SATUAN KERJA : Pengembangan Air Minum ULP Satker Pengembangan Air Minum Provinsi Kalimantan Timur
PAKET PEKERJAAN : P/P PIPA HDPE DIA. 150 - 75 MM, Kec. Muara Jawaq
LOKASI : Kab. Kutai Barat
TAHUN ANGGARAN : 2016
I PEKERJAAN PERSIAPAN
1 Mobilisasi-Demobilisasi , Pengukuran & Pematokan Ls 1.00 25,000,000.00 25,000,000.00 1.00 25,000,000.00 Tetap
2 Pelaporan, Gambar (Shop Drawing+Asbuilt Drawing), Dokumentasi & Ls 1.00 15,000,000.00 15,000,000.00 1.00 15,000,000.00 Tetap
Administrasi Proyek
KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG CONTRACT CHANGE ORDER (CCO)
NO URAIAN PEKERJAAN SAT HARGA JUMLAH JUMLAH JUMLAH JUMLAH KETERANGAN
VOLUME SATUAN HARGA VOLUME HARGA VOLUME HARGA VOLUME HARGA
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 3 4 6 7 8 9 10 11 12 13
I PEKERJAAN PERSIAPAN
1 Mobilisasi-Demobilisasi , Pengukuran & Pematokan Ls 1.00 25,000,000.00 25,000,000.00 1.00 25,000,000.00 Tetap
2 Pelaporan, Gambar (Shop Drawing+Asbuilt Drawing), Dokumentasi & Ls 1.00 15,000,000.00 15,000,000.00 1.00 15,000,000.00 Tetap
Administrasi Proyek
SATUAN KERJA : Pengembangan Air Minum ULP Satker Pengembangan Air Minum Provinsi Kalimantan Timur
PAKET PEKERJAAN : P/P PIPA HDPE DIA. 150 - 75 MM, Kec. Muara Jawaq
LOKASI : Kab. Kutai Barat
TAHUN ANGGARAN : 2016
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
1 2 3
Jumlah 1,943,659,087.86
PPn 10% 194,365,908.79
Jumlah + PPn 10% 2,138,024,996.64
Dibulatkan 2,138,024,000.00
Terbilang : Dua Milyar Empat Ratus Empat Juta Sembilan Ratus Sembilan Puluh Sembilan Ribu Rupiah
Materai
-,Rp. 6.000
dan diberi tanggal
RUBAYANTI MAMONTO
DIREKTUR
DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : Pengembangan Air Minum ULP Satker Pengembangan Air Minum Provinsi Kalimantan Timur
PAKET PEKERJAAN : P/P PIPA HDPE DIA. 150 - 75 MM, Kec. Muara Jawaq
LOKASI : Kab. Kutai Barat
TAHUN ANGGARAN : 2016
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT SATUAN VOLUME HARGA
(Rp) (Rp)
1 2 3 5 5 6
I PEKERJAAN PERSIAPAN
1 Mobilisasi-Demobilisasi , Pengukuran & Pematokan Ls 25,000,000.00 1.00 25,000,000.00
2 Pelaporan, Gambar (Shop Drawing+Asbuilt Drawing), Dokumentasi & Ls 15,000,000.00 1.00 15,000,000.00
Administrasi Proyek
A Galian Tanah
1 Pekerja Biasa HO 0.7560 80,000.00 60,480.00
2 Mandor HO 0.0378 125,000.00 4,725.00
A Galian Tanah
1 Pekerja Biasa HO 0.3375 80,000.00 27,000.00
2 Mandor HO 0.0113 125,000.00 1,406.25
A Galian Tanah
1 Pekerja Biasa HO 0.2400 80,000.00 19,200.00
2 Mandor HO 0.0080 125,000.00 1,000.00
Kuantitas/ Jumlah
No Uraian Satuan Harga Satuan
Koefisien ( Rp )
( Rp )
1 2 3 4 5 6
A Tenaga Kerja
B Material
A TENAGA KERJA
1 Mandor HO 0.0330 125,000 4,125
Total A 77,825
B MATERIAL
Total B
C PERALATAN
1 Alat Bantu Ls 1.0000 15,000 15,000
Total C 15,000
Kuantitas/ Jumlah
No Uraian Satuan Harga Satuan
Koefisien ( Rp )
( Rp )
1 2 3 4 5 6
Kuantitas/ Jumlah
No Uraian Satuan Harga Satuan
Koefisien ( Rp )
( Rp )
1 2 3 4 5 6
Kuantitas/ Jumlah
No Uraian Satuan Harga Satuan
Koefisien ( Rp )
( Rp )
1 2 3 4 5 6
Harga Satuan
No. Uraian Satuan ( Rupiah )
1 2 3 4
A UPAH
1 Mandor HO 125,000.00
2 Kepala Tukang HO 120,000.00
3 Tukang HO 110,000.00
4 Pekerja Biasa HO 80,000.00
5 Pekerja Terlatih HO 96,000.00
6 Pembantu Tukang HO 80,000.00
7 Buruh Tak Terampil HO 75,000.00
8 Operator Terampil HO 120,000.00
B MATERIAL/BAHAN
B.1 Bahan Dinding dan Pondasi
1 Batu Gunung
2 Batu Padas M³ 125,000.00
3 Kerikil/Koral
4 Biasa M³ 195,000.00
5 Beton M³ 300,000.00
6 Timbunan M³ 137,500.00
7 Pasir
8 Pasangan M³ 125,000.00
9 Beton M³ 320,000.00
10 Urug M³ 100,000.00
11 Tanah Urug/Timbunan M³ 82,500.00
12 Batu Bata Bh 700.00
13 Semen Pc 50 Kg Kg 1,300.00
14 Semen Putih Kg 1,320.00
15 Minyak Begisting ltr 10,000.00
E.2. REDUCER
E.2.1 HDPE
1 Ø 300 x 250 mm Bh 1,238,400.00
2 Ø 300 x 200 mm Bh 1,238,400.00
3 Ø 300 x 150 mm Bh 1,238,400.00
4 Ø 300 x 100 mm Bh 1,238,400.00
5 Ø 250 x 200 mm Bh 1,061,400.00
6 Ø 250 x 150 mm Bh 1,061,400.00
7 Ø 250 x 100 mm Bh 1,061,400.00
8 Ø 200 x 150 mm Bh 884,600.00
9 Ø 200 x 100 mm Bh 884,600.00
10 Ø 150 x 100 mm Bh 638,400.00
11 Ø 150 x 75 mm Bh 638,400.00
12 Ø 100 x 75 mm Bh 266,700.00
13 Ø 100 x 50 mm Bh 266,700.00
14 Ø 75 x 50 mm Bh 201,900.00
E.3. TEE
E.3.1 HDPE
1 Ø 400 x 400 mm Bh 7,280,510.00
2 Ø 400 x 350 mm Bh 7,228,420.00
3 Ø 400 x 300 mm Bh 7,206,170.00
4 Ø 400 x 250 mm Bh 7,164,510.00
5 Ø 400 x 200 mm Bh 7,141,860.00
6 Ø 350 x 350 mm Bh 6,057,840.00
7 Ø 350 x 300 mm Bh 6,013,020.00
8 Ø 350 x 250 mm Bh 5,979,810.00
9 Ø 350 x 200 mm Bh 5,935,310.00
10 Ø 350 x 150 mm Bh 5,916,550.00
11 Ø 300 x 300 mm Bh 4,522,190.00
12 Ø 300 x 250 mm Bh 4,476,960.00
13 Ø 300 x 200 mm Bh 4,432,130.00
14 Ø 300 x 150 mm Bh 4,387,880.00
15 Ø 300 x 100 mm Bh 4,333,250.00
16 Ø 250 x 250 mm Bh 2,211,780.00
17 Ø 250 x 200 mm Bh 2,189,670.00
18 Ø 250 x 150 mm Bh 2,167,800.00
19 Ø 250 x 100 mm Bh 2,146,090.00
20 Ø 250 x 75 mm Bh 1,770,490.00
21 Ø 200 x 200 mm Bh 1,216,210.00
22 Ø 200 x 150 mm Bh 1,204,060.00
23 Ø 200 x 100 mm Bh 1,191,990.00
24 Ø 200 x 75 mm Bh 983,340.00
25 Ø 200 x 50 mm Bh 973,450.00
26 Ø 150 x 150 mm Bh 776,710.00
27 Ø 150 x 100 mm Bh 768,910.00
28 Ø 150 x 75 mm Bh 761,190.00
29 Ø 150 x 50 mm Bh 748,990.00
30 Ø 100 x 100 mm Bh 338,140.00
31 Ø 100 x 75 mm Bh 334,730.00
32 Ø 100 x 50 mm Bh 331,410.00
33 Ø 75 x 75 mm Bh 191,480.00
34 Ø 75 x 50 mm Bh 189,570.00
35 Ø 50 x 50 mm Bh 88,220.00
Harga Satuan
No. Uraian Satuan ( Rupiah )
E.3.2 ALL Flange (CI)
1 Ø 300 x 300 mm (CI) Bh 1,338,750.00
2 Ø 300 x 250 mm (CI) Bh 1,232,500.00
3 Ø 300 x 200 mm (CI) Bh 1,181,500.00
4 Ø 300 x 150 mm (CI) Bh 1,105,000.00
5 Ø 250 x 250 mm (CI) Bh 1,049,070.00
6 Ø 250 x 200 mm (CI) Bh 992,500.00
7 Ø 250 x 150 mm (CI) Bh 949,020.00
8 Ø 250 x 100 mm (CI) Bh 864,870.00
9 Ø 200 x 200 mm (CI) Bh 728,590.00
10 Ø 200 x 150 mm (CI) Bh 666,650.00
11 Ø 200 x 100 mm (CI) Bh 630,470.00
12 Ø 200 x 75 mm (CI) Bh 615,880.00
13 Ø 150 x 150 mm (CI) Bh 477,310.00
14 Ø 150 x 100 mm (CI) Bh 433,600.00
15 Ø 150 x 75 mm (CI) Bh 419,020.00
16 Ø 150 x 50 mm (CI) Bh 411,860.00
17 Ø 100 x 100 mm (CI) Bh 291,430.00
18 Ø 100 x 75 mm (CI) Bh 266,190.00
19 Ø 100 x 50 mm (CI) Bh 240,940.00
20 Ø 75 x 75 mm (CI) Bh 323,130.00
21 Ø 75 x 50 mm (CI) Bh 189,430.00
22 Ø 50 x 50 mm (CI) Bh 160,350.00
E.4 VALVE
E.4.1 GATE VALVE
1 Ø 450 mm, CI all flange ( PN 10 ) Bh 36,900,000.00
2 Ø 400 mm, CI all flange ( PN 10 ) Bh 28,700,000.00
3 Ø 350 mm, CI all flange ( PN 10 ) Bh 20,500,000.00
4 Ø 300 mm, CI all flange ( PN 10 ) Bh 17,589,000.00
5 Ø 250 mm, CI all flange ( PN 10 ) Bh 14,206,500.00
6 Ø 200 mm, CI all flange ( PN 10 ) Bh 9,471,000.00
7 Ø 150 mm, CI all flange ( PN 10 ) Bh 6,057,832.00
8 Ø 100 mm, CI all flange ( PN 10 ) Bh 3,630,550.00
9 Ø 75 mm, CI all flange ( PN 10 ) Bh 1,978,446.80
10 Ø 50 mm, CI all flange ( PN 10 ) Bh 1,332,840.30
E.4.3.2 Double
1 Ø 100 mm Bh 1,958,000.00
2 Ø 75 mm Bh 1,320,000.00
Harga Satuan
No. Uraian Satuan ( Rupiah )
E.9.1.2 Rubbering
1 Ø 300 mm Bh 545,820.00
2 Ø 250 mm Bh 443,025.00
3 Ø 200 mm Bh 368,390.00
4 Ø 150 mm Bh 172,700.00
5 Ø 100 mm Bh 104,280.00
6 Ø 75 mm Bh 58,080.00
7 Ø 50 mm Bh 31,120.00
E.9.2 CI/STEEL
1 Ø 200 mm Bh 312,530.00
2 Ø 150 mm Bh 214,390.00
3 Ø 100 mm Bh 163,075.00
4 Ø 75 mm Bh 141,460.00
5 Ø 50 mm Bh 125,070.00
E.9.3 HDPE
1 Ø 300 mm Bh 2,207,680.00
2 Ø 250 mm Bh 1,191,950.00
3 Ø 200 mm Bh 762,920.00
4 Ø 150 mm Bh 454,110.00
5 Ø 100 mm Bh 227,140.00
6 Ø 75 mm Bh 144,150.00
7 Ø 50 mm Bh 70,600.00
E.10 CONNECTOR
E.10.1 Stub Flange ( PE )
1 Ø 300 mm Bh 3,210,600.00
2 Ø 250 mm Bh 2,162,700.00
3 Ø 200 mm Bh 1,512,500.00
4 Ø 150 mm Bh 1,096,500.00
5 Ø 100 mm Bh 305,600.00
6 Ø 75 mm Bh 259,300.00
7 Ø 50 mm Bh 179,900.00
Harga Satuan
No. Uraian Satuan ( Rupiah )
TERDIRI DARI :
SDN 001 Malinau Selatan Hilir, SDN 005 Malinau Selatan Hilir, SDN 005
Malinau Selatan Hulu, SDN 005 Malinau Selatan, SMKN 1 Malinau, dan
SMPN 1 Sekatak Bulungan
LOKASI
SDN 001 MALINAU SELATAN HILIR
SCHEDULE PEKERJAAN
PEKERJAAN : REHABILITASI DAN RENOVASI SATUAN PENDIDIKAN DASAR DAN MENENGAH DI PROVINSI KALIMANTAN UTARA 4.
LOKASI : SD NEGERI 001 MALINAU SELATAN HILIR
TAHUN : 2019
B RKB LOKAL A
1 Pekerjaan Persiapan
1 Foto dokumentasi 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Pembuatan gudang semen dan alat-alat 4.08 2.04 2.04
3 Membersihkan lapangan dan perataan lokasi 0.20 0.20
2 Pekerjaan Tanah
3 Pekerjaan Pondasi Batu Gunung
4 Pekerjaan PasanganDinding
5 Pekerjaan Pembetonan
JANGKA WAKTU PELAKSANAAN 210 (Hari Kalender)
BOBOT
NO URAIAN PEKERJAAN BULAN KE - I BULAN KE - II BULAN KE - III BULAN KE - IV BULAN KE - V BULAN KE - VI KET
(%) 1-7 8-14 15-23 24-30 31-38 39-45 46-53 54-60 61-68 69-76 77-83 84-90 91-98 99-106 107-113 114-120 121-128 129-135 136-143 144-150 151-158 159-165 167-173 174-180
8 Pekerjaan Atap
9 Pekerjaan Pengecatan
1 Pengecatan bidang kayu baru 1 lapis plamir, 1 lapis cat dasr, 2 lapis cat penu 0.40 0.10 0.10 0.10 0.10
2 Pengecatan plapond plywood dan list kayu 1.14 0.57 0.57
3 Pengecatan tembok, kolom teras dan plat canopy baru 1 lps plamir,1 lps cat 0.30 0.10 0.10 0.10
10 Pekerjaan Penutup Lantai
1 Pasang lantai keramik 40 x 40 cm 9.06 3.02 3.02 3.02
2 Pasang lantai keramik untuk tangga 20x20 cm 0.22 0.22
11 Pekerjaan Langit-Langit -
1 Langit-langit plywood, tebal 3 mm 0.40 0.20 0.20
2 List langit-langit kayu profil 0.25 0.25
12 PekerjaanPengunci dan Kaca
1 Pasang kunci tanam YALE type 1 0.06 0.06
2 Pasang engsel kuningan pintu 0.03 0.03
3 pasang grendel pintu 0.01 0.01
4 Pasang pegangan pintu / door closer ( P.1 ) 0.05 0.05
13 Pekerjaan Elektrikal
-
C RKB LOKAL B
1 Pekerjaan Persiapan
1 Foto dokumentasi 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Pembuatan gudang semen dan alat-alat 4.08 2.04 2.04
3 Membersihkan lapangan dan perataan lokasi 0.20 0.20
2 Pekerjaan Tanah
3 Pekerjaan Pondasi Batu Gunung
4 Pekerjaan PasanganDinding
5 Pekerjaan Pembetonan
2 Tangga beton 1Pc:3Ps:5Kr 0.11 0.11
6 Pekerjaan Plesteran
1 Plesteran Dinding 1 Pc : 4 Ps, tebal 15 mm 0.53 0.26 0.26
2 Memasang Dinding Acian Kolom Beton, Dinding dan Canopy 0.35 0.18 0.18
7 Pekerjaan Kayu
1 Pasang pintu panil kayu kapur 0.25 0.12 0.12
2 Pasang rangka langit-langit meter kayu kapur 0.82 0.41 0.41
8 Pekerjaan Atap
9 Pekerjaan Pengecatan
1 Pengecatan bidang kayu baru 1 lapis plamir, 1 lapis cat dasr, 2 lapis cat penu 0.40 0.10 0.10 0.10 0.10
2 Pengecatan plapond plywood dan list kayu 1.14 0.57 0.57
JANGKA WAKTU PELAKSANAAN 210 (Hari Kalender)
BOBOT
NO URAIAN PEKERJAAN BULAN KE - I BULAN KE - II BULAN KE - III BULAN KE - IV BULAN KE - V BULAN KE - VI KET
(%) 1-7 8-14 15-23 24-30 31-38 39-45 46-53 54-60 61-68 69-76 77-83 84-90 91-98 99-106 107-113 114-120 121-128 129-135 136-143 144-150 151-158 159-165 167-173 174-180
3 Pengecatan tembok, kolom teras dan plat canopy baru 1 lps plamir,1 lps cat 0.30 0.10 0.10 0.10
10 Pekerjaan Penutup Lantai
1 Pasang lantai keramik 40 x 40 cm 9.06 3.02 3.02 3.02
2 Pasang lantai keramik untuk tangga 20x20 cm 0.22 0.22
11 Pekerjaan Langit-Langit -
1 Langit-langit plywood, tebal 3 mm 0.40 0.20 0.20
2 List langit-langit kayu profil 0.25 0.25
12 PekerjaanPengunci dan Kaca
1 Pasang kunci tanam YALE type 1 0.06 0.06
2 Pasang engsel kuningan pintu 0.03 0.03
3 pasang grendel pintu 0.01 0.01
4 Pasang pegangan pintu / door closer ( P.1 ) 0.05 0.05
13 Pekerjaan Elektrikal
JUMLAH 100.0
BOBOT RENCANA (%) 5.53 7.33 6.10 1.43 1.46 3.56 2.22 1.87 5.47 2.29 2.75 4.16 1.89 3.59 4.33 3.96 2.46 1.56 3.06 2.78 1.65 8.03 11.58 8.72 0.84 1.38
AKUMULATIF BOBOT RENCANA (%) 5.53 12.87 18.97 20.40 21.86 25.42 27.64 29.50 34.97 37.26 40.01 44.17 46.06 49.65 53.98 57.93 60.39 61.95 65.01 67.79 69.44 77.48 89.06 97.78 98.62 100.00
BOBOT REALISASI (%) 3.89 5.03 4.08 3.45 12.91 5.80 5.33 7.39 2.99 1.46 0.83 4.47 3.95 4.07 0.60 0.32 3.63 3.32 3.69 0.26 3.84 1.81 2.53 0.00 0.00 0.00
AKUMULATIF BOBOT REALISASI (%) 3.89 8.92 13.00 16.45 43.72 49.52 54.85 62.24 65.24 66.69 67.52 71.99 75.94 80.01 80.60 80.92 84.55 87.86 91.55 91.81 95.65 97.46 99.99 99.99 100.00 100.00
DEVIASI (%) (1.65) (3.95) (5.97) (3.95) 21.86 24.10 27.22 32.74 30.26 29.43 27.51 27.81 29.87 30.36 26.63 22.98 24.16 25.91 26.54 24.02 26.21 19.98 10.93 2.21 1.38 -
Dibuat Oleh :
PT. BATARA GURU GROUP
MUAMMAR KHADAVI, ST
Direktur