BEFORE CASTING THE FOUNDATION VERIFY THE DIMENSIONS OF THE WIND SPEED (M/SEC) 44
FOUNDATION BOLT (DIA.& QTY.) AND ANCHOR PLATE (PCD) WITH BENDING MOMENT (T-M) 178.108
RESPECT TO THE DIMENSIONS MENTIONED IN THIS DRG. HORIZONTAL SHEAR (T) 6.181
VERTICAL LOAD (T) 8.755
MAX GR BEARING
PRESSURE (T/M2) 17.286
1900 88 nos 12 tor (T1) SAFETY FACTOR AGAINST
OVERTURNING 0.836
CONCRETE MIX VIBRATED M-25
MIN COVER (MM) 50
1900
1900
Nos.of hole/Dia.(mm) = 24 / 41
SECTIONAL ELEVATION
PCC (1:4:8)
100
2575
SECTIONAL ELEVATION T1 88 12 2995
4600 320
100
T2 152 10 4700
4500
1800
24 nos.
1800
Bolts T3 15 8 7392
4600
100
T4 44 10 4700
4500
QUANTITIES
22 nos 10 tor Bothways (T4) RCC PCC STEEL
76 nos 10 tor Bothways (T2) (M3) (M3) (kg)