M G Banshidhar Pvt. Ltd.

Scope of Work Four Laning of Khjuri to Wyandhamganj (JH/UP Border) section of NH-75 (New NH-39) From Existing Km 218+500 to 259+640 (Section-V)in the state of Jharkhand on Hybrid
Annuity Mode.
Client National HighwaysAuthority of India.
Authority Engineer Bloom
EPC Contractor M G Contractors Pvt Ltd.
Drawing No. FLY/201
Length of Pier Cap 10400 mm Width of Pier Cap 3000 Lap Length 41 d
Clear Cover of Pier Cap 45 mm Thickness of Pier Cap 2200
Clear cover of Pedestal 45 mm Size of Pedestal 1100 x 1100 x 410 Ld = 30 d Nos of Pedestal= 2

Bar Bending Schedule of Pier Cap P5,P7,P9,P11,P15,P25,P27,P29,P31,P33,P35,P45,P47,P49,P59


Cutting Total
Nos of Length
Length Length
Bar No. Description Bar Shape Dia Spacing Bend No of Bar Over of One Reinforcement Bar Length in M
without lap in After Lap
Lap Lap (m)
M in M
8 10 12 16 20 25 32
10286
300 300
1 32 128 10.758 26 - 1.312 279.708 - - - - - - 279.708

2854
Spacer Bar 32 128 2.726 10 - 1.312 27.260 - - - - - - 27.260

10158
300 300
1a 32 128 10.630 26 - 1.312 276.380 - - - - - - 276.380

2854
Spacer Bar 32 128 2.726 10 - 1.312 27.260 - - - - - - 27.260

10030
300 300
1b 32 128 10.502 26 - 1.312 273.052 - - - - - - 273.052

2910
Ring in Straight
2 16 135 160 10.152 19 - 0.656 192.888 - - - 192.888 - - -
Portion 2086 2086
2910
Ring in Tapper 2910
Portion 2046 2046
2 16 135 160 8.931 58 - 0.656 517.998 - - - 517.998 - - -
Total Nos of Bar to to
Divided in Both Side
905 2910 905
10L Ring in 394
Tapper Portion 2046 2046
3 Total Nos of Bar 16 135 160 3.899 290 - 0.656 1,130.710 - - - 1,130.710 - - -
to to
Divided in Both Side in
5 set 905 394 905
800 800
4 20 80 12.159 26 1.00 0.820 337.454 - - - - 337.454 - -
4102 4102
2435

Side 10310
5 12 0 10.310 14 - 0.492 144.340 - - 144.340 - - - -
Distribution Bar

Side 9459
5 12 - 6.478 14 - 0.492 90.692 - - 90.692 - - - -
Distribution Bar 3497

800
2910
6 12 48 4.462 28 - 0.492 124.936 - - 124.936 - - - -
800

Pedestal
970
7 25 200.00 3.300 20 - 1.025 66.000 - - - - - 66.000 -
1115 1115
150 150
970
8 25 200.00 3.250 16 - 1.025 52.000 - - - - - 52.000 -
1090 1090
150 150
1010
Ring in Straight
2 20 100 200 4.240 3 - 0.820 12.720 - - - - 12.720 - -
Portion 1010 1010
1010
75
975
Mesh in Pedestal 8 75 - 15.182 8 1.00 0.328 124.076 124.076 - - - - - -

Mesh in Jack Point


75
Mesh in Jack 450
8 75 - 3.857 8 - 0.328 30.855 30.855 - - - - - -
Point

REINFOECEMENT BAR LENGTH(M) 154.931 - 359.968 1,841.596 350.174 118.000 883.660


UNIT WEIGHT(KG/M) 0.395 0.617 0.888 1.580 2.470 3.850 6.310
STEEL WEIGHT(MT) 0.061 0.000 0.320 2.910 0.865 0.454 5.576

TOTAL WEIGHT 10.186

Contractor Rep. JE/W/CON/DDU/ECR AEN/CON/MGS/ECR