Professional Documents
Culture Documents
5. 6. 8.
I PEKERJAAN PERSIAPAN : 313.540,00
1/2
RAB POS SECURITY.xls.pdf
1 Pas. Pipa Leiding PVC dia 3/4" + Accessories M' 6,000 11.680,00 70.080,00
2 Pas. Kran Leiding 0 1/2" BH 1,000 39.340,00 39.340,00
4 Pas. Pipa pembuangan :
- Sal Tinja pipa PVC dia 4" M' 6,000 38.840,00 233.040,00
- Sal air kotor bawah lantai PVC dia 3" M' 8,000 33.310,00 266.480,00
5 Pas. Closet Jongkok ex INA BH 1,000 125.000,00 125.000,00
6 Pas. septiktank lengkap BH 1,000 1.000.000,00 1.000.000,00
7 Pas. Sumur resapan BH 1,000 750.000,00 750.000,00
8 Pas. Floor Drain Bh 1,000 45.000,00 45.000,00
9 Water torn 1 m3 BH 1,000 1.300.000,00 1.300.000,00
10 Sumur bor + casing + pompa Bh 1,000 8.000.000,00 8.000.000,00
E. PEKERJAAN PENGECATAN 1.463.209,44
2/2