INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit #8 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 03 Jul 2017
Placement In Welding/Bolting
Pre-Assembly Alignment Ndt/Sr/Ht
Srl Date ON PgmaNo DuNo Position /Fixing
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 03/07/2017 35-150 29 1 7138.01 1 7138.01 0 0 0 0 0 0
Sub Total 7138.01 7138.01 0 0 0
1 03/07/2017 35-311 9 1 682.03 1 682.03 0 0 0 0 0 0
2 03/07/2017 35-311 10 1 404.17 1 404.17 0 0 0 0 0 0
3 03/07/2017 35-311 11 1 338.42 1 338.42 0 0 0 0 0 0
4 03/07/2017 35-311 13 1 968.92 1 968.92 0 0 0 0 0 0
5 03/07/2017 35-311 16 1 1246.1 1 1246.1 0 0 0 0 0 0
6 03/07/2017 35-311 17 1 1246.1 1 1246.1 0 0 0 0 0 0
7 03/07/2017 35-311 20 1 904.59 1 904.59 0 0 0 0 0 0
8 03/07/2017 35-311 21 1 439.19 1 439.19 0 0 0 0 0 0
9 03/07/2017 35-311 36 1 75.87 1 75.87 0 0 0 0 0 0
10 03/07/2017 35-311 42 2 207.9 2 207.9 0 0 0 0 0 0
11 03/07/2017 35-311 43 1 111.41 1 111.41 0 0 0 0 0 0
12 03/07/2017 35-311 59 1 152.04 1 152.04 0 0 0 0 0 0
13 03/07/2017 35-311 60 1 231.9 1 231.9 0 0 0 0 0 0
14 03/07/2017 35-311 61 1 132.8 1 132.8 0 0 0 0 0 0
15 03/07/2017 35-311 62 1 155.04 1 155.04 0 0 0 0 0 0
16 03/07/2017 35-311 78 1 94.48 1 94.48 0 0 0 0 0 0
17 03/07/2017 35-311 83 1 44.38 1 44.38 0 0 0 0 0 0
18 03/07/2017 35-311 84 1 62.35 1 62.35 0 0 0 0 0 0
19 03/07/2017 35-311 88 1 76.82 1 76.82 0 0 0 0 0 0
20 03/07/2017 35-311 89 1 89.09 1 89.09 0 0 0 0 0 0
21 03/07/2017 35-311 90 1 89.12 1 89.12 0 0 0 0 0 0
22 03/07/2017 35-311 91 1 406.46 1 406.46 0 0 0 0 0 0
Sub Total 8159.18 8159.18 0 0 0
1 03/07/2017 35-441 8 1 2011.52 1 2011.52 0 0 0 0 0 0
Sub Total 2011.52 2011.52 0 0 0
Day Total in MT 17.309 17.309 0 0 0
Total for the Month in MT 44.756 44.756 0 0 0
Cumulative Total in MT 526.023 526.023 0 0 0
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 04 Jul 2017
Placement In Welding/Bolting
Pre-Assembly Alignment Ndt/Sr/Ht
Srl Date ON PgmaNo DuNo Position /Fixing
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 04/07/2017 35-111 1 1 9841.905 1 9841.905 0 0 0 0 0 0
Sub Total 9841.905 9841.905 0 0 0
1 04/07/2017 35-121 1 1 9841.905 1 9841.905 0 0 0 0 0 0
Sub Total 9841.905 9841.905 0 0 0
1 04/07/2017 35-130 9 1 15604.952 1 15604.952 0 0 0 0 0 0
Sub Total 15604.952 15604.952 0 0 0
1 04/07/2017 35-442 1 1 3418.055 1 3418.055 0 0 0 0 0 0
2 04/07/2017 35-442 24 1 1414.26 1 1414.26 0 0 0 0 0 0
3 04/07/2017 35-442 26 1 1771.42 1 1771.42 0 0 0 0 0 0
Sub Total 6603.735 6603.735 0 0 0
Day Total in MT 41.892 41.892 0 0 0
Total for the Month in MT 86.649 86.649 0 0 0
Cumulative Total in MT 567.915 567.915 0 0 0
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 05 Jul 2017
Placement In Welding/Bolting
Pre-Assembly Alignment Ndt/Sr/Ht
Srl Date ON PgmaNo DuNo Position /Fixing
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 05/07/2017 35-130 002 1.00 15604.952 1.00 15604.952 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 15604.952 15604.952 0.000 0.000 0.000
1 05/07/2017 35-140 030 1.00 7138.010 1.00 7138.010 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 7138.010 7138.010 0.000 0.000 0.000
1 05/07/2017 35-442 001 1.00 3418.055 1.00 3418.055 0.00 0.000 0.00 0.000 0.00 0.000
2 05/07/2017 35-442 024 1.00 1414.260 1.00 1414.260 0.00 0.000 0.00 0.000 0.00 0.000
3 05/07/2017 35-442 025 1.00 3297.750 1.00 3297.750 0.00 0.000 0.00 0.000 0.00 0.000
4 05/07/2017 35-442 026 1.00 1771.420 1.00 1771.420 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 9901.485 9901.485 0.000 0.000 0.000
Day Total in MT 32.644 32.644 0.000 0.000 0.000
Total for the Month in MT 119.293 119.293 0.000 0.000 0.000
Cumulative Total in MT 600.560 600.560 0.000 0.000 0.000
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 06 Jul 2017
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 08 Jul 2017
Placement In Welding/Bolting
Pre-Assembly Alignment Ndt/Sr/Ht
Srl Date ON PgmaNo DuNo Position /Fixing
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 07/07/2017 35-150 036 1.00 7024.880 1.00 7024.880 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 7024.880 7024.880 0.000 0.000 0.000
1 07/07/2017 35-381 001 1.00 1348.500 1.00 1348.500 0.00 0.000 0.00 0.000 0.00 0.000
2 07/07/2017 35-381 010 1.00 1456.300 1.00 1456.300 0.00 0.000 0.00 0.000 0.00 0.000
3 07/07/2017 35-381 013 1.00 2658.655 1.00 2658.655 0.00 0.000 0.00 0.000 0.00 0.000
4 07/07/2017 35-381 021 1.00 2509.680 1.00 2509.680 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 7973.135 7973.135 0.000 0.000 0.000
1 07/07/2017 35-382 094 1.00 68.220 1.00 68.220 0.00 0.000 0.00 0.000 0.00 0.000
2 07/07/2017 35-382 095 1.00 68.270 1.00 68.270 0.00 0.000 0.00 0.000 0.00 0.000
3 07/07/2017 35-382 098 1.00 218.010 1.00 218.010 0.00 0.000 0.00 0.000 0.00 0.000
4 07/07/2017 35-382 099 1.00 64.435 1.00 64.435 0.00 0.000 0.00 0.000 0.00 0.000
5 07/07/2017 35-382 099 1.00 64.435 1.00 64.435 0.00 0.000 0.00 0.000 0.00 0.000
6 07/07/2017 35-382 100 1.00 534.550 1.00 534.550 0.00 0.000 0.00 0.000 0.00 0.000
7 07/07/2017 35-382 101 2.00 164.230 2.00 164.230 0.00 0.000 0.00 0.000 0.00 0.000
8 07/07/2017 35-382 103 1.00 410.080 1.00 410.080 0.00 0.000 0.00 0.000 0.00 0.000
9 07/07/2017 35-382 107 1.00 1456.890 1.00 1456.890 0.00 0.000 0.00 0.000 0.00 0.000
10 07/07/2017 35-382 108 1.00 1055.040 1.00 1055.040 0.00 0.000 0.00 0.000 0.00 0.000
11 07/07/2017 35-382 110 2.00 53.257 2.00 53.257 0.00 0.000 0.00 0.000 0.00 0.000
12 07/07/2017 35-382 111 3.00 50.840 3.00 50.840 0.00 0.000 0.00 0.000 0.00 0.000
13 07/07/2017 35-382 112 3.00 50.870 3.00 50.870 0.00 0.000 0.00 0.000 0.00 0.000
14 07/07/2017 35-382 116 1.00 80.380 1.00 80.380 0.00 0.000 0.00 0.000 0.00 0.000
15 07/07/2017 35-382 119 1.00 14.640 1.00 14.640 0.00 0.000 0.00 0.000 0.00 0.000
16 07/07/2017 35-382 120 1.00 269.740 1.00 269.740 0.00 0.000 0.00 0.000 0.00 0.000
17 07/07/2017 35-382 124 1.00 534.550 1.00 534.550 0.00 0.000 0.00 0.000 0.00 0.000
18 07/07/2017 35-382 129 1.00 68.240 1.00 68.240 0.00 0.000 0.00 0.000 0.00 0.000
19 07/07/2017 35-382 130 1.00 68.290 1.00 68.290 0.00 0.000 0.00 0.000 0.00 0.000
20 07/07/2017 35-382 131 1.00 111.880 1.00 111.880 0.00 0.000 0.00 0.000 0.00 0.000
21 07/07/2017 35-382 132 3.00 64.750 3.00 64.750 0.00 0.000 0.00 0.000 0.00 0.000
22 07/07/2017 35-382 133 2.00 85.860 2.00 85.860 0.00 0.000 0.00 0.000 0.00 0.000
23 07/07/2017 35-382 137 2.00 53.340 2.00 53.340 0.00 0.000 0.00 0.000 0.00 0.000
24 07/07/2017 35-382 140 4.00 171.730 4.00 171.730 0.00 0.000 0.00 0.000 0.00 0.000
25 07/07/2017 35-382 145 2.00 37.630 2.00 37.630 0.00 0.000 0.00 0.000 0.00 0.000
26 07/07/2017 35-382 146 1.00 18.210 1.00 18.210 0.00 0.000 0.00 0.000 0.00 0.000
27 07/07/2017 35-382 147 1.00 20.380 1.00 20.380 0.00 0.000 0.00 0.000 0.00 0.000
28 07/07/2017 35-382 148 1.00 38.050 1.00 38.050 0.00 0.000 0.00 0.000 0.00 0.000
29 07/07/2017 35-382 149 1.00 43.320 1.00 43.320 0.00 0.000 0.00 0.000 0.00 0.000
30 07/07/2017 35-382 157 1.00 20.060 1.00 20.060 0.00 0.000 0.00 0.000 0.00 0.000
31 07/07/2017 35-382 158 1.00 20.050 1.00 20.050 0.00 0.000 0.00 0.000 0.00 0.000
32 07/07/2017 35-382 159 2.00 40.100 2.00 40.100 0.00 0.000 0.00 0.000 0.00 0.000
33 07/07/2017 35-382 160 1.00 221.680 1.00 221.680 0.00 0.000 0.00 0.000 0.00 0.000
34 07/07/2017 35-382 163 1.00 103.250 1.00 103.250 0.00 0.000 0.00 0.000 0.00 0.000
35 07/07/2017 35-382 164 1.00 260.190 1.00 260.190 0.00 0.000 0.00 0.000 0.00 0.000
36 07/07/2017 35-382 165 1.00 193.900 1.00 193.900 0.00 0.000 0.00 0.000 0.00 0.000
37 07/07/2017 35-382 170 1.00 221.830 1.00 221.830 0.00 0.000 0.00 0.000 0.00 0.000
38 07/07/2017 35-382 171 1.00 106.450 1.00 106.450 0.00 0.000 0.00 0.000 0.00 0.000
39 07/07/2017 35-382 172 1.00 294.180 1.00 294.180 0.00 0.000 0.00 0.000 0.00 0.000
40 07/07/2017 35-382 174 1.00 469.810 1.00 469.810 0.00 0.000 0.00 0.000 0.00 0.000
17
Placement In Welding/Bolting
Pre-Assembly Alignment Ndt/Sr/Ht
Srl Date ON PgmaNo DuNo Position /Fixing
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
41 07/07/2017 35-382 177 1.00 276.550 1.00 276.550 0.00 0.000 0.00 0.000 0.00 0.000
42 07/07/2017 35-382 178 1.00 414.860 1.00 414.860 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 8583.027 8583.027 0.000 0.000 0.000
1 07/07/2017 35-442 014 1.00 2097.605 1.00 2097.605 0.00 0.000 0.00 0.000 0.00 0.000
2 07/07/2017 35-442 020 1.00 4746.830 1.00 4746.830 0.00 0.000 0.00 0.000 0.00 0.000
3 07/07/2017 35-442 030 1.00 5324.180 1.00 5324.180 0.00 0.000 0.00 0.000 0.00 0.000
4 07/07/2017 35-442 034 1.00 2982.300 1.00 2982.300 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 15150.915 15150.915 0.000 0.000 0.000
Day Total in MT 38.732 38.732 0.000 0.000 0.000
Total for the Month in MT 185.308 185.308 0.000 0.000 0.000
Cumulative Total in MT 666.575 666.575 0.000 0.000 0.000
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 10 Jul 2017
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 11 Jul 2017
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 12 Jul 2017
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 13 Jul 2017
17
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 12/07/2017 35-442 014 1.00 2097.605 1.00 2097.605 0.00 0.000 0.00 0.000 0.00 0.000
2 12/07/2017 35-442 020 1.00 4746.830 1.00 4746.830 0.00 0.000 0.00 0.000 0.00 0.000
3 12/07/2017 35-442 031 1.00 3792.180 1.00 3792.180 0.00 0.000 0.00 0.000 0.00 0.000
4 12/07/2017 35-442 050 1.00 2040.050 1.00 2040.050 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 12676.665 12676.665 0.000 0.000 0.000
Day Total in MT 23.745 23.745 0.000 0.000 0.000
Total for the Month in MT 275.644 275.644 0.000 0.000 0.000
Cumulative Total in MT 756.911 756.911 0.000 0.000 0.000
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 13 Jul 2017
Placement In Welding/Bolting
Pre-Assembly Alignment Ndt/Sr/Ht
Srl Date ON PgmaNo DuNo Position /Fixing
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 13/07/2017 35-012 016 50.00 154.550 50.00 154.550 0.00 0.000 0.00 0.000 0.00 0.000
2 13/07/2017 35-012 017 50.00 245.300 50.00 245.300 0.00 0.000 0.00 0.000 0.00 0.000
3 13/07/2017 35-012 018 50.00 490.650 50.00 490.650 0.00 0.000 0.00 0.000 0.00 0.000
4 13/07/2017 35-012 019 50.00 785.000 50.00 785.000 0.00 0.000 0.00 0.000 0.00 0.000
5 13/07/2017 35-012 020 50.00 981.250 50.00 981.250 0.00 0.000 0.00 0.000 0.00 0.000
6 13/07/2017 35-012 021 50.00 1226.550 50.00 1226.550 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 3883.300 3883.300 0.000 0.000 0.000
1 13/07/2017 35-111 007 0.00 0.000 0.00 0.000 1.00 14042.415 0.00 0.000 0.00 0.000
2 13/07/2017 35-111 008 0.00 0.000 0.00 0.000 1.00 17474.559 0.00 0.000 0.00 0.000
3 13/07/2017 35-111 015 0.00 0.000 0.00 0.000 1.00 19840.880 0.00 0.000 0.00 0.000
4 13/07/2017 35-111 016 1.00 21188.920 1.00 21188.920 0.00 0.000 0.00 0.000 0.00 0.000
5 13/07/2017 35-111 022 1.00 21952.640 1.00 21952.640 0.00 0.000 0.00 0.000 0.00 0.000
6 13/07/2017 35-111 026 0.00 0.000 0.00 0.000 1.00 28093.710 0.00 0.000 0.00 0.000
Sub Total 43141.560 43141.560 79451.564 0.000 0.000
1 13/07/2017 35-112 001 0.00 0.000 0.00 0.000 1.00 27489.430 0.00 0.000 0.00 0.000
2 13/07/2017 35-112 008 0.00 0.000 0.00 0.000 1.00 17396.480 0.00 0.000 0.00 0.000
Sub Total 0.000 0.000 44885.910 0.000 0.000
1 13/07/2017 35-121 007 0.00 0.000 0.00 0.000 1.00 14042.415 0.00 0.000 0.00 0.000
2 13/07/2017 35-121 008 0.00 0.000 0.00 0.000 1.00 17474.559 0.00 0.000 0.00 0.000
3 13/07/2017 35-121 015 0.00 0.000 0.00 0.000 1.00 19840.912 0.00 0.000 0.00 0.000
4 13/07/2017 35-121 025 0.00 0.000 0.00 0.000 1.00 28093.747 0.00 0.000 0.00 0.000
Sub Total 0.000 0.000 79451.633 0.000 0.000
1 13/07/2017 35-122 001 0.00 0.000 0.00 0.000 1.00 27489.430 0.00 0.000 0.00 0.000
2 13/07/2017 35-122 008 0.00 0.000 0.00 0.000 1.00 17396.480 0.00 0.000 0.00 0.000
Sub Total 0.000 0.000 44885.910 0.000 0.000
1 13/07/2017 35-130 001 0.00 0.000 0.00 0.000 1.00 13287.210 0.00 0.000 0.00 0.000
2 13/07/2017 35-130 008 0.00 0.000 0.00 0.000 1.00 13287.210 0.00 0.000 0.00 0.000
Sub Total 0.000 0.000 26574.420 0.000 0.000
1 13/07/2017 35-140 029 0.00 0.000 0.00 0.000 1.00 7174.500 0.00 0.000 0.00 0.000
2 13/07/2017 35-140 036 0.00 0.000 0.00 0.000 1.00 9022.000 0.00 0.000 0.00 0.000
3 13/07/2017 35-140 043 0.00 0.000 0.00 0.000 1.00 6482.270 0.00 0.000 0.00 0.000
4 13/07/2017 35-140 050 0.00 0.000 0.00 0.000 1.00 10062.580 0.00 0.000 0.00 0.000
5 13/07/2017 35-140 051 1.00 8283.160 1.00 8283.160 0.00 0.000 0.00 0.000 0.00 0.000
6 13/07/2017 35-140 057 0.00 0.000 0.00 0.000 1.00 11890.790 0.00 0.000 0.00 0.000
7 13/07/2017 35-140 058 1.00 9055.170 1.00 9055.170 0.00 0.000 0.00 0.000 0.00 0.000
8 13/07/2017 35-140 070 0.00 0.000 0.00 0.000 1.00 9410.360 0.00 0.000 0.00 0.000
Sub Total 17338.330 17338.330 54042.500 0.000 0.000
1 13/07/2017 35-150 035 0.00 0.000 0.00 0.000 1.00 7174.500 0.00 0.000 0.00 0.000
2 13/07/2017 35-150 042 0.00 0.000 0.00 0.000 1.00 9022.000 0.00 0.000 0.00 0.000
3 13/07/2017 35-150 043 0.00 0.000 0.00 0.000 1.00 6482.270 0.00 0.000 0.00 0.000
4 13/07/2017 35-150 050 0.00 0.000 0.00 0.000 1.00 10062.580 0.00 0.000 0.00 0.000
5 13/07/2017 35-150 063 0.00 0.000 0.00 0.000 1.00 11890.790 0.00 0.000 0.00 0.000
6 13/07/2017 35-150 070 0.00 0.000 0.00 0.000 1.00 9410.360 0.00 0.000 0.00 0.000
Sub Total 0.000 0.000 54042.500 0.000 0.000
1 13/07/2017 35-381 013 0.00 0.000 0.00 0.000 1.00 2658.655 1.00 2658.655 0.00 0.000
Sub Total 0.000 0.000 2658.655 2658.655 0.000
1 13/07/2017 35-441 002 0.00 0.000 0.00 0.000 2.00 2496.415 2.00 2496.415 0.00 0.000
17
Placement In Welding/Bolting
Pre-Assembly Alignment Ndt/Sr/Ht
Srl Date ON PgmaNo DuNo Position /Fixing
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
2 13/07/2017 35-441 003 0.00 0.000 0.00 0.000 1.00 2238.960 1.00 2238.960 0.00 0.000
3 13/07/2017 35-441 004 0.00 0.000 0.00 0.000 2.00 977.670 2.00 977.670 0.00 0.000
4 13/07/2017 35-441 005 0.00 0.000 0.00 0.000 1.00 2343.330 1.00 2343.330 0.00 0.000
5 13/07/2017 35-441 006 0.00 0.000 0.00 0.000 1.00 2848.530 1.00 2848.530 0.00 0.000
6 13/07/2017 35-441 007 0.00 0.000 0.00 0.000 2.00 3783.440 2.00 3783.440 0.00 0.000
7 13/07/2017 35-441 008 0.00 0.000 0.00 0.000 1.00 2011.520 1.00 2011.520 0.00 0.000
8 13/07/2017 35-441 009 0.00 0.000 0.00 0.000 1.00 2747.600 1.00 2747.600 0.00 0.000
9 13/07/2017 35-441 010 0.00 0.000 0.00 0.000 1.00 1405.030 1.00 1405.030 0.00 0.000
10 13/07/2017 35-441 011 0.00 0.000 0.00 0.000 1.00 2391.190 1.00 2391.190 0.00 0.000
11 13/07/2017 35-441 012 0.00 0.000 0.00 0.000 2.00 8457.120 2.00 8457.120 0.00 0.000
12 13/07/2017 35-441 013 0.00 0.000 0.00 0.000 1.00 1837.720 1.00 1837.720 0.00 0.000
13 13/07/2017 35-441 014 0.00 0.000 0.00 0.000 1.00 1400.420 1.00 1400.420 0.00 0.000
14 13/07/2017 35-441 015 0.00 0.000 0.00 0.000 1.00 1500.360 1.00 1500.360 0.00 0.000
15 13/07/2017 35-441 016 0.00 0.000 0.00 0.000 1.00 2287.210 1.00 2287.210 0.00 0.000
16 13/07/2017 35-441 017 0.00 0.000 0.00 0.000 2.00 5431.130 2.00 5431.130 0.00 0.000
17 13/07/2017 35-441 020 0.00 0.000 0.00 0.000 1.00 1982.340 1.00 1982.340 0.00 0.000
18 13/07/2017 35-441 022 0.00 0.000 0.00 0.000 1.00 1397.350 1.00 1397.350 0.00 0.000
19 13/07/2017 35-441 023 0.00 0.000 0.00 0.000 1.00 2489.510 1.00 2489.510 0.00 0.000
20 13/07/2017 35-441 024 0.00 0.000 0.00 0.000 1.00 2156.210 1.00 2156.210 0.00 0.000
Sub Total 0.000 0.000 52183.055 52183.055 0.000
1 13/07/2017 35-451 001 0.00 0.000 0.00 0.000 2.00 2794.690 2.00 2794.690 0.00 0.000
2 13/07/2017 35-451 004 0.00 0.000 0.00 0.000 1.00 1598.360 1.00 1598.360 0.00 0.000
3 13/07/2017 35-451 005 0.00 0.000 0.00 0.000 2.00 3682.010 2.00 3682.010 0.00 0.000
4 13/07/2017 35-451 006 0.00 0.000 0.00 0.000 2.00 6920.180 2.00 6920.180 0.00 0.000
5 13/07/2017 35-451 009 0.00 0.000 0.00 0.000 1.00 1536.440 1.00 1536.440 0.00 0.000
6 13/07/2017 35-451 010 0.00 0.000 0.00 0.000 1.00 2417.770 1.00 2417.770 0.00 0.000
7 13/07/2017 35-451 011 0.00 0.000 0.00 0.000 1.00 1285.110 1.00 1285.110 0.00 0.000
8 13/07/2017 35-451 012 0.00 0.000 0.00 0.000 2.00 2674.770 2.00 2674.770 0.00 0.000
Sub Total 0.000 0.000 22909.330 22909.330 0.000
Day Total in MT 64.363 64.363 461.085 77.751 0.000
Total for the Month in MT 340.007 340.007 461.085 77.751 0.000
Cumulative Total in MT 821.274 821.274 461.085 77.751 0.000
17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 14.07.2017
Placement In Welding/Bolting
Pre-Assembly Alignment Ndt/Sr/Ht
Srl Date ON PgmaNo DuNo Position /Fixing
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 14.07.2017 35-442 39 01 2146.307 01 2146.307 0.00 0.000 0.00 0.000 0.00 0.000
2 14.07.2017 35-442 49 01 3596.412 01 3596.412
Sub Total 5742.719 5742.719 0.000 0.000 0.000
1 14.07.2017 35-452 11 01 1723.573 01 1723.573 0 0 0.00 0.000 0.00 0.000
2 14.07.2017 35-452 18 01 2424.162 01 2424.162 0 0 0 0 0
Sub Total 4147.735 4147.735 0 0.000 0.000
1 14.07.2017 35-381 11 01 1073.828 01 1073.828 0 0 0.00 0.000 0.00 0.000
2 14.07.2017 35-381 12 01 1034.013 01 1034.013
3 14.07.2017 35-381 10 01 1456.301 01 1456.301
Sub Total 3564.142 3564.142 0 0.000 0.000
1 14.07.2017 35-821 01 01 461.14 01 461.14 0 0 0.00 0.000 0.00 0.000
2 14.07.2017 35-821 02 01 487.312 01 487.312
Sub Total 948.452 948.452 0 0 0.000
Day Total in MT 14.403 14.403 0 0 0.000
Total for the Month in MT 354.41 354.41 0 0 0.000
Cumulative Total in MT 835.677 835.677 0 0 0.000
17
INDWeLL CONSTrUCTIONS PVT LIMITeD
APGENCO, STAGE-V, 1 X 800 MW, Dr.NTTPS IBRAHIMPATNAM
DAILY PROGRESS REPORT(SUMMARY)
Report Date: 15-Jul-17
Erected on: 14.07.2017
1 Staff 18 17 1
2 Foremen 3 3 0
3 Skilled 50 30 20
4 Semi Skilled 23 22 1
5 Un skilled 7 4 3
6 Operators 8 8 0
Total 109 84 25