You are on page 1of 17

INDWeLL CONSTrUCTIONS PrIVATe LIMITeD

Unit # 1x800 MW,Stage-V


Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 03 Oct 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 01/10/2017 35-112 013 1.00 7079.130 1.00 7079.130 0.00 0.000 0.00 0.000 0.00
Sub Total 7079.130 7079.130 0.000 0.000
1 01/10/2017 35-122 006 1.00 13917.140 1.00 13917.140 0.00 0.000 0.00 0.000 0.00
2 01/10/2017 35-122 013 1.00 7079.130 1.00 7079.130 0.00 0.000 0.00 0.000 0.00
Sub Total 20996.270 20996.270 0.000 0.000
1 01/10/2017 35-811 003 50.00 13330.050 50.00 13330.050 0.00 0.000 0.00 0.000 0.00
Sub Total 13330.050 13330.050 0.000 0.000
Day Total in MT 41.405 41.405 0.000 0.000
Total for the Month in MT 41.405 41.405 0.000 0.000
Cumulative Total in MT 3049.561 3049.561 1962.626 1962.626

Page 1 of 17
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1203.783

Page 2 of 17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 04 Oct 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 03/10/2017 35-112 006 1.00 13917.140 1.00 13917.140 0.00 0.000 0.00 0.000 0.00
Sub Total 13917.140 13917.140 0.000 0.000
1 03/10/2017 36-150 176 1.00 1606.220 1.00 1606.220 0.00 0.000 0.00 0.000 0.00
2 03/10/2017 36-150 177 1.00 1838.148 1.00 1838.148 0.00 0.000 0.00 0.000 0.00
Sub Total 3444.368 3444.368 0.000 0.000
Day Total in MT 17.362 17.362 0.000 0.000
Total for the Month in MT 58.767 58.767 0.000 0.000
Cumulative Total in MT 3066.922 3066.922 1962.626 1962.626

Page 3 of 17
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1203.783

Page 4 of 17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 05 Oct 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 04/10/2017 35-140 067 1.00 4122.440 1.00 4122.440 0.00 0.000 0.00 0.000 0.00
Sub Total 4122.440 4122.440 0.000 0.000
1 04/10/2017 35-524 008 1.00 4553.000 1.00 4553.000 0.00 0.000 0.00 0.000 0.00
Sub Total 4553.000 4553.000 0.000 0.000
1 04/10/2017 35-534 004 2.00 6061.240 2.00 6061.240 0.00 0.000 0.00 0.000 0.00
2 04/10/2017 35-534 006 1.00 3680.950 1.00 3680.950 0.00 0.000 0.00 0.000 0.00
Sub Total 9742.190 9742.190 0.000 0.000
Day Total in MT 18.418 18.418 0.000 0.000
Total for the Month in MT 77.185 77.185 0.000 0.000
Cumulative Total in MT 3085.340 3085.340 1962.626 1962.626

Page 5 of 17
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1203.783

Page 6 of 17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 06 Oct 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 05/10/2017 35-150 067 1.00 4122.440 1.00 4122.440 0.00 0.000 0.00 0.000 0.00
Sub Total 4122.440 4122.440 0.000 0.000
1 05/10/2017 35-384 001 1.00 152.510 1.00 152.510 0.00 0.000 0.00 0.000 0.00
2 05/10/2017 35-384 002 1.00 111.375 1.00 111.375 0.00 0.000 0.00 0.000 0.00
3 05/10/2017 35-384 003 3.00 31.410 3.00 31.410 0.00 0.000 0.00 0.000 0.00
4 05/10/2017 35-384 005 1.00 219.680 1.00 219.680 0.00 0.000 0.00 0.000 0.00
5 05/10/2017 35-384 008 1.00 113.030 1.00 113.030 0.00 0.000 0.00 0.000 0.00
6 05/10/2017 35-384 010 1.00 318.730 1.00 318.730 0.00 0.000 0.00 0.000 0.00
7 05/10/2017 35-384 011 5.00 60.275 5.00 60.275 0.00 0.000 0.00 0.000 0.00
8 05/10/2017 35-384 014 2.00 28.550 2.00 28.550 0.00 0.000 0.00 0.000 0.00
9 05/10/2017 35-384 015 2.00 28.250 2.00 28.250 0.00 0.000 0.00 0.000 0.00
10 05/10/2017 35-384 018 3.00 108.610 3.00 108.610 0.00 0.000 0.00 0.000 0.00
11 05/10/2017 35-384 019 2.00 1752.307 2.00 1752.307 0.00 0.000 0.00 0.000 0.00
12 05/10/2017 35-384 025 1.00 102.890 1.00 102.890 0.00 0.000 0.00 0.000 0.00
13 05/10/2017 35-384 026 2.00 21.850 2.00 21.850 0.00 0.000 0.00 0.000 0.00
14 05/10/2017 35-384 028 1.00 106.370 1.00 106.370 0.00 0.000 0.00 0.000 0.00
15 05/10/2017 35-384 029 2.00 204.360 2.00 204.360 0.00 0.000 0.00 0.000 0.00
16 05/10/2017 35-384 032 1.00 517.130 1.00 517.130 0.00 0.000 0.00 0.000 0.00
17 05/10/2017 35-384 033 2.00 493.980 2.00 493.980 0.00 0.000 0.00 0.000 0.00
18 05/10/2017 35-384 036 2.00 22.640 2.00 22.640 0.00 0.000 0.00 0.000 0.00
19 05/10/2017 35-384 040 1.00 14.700 1.00 14.700 0.00 0.000 0.00 0.000 0.00
20 05/10/2017 35-384 042 2.00 17.060 2.00 17.060 0.00 0.000 0.00 0.000 0.00
21 05/10/2017 35-384 043 2.00 18.710 2.00 18.710 0.00 0.000 0.00 0.000 0.00
22 05/10/2017 35-384 046 2.00 88.900 2.00 88.900 0.00 0.000 0.00 0.000 0.00
23 05/10/2017 35-384 048 1.00 46.710 1.00 46.710 0.00 0.000 0.00 0.000 0.00
24 05/10/2017 35-384 051 2.00 22.710 2.00 22.710 0.00 0.000 0.00 0.000 0.00
Sub Total 4602.737 4602.737 0.000 0.000
1 05/10/2017 35-524 005 1.00 1212.370 1.00 1212.370 0.00 0.000 0.00 0.000 0.00
2 05/10/2017 35-524 006 2.00 4685.300 2.00 4685.300 0.00 0.000 0.00 0.000 0.00
3 05/10/2017 35-524 007 1.00 2182.315 1.00 2182.315 0.00 0.000 0.00 0.000 0.00
4 05/10/2017 35-524 011 1.00 4553.000 1.00 4553.000 0.00 0.000 0.00 0.000 0.00
Sub Total 12632.985 12632.985 0.000 0.000
1 05/10/2017 35-534 003 1.00 3709.150 1.00 3709.150 0.00 0.000 0.00 0.000 0.00
Sub Total 3709.150 3709.150 0.000 0.000
1 05/10/2017 36-311 009 1.00 64.930 1.00 64.930 0.00 0.000 0.00 0.000 0.00
2 05/10/2017 36-311 019 1.00 43.820 1.00 43.820 0.00 0.000 0.00 0.000 0.00
3 05/10/2017 36-311 020 1.00 25.620 1.00 25.620 0.00 0.000 0.00 0.000 0.00
4 05/10/2017 36-311 021 2.00 80.190 2.00 80.190 0.00 0.000 0.00 0.000 0.00
5 05/10/2017 36-311 027 2.00 89.830 2.00 89.830 0.00 0.000 0.00 0.000 0.00
6 05/10/2017 36-311 028 2.00 46.660 2.00 46.660 0.00 0.000 0.00 0.000 0.00
7 05/10/2017 36-311 033 1.00 20.003 1.00 20.003 0.00 0.000 0.00 0.000 0.00
8 05/10/2017 36-311 033 1.00 20.003 1.00 20.003 0.00 0.000 0.00 0.000 0.00
9 05/10/2017 36-311 036 1.00 71.100 1.00 71.100 0.00 0.000 0.00 0.000 0.00
10 05/10/2017 36-311 037 1.00 145.200 1.00 145.200 0.00 0.000 0.00 0.000 0.00
11 05/10/2017 36-311 040 6.00 251.520 6.00 251.520 0.00 0.000 0.00 0.000 0.00
12 05/10/2017 36-311 047 1.00 35.540 1.00 35.540 0.00 0.000 0.00 0.000 0.00
13 05/10/2017 36-311 048 1.00 32.810 1.00 32.810 0.00 0.000 0.00 0.000 0.00
14 05/10/2017 36-311 049 1.00 41.800 1.00 41.800 0.00 0.000 0.00 0.000 0.00
15 05/10/2017 36-311 053 2.00 31.830 2.00 31.830 0.00 0.000 0.00 0.000 0.00
16 05/10/2017 36-311 054 1.00 23.340 1.00 23.340 0.00 0.000 0.00 0.000 0.00
17 05/10/2017 36-311 055 1.00 43.850 1.00 43.850 0.00 0.000 0.00 0.000 0.00
18 05/10/2017 36-311 056 1.00 15.990 1.00 15.990 0.00 0.000 0.00 0.000 0.00
19 05/10/2017 36-311 057 1.00 15.980 1.00 15.980 0.00 0.000 0.00 0.000 0.00
20 05/10/2017 36-311 058 1.00 15.910 1.00 15.910 0.00 0.000 0.00 0.000 0.00
21 05/10/2017 36-311 059 1.00 15.914 1.00 15.914 0.00 0.000 0.00 0.000 0.00
22 05/10/2017 36-311 061 1.00 15.940 1.00 15.940 0.00 0.000 0.00 0.000 0.00
23 05/10/2017 36-311 064 3.00 47.910 3.00 47.910 0.00 0.000 0.00 0.000 0.00
24 05/10/2017 36-311 070 2.00 88.090 2.00 88.090 0.00 0.000 0.00 0.000 0.00
25 05/10/2017 36-311 071 2.00 88.150 2.00 88.150 0.00 0.000 0.00 0.000 0.00
26 05/10/2017 36-311 072 2.00 84.030 2.00 84.030 0.00 0.000 0.00 0.000 0.00
27 05/10/2017 36-311 073 1.00 41.990 1.00 41.990 0.00 0.000 0.00 0.000 0.00
28 05/10/2017 36-311 074 1.00 88.570 1.00 88.570 0.00 0.000 0.00 0.000 0.00

Page 7 of 17
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
29 05/10/2017 36-311 080 1.00 31.750 1.00 31.750 0.00 0.000 0.00 0.000 0.00
30 05/10/2017 36-311 082 1.00 23.860 1.00 23.860 0.00 0.000 0.00 0.000 0.00
31 05/10/2017 36-311 092 2.00 167.640 2.00 167.640 0.00 0.000 0.00 0.000 0.00
32 05/10/2017 36-311 093 2.00 42.670 2.00 42.670 0.00 0.000 0.00 0.000 0.00
33 05/10/2017 36-311 106 1.00 74.580 1.00 74.580 0.00 0.000 0.00 0.000 0.00
34 05/10/2017 36-311 109 1.00 20.010 1.00 20.010 0.00 0.000 0.00 0.000 0.00
35 05/10/2017 36-311 116 2.00 47.830 2.00 47.830 0.00 0.000 0.00 0.000 0.00
Sub Total 1994.860 1994.860 0.000 0.000
Day Total in MT 27.062 27.062 0.000 0.000
Total for the Month in MT 104.247 104.247 0.000 0.000
Cumulative Total in MT 3112.402 3112.402 1962.626 1962.626

Page 8 of 17
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 9 of 17
NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1203.783

Page 10 of 17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 07 Oct 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 06/10/2017 35-384 001 1.00 152.510 1.00 152.510 0.00 0.000 0.00 0.000 0.00
2 06/10/2017 35-384 002 1.00 111.375 1.00 111.375 0.00 0.000 0.00 0.000 0.00
3 06/10/2017 35-384 004 3.00 31.700 3.00 31.700 0.00 0.000 0.00 0.000 0.00
4 06/10/2017 35-384 006 1.00 159.170 1.00 159.170 0.00 0.000 0.00 0.000 0.00
5 06/10/2017 35-384 007 2.00 18.935 2.00 18.935 0.00 0.000 0.00 0.000 0.00
6 06/10/2017 35-384 009 1.00 126.650 1.00 126.650 0.00 0.000 0.00 0.000 0.00
7 06/10/2017 35-384 010 1.00 318.730 1.00 318.730 0.00 0.000 0.00 0.000 0.00
8 06/10/2017 35-384 012 6.00 50.820 6.00 50.820 0.00 0.000 0.00 0.000 0.00
9 06/10/2017 35-384 013 2.00 28.250 2.00 28.250 0.00 0.000 0.00 0.000 0.00
10 06/10/2017 35-384 014 1.00 14.275 1.00 14.275 0.00 0.000 0.00 0.000 0.00
11 06/10/2017 35-384 016 2.00 72.350 2.00 72.350 0.00 0.000 0.00 0.000 0.00
12 06/10/2017 35-384 017 1.00 61.250 1.00 61.250 0.00 0.000 0.00 0.000 0.00
13 06/10/2017 35-384 019 1.00 876.153 1.00 876.153 0.00 0.000 0.00 0.000 0.00
14 06/10/2017 35-384 020 1.00 1221.410 1.00 1221.410 0.00 0.000 0.00 0.000 0.00
15 06/10/2017 35-384 027 1.00 10.905 1.00 10.905 0.00 0.000 0.00 0.000 0.00
16 06/10/2017 35-384 030 2.00 174.480 2.00 174.480 0.00 0.000 0.00 0.000 0.00
17 06/10/2017 35-384 031 1.00 512.210 1.00 512.210 0.00 0.000 0.00 0.000 0.00
18 06/10/2017 35-384 034 2.00 164.080 2.00 164.080 0.00 0.000 0.00 0.000 0.00
19 06/10/2017 35-384 035 1.00 156.400 1.00 156.400 0.00 0.000 0.00 0.000 0.00
20 06/10/2017 35-384 037 2.00 22.800 2.00 22.800 0.00 0.000 0.00 0.000 0.00
21 06/10/2017 35-384 038 1.00 10.690 1.00 10.690 0.00 0.000 0.00 0.000 0.00
22 06/10/2017 35-384 039 1.00 9.570 1.00 9.570 0.00 0.000 0.00 0.000 0.00
23 06/10/2017 35-384 044 2.00 18.710 2.00 18.710 0.00 0.000 0.00 0.000 0.00
24 06/10/2017 35-384 045 2.00 18.240 2.00 18.240 0.00 0.000 0.00 0.000 0.00
25 06/10/2017 35-384 047 2.00 85.880 2.00 85.880 0.00 0.000 0.00 0.000 0.00
26 06/10/2017 35-384 050 1.00 88.620 1.00 88.620 0.00 0.000 0.00 0.000 0.00
27 06/10/2017 35-384 052 2.00 22.700 2.00 22.700 0.00 0.000 0.00 0.000 0.00
28 06/10/2017 35-384 055 1.00 479.915 1.00 479.915 0.00 0.000 0.00 0.000 0.00
Sub Total 5018.778 5018.778 0.000 0.000
1 06/10/2017 35-524 005 1.00 1212.370 1.00 1212.370 0.00 0.000 0.00 0.000 0.00
2 06/10/2017 35-524 007 1.00 2182.315 1.00 2182.315 0.00 0.000 0.00 0.000 0.00
Sub Total 3394.685 3394.685 0.000 0.000
1 06/10/2017 36-130 005 1.00 3196.060 1.00 3196.060 0.00 0.000 0.00 0.000 0.00
2 06/10/2017 36-130 011 1.00 3196.060 1.00 3196.060 0.00 0.000 0.00 0.000 0.00
Sub Total 6392.120 6392.120 0.000 0.000
Day Total in MT 14.806 14.806 0.000 0.000
Total for the Month in MT 119.052 119.052 0.000 0.000
Cumulative Total in MT 3127.208 3127.208 1962.626 1962.626

Page 11 of 17
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1203.783

Page 12 of 17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 09 Oct 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 07/10/2017 35-140 033 1.00 3196.060 1.00 3196.060 0.00 0.000 0.00 0.000 0.00
Sub Total 3196.060 3196.060 0.000 0.000
1 07/10/2017 35-525 002 1.00 4659.640 1.00 4659.640 0.00 0.000 0.00 0.000 0.00
2 07/10/2017 35-525 003 1.00 4206.450 1.00 4206.450 0.00 0.000 0.00 0.000 0.00
3 07/10/2017 35-525 009 1.00 2516.435 1.00 2516.435 0.00 0.000 0.00 0.000 0.00
Sub Total 11382.525 11382.525 0.000 0.000
Day Total in MT 14.579 14.579 0.000 0.000
Total for the Month in MT 133.631 133.631 0.000 0.000
Cumulative Total in MT 3141.786 3141.786 1962.626 1962.626

Page 13 of 17
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1203.783

Page 14 of 17
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 09 Oct 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 08/10/2017 35-140 040 1.00 3931.390 1.00 3931.390 0.00 0.000 0.00 0.000 0.00
2 08/10/2017 35-140 047 1.00 3366.770 1.00 3366.770 0.00 0.000 0.00 0.000 0.00
3 08/10/2017 35-140 054 1.00 4122.440 1.00 4122.440 0.00 0.000 0.00 0.000 0.00
4 08/10/2017 35-140 061 1.00 4937.930 1.00 4937.930 0.00 0.000 0.00 0.000 0.00
Sub Total 16358.530 16358.530 0.000 0.000
Day Total in MT 16.359 16.359 0.000 0.000
Total for the Month in MT 149.989 149.989 0.000 0.000
Cumulative Total in MT 3158.145 3158.145 1962.626 1962.626

Page 15 of 17
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1203.783

Page 16 of 17
INDWeLL CONSTrUCTIONS PVT LIMITeD
APGENCO, STAGE-V, 1 X 800 MW, Dr.NTTPS IBRAHIMPATNAM
DAILY PROGRESS REPORT(SUMMARY)
Report Date: 17-Oct-20
Erected on: 16-Oct-20

WEIGHT AS THS MONTH


WEIGHT
PER CUMMULATIVE
Sl.No CATEGORY UPTO LAST
CONTRACT IN MT
MONTH MONTH
(MT) DAY WISE
WISE

1 Structures 12673.71 3008.155 16.359 149.989 3158.144


2 Pressure Parts 11635.47 0 0.000 0.000 0.000
3 Non-Pressure Parts 4973.2 0 0.000 0.000 0.000
4 Rotating Equipments 1992.64 0 0.000 0.000 0.000
Rotating Machine Handling
5 45.1 0 0.000 0.000 0.000
Equipments
Grand Total 31320.12 3008.155 16.359 149.989 3158.144
Note:
1 Proper road approach is required in site for marching hydra
2 Area Is not avialble for pre assembly
3 Area not provided to tie gai rope for column alignment
4 Road Required for Ambulance Movement at Boiler Surroundings

MANPOWER REPORT AS ON 09.10.2017

Sl.No Designation Total Workmen Present Absent

1 Staff 24 24 0
2 Foremen 3 3 0
3 Skilled 77 65 12
4 Semi Skilled 43 35 8
5 Un skilled 44 35 9
6 Operators 12 12 0
Total 203 174 29

17