PROJECT: FOUR LANING OF VADUGAPATTI TO THERKUVENGANALLUR SECTION FROM KM: 36+000 TO KM: 71+600 OF NH-744 UNDER

BHARATHMALA PARIYOJANA SCHEME IN THE STATE OF TAMILNADU ON EPC MODE.


Type 1x1.25x0.125 Formation Length 260 RMT 130 Slab= d 0.100 LHS 1.25 Cover 0.05 50

Actual a 1.25 LHS Z- 01 L Wall= f 0.125 RHS 1.25 0.035 35

b 1 550 Raft= e Median 1.25


Bar Bending Schedule - Drain( CH 46520 to 46780) 260 RMT
Location: Design chainage-46520 to 46780 LHS
Drawing Ref.no. : HBS/VA-TH//U-TYPE DRAIN/REINF/001 Net Base pressure- 11.5 T/Sqm

Bar Bar Shape Bar Dia Spacing No .of


Cutting
Total Length
Unit Total Quantity of Reinforcement in (MT)
Item Description Bend Side Length Weight Weight
Mark Dimensions in (mm) (mm) (c/c) Bars (M)
(M) (Kgs) (Kgs) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm

866
1 46520 to 46650 8 150 2 1 3.219 2787.901 0.395 1101.221 1.101 - - - - - -
926 926 866
1400

866
2 46650 to 46780 8 150 2 1 3.264 2826.871 0.395 1116.614 1.117 - - - - - -
948 948 866
1400

1733
30 1430 30
7 Slab 8 150 2 1 1.458 2526.228 0.395 998 0.998 - - - - - -
1733

16
260
8 Distributor 8 300 0 1 260 4160.000 0.395 1643 1.643 - - - - - -
16

Total Quantity in MT 4.859 0.000 0.000 0.000 0.000 0.000 0.000


Lap Length 66*D
Grand Total in MT 4.859

16
528
6 Lap Length 8 300 0 22 0.528 185.856 0.395 73 0.073 - - - - - -

352

Total Quantity in MT 0.073 0.000 0.000 0.000 0.000 0.000 0.000


Grand Total in MT 0.073
EPC Contractor: Concessionaire: I.E Representative:
Signature: Signature: Signature:
Name : Name : Name :
Designation : Designation : Designation :
Date : Date : Date :
PROJECT: FOUR LANING OF VADUGAPATTI TO THERKUVENGANALLUR SECTION FROM KM: 36+000 TO KM: 71+600 OF NH-744 UNDER
BHARATHMALA PARIYOJANA SCHEME IN THE STATE OF TAMILNADU ON EPC MODE.
Type 1x1.25x0.125 Formation Length 270 RMT 130 Slab= d 0.100 LHS 1.25 Cover 0.05 50

Actual a 1.25 LHS Z- 01 R 140 Wall= f 0.125 RHS 1.25 0.035 35

b 1 550 Raft= e Median 1.25


Bar Bending Schedule - Drain( CH 46520 to 46780) 260 RMT
Location: Design chainage-46520 to 46790 RHS
Drawing Ref.no. : HBS/VA-TH//U-TYPE DRAIN/REINF/001 Net Base pressure- 11.5 T/Sqm

Bar Bar Shape Bar Dia Spacing No .of


Cutting
Total Length
Unit Total Quantity of Reinforcement in (MT)
Item Description Bend Side Length Weight Weight
Mark Dimensions in (mm) (mm) (c/c) Bars (M)
(M) (Kgs) (Kgs) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm

866
1 46520 to 46650 8 150 2 1 3.222 2790.623 0.395 1102.296 1.102 - - - - - -
927 927 866
1400

933
2 46650 to 46780 8 150 2 1 3.288 3066.608 0.395 1211.310 1.211 - - - - - -
960 960 933
1400

1799
30 1430 30
7 Slab 8 150 2 1 1.458 2623.428 0.395 1036 1.036 - - - - - -
1799

16
270
8 Distributor 8 300 0 1 270 4320.000 0.395 1706 1.706 - - - - - -
16

Total Quantity in MT 5.056 0.000 0.000 0.000 0.000 0.000 0.000


Lap Length 66*D
Grand Total in MT 5.056

16
528
6 Lap Length 8 300 0 23 0.528 194.304 0.395 77 0.077 - - - - - -

368

Total Quantity in MT 0.077 0.000 0.000 0.000 0.000 0.000 0.000


Grand Total in MT 0.077
EPC Contractor: Concessionaire: I.E Representative:
Signature: Signature: Signature:
Name : Name : Name :
Designation : Designation : Designation :
Date : Date : Date :
PROJECT: FOUR LANING OF VADUGAPATTI TO THERKUVENGANALLUR SECTION FROM KM: 36+000 TO KM: 71+600 OF NH-744 UNDER
BHARATHMALA PARIYOJANA SCHEME IN THE STATE OF TAMILNADU ON EPC MODE.
Type 1x1.25x0.125 Formation Length 30 RMT Slab= d 0.100 LHS 1.25 Cover 0.05 50

Actual a 1.25 LHS Z- 03-L Wall= f 0.125 RHS 1.25 0.035 35

b 1 550 Raft= e Median 1.25


Bar Bending Schedule - Drain( CH 46780 O 46810) 30 RMT
Location: Design chainage-46790 TO 46810 LHS
Drawing Ref.no. : HBS/VA-TH//U-TYPE DRAIN/REINF/001 Net Base pressure- 11.5 T/Sqm

Bar Bar Shape Bar Dia Spacing No .of


Cutting
Total Length
Unit Total Quantity of Reinforcement in (MT)
Item Description Bend Side Length Weight Weight
Mark Dimensions in (mm) (mm) (c/c) Bars (M)
(M) (Kgs) (Kgs) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm

239
46780 TO
1 12 125 2 1 4.647 1111.483 0.889 988.108 - - 0.988 - - - -
46810 1647 1647
1400 239

239
30 1430 30
7 Slab 12 125 2 1 1.442 344.926 0.889 307 - - 0.307 - - - -
239

31
30
8 Distributor 8 200 0 1 30 930.000 0.395 367 0.367 - - - - - -
31

Total Quantity in MT 0.367 0.000 1.295 0.000 0.000 0.000 0.000


Lap Length 66*D
Grand Total in MT 1.662

31
528
6 Lap Length 8 200 0 3 0.528 49.104 0.395 19 0.019 - - - - - -

93

Total Quantity in MT 0.019 0.000 0.000 0.000 0.000 0.000 0.000


Grand Total in MT 0.019
EPC Contractor: Concessionaire: I.E Representative:
Signature: Signature: Signature:
Name : Name : Name :
Designation : Designation : Designation :
Date : Date : Date :
PROJECT: FOUR LANING OF VADUGAPATTI TO THERKUVENGANALLUR SECTION FROM KM: 36+000 TO KM: 71+600 OF NH-744 UNDER
BHARATHMALA PARIYOJANA SCHEME IN THE STATE OF TAMILNADU ON EPC MODE.
Type 1x1.25x0.125 Formation Length 20 RMT Slab= d 0.100 LHS 1.25 Cover 0.05 50

Actual a 1.25 LHS Z- 03-L Wall= f 0.125 RHS 1.25 0.035 35

b 1 550 Raft= e Median 1.25


Bar Bending Schedule - Drain( CH 46790 TO 46810) 20 RMT
Location: Design chainage-46790 TO 46810 RHS
Drawing Ref.no. : HBS/VA-TH//U-TYPE DRAIN/REINF/001 Net Base pressure- 11.5 T/Sqm

Bar Bar Shape Bar Dia Spacing No .of


Cutting
Total Length
Unit Total Quantity of Reinforcement in (MT)
Item Description Bend Side Length Weight Weight
Mark Dimensions in (mm) (mm) (c/c) Bars (M)
(M) (Kgs) (Kgs) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm

159
46780 TO
1 12 125 2 1 4.675 744.260 0.889 661.647 - - 0.662 - - - -
46810 1661 1661
1400 159

159
30 1430 30
7 Slab 12 125 2 1 1.442 229.566 0.889 204 - - 0.204 - - - -
159

31
20
8 Distributor 8 200 0 1 20 620.000 0.395 245 0.245 - - - - - -
31

Total Quantity in MT 0.245 0.000 0.866 0.000 0.000 0.000 0.000


Lap Length 66*D
Grand Total in MT 1.111

31
528
6 Lap Length 8 200 0 2 0.528 32.736 0.395 13 0.013 - - - - - -

62

Total Quantity in MT 0.013 0.000 0.000 0.000 0.000 0.000 0.000


Grand Total in MT 0.013
EPC Contractor: Concessionaire: I.E Representative:
Signature: Signature: Signature:
Name : Name : Name :
Designation : Designation : Designation :
Date : Date : Date :
PROJECT: FOUR LANING OF VADUGAPATTI TO THERKUVENGANALLUR SECTION FROM KM: 36+000 TO KM: 71+600 OF NH-744 UNDER
BHARATHMALA PARIYOJANA SCHEME IN THE STATE OF TAMILNADU ON EPC MODE.
Type 1x1.25x0.125 Formation Length 190 RMT 100 Slab= d 0.100 LHS 1.25 Cover 0.05 50

Actual a 1.25 LHS Z- 02 L 90 Wall= f 0.125 RHS 1.25 0.035 35

b 1 550 Raft= e Median 1.25


Bar Bending Schedule - Drain( CH 46810 TO 47000) 190 RMT
Location: Design chainage-46810 TO 47000 LHS
Drawing Ref.no. : HBS/VA-TH//U-TYPE DRAIN/REINF/001 Net Base pressure- 11.5 T/Sqm

Bar Bar Shape Bar Dia Spacing No .of


Cutting
Total Length
Unit Total Quantity of Reinforcement in (MT)
Item Description Bend Side Length Weight Weight
Mark Dimensions in (mm) (mm) (c/c) Bars (M)
(M) (Kgs) (Kgs) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm

666
46810 TO
1 8 150 2 1 4.055 2700.933 0.395 1066.868 1.067 - - - - - -
46910 1344 1344
1400 666

599
46910 TO
2 8 150 2 1 3.664 2195.957 0.395 867.403 0.867 - - - - - -
47000 1148 1148
1400 599

1266
30 1430 30
7 Slab 8 150 2 1 1.458 1845.828 0.395 729 0.729 - - - - - -
1266

18
190
8 Distributor 8 300 0 1 190 3420.000 0.395 1351 1.351 - - - - - -
18

Total Quantity in MT 4.014 0.000 0.000 0.000 0.000 0.000 0.000


Lap Length 66*D
Grand Total in MT 4.014

18
528
6 Lap Length 8 300 0 16 0.528 152.064 0.395 60 0.060 - - - - - -

288

Total Quantity in MT 0.060 0.000 0.000 0.000 0.000 0.000 0.000


Grand Total in MT 0.060
EPC Contractor: Concessionaire: I.E Representative:
Signature: Signature: Signature:
Name : Name : Name :
Designation : Designation : Designation :
Date : Date : Date :
PROJECT: FOUR LANING OF VADUGAPATTI TO THERKUVENGANALLUR SECTION FROM KM: 36+000 TO KM: 71+600 OF NH-744 UNDER
BHARATHMALA PARIYOJANA SCHEME IN THE STATE OF TAMILNADU ON EPC MODE.
Type 1x1.25x0.125 Formation Length 190 RMT 100 Slab= d 0.100 LHS 1.25 Cover 0.05 50

Actual a 1.25 LHS Z- 02 R 90 Wall= f 0.125 RHS 1.25 0.035 35

b 1 550 Raft= e Median 1.25


Bar Bending Schedule - Drain( CH 46810 TO 47000) 190 RMT
Location: Design chainage-46810 TO 47000 RHS
Drawing Ref.no. : HBS/VA-TH//U-TYPE DRAIN/REINF/001 Net Base pressure- 11.5 T/Sqm

Bar Bar Shape Bar Dia Spacing No .of


Cutting
Total Length
Unit Total Quantity of Reinforcement in (MT)
Item Description Bend Side Length Weight Weight
Mark Dimensions in (mm) (mm) (c/c) Bars (M)
(M) (Kgs) (Kgs) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm

666
46810 TO
1 8 150 2 1 4.133 2752.517 0.395 1087.244 1.087 - - - - - -
46910 1382 1382
1400 666

599
46910 TO
2 8 150 2 1 3.670 2199.433 0.395 868.776 0.869 - - - - - -
47000 1151 1151
1400 599

1266
30 1430 30
7 Slab 8 150 2 1 1.458 1845.828 0.395 729 0.729 - - - - - -
1266

19
190
8 Distributor 8 300 0 1 190 3610.000 0.395 1426 1.426 - - - - - -
19

Total Quantity in MT 4.111 0.000 0.000 0.000 0.000 0.000 0.000


Lap Length 66*D
Grand Total in MT 4.111

19
528
6 Lap Length 8 300 0 16 0.528 160.512 0.395 63 0.063 - - - - - -

304

Total Quantity in MT 0.063 0.000 0.000 0.000 0.000 0.000 0.000


Grand Total in MT 0.063
EPC Contractor: Concessionaire: I.E Representative:
Signature: Signature: Signature:
Name : Name : Name :
Designation : Designation : Designation :
Date : Date : Date :
PROJECT: FOUR LANING OF VADUGAPATTI TO THERKUVENGANALLUR SECTION FROM KM: 36+000 TO KM: 71+600 OF NH-744 UNDER
BHARATHMALA PARIYOJANA SCHEME IN THE STATE OF TAMILNADU ON EPC MODE.
Type 1x1.25x0.1 Formation Length 500 RMT 150 0.100 LHS 1 Cover 0.05 50

Actual a 1.25 LHS Z-1 & 2 100 0.125 RHS 1 0.035 35

b 1 340 0.250 Median 1


Bar Bending Schedule - Drain( CH 47000 TO 47500) 500 RMT
Location: Design chainage-47000 TO 47500 LHS
Drawing Ref.no. : HBS/VA-TH//U-TYPE DRAIN/REINF/001 Net Base pressure- 11.5 T/Sqm

Bar Bar Shape Bar Dia Spacing No .of Length


Cutting Unit Total Quantity of Reinforcement in (MT)
Item Description Bend Side Length Weight Weight
Mark Dimensions in (mm) (mm) (c/c) Bars (in mm)
(M) (Kgs) (Kgs) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm

999
47000 TO
1 8 150 2 1 3575 3.543 0.395 1398.086 1.398 - - - - - -
47150 1087 1087
1400 999

999
47150 TO
1 8 150 2 1 3425 3.393 0.395 1338.895 1.339 - - - - - -
47300 1012 1012
1400 999

666
47300 TO
1 8 150 2 1 3300 3.268 0.395 859.713 0.860 - - - - - -
47400 950 950
1400 666

666
47400 TO
2 8 150 2 1 3222.3636 3.190 0.395 839.289 0.839 - - - - - -
47500 911 911
1400 666

3333
30 1430 30
3 Slab rod 8 150 2 1 1490 1.458 0.395 1919 1.919 - - - - - -
3333

500 17
55960 to 56300
4 8 300 0 1 500 500 0.395 3358 3.358 - - - - - -
- Dist rod
17

Total Quantity in MT 9.713 0.000 0.000 0.000 0.000 0.000 0.000


Lap Length 66*D Grand Total in MT 9.713

17
528
3 Lap Length 8 300 0 42 528 0.528 0.395 149 0.149 - - - - - -
714
Total Quantity in MT 0.149 0.000 0.000 0.000 0.000 0.000 0.000
Grand Total in MT 0.149
EPC Contractor: Concessionaire: I.E Representative:
Signature: Signature: Signature:

Name : Name : Name :

Designation : Designation : Designation :

Date : Date : Date :


PROJECT: FOUR LANING OF VADUGAPATTI TO THERKUVENGANALLUR SECTION FROM KM: 36+000 TO KM: 71+600 OF NH-744 UNDER
BHARATHMALA PARIYOJANA SCHEME IN THE STATE OF TAMILNADU ON EPC MODE.
Type 1x1.25x0.1 Formation Length 500 RMT 150 0.100 LHS 1 Cover 0.05 50

Actual a 1.25 LHS Z-1 & 2 100 0.125 RHS 1 0.035 35

b 1 340 0.250 Median 1


Bar Bending Schedule - Drain( CH 47000 TO 47500) 500 RMT
Location: Design chainage-47000 TO 47500 RHS
Drawing Ref.no. : HBS/VA-TH//U-TYPE DRAIN/REINF/001 Net Base pressure- 11.5 T/Sqm

Bar Bar Shape Bar Dia Spacing No .of Length


Cutting Unit Total Quantity of Reinforcement in (MT)
Item Description Bend Side Length Weight Weight
Mark Dimensions in (mm) (mm) (c/c) Bars (in mm)
(M) (Kgs) (Kgs) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm

999
47000 TO
1 8 150 2 1 3575 3.543 0.395 1398.086 1.398 - - - - - -
47150 1087 1087
1400 999

999
47150 TO
1 8 150 2 1 3425 3.393 0.395 1338.895 1.339 - - - - - -
47300 1012 1012
1400 999

666
47300 TO
1 8 150 2 1 3300 3.268 0.395 859.713 0.860 - - - - - -
47400 950 950
1400 666

666
47400 TO
2 8 150 2 1 3219.0909 3.187 0.395 838.428 0.838 - - - - - -
47500 910 910
1400 666

3333
30 1430 30
3 Slab rod 8 150 2 1 1490 1.458 0.395 1919 1.919 - - - - - -
3333

500 17

4 Dist rod 8 300 0 1 500 500 0.395 3358 3.358 - - - - - -


17

Total Quantity in MT 9.712 0.000 0.000 0.000 0.000 0.000 0.000


Lap Length 66*D Grand Total in MT 9.712

17
528
3 Lap Length 8 300 0 42 528 0.528 0.395 149 0.149 - - - - - -
714
Total Quantity in MT 0.149 0.000 0.000 0.000 0.000 0.000 0.000
Grand Total in MT 0.149
EPC Contractor: Concessionaire: I.E Representative:
Signature: Signature: Signature:

Name : Name : Name :

Designation : Designation : Designation :

Date : Date : Date :