Prices quoted are on lumpsum basis. It was specifically discussed with GE officials to provide
individual / split pricing as discussed during the 14th April meeting and reiterated through mail
dated 13/05/2011. Despite the same the split pricing has NOT been provided. It is requested to
provide the split pricing as per the following:
1) Gas Conversion hardware (without SPRINT) alongwith gas filters:
2) Gas Conversion hardware (with SPRINT) alongwith gas filters:
3) Control system and its upgrade to Micronet +:
a) Complete Hardware with detailing & Specs
b) Softwares (including System 1 as platform + Performance (EMAP+GC) and Vibration
diagnostic modules)
1 Pricing 2
c) EX2100
4) De-Nox system hardware:
5) Complete Manpower cost (should be ALL INCLUSIVE, including travel, out of pocket, etc, etc.)
related to complete activities of engineering, erection, including combustor replacement,
commissioning, trouble shooting, completion of punch list points, performance demonstration:
6) BKPL has 5 combustors meant for Naphtha operation with water injection. These would be
required to be changed to Gas operation with water injection. GE to indicate the prices for :
a) Changing the combustors for Gas operation with water injection (G42)
b) GE to take these combustors and supply NEW combustors
7) Fire and gas detection system design, supply, implementaton and commissioning
Fuel gas conversion from Liquid & water to gas & water and Control System Upgrade
GE Proposal NO.714283B dt 18th May 2011
Sl no Section Sub Section Customer comments Customer comment
Degradation curves for a standard LM6000PC engine with respect to operating hours:
We have received degradation curve for ISO condition and for 25 ppm NOx on Gas, while all our
discussions during site meeting on 14th Apr11, were centered around BKPL Site and 50 ppm NOx.
In view of above, please provide similar degradation curves [for a) POWER, b) HEAT RATE; c)
EXHUAST ENTHALPY] on GAS and NAPHTHA considering the following:
1(c) DESIGN
1) BKPL Site conditions: Attached in adjacent xls worksheet
2) NOx 50 ppm
3) With Chill (NO Sprint) ON Gas as well as Naphtha
4) With SPRINT (NO Chill, Or Partial Chill as you have considered in the APPS run attached
below) ON Gas as well as Naphtha
GE to specify the relevant design and manufacturing code and standards for all items that are
covered unders scope of supply such as tubes and piping, flanges, vessels, valves, field
4 Pricing 2.1.6
instruments/sensors/cables, softwares, electric cables, cards, panels, computers and other electric
and electronic hardware, etc
Fuel gas conversion from Liquid & water to gas & water and Control System Upgrade
GE Proposal NO.714283B dt 18th May 2011
Sl no Section Sub Section Customer comments Customer comment
Payment schedule to have successful commissioning and PG test as one of the milestones as
5 Pricing 2.2
discussed during the 14th April meeting. However the same is NOT reflected in the offer.
Completion of technical advisory services is defined as the material completion of installation of the
GE scope of supplied equipments.Completion of TA services to be modified as successful
commissioning, in cluding performance demonstration of the unit in every aspect. This was
6 Pricing 2.2 discussed during the meeting on 14th April but the same is NOT reflected in the offer.
Payment has to be linked with certain milestones achieved for material supplies as well as site
progress achieved. Detailed terms would be discussed during the meeting at RPower Office at
DAKC, Mumbai.
Fuel gas conversion from Liquid & water to gas & water and Control System Upgrade
GE Proposal NO.714283B dt 18th May 2011
Sl no Section Sub Section Customer comments Customer comment
Depot visit of the engine, whether it is required for SPRINT conversion? There was no mention of
Delivery ,title
this requirement in the original offer or during the 14th April meeting. It is understood that the
7 transfer and risk of 3.1
SPRINT conversion for all the machines at GMR was done at site only. BKPL doesn't intend to
loss
send the machine to depot for SPRINT conversion.
Delivery ,title This is a comprehensive contract to GE which include design, supply, erection and commissioning
8 transfer and risk of 3.2 by ONE party as far as BKPL is concerned. Hence the Title trasnfer of service can be completed
loss ONLY when the successful performance demonstration and handing over the unit has taken place.
Delivery ,title
9 transfer and risk of 3.3.1 Project time schedule has to be firm ie. 12 months from date of placement of order.
loss
We understand that there are three gas filter skid (one each of a GT) and filters are duplex filters,
complete with isoltation valves, autochangeover valves with manual override, venting and draining
12 Attachment 1 A arrangement and field instrumentation and transmitters for hooking up the required signals (such as
dp, valve positions and torque switches, etc) for monitoring, operation, alarm and control) to the
GTG control system. GE to confirm the same. Also refer sr. no. (2) above for providing the details.
For an improved power output as part of this proposal the seller will fit both turbines with fixed
15 Attachment 1 A
IGVs at -5 degree - Whether the offer is inclusive of these two FIGVs ?
Fuel gas conversion from Liquid & water to gas & water and Control System Upgrade
GE Proposal NO.714283B dt 18th May 2011
Sl no Section Sub Section Customer comments Customer comment
Heat rate improvement for -5 deg FIGV as compared to 0 deg FIGV if any is to be confirmed by
16 Attachment 1 A
GE. Increased power output without heat rate improvement is not of interest to BKPL
Water injection for Nox abatement-GE has not quoted for new Denox pumps as an optional item as
17 Attachment 1 A requested (It can't be made out of the offer ).It is assumed that existing Nox injection pump can be
reused.GE to specify the injection water pressure requirements
No performance guarantees are included in the revised though it was informed during the 14th April
meeting that GE would give the performance guarantees after assessing the latest engine data and
21 Attachment 1 B
applicable degradation. BKPL has already supplied HS data for the GTGs (except 191-101) thru
email dated 04/05/2011.
Fuel gas conversion from Liquid & water to gas & water and Control System Upgrade
GE Proposal NO.714283B dt 18th May 2011
Sl no Section Sub Section Customer comments Customer comment
1) Redundancy of Critical IO at card level is not mentioned. GE to provide the list of critical IOs as
22 A Attachment 1 C
requested during the 14th April meeting
3) Are On/Off feedback of critical drives considered in the offer? Actual on/off feedback of critical
22 C Attachment 1 C drives are not configured in exisiting system (Generator lub oil pump, Jacking oil Pump, Turning
gear etc). Total 16 no of feed back should be configured.
22 D Attachment 1 C 4) GE to let BKPL know if soft start/stop feature for critical drives can be provided in the HMI.
Fuel gas conversion from Liquid & water to gas & water and Control System Upgrade
GE Proposal NO.714283B dt 18th May 2011
Sl no Section Sub Section Customer comments Customer comment
EMAP scope of supply should include major equipments such as cooling water, boiler feed and
25 A Attachment 1 D condensate extraction pumps, De-Nox & SPRINT pumps, Chillers, compressors, blowers, Cooling
Tower cells, and transformers, etc
72 hour test run after gas conversion should be a test run to demonstrate performance as per
27 Attachment 1 F
guarantee in addition to proving the reliability as mentioned in the revised offer
Fuel gas conversion from Liquid & water to gas & water and Control System Upgrade
GE Proposal NO.714283B dt 18th May 2011
Sl no Section Sub Section Customer comments Customer comment
Scope of Attachment-2
39
Responsibility page 103 and 104
Seller excludes the capability to ‘hot swap’ modules within the control system while the unit is
40 Controls Page 119 running. Any board failures or removal while thecontrol system is operating issues FSLO Fast Stop
Lock Out logic to shut the turbine down.
Note
1.Comments upto Sl number 38 refers to GE offer (714823B) dated June 2011
2.Comments 39&40 refers to GE offer(71823C) dated 13th Sep
Date :19th Sep 2011
GE feeback BKPL comments based on GE proposal ( Mark VIe )
Project leadtime between PO acceptance and installation GE to consider further reducing the delivery time to around 10
start of the 1st unit is 12 month. months
Three duplex gas filter skids are part of the scope (one each
GE to confirm if the inlet and outlet valves of gas filter are of
GT).
double block and bleed (for positive isolation).If not please
Please find attached filter schematic drawing for your
make provision for the same
reference - GE gas filter schematic drawing.pdf
GE recommendation is to use new Water Injection pumps, 100 % redundancy required for all the three units.GE to let
one per unit. The new pumps were included in the BKPL know what will be the incremental cost for 100%
previous offering. redundancy
Please find expected delta performances after the gas The attached performance curves don't indicate any delta
conversion for both Sprinted and non-Sprinted scenario. performance either for power or for heat rate .GE to guarantee
However correction method, related tolerance range and performance both for power and heat rate based on present
test method is still being worked out by GE. engine condition
Date :19th Sep 2011
GE feeback BKPL comments based on GE proposal ( Mark VIe )
During the April 14 meeting the discussion was about
LinkNet card redundancy in the MTTB. GE has confirmed BKPL's requirement is to incorporate redundancy at card level
during the meeting, that such redundancy can't be without doing any modification to the signals (Duplex IO
implemented on BSES unit. modules) for GTS and STG.GE to revert back if further should
The level of redundancy of the I/O card will be according further clarity on the subject is required
to the existing signal redundancy.
2. Mark VIe
Gas Turbine Controls, 3 units: $ 2,776,450.00
Plant DCS total: $ 1,642,790.00
Noted
3. EMAP: $ 326,520.00
6. As per point 19
Date: 12th Oct 2011
GE Comments BKPL COMENTS
Post major overhaul, Power and heat rate is expected to regain with
Noted
2-3% of new engine performance levels
Motors in Sprint skid and Water Injection skid are ATEX Zone 2
certified. Noted
Intrinsically safe equipment is not part of the scope of supply.
Date: 12th Oct 2011
GE Comments BKPL COMENTS
As per point 5
Date: 12th Oct 2011
GE Comments BKPL COMENTS
As per point 5
Inlet and outlet valves of the gas filter are double block and bleed.
The block and bleed system is bleeding to the atmosphere.
Seller experience shows that the switch in fuels will not cause
differences in the turbine performance.
Without the Sprint system:
Seller grants to maintain the same level of performance as before the
conversion.
With the Sprint system:
Seller grants to maintain the same level of performance as before the
gas conversion, while maintaining higher T2 than without the Sprint
(Buyer will be able to save aux power)
Date: 12th Oct 2011
GE Comments BKPL COMENTS
The level of redundancy of the I/O card will be according to the
existing signal redundancy. If customer doesn’t have redundant
sensors then customer doesn’t need redundant cards. For example
customer do have T3 redundancy - so we split the sensors on
different cards. GE has quoted dual controllers as part of
redundancy.
1. Provision for Manual entry can be given, however, Seller does not
recommend manual entry of critical data which is used for doing
online calculation, since the calculation frequency is around 10 mins
and it is tough to enter the data that frequently which can lead to
inaccuracy of result. If the data is not critical like Gas Composition it
can be entered manually whenever there is a change.
2. Please clarify request. The GateCycle version that we include in
EfficiencyMap is only for EfficiencyMap calculations and it is not
available to the end-user for any modification.
1) Typo by GE.
Correct wording sounds 'Install Standard Gas Combustor,Fuel
Nozzles and Gas-Water Manifolds'
Combustor exchange is GE Scope
2) Please clarify concern