Professional Documents
Culture Documents
4 Maintenance
02
Preparation before Installation
Tools
Precautions Skills
4
Precautions
Preparation before Installation
Precautions If the air conditioner is installed in the following places, it may cause
malfunction. If it is unavoidable, please contact the local service center.
Coastal places
Circuit Breaker
Caution:
1.the outer material of the circuit breaker should be fireproof
2.normally, it is 2 times of the nominal current
Preparation before Installation
3.0kgf/cm2 N2
vertical Not
vertical
Correct Wrong
Caution 2: Pay attention to the cutting speed and force to avoid deforming the pipe.
Too much
copper pipe is
force deformed
Wrong Wrong
Preparation before Installation
Caution 3: When removing the burr, the pipe orifice should be downward
to prevent the scrap from getting into the pipe.
Skills
Wrong Correct
Burr Pipe orifice downward
Double
surface Crack
1 Preparation before Installation
4 Maintenance
02
Installation of the Air Conditioner
Process
2.2 2.3
2.1 select 2.4 connect wire
install mounting install outdoor
installation site of indoor unit
plate and drill holes unit support
2.7
2.8 connect wire 2.6 connect tube 2.5 install
install indoor unit
of outdoor unit of indoor unit drain hose
and outdoor unit
2.10
2.9 connect tube 2.11 vacuum
install drain block
of outdoor unit leak test
(heat pump unit)
Installation of the Air Conditioner
Installation sketch
°²×°³ß´çͼ
Installation site of indoor unit
1.The air inlet and outlet should be far away from the obstructions. Ensure that the air
can be blown throughout the whole room.
2. The condensate is easy to be discharged. It is easy to connect to the outdoor unit.
3. It is out of reach of children.
4. It can bear the weight of the indoor unit and minimize the noise and vibration.
5. Ensure that there is enough space for maintenance.
6. It should be far away from the television and stereo, at least 1m.
7. Make sure that the indoor unit is installed in accordance with installation dimension
instructions.
8. Do not use the unit in the laundry or by swimming pool etc.
Installation of the Air Conditioner
2.1 Selection of Installation Site
Installation of the Air Conditioner
Problem?
Installation of the Air Conditioner
Installation site of outdoor unit
1. The noise and the air
flow will not affect the
neighbor, the animal or the
plant.
2. There should be good
ventilation.
3. The air inlet and outlet
should be far away from
obstructions.
4. It can bear the weight of
the outdoor unit and
vibration.
5. Select dry places. It
should not be exposed to
sunlight or strong wind.
Installation of the Air Conditioner
Installation site of outdoor unit
Note: H
“H” stands for “Max Distance Height”
“L” stands for “Max Distance Length”
IDU
U Trap
23
Oil Trap
C=3~ 5 x A
Installation of the Air Conditioner
2.1 Selection of Installation Site
Problem?
Installation of the Air Conditioner
Capacity D(mm)
05K~12K ¢55
18K/24K ¢65
Note:
“D” stand for dimension of the hole
Install wall pipe to protect the tube and
Drill holes the wire.
outdoor unit
Expansion
screw
Open electric box cover 2. Connect power connecting wire and signal cable according
to wiring board.
wiring
Installation of the Air Conditioner
Plug
Installation of the Air Conditioner
Attention :
1.Connect the tube to indoor unit first and then outdoor unit.
2.The nut of the connector should not be too tight, or it may lead to
leakage.
Installation of the Air Conditioner
Liquid Pipe Gas Pipe Cooling Only , Heat Cooling Only Heat Pump
Pump (g / m) (g / m) (g / m)
Ф6 Ф9.52 or Ф12 20 15 20
Ф6 or Ф9.52 Ф16 or Ф19 50 15 50
Installation of the Air Conditioner
Connecting pipe, discharge pipe, wrapping wires
The bottom case of the indoor unit should cling to the wall.
The block of the connecting pipe should be tight to prevent dust.
Seal the hole with plaster.
Installation of the Air Conditioner
Open electric box cover 2. Connect power connecting wire and signal cable according
to wiring board.
Install the connector of discharge pipe in Φ25 hole of the chassis. Put the water outlet of
the discharge pipe in a place easy for drainage.
1. Vacuum pump(R410A)
2. Connect the charge hose from manifold valve to the
service port of the gas valve and connect the
charge hose to the port of the vacuum pump.
3. Open the low pressure gauge and operate the
vacuum pump till the pressure is ≤-0.1MPa.
4. Close the pressure gauge first, then the vacuum
pump.
5. Observe the pressure gauge for 10-15mins, if it
returns to more than -0.08Mpa, there is leakage.
6. Check the possible leakage spots and repeat the
above.
7. When finish, Open the small valve a bit and close it
when the pressure reaches 0.05MPa, remove the
gauge quickly. (key process)
8. Completely open the small valve and then the big
valve, screw up the back cover screw nut of valve.
2.11 Vacuum & Leak Test
Installation of the Air Conditioner
Leak Test
Soapy water: coat soapy water on the connector and the stop valve and keep for
3min. Bubbles indicate leak.
In summer, test it when the unit is off. In winter, test it when the unit is heating.
Electronic leak detector: test for 3s~5s
Do not install the split air conditioner when it is rainy or snowy.
1 Preparation before Installation
4 Maintenance
02
Inspection & Test Run
Inspection
Test Run
Others
Inspection
Does the wire model reach the requirement? Malfunction , burnout of parts
Is there obstruction near air inlet or air outlet? insufficient cooling (heating)
Are length of refrigerant pipe and refrigerant Insufficient or surplus refrigerant volume
volume recorded?
Others
Test Run
1.Preparation
Make sure you do a proper installation according to previous process.
2. Method
Test Run
1. Drainpipe test
• Open the panel and fill the water into evaporator slowly.
Note: (1) Make sure all procedure have been finished and the drainpipe is well installed.
(2) Pay attention to the speed and airflow volume when filling water, to avoid getting
wet of the electric part.
Test Run
③ Pressure observation
• The low operation pressure value under 30℃ ambient temperature is around
0.8~1MPa(On/off),0.72-0.88Mpa(inverter)
1 Preparation before Installation
4 Maintenance
02
Maintenance
4 Maintenance
cleaning