00 88.00 #2+3.68 1033.55 1020.## 35.$8 11363.+1 $#0.50 #8.10 32.0# 123.38 1210+.++
30 1650 10.00 12.50 $0.00 $15.53 5.32 5.26 23.00 200.00 88.00 #55+.28 106$.#+ 1052.$0 36.5+ 11+11.22 505.50 101.10 33.0+ 12+.15 12$+8.0$
31 1+00 10.00 12.50 $0.00 $2+.86 5.$8 5.$2 23.00 200.00 88.00 #8$0.88 10#6.38 1083.82 3+.65 12058.+$ 520.50 10$.10 3$.05 130.#3 128$8.31
32 1+50 10.00 12.50 $0.00 $$0.1# 5.6$ $.#5 23.00 200.00 88.00 1012$.$8 112+.80 #8#.10 38.+$ 12280.12 535.50 10+.10 35.03 13$.+0 130#2.$5
33 1800 10.00 12.50 $0.00 $52.53 5.80 3.85 23.00 200.00 88.00 10$08.08 115#.21 +6#.30 3#.82 123+6.$2 550.50 110.10 36.01 138.$+ 13211.50
3$ 1850 10.00 12.50 $0.00 $6$.86 5.#5 5.8# 23.00 200.00 88.00 106#1.68 11#0.63 11+8.06 $0.#1 13101.28 565.50 113.10 36.## 1$2.25 13#5#.12
35 1#00 10.00 12.50 $0.00 $++.1# 6.11 6.05 23.00 200.00 88.00 10#+5.28 1222.0$ 120#.$8 $1.## 13$$8.+# 580.50 116.10 3+.#+ 1$6.02 1$32#.38
36 1#50 10.00 12.50 $0.00 $8#.52 6.2+ 6.20 23.00 200.00 88.00 11258.88 1253.$6 12$0.8# $3.08 13+#6.31 5#5.50 11#.10 38.#6 1$#.+# 1$6##.65
3+ 2000 12.00 12.50 $0.00 602.81 6.$$ 6.36 23.00 200.00 88.00 1386$.58 128+.3# 12+2.31 53.05 16$++.32 611.10 122.22 3#.#8 18$.$6 1+$35.08

Area in
Area insqmtRate of sqmt per per mt Rate Guniting / Fie1d
Size of Outside Wt. In Kg mt forforper Lining per U1trasonic Hydrau1ic
pipe (in Thickness(m Inside Lining Guniting per Mt Guniting 1iningKgsqmttest per M.T. Bare Pipe Guniting Lining U1trasonic Laying & Testing & C Radiograp Cost of
Sr.No mm)m) 3$$56# Test Tota1 Jointing va1ue Test hy Specia1s Tota1
1 2 3 + 8 10 11
38 2050 12.00 12.50 $0.00 61+.60 6.5# 6.52 23.00 200.00 88.00 1$20$.#0 1318.80 1303.+2 5$.35 16881.+8 626.10 125.22 $0.#6 188.## 1+863.0$
3# 2100 12.00 12.50 $0.00 632.$0 6.+5 6.68 23.00 200.00 88.00 1$5$5.22 1350.22 1335.1$ 55.65 1+286.23 6$1.10 128.22 $1.#$ 1#3.51 182#1.00
$0 2150 12.00 12.50 $0.00 6$+.20 6.#1 6.83 23.00 200.00 88.00 1$885.5$ 1381.63 1366.55 56.#5 1+6#0.68 656.10 131.22 $2.#2 1#8.0$ 18+18.#6
$1 2200 1$.00 12.50 $0.00 ++3.02 +.08 6.## 23.00 200.00 88.00 1+++#.38 1$15.56 13#+.#+ 68.03 20660.#$ 6+1.+0 13$.3$ $3.#$ 236.5$ 21+$+.$6
$2 2250 1$.00 12.50 $0.00 +#0.28 +.23 +.15 23.00 200.00 88.00 181+6.$2 1$$6.#+ 1$2#.38 6#.5$ 21122.32 686.+0 13+.3$ $$.#2 2$1.83 22233.11
$3 2300 1$.00 12.50 $0.00 80+.5$ +.3# +.30 23.00 200.00 88.00 185+3.$6 1$+8.3# 1$60.80 +1.06 21583.+1 +01.+0 1$0.3$ $5.#0 2$+.11 22+18.+6
$$ 2350 1$.00 12.50 $0.00 82$.80 +.55 +.$6 23.00 200.00 88.00 18#+0.50 150#.80 1$#2.21 +2.58 220$5.10 +16.+0 1$3.3$ $6.88 252.3# 2320$.$1
Area in
Area insqmtRate of sqmt per per mt Rate Guniting / Fie1d
Size of Outside Wt. In Kg mt forforper Lining per U1trasonic Hydrau1ic
pipe (in Thickness(m Inside Guniting per Mt Guniting 1iningKgsqmttest per M.T. Bare Pipe Guniting Lining U1trasonic Laying & Testing & C Radiograp Cost of
Sr.No mm)m)Lining Test Tota1 Jointing va1ue Test hy Specia1s Tota1
1 2 3 3 $ $ 5 6 + 8 # 10 11
38 2050 12.00 12.50 $0.00 61+.60 6.5# 6.52 23.00 200.00 88.00 1$20$.#0 1318.80 1303.+2 5$.35 16881.+8 626.10 125.22 $0.#6 188.## 1+863.0$
3# 2100 12.00 12.50 $0.00 632.$0 6.+5 6.68 23.00 200.00 88.00 1$5$5.22 1350.22 1335.1$ 55.65 1+286.23 6$1.10 128.22 $1.#$ 1#3.51 182#1.00
$0 2150 12.00 12.50 $0.00 6$+.20 6.#1 6.83 23.00 200.00 88.00 1$885.5$ 1381.63 1366.55 56.#5 1+6#0.68 656.10 131.22 $2.#2 1#8.0$ 18+18.#6
$1 2200 1$.00 12.50 $0.00 ++3.02 +.08 6.## 23.00 200.00 88.00 1+++#.38 1$15.56 13#+.#+ 68.03 20660.#$ 6+1.+0 13$.3$ $3.#$ 236.5$ 21+$+.$6
$2 2250 1$.00 12.50 $0.00 +#0.28 +.23 +.15 23.00 200.00 88.00 181+6.$2 1$$6.#+ 1$2#.38 6#.5$ 21122.32 686.+0 13+.3$ $$.#2 2$1.83 22233.11
$3 2300 1$.00 12.50 $0.00 80+.5$ +.3# +.30 23.00 200.00 88.00 185+3.$6 1$+8.3# 1$60.80 +1.06 21583.+1 +01.+0 1$0.3$ $5.#0 2$+.11 22+18.+6
$$ 2350 1$.00 12.50 $0.00 82$.80 +.55 +.$6 23.00 200.00 88.00 18#+0.50 150#.80 1$#2.21 +2.58 220$5.10 +16.+0 1$3.3$ $6.88 252.3# 2320$.$1

322863051.xls
P . H . WO R KS D IV ISIO N ,P OR B AN D A R.
P. H . W O R K S D I V IS I ON ,
PORBANDAR

DESIGN OF RISING MAIN & PUMPING MACHINARY

For Ka1indri RWSS Sump to HGLR

1 Ultimate stage population 27,288.00 Souls


2 Hours of pumping 22.00 hrs
3 Rate of water supply 70.00 l.p.c.d.
4 Design discharge 2.87 m.l.d.
5 H-Z constant 130.00
6 Pipe material DI
7 $ipe diameter 26&.96 mm (>eeping h
between 1.00 to
3.00mt+km@
Adopting 2)0.00 mm
8 *nner Diameter 2)0.00 mm
9 Rate of head loss 2.02 mt+km
10 Length of rising main 900.00 mts
11 Total head loss 1.82 mts
322863051.xls
P . H . WO R KS D IV ISIO N ,P OR B AN D A R.
P. H . W O R K S D I V IS I ON ,
PORBANDAR

DESIGN OF RISING MAIN & PUMPING MACHINARY

For Ka1indri RWSS Sump to HGLR

1 Ultimate stage population 27,288.00 Souls


2 Hours of pumping 22.00 hrs
3 Rate of water supply 70.00 l.p.c.d.
4 Design discharge 2.87 m.l.d.
5 H-Z constant 130.00
6 Pipe material DI
7 $ipe diameter 26&.96 mm (>eeping h
between 1.00 to
3.00mt+km@
Adopting 2)0.00 mm
8 *nner Diameter 2)0.00 mm
9 Rate of head loss 2.02 mt+km
10 Length of rising main 900.00 mts
11 Total head loss 1.82 mts

DESIGN OF PUMPING MACHINARY

1 *nter Stage population 22,7&1.00 Souls


2 Hours of pumping 22.00 hrs
3 Rate of water supply 70.00 l.p.c.d
4 Design discharge 1.7& m.l.d.
5 21.93 l.p.s.
6 Static head 30.00 mts
7 /riction loss in R.M. 0.80 mts
8 Additional losses 1.00 mts
9 Dri1ing head 3.00 mts
10 Total head 3&.80 mts
11 B.H.$. 10.17 Hp
12 3ith 104 o1er loadings 11.19 Hp
13 At 704 effi. 5f elect. Motor 1).99 Hp
14 Selecting Hp of pump 20.00 Hp
14.92 KVA

DE$UTY EXECUT*VE E;<*;EER


$. H. S. SUBD*V*S*5;
GUJARATWATERSUPPLY&SEWERAGEBOARD

SAURASHTRA PIPELINE PROJECT (NARMADA) BASED DISTRIBUTION NET


SUPPLY PROJECT FOR RAJKOT DISTRICT

MOVIYAGR

OUP

STATEMEN

TNo.

DESIGNOFPUMPING MACH.AT CWSTOESRATMADHAPAR

1 8.23

Totalrequirementofwater(Intermi
diate) :-
2 Hoursofpumping :- 16

3 Rateofpumping :- 5145 0

:- 8575

:- 143

4 LowestsuctionlevelatSump :- 132.0

5 168.0

FulsuplylevelatSumpnearMotaumv
ada :-
6 StaticHead :- 46.50

7 Frictionaloses :- 13.47

402mm diaDIpipe 450Mt.longfor

130Cvalue&for 12.35MLD

8 Otherlosesduebendsetc. :- 1.35

9 Residualhead :- 0.0

10 TotalHeadforPump :- 61.32

Say:- 62.0

NowHPrequired :- 18.21

BHPrequiredat80% efficiency :- 147.7

Say:- 150

Howeveritisproposedtoprovide2 150
setsofpumping :-
machinaryconsistingofcentrifu
galpump.(1SetStandby) 1.90
:-

Capableofdischarg :- 143.0
ing
Say:- 143.0
:- 514.8

Againstotalhead :- 62

DEPUTYEXECUTIVEEN
P.H.S.SUB DIVISI
ORK WATER

MLD

Hour

Lith

our

L mn

sec

Mt.R

.L

Mt.R.L

Mt.

Mt.

Mt.

Mt.

Mt.

Mt

HP

HP

HP

HP

KV

sec
L

sec

M^3/

hr

Mt.

INEE
R N

You might also like