OTR Korean Furniture is operating in Davao City producing tables, chairs
cabinets and other custom-made furniture whose 12-month demand cycle is shown below. OTR produces tables on a make to stock basis. Each unit of table requires 10 worker-hours to be produced at a labor cost of P 60.00 per hour (regular rate) and P 70.00 overtime cost per hour. The total cost per unit is estimated at P 6,500.00. Units also can be subcontracted at P 6,700 per unit. There are currently 18 workers employed in the production department. To hire additional workers entail hiring and training costs of P 6,800.00 per person. OTR Korean Furniture maintains a policy of retaining a safety stock equal to 20% of the monthly forecast. Currently, the beginning inventory as of January is 50 units of tables at a cost of P 85.00 per unit per month. Stock outs will be assigned to a cost of P 6,500.00 per unit per month. The safety stock of the month is already the given volume as the beginning inventory of the following month. In an instance of excessive volume, sub-contracting can be done at a cost of P 1,100 per unit. Month FCast Workdays Work Hours (@ 8 hrs/day) Jan 300 22 176 Feb 380 19 152 Mar 360 21 168 Apr 260 21 168 May 250 22 176 Jun 300 20 160 Jul 350 20 160 Aug 230 21 168 Sep 350 20 160 Oct 370 21 168 Nov 380 20 160 Dec 430 17 136 Three aggregate plans are proposed, compare the three and identify which among the choices is the best alternative based on the parameter-lowest cost.
Aggregate Plan 1 Hire additional Workforce for each month needing
manpower, zero overtime. Aggregate Plan 2 Maintain a constant of 18 workers and use overtime for excess requirement. (The maximum limit of OT hours per person is 8 hours OT per day per person)
Aggregate Plan 3 Hire Sub-contractor for excess volume ensure zero
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
SRL Date On Pgmano Duno Pre-Assembly PLCMNT in Position Alignment Weld/Bolt/Fix NDT/SR/HT Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs