You are on page 1of 22

INDWeLL CONSTrUCTIONS PrIVATe LIMITeD

Unit # 1x800 MW,Stage-V


Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 02 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 01/08/2017 35-130 003 1.00 12887.646 1.00 12887.646 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 12887.646 12887.646 0.000 0.000 0.000
1 01/08/2017 35-322 079 1.00 1420.460 1.00 1420.460 0.00 0.000 0.00 0.000 0.00 0.000
2 01/08/2017 35-322 093 1.00 477.890 1.00 477.890 0.00 0.000 0.00 0.000 0.00 0.000
3 01/08/2017 35-322 106 2.00 116.110 2.00 116.110 0.00 0.000 0.00 0.000 0.00 0.000
4 01/08/2017 35-322 107 3.00 219.610 3.00 219.610 0.00 0.000 0.00 0.000 0.00 0.000
5 01/08/2017 35-322 114 1.00 154.490 1.00 154.490 0.00 0.000 0.00 0.000 0.00 0.000
6 01/08/2017 35-322 120 1.00 171.380 1.00 171.380 0.00 0.000 0.00 0.000 0.00 0.000
7 01/08/2017 35-322 127 1.00 225.410 1.00 225.410 0.00 0.000 0.00 0.000 0.00 0.000
8 01/08/2017 35-322 141 1.00 100.700 1.00 100.700 0.00 0.000 0.00 0.000 0.00 0.000
9 01/08/2017 35-322 142 1.00 122.430 1.00 122.430 0.00 0.000 0.00 0.000 0.00 0.000
10 01/08/2017 35-322 143 1.00 97.420 1.00 97.420 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 3105.900 3105.900 0.000 0.000 0.000
1 01/08/2017 35-452 006 1.00 2769.380 1.00 2769.380 0.00 0.000 0.00 0.000 0.00 0.000
2 01/08/2017 35-452 007 1.00 2049.900 1.00 2049.900 0.00 0.000 0.00 0.000 0.00 0.000
3 01/08/2017 35-452 013 1.00 1297.410 1.00 1297.410 0.00 0.000 0.00 0.000 0.00 0.000
4 01/08/2017 35-452 019 1.00 1409.650 1.00 1409.650 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 7526.340 7526.340 0.000 0.000 0.000
Day Total in MT 23.520 23.520 0.000 0.000 0.000
Total for the Month in MT 23.520 23.520 0.000 0.000 0.000
Cumulative Total in MT 1305.717 1305.717 656.342 257.002 0.000

Page 1 of 22
Wt. in Kgs

Page 2 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE03 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 02/08/2017 35-381 002 2.00 20.960 2.00 20.960 0.00 0.000 0.00 0.000 0.00 0.000
2 02/08/2017 35-381 003 4.00 795.680 4.00 795.680 0.00 0.000 0.00 0.000 0.00 0.000
3 02/08/2017 35-381 004 6.00 95.720 6.00 95.720 0.00 0.000 0.00 0.000 0.00 0.000
4 02/08/2017 35-381 005 3.00 60.801 3.00 60.801 0.00 0.000 0.00 0.000 0.00 0.000
5 02/08/2017 35-381 006 2.00 349.640 2.00 349.640 0.00 0.000 0.00 0.000 0.00 0.000
6 02/08/2017 35-381 008 1.00 170.130 1.00 170.130 0.00 0.000 0.00 0.000 0.00 0.000
7 02/08/2017 35-381 009 1.00 170.130 1.00 170.130 0.00 0.000 0.00 0.000 0.00 0.000
8 02/08/2017 35-381 014 1.00 165.400 1.00 165.400 0.00 0.000 0.00 0.000 0.00 0.000
9 02/08/2017 35-381 015 2.00 583.730 2.00 583.730 0.00 0.000 0.00 0.000 0.00 0.000
10 02/08/2017 35-381 016 2.00 602.220 2.00 602.220 0.00 0.000 0.00 0.000 0.00 0.000
11 02/08/2017 35-381 019 1.00 15.800 1.00 15.800 0.00 0.000 0.00 0.000 0.00 0.000
12 02/08/2017 35-381 020 1.00 170.595 1.00 170.595 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 3200.806 3200.806 0.000 0.000 0.000
1 02/08/2017 35-821 001 1.00 461.140 1.00 461.140 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 461.140 461.140 0.000 0.000 0.000
Day Total in MT 3.662 3.662 0.000 0.000 0.000
Total for the Month in MT 27.182 27.182 0.000 0.000 0.000
Cumulative Total in MT 1309.379 1309.379 656.342 257.002 0.000

Page 3 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 04 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 03/08/2017 35-381 005 12.00 243.205 12.00 243.205 0.00 0.000 0.00 0.000 0.00
2 03/08/2017 35-381 007 6.00 112.930 6.00 112.930 0.00 0.000 0.00 0.000 0.00
Sub Total 356.135 356.135 0.000 0.000
1 03/08/2017 35-382 014 1.00 12.095 1.00 12.095 0.00 0.000 0.00 0.000 0.00
2 03/08/2017 35-382 017 1.00 164.825 1.00 164.825 0.00 0.000 0.00 0.000 0.00
3 03/08/2017 35-382 022 3.00 47.715 3.00 47.715 0.00 0.000 0.00 0.000 0.00
4 03/08/2017 35-382 024 1.00 170.005 1.00 170.005 0.00 0.000 0.00 0.000 0.00
5 03/08/2017 35-382 025 1.00 294.460 1.00 294.460 0.00 0.000 0.00 0.000 0.00
6 03/08/2017 35-382 026 1.00 264.410 1.00 264.410 0.00 0.000 0.00 0.000 0.00
Sub Total 953.510 953.510 0.000 0.000
1 03/08/2017 35-821 005 1.00 427.700 1.00 427.700 0.00 0.000 0.00 0.000 0.00
Sub Total 427.700 427.700 0.000 0.000
Day Total in MT 1.737 1.737 0.000 0.000
Total for the Month in MT 28.919 28.919 0.000 0.000
Cumulative Total in MT 1311.116 1311.116 656.342 257.002

Page 4 of 22
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 5 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 05 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 04/08/2017 35-382 001 1.00 1348.480 1.00 1348.480 0.00 0.000 0.00 0.000 0.00
2 04/08/2017 35-382 012 1.00 981.420 1.00 981.420 0.00 0.000 0.00 0.000 0.00
Sub Total 2329.900 2329.900 0.000 0.000
Day Total in MT 2.330 2.330 0.000 0.000
Total for the Month in MT 31.249 31.249 0.000 0.000
Cumulative Total in MT 1313.446 1313.446 656.342 257.002

Page 6 of 22
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000

Page 7 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 07 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 05/08/2017 35-382 031 1.00 2015.440 1.00 2015.440 0.00 0.000 0.00 0.000 0.00
Sub Total 2015.440 2015.440 0.000 0.000
Day Total in MT 2.015 2.015 0.000 0.000
Total for the Month in MT 33.265 33.265 0.000 0.000
Cumulative Total in MT 1315.462 1315.462 656.342 257.002

Page 8 of 22
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000

Page 9 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 08 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 07/08/2017 35-382 048 1.00 1624.420 1.00 1624.420 0.00 0.000 0.00 0.000 0.00
Sub Total 1624.420 1624.420 0.000 0.000
Day Total in MT 1.624 1.624 0.000 0.000
Total for the Month in MT 34.889 34.889 0.000 0.000
Cumulative Total in MT 1317.086 1317.086 656.342 257.002

Page 10 of 22
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000

Page 11 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 09 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 08/08/2017 35-111 002 1.00 7760.224 1.00 7760.224 0.00 0.000 0.00 0.000 0.00
Sub Total 7760.224 7760.224 0.000 0.000
1 08/08/2017 35-121 002 1.00 7760.224 1.00 7760.224 0.00 0.000 0.00 0.000 0.00
Sub Total 7760.224 7760.224 0.000 0.000
1 08/08/2017 35-130 010 1.00 12887.646 1.00 12887.646 0.00 0.000 0.00 0.000 0.00
Sub Total 12887.646 12887.646 0.000 0.000
1 08/08/2017 35-140 031 1.00 5193.460 1.00 5193.460 0.00 0.000 0.00 0.000 0.00
Sub Total 5193.460 5193.460 0.000 0.000
1 08/08/2017 35-150 030 1.00 5193.460 1.00 5193.460 0.00 0.000 0.00 0.000 0.00
Sub Total 5193.460 5193.460 0.000 0.000
1 08/08/2017 35-512 004 1.00 3288.350 1.00 3288.350 0.00 0.000 0.00 0.000 0.00
2 08/08/2017 35-512 005 1.00 3288.350 1.00 3288.350 0.00 0.000 0.00 0.000 0.00
Sub Total 6576.700 6576.700 0.000 0.000
Day Total in MT 45.372 45.372 0.000 0.000
Total for the Month in MT 80.261 80.261 0.000 0.000
Cumulative Total in MT 1362.458 1362.458 656.342 257.002

Page 12 of 22
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 13 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 10 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 09/08/2017 35-311 001 0.00 0.000 0.00 0.000 1.00 274.450 0.00 0.000 0.00
2 09/08/2017 35-311 001 0.00 0.000 0.00 0.000 0.00 0.000 1.00 274.450 0.00
3 09/08/2017 35-311 002 0.00 0.000 0.00 0.000 1.00 286.120 0.00 0.000 0.00
4 09/08/2017 35-311 002 0.00 0.000 0.00 0.000 0.00 0.000 1.00 286.120 0.00
5 09/08/2017 35-311 003 0.00 0.000 0.00 0.000 1.00 219.940 1.00 219.940 0.00
6 09/08/2017 35-311 004 0.00 0.000 0.00 0.000 1.00 263.920 1.00 263.920 0.00
7 09/08/2017 35-311 005 0.00 0.000 0.00 0.000 1.00 387.370 1.00 387.370 0.00
8 09/08/2017 35-311 006 0.00 0.000 0.00 0.000 1.00 773.300 1.00 773.300 0.00
9 09/08/2017 35-311 007 0.00 0.000 0.00 0.000 1.00 230.460 1.00 230.460 0.00
10 09/08/2017 35-311 008 0.00 0.000 0.00 0.000 1.00 297.680 1.00 297.680 0.00
11 09/08/2017 35-311 009 0.00 0.000 0.00 0.000 1.00 682.030 1.00 682.030 0.00
12 09/08/2017 35-311 010 0.00 0.000 0.00 0.000 1.00 404.170 1.00 404.170 0.00
13 09/08/2017 35-311 011 0.00 0.000 0.00 0.000 1.00 338.420 1.00 338.420 0.00
14 09/08/2017 35-311 012 0.00 0.000 0.00 0.000 1.00 1831.760 1.00 1831.760 0.00
15 09/08/2017 35-311 013 0.00 0.000 0.00 0.000 1.00 968.920 1.00 968.920 0.00
16 09/08/2017 35-311 014 0.00 0.000 0.00 0.000 1.00 1420.710 1.00 1420.710 0.00
17 09/08/2017 35-311 016 0.00 0.000 0.00 0.000 1.00 1246.100 1.00 1246.100 0.00
18 09/08/2017 35-311 017 0.00 0.000 0.00 0.000 1.00 1246.100 1.00 1246.100 0.00
19 09/08/2017 35-311 018 0.00 0.000 0.00 0.000 1.00 1420.460 1.00 1420.460 0.00
20 09/08/2017 35-311 019 0.00 0.000 0.00 0.000 1.00 1420.460 1.00 1420.460 0.00
21 09/08/2017 35-311 020 0.00 0.000 0.00 0.000 1.00 904.590 1.00 904.590 0.00
22 09/08/2017 35-311 021 0.00 0.000 0.00 0.000 1.00 439.190 1.00 439.190 0.00
23 09/08/2017 35-311 022 0.00 0.000 0.00 0.000 1.00 356.850 1.00 356.850 0.00
24 09/08/2017 35-311 023 0.00 0.000 0.00 0.000 1.00 253.700 1.00 253.700 0.00
25 09/08/2017 35-311 024 0.00 0.000 0.00 0.000 1.00 265.220 1.00 265.220 0.00
26 09/08/2017 35-311 025 0.00 0.000 0.00 0.000 2.00 557.510 2.00 557.510 0.00
27 09/08/2017 35-311 026 0.00 0.000 0.00 0.000 1.00 278.660 1.00 278.660 0.00
28 09/08/2017 35-311 027 0.00 0.000 0.00 0.000 1.00 303.350 1.00 303.350 0.00
29 09/08/2017 35-311 028 0.00 0.000 0.00 0.000 1.00 277.180 1.00 277.180 0.00
30 09/08/2017 35-311 031 0.00 0.000 0.00 0.000 3.00 223.900 3.00 223.900 0.00
31 09/08/2017 35-311 035 0.00 0.000 0.00 0.000 1.00 70.780 1.00 70.780 0.00
32 09/08/2017 35-311 036 0.00 0.000 0.00 0.000 1.00 75.870 1.00 75.870 0.00
33 09/08/2017 35-311 042 0.00 0.000 0.00 0.000 2.00 207.900 2.00 207.900 0.00
34 09/08/2017 35-311 043 0.00 0.000 0.00 0.000 1.00 111.410 1.00 111.410 0.00
35 09/08/2017 35-311 044 0.00 0.000 0.00 0.000 1.00 219.550 1.00 219.550 0.00
36 09/08/2017 35-311 047 0.00 0.000 0.00 0.000 1.00 277.370 1.00 277.370 0.00
37 09/08/2017 35-311 048 0.00 0.000 0.00 0.000 1.00 74.630 1.00 74.630 0.00
38 09/08/2017 35-311 050 0.00 0.000 0.00 0.000 1.00 940.040 1.00 940.040 0.00
39 09/08/2017 35-311 059 0.00 0.000 0.00 0.000 1.00 152.040 1.00 152.040 0.00
40 09/08/2017 35-311 060 0.00 0.000 0.00 0.000 1.00 231.900 1.00 231.900 0.00
41 09/08/2017 35-311 061 0.00 0.000 0.00 0.000 1.00 132.800 1.00 132.800 0.00
42 09/08/2017 35-311 062 0.00 0.000 0.00 0.000 1.00 155.040 1.00 155.040 0.00
43 09/08/2017 35-311 065 0.00 0.000 0.00 0.000 1.00 125.070 1.00 125.070 0.00
44 09/08/2017 35-311 066 0.00 0.000 0.00 0.000 1.00 120.940 1.00 120.940 0.00
45 09/08/2017 35-311 067 0.00 0.000 0.00 0.000 1.00 118.110 1.00 118.110 0.00
46 09/08/2017 35-311 068 0.00 0.000 0.00 0.000 1.00 124.980 1.00 124.980 0.00
47 09/08/2017 35-311 069 0.00 0.000 0.00 0.000 1.00 122.770 1.00 122.770 0.00
48 09/08/2017 35-311 070 0.00 0.000 0.00 0.000 1.00 123.150 1.00 123.150 0.00
49 09/08/2017 35-311 071 0.00 0.000 0.00 0.000 1.00 119.190 1.00 119.190 0.00
50 09/08/2017 35-311 072 0.00 0.000 0.00 0.000 1.00 129.170 1.00 129.170 0.00
51 09/08/2017 35-311 073 0.00 0.000 0.00 0.000 1.00 124.560 1.00 124.560 0.00
52 09/08/2017 35-311 074 0.00 0.000 0.00 0.000 1.00 113.730 1.00 113.730 0.00
53 09/08/2017 35-311 075 0.00 0.000 0.00 0.000 1.00 120.550 1.00 120.550 0.00
54 09/08/2017 35-311 076 0.00 0.000 0.00 0.000 1.00 116.360 1.00 116.360 0.00
55 09/08/2017 35-311 077 0.00 0.000 0.00 0.000 1.00 116.670 1.00 116.670 0.00
56 09/08/2017 35-311 078 0.00 0.000 0.00 0.000 1.00 94.480 1.00 94.480 0.00
57 09/08/2017 35-311 080 0.00 0.000 0.00 0.000 1.00 127.240 1.00 127.240 0.00
58 09/08/2017 35-311 081 0.00 0.000 0.00 0.000 1.00 116.210 1.00 116.210 0.00
59 09/08/2017 35-311 082 0.00 0.000 0.00 0.000 1.00 44.410 1.00 44.410 0.00
60 09/08/2017 35-311 083 0.00 0.000 0.00 0.000 1.00 44.380 1.00 44.380 0.00
61 09/08/2017 35-311 084 0.00 0.000 0.00 0.000 1.00 62.350 1.00 62.350 0.00
62 09/08/2017 35-311 085 0.00 0.000 0.00 0.000 1.00 81.280 1.00 81.280 0.00
63 09/08/2017 35-311 086 0.00 0.000 0.00 0.000 1.00 80.180 1.00 80.180 0.00
64 09/08/2017 35-311 087 0.00 0.000 0.00 0.000 1.00 81.320 1.00 81.320 0.00

Page 14 of 22
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
65 09/08/2017 35-311 088 0.00 0.000 0.00 0.000 1.00 76.820 1.00 76.820 0.00
66 09/08/2017 35-311 089 0.00 0.000 0.00 0.000 1.00 89.090 1.00 89.090 0.00
67 09/08/2017 35-311 090 0.00 0.000 0.00 0.000 1.00 89.120 1.00 89.120 0.00
68 09/08/2017 35-311 091 0.00 0.000 0.00 0.000 1.00 406.460 1.00 406.460 0.00
69 09/08/2017 35-311 092 0.00 0.000 0.00 0.000 1.00 411.000 1.00 411.000 0.00
70 09/08/2017 35-311 093 0.00 0.000 0.00 0.000 1.00 418.370 1.00 418.370 0.00
71 09/08/2017 35-311 094 0.00 0.000 0.00 0.000 1.00 429.310 1.00 429.310 0.00
72 09/08/2017 35-311 096 0.00 0.000 0.00 0.000 1.00 445.830 1.00 445.830 0.00
Sub Total 0.000 0.000 24894.950 24894.950
1 09/08/2017 35-312 001 0.00 0.000 0.00 0.000 2.00 222.870 2.00 222.870 0.00
2 09/08/2017 35-312 002 0.00 0.000 0.00 0.000 1.00 276.700 1.00 276.700 0.00
3 09/08/2017 35-312 003 0.00 0.000 0.00 0.000 1.00 641.620 1.00 641.620 0.00
4 09/08/2017 35-312 004 0.00 0.000 0.00 0.000 1.00 253.650 1.00 253.650 0.00
5 09/08/2017 35-312 005 0.00 0.000 0.00 0.000 1.00 641.910 1.00 641.910 0.00
6 09/08/2017 35-312 006 0.00 0.000 0.00 0.000 1.00 364.920 1.00 364.920 0.00
7 09/08/2017 35-312 007 0.00 0.000 0.00 0.000 2.00 164.490 2.00 164.490 0.00
8 09/08/2017 35-312 009 0.00 0.000 0.00 0.000 1.00 1420.710 1.00 1420.710 0.00
9 09/08/2017 35-312 010 0.00 0.000 0.00 0.000 6.00 440.060 6.00 440.060 0.00
10 09/08/2017 35-312 011 0.00 0.000 0.00 0.000 2.00 1390.000 2.00 1390.000 0.00
11 09/08/2017 35-312 014 0.00 0.000 0.00 0.000 4.00 232.490 4.00 232.490 0.00
12 09/08/2017 35-312 015 0.00 0.000 0.00 0.000 1.00 357.200 1.00 357.200 0.00
13 09/08/2017 35-312 016 0.00 0.000 0.00 0.000 1.00 357.200 1.00 357.200 0.00
14 09/08/2017 35-312 023 0.00 0.000 0.00 0.000 1.00 386.160 1.00 386.160 0.00
15 09/08/2017 35-312 024 0.00 0.000 0.00 0.000 1.00 313.590 1.00 313.590 0.00
16 09/08/2017 35-312 025 0.00 0.000 0.00 0.000 1.00 164.140 1.00 164.140 0.00
17 09/08/2017 35-312 026 0.00 0.000 0.00 0.000 1.00 393.300 1.00 393.300 0.00
18 09/08/2017 35-312 027 0.00 0.000 0.00 0.000 1.00 324.590 1.00 324.590 0.00
19 09/08/2017 35-312 028 0.00 0.000 0.00 0.000 1.00 93.180 1.00 93.180 0.00
20 09/08/2017 35-312 029 0.00 0.000 0.00 0.000 1.00 91.470 1.00 91.470 0.00
21 09/08/2017 35-312 030 0.00 0.000 0.00 0.000 1.00 172.140 1.00 172.140 0.00
22 09/08/2017 35-312 031 0.00 0.000 0.00 0.000 1.00 81.920 1.00 81.920 0.00
23 09/08/2017 35-312 032 0.00 0.000 0.00 0.000 1.00 102.690 1.00 102.690 0.00
24 09/08/2017 35-312 033 0.00 0.000 0.00 0.000 1.00 81.570 1.00 81.570 0.00
25 09/08/2017 35-312 034 0.00 0.000 0.00 0.000 1.00 80.630 1.00 80.630 0.00
26 09/08/2017 35-312 035 0.00 0.000 0.00 0.000 1.00 99.920 1.00 99.920 0.00
27 09/08/2017 35-312 036 0.00 0.000 0.00 0.000 1.00 103.710 1.00 103.710 0.00
28 09/08/2017 35-312 038 0.00 0.000 0.00 0.000 1.00 94.470 1.00 94.470 0.00
29 09/08/2017 35-312 039 0.00 0.000 0.00 0.000 1.00 69.880 1.00 69.880 0.00
30 09/08/2017 35-312 040 0.00 0.000 0.00 0.000 1.00 83.090 1.00 83.090 0.00
31 09/08/2017 35-312 041 0.00 0.000 0.00 0.000 1.00 59.150 1.00 59.150 0.00
32 09/08/2017 35-312 042 0.00 0.000 0.00 0.000 1.00 93.110 1.00 93.110 0.00
33 09/08/2017 35-312 051 0.00 0.000 0.00 0.000 1.00 65.090 1.00 65.090 0.00
34 09/08/2017 35-312 052 0.00 0.000 0.00 0.000 1.00 85.840 1.00 85.840 0.00
Sub Total 0.000 0.000 9803.460 9803.460
1 09/08/2017 35-383 001 1.00 2240.760 1.00 2240.760 0.00 0.000 0.00 0.000 0.00
2 09/08/2017 35-383 003 1.00 2171.200 1.00 2171.200 0.00 0.000 0.00 0.000 0.00
3 09/08/2017 35-383 075 1.00 2240.760 1.00 2240.760 0.00 0.000 0.00 0.000 0.00
4 09/08/2017 35-383 078 1.00 2171.200 1.00 2171.200 0.00 0.000 0.00 0.000 0.00
Sub Total 8823.920 8823.920 0.000 0.000
1 09/08/2017 35-443 001 2.00 4012.520 2.00 4012.520 0.00 0.000 0.00 0.000 0.00
2 09/08/2017 35-443 002 2.00 4693.610 2.00 4693.610 0.00 0.000 0.00 0.000 0.00
3 09/08/2017 35-443 008 1.00 1670.280 1.00 1670.280 0.00 0.000 0.00 0.000 0.00
4 09/08/2017 35-443 022 1.00 2568.290 1.00 2568.290 0.00 0.000 0.00 0.000 0.00
5 09/08/2017 35-443 023 2.00 3940.285 2.00 3940.285 0.00 0.000 0.00 0.000 0.00
6 09/08/2017 35-443 029 1.00 1670.280 1.00 1670.280 0.00 0.000 0.00 0.000 0.00
7 09/08/2017 35-443 035 1.00 2239.320 1.00 2239.320 0.00 0.000 0.00 0.000 0.00
Sub Total 20794.585 20794.585 0.000 0.000
Day Total in MT 29.619 29.619 34.698 34.698
Total for the Month in MT 109.879 109.879 34.698 34.698
Cumulative Total in MT 1392.076 1392.076 691.040 291.701

Page 15 of 22
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 16 of 22
NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 17 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 11 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 10/08/2017 35-150 037 1.00 4788.340 1.00 4788.340 0.00 0.000 0.00 0.000 0.00
Sub Total 4788.340 4788.340 0.000 0.000
1 10/08/2017 35-512 002 2.00 8148.390 2.00 8148.390 0.00 0.000 0.00 0.000 0.00
2 10/08/2017 35-512 003 2.00 9917.230 2.00 9917.230 0.00 0.000 0.00 0.000 0.00
Sub Total 18065.620 18065.620 0.000 0.000
Day Total in MT 22.854 22.854 0.000 0.000
Total for the Month in MT 132.733 132.733 34.698 34.698
Cumulative Total in MT 1414.930 1414.930 691.040 291.701

Page 18 of 22
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 19 of 22
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 12 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 11/08/2017 35-121 010 1.00 15427.076 1.00 15427.076 0.00 0.000 0.00 0.000 0.00
Sub Total 15427.076 15427.076 0.000 0.000
1 11/08/2017 35-140 038 1.00 4788.340 1.00 4788.340 0.00 0.000 0.00 0.000 0.00
Sub Total 4788.340 4788.340 0.000 0.000
1 11/08/2017 35-383 029 2.00 2801.510 2.00 2801.510 0.00 0.000 0.00 0.000 0.00
2 11/08/2017 35-383 096 2.00 2801.510 2.00 2801.510 0.00 0.000 0.00 0.000 0.00
Sub Total 5603.020 5603.020 0.000 0.000
1 11/08/2017 35-443 030 2.00 2933.070 2.00 2933.070 0.00 0.000 0.00 0.000 0.00
Sub Total 2933.070 2933.070 0.000 0.000
Day Total in MT 28.752 28.752 0.000 0.000
Total for the Month in MT 161.485 161.485 34.698 34.698
Cumulative Total in MT 1443.682 1443.682 691.040 291.701

Page 20 of 22
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 21 of 22
INDWeLL CONSTrUCTIONS PVT LIMITeD
APGENCO, STAGE-V, 1 X 800 MW, Dr.NTTPS IBRAHIMPATNAM
DAILY PROGRESS REPORT(SUMMARY)
Report Date: 17-Oct-20
Erected on: 16-Oct-20

WEIGHT AS THS MONTH


WEIGHT
PER CUMMULATIVE
Sl.No CATEGORY UPTO LAST
CONTRACT IN MT
MONTH MONTH
(MT) DAY WISE
WISE

1 Structures 12673.71 1282.197 28.752 161.485 1443.682


2 Pressure Parts 11635.47 0 0 0.000
3 Non-Pressure Parts 4973.2 0 0 0.000
4 Rotating Equipments 1992.64 0 0 0.000
Rotating Machine Handling
5 45.1 0 0 0.000
Equipments
Grand Total 31320.12 1282.197 28.752 161.485 1443.682
Note:
1 Proper road approach is required in site for marching hydra
2 Area Is not avialble for pre assembly
3 Area not provided to tie gai rope for column alignment

MANPOWER REPORT AS ON 12.08.2017

Sl.No Designation Total Workmen Present Absent

1 Staff 26 20 6
2 Foremen 3 3 0
3 Skilled 68 45 23
4 Semi Skilled 24 16 8
5 Un skilled 10 8 2
6 Operators 10 9 1
Total 141 101 40

22

You might also like