VO 

for Concrete pipe foundation 

KEGIATAN :  Pembangunan SBM biogas Plant 
Client :  PT. Agro Bukit Central Kalimantan KONTRAKTOR : PT. KIS
Location  :  Pipe Support for Feeding , Recirrculation , Gas Line pipe 

No. Pekerjaan Tambah /VO
Mata Uraian Satuan Penambahan Pengurangan
 Harga Satuan   Remarks 
(Rupiah)   Jumlah Harga 
Kwantitas Kwantitas  Jumlah Harga (Rupiah) 
(Rupiah) 
Pembayaran
a b c g h i = (gxh) j k = (gxj) n
1 Pipe Support Foundation Tipe F ( Qty = 13)
Concrete ,rebar ,formwork etc M3             4.000.000,00               6,05          24.192.000,00                 ‐                                     ‐
Used for 
Footing size(1.2x1.2)                               ‐                              ‐                 ‐                                     ‐ pipe 
Column size(0.30x0.30)                               ‐                              ‐                 ‐                                     ‐ overflow Dia 
315 mm
P.C.C 100mm thk. M3             1.250.000,00               2,74            3.430.000,00

Earthwork M3 45.000,00               2,35               105.840,00                 ‐                                     ‐


Sandfilling M3                400.000,00               1,61               644.000,00                                     ‐

2 Pipe Support Foundation Tipe K ( Qty = 140)
Concrete ,rebar ,formwork etc M3             4.000.000,00             11,20          44.800.000,00                 ‐                                     ‐
Footing size(0,5x 0,4x 0,4)                               ‐                 ‐                              ‐                 ‐                                     ‐ Used for Gas 
P.C.C 100mm thk. M3             1.250.000,00               2,80            3.500.000,00 pipe line , 
feeding & 
Earthwork M3 45.000,00             16,80               756.000,00                 ‐                                     ‐ recirrculatio
Sandfilling M3                400.000,00               8,40            3.360.000,00                                     ‐ n pipe line 

(A) Jumlah Harga Pekerjaan      80.787.840,00                                     ‐

(D) Pembulatan

Approved By 