SECTION A :- DAILY DAM AND RIVERS DATA DATE 06/06/2016

reservoir in
Data
Sr. No. Particulars ft./Mtr Critical Observation Net release in River Remarks
2016 2017 + -
1 DAMS
(A) BHAKRA Low flood 0.5 -1.0 lac Total release =
MAXIMUM=1680.00’ Med. Flood 1.0-1.5 lac Used for Irrigation=
MINIMUM=1462.00’ High Flood >1.5 lac Released in River =
LEVEL IN FEET
INFLOW (CS)
RELEASES (CS)
(B) PONG Low flood 0.5 -1.0 lac Total release = Chakki River=
MAXIMUM=1390.00’ Med. Flood 1.0-1.5 lac Used for Irrigation =
MINIMUM=1260.00’ High Flood >1.5 lac Released in River =
LEVEL IN FEET
INFLOW (CS)
RELEASES (CS)
(C) RANJIT SAGAR (Permissible Level=524.91 Total release = River Ujh =
mtr.)
MAXIMUM=527.91 mtr. Used for Irrigation =
MINIMUM=487.00 mtr. Released in River =
LEVEL IN METERS
INFLOW (CS)
RELEASES (CS)
2 HEAD WORKS
(a) NANGAL(SUTLEJ) Low flood 0.5 -1.0 lac
Med. Flood 1.0-1.5 lac
D/S DISCHARGE (CS) High Flood >1.5 lac
(b) ROPAR (SUTLEJ) Low flood 0.8 -1.4 lac Tributaries:
Med. Flood 1.4-2.00 lac (Swan,Sirsa etc.)
D/S DISCHARGE (CS) High Flood >2.0 lac
(c) Harike (Sutlej) Low flood 0.5 -2.00 lac Ferozepur Feeder = Tributaries u/s
Med. Flood 2.00-3.00 lac Rajasthan Feeder = Harike:
D/S DISCHARGE (CS) High Flood >3.00 lac TOTAL = (Sagrao,
(d) Hussaini Wala (Sutlej) Low flood 0.5 -1.50 lac Budhki,
Med. Flood 1.50-2.25 lac
D/S DISCHARGE (CS) High Flood >2.25 lac
(e) Madhopur (Ravi) Low flood 0.3 -0.6 lac
Med. Flood 0.60-1.00 lac
D/S DISCHARGE (CS) High Flood >1.00 lac
3 RIVERS DISCHARGE SITES
(I) River Ravi
Dharamkot
(II) River Beas Low flood 1.5-2.0 lac
Naushera Mirthal Med. Flood 2.00 3.0lac
Passi High Flood >3.00 lac
Dhilwan
(III) River Sutlej Low flood 1.0-1.5 lac
Med. Flood 1.50- 2.00lac
Phillaur High Flood >2.00 lac
(IV) River Ghaggar
(a) Bhankharpur Low flood 0.21-0.315 lac
Med. Flood 0.315-.42lac
High Flood >0.42 lac
(b) Narwana Branch Xing RD
148
RD150
B.M.L Xing RD 455 Low flood 0.10-0.15 lac
Med. Flood 0.15-.20lac
(Khanauri )
RD 460 (Khanauri ) High Flood >0.20 lac
4 MAIN NADI/CHOE
Sirsa
Swan
Siswan
Budhki
Sagrao

Abbreviations: -1.Cs- Cusecs 2. NR-Not received 3. Lkg- Leakage

CONTNUED ON PAGE 2
IRRIGATION DEPARTMENT, PUNJAB

SECTION B :- DAILY RAINFALL DATA (IN mm) DATE 01 /07/2017

S.N. STATION R/F S.N. STATION R/F S.N. STATION R/F S.N. STATION R/F
Distt. Amritsar Distt. Pathankot Distt. Moga
1 Amritsar (MG) 44 SPK 84 Moga (MG) H.P.
2 Jandiala(MG)) 45 RSD(AG) 85 Channowal (MG) 126 Kheri
3 Kohali (MG) 46 Bhimpur (AG/MG) 86 Fatehgarh Panjtoor (AG) 127 Chamba
4 Mujupur(MG) 47 Madhopur (AG/MG) 87 Noorpur (MG) 128 Surgani
5 Raiya (MG) Distt. Hoshiarpur 88 Rannia (AG) 129 Chaura
6 Ranewale (AG/MG) NW/ 48 Mukerian(AG/MG) 89 Jaimalwala (MG) NW 130 Chatradi
Distt. Barnala 49 Talwara (AG) Distt. mukatsar 131 Tissa
7 Hadiaya (MG) 50 Gharshankar (MG) 90 Mukatsar Sahib (AG)
8 Sahoke (MG) Distt. Jalandhar 91 Gidderbaha(AG) J&K
9 Sehna (AG/MG) /NW 51 Adampur (AG/MG) 92 Kandu khera (AG) 132 Boond
Distt. Bathinda 52 Bilga (AG/MG) 93 Shehna Khera (MG) NW 133 Patti
10 Jodhpur (MG) 53 Jalandhar (AG/MG) 94 Maha Badhar (MG) NW 134 Basoli
11 Kot Bakhtu (MG) 54 Sarin (AG) 95 Assa Butter (MG) NW 135 Sangota
12 Ramnagar (AG/MG) 55 Mukandpur (AG) Distt. Patiala SDO BBMB NANGAL DAM
13 Rama ((MG) Distt. Kapurthala 96 Bhadson (MG) 136 Lohand (MG)
14 Raikekalan (AG) 56 Goraya (AG/MG) 97 Devigarh (MG) 137 Nangal (MG)
15 Talwandisabo (AG/MG) Distt. Ludhiana 98 Ganda Kheri (MG) 138 Ganguwal (MG)
16 Bibiwala (AG) 57 Akhara (MG) 99 Patiala(MG) 139 Kotla (MG)
17 Nandgarh (AG) 58 Bassian (MG) 100 Rohti (AG) 140 Bharatgarh (MG)
18 Rampura Phul (AG/MG) /NW 59 Bharthala(AG/MG) 101 Samana (AG/MG) XEN HYDROLOGY BBMB NANGAL
Distt. Fatehgarh Sahib 60 Bool (MG) 102 Seel (AG) NW River Satluj
19 Adampur (AG/MG) 61 Ludhiana (MG) 103 Dhanetha (MG) 141 Rampur
20 Amloh(AG/MG) NW/ 62 Sidhwan Bet (AG/MG) 104 Dedhna (AG) 142 Suni
21 Sounda (AG/MG) 63 Doraha(MG) 105 Allowal (AG) 143 Kasol
22 Dhangrin (AG) 64 Dadahur (MG) 106 Hiragarh( MG) 144 Kahu
23 Khamano (AG/MG) 65 Gadi (MG) Distt. Ropar 145 Berthin
24 Akash (MG) 66 Jarg (MG) NW 107 Ballan (MG) 146 R/L 1700
Distt. Faridkot 67 Dalla (MG NW 108 Chamkaur Sahib (AG/MG) 147 NGL Dam
25 Faridkot (AG) Distt. Mansa 109 Siswan (MG) BEAS UNIT - I
26 Dhaipai (AG) 68 Bhikhi (MG) 110 Ropar (AG/MG) 148 Pandoh
27 Kingra (MG) NW 69 Golewala(MG)) Distt. S.B.S. Nagar 149 Bhunter
28 Dhalpur (MG) 70 Hingna (MG) 111 Nawansehar (AG) 150 S/Nagar
Distt. Ferozepur 71 Jhunir (AG) Distt. S.A.S. Nagar BEAS UNIT - II
29 Ferozepur (AG) 72 Jawarke(MG) 112 Banur (AG) 151 Sujanpur Tera
30 Hussaniwala (AG) NW 73 Joga(MG) Distt. Sangrur 152 Nadaun
31 Makhu (AG) 74 Khusla (AG/MG) 113 Balad Kothi (AG) 153 Geelav
32 Mallanwala(MG) 75 Sangreri (AG) 114 Dialpura (AG) 154 Nagrota Surian
33 Talwandi(MG) 76 Kalipur (AG) 115 Gujran (MG) NW 155 Ghamroor (Pong Dam Site)
34 Jalalabad (MG) Distt. Tarantaran 116 Kotra (MG)
Harike (MG) 77 Bhucher (AG/MG) NW/ 117 Khanauri (AG/MG)
Distt. Fazilka 78 Dilawalpur (MG) 118 Ladha (AG/MG)
35 Jandwala (MG) NW 79 Khawaspur (AG/MG) 119 Babanpur (AG)
36 Amirkhas (AG) 80 Dera Sahib (AG) 120 Bugran (AG)
37 Fazlika (AG) 81 Manihala (AG/MG) 121 Mahorana (AG)
38 Abohar (AG) 82 Rasulpur (AG/MG) 122 Lehla (AG)
Distt. Gurdaspur 83 Valtoha (AG/MG) 123 Nadampur (MG)
39 Aliwal (MG) 124 Ranike(MG)
40 Dhariwal (MG) 125 Sheron (MG) NW
41 Sathiali (AG/MG)
42 Tibri (AG/MG)
43 Athwal (AG/MG)

Abreviations:- 1- NW- Not Working 2- R/F- rainfall 3- AG- AutoGauge 4 MG- MannualGauge

S.N. Rainfall Position


Name of the rivers where water levekl is exceeding warning level
1 (Specify danger level and actual water level)
Name of the rivers where water levekl is exceeding warning level
2 (Specify danger level and actual water level)

3 Critical Observation
IRRIGATION DEPARTMENT ,PUNJAB
SECTION C : - DAILY CANAL DATA DATE :- 01/07/2017

Sr. No. DESCRIPTION UNIT last year INDENT


DATA

1 MADHOPUR H/W
i) KASHMIR CANAL (1050 CS) CS 642
2 UBDC SYSTEM
i) CHAKANDAR FEEDER CS 269
ii) U.B.D.C. AT HEAD(8200CS AVG) CS 6476
Iii) HEAD SALAMPUR DISTY. CS 608
iv)SILET EJECTOR RD- 72000CS( AVG) CS 296
PUNJAB INDENT/DELIVERED (UBDC+CKDR FDR+SLP) (-) S.E. 72000)At Madhopur
AVG. DIVERSION FROM RIVER RAVI TO BEAS INCLUDING M.B. LINK
( a) TOTAL M.B. LINK AT HEAD CS 3815
(b) SILT EJECTOR 72000 CS 608
TOTAL DIVERSION ( A+B) = CS 4423
3 NANGAL DAM (RL=1150 FT)
i) SUPPLY FROM NANGAL CS 34000
ii) NANGAL HYDEL CHANNEL CS 12500
iii) ANANDPUR SAHIB HYDEL CHANNEL CS 10150
iv) D/S NAGAL DISCHARGE CS 11350
4 BML SYSTEM
i)SUPPLY AT HEAD BML (12500 CS) CS 11308
ii)SUPLLY IN BML AT RD3,90,000 (6772CS) CS 5470
iii)SUPPLY IN NARWANA BR.AT RD1,60,000 (4022CS) CS 3669
iv) TOTAL HARYANA SHARE/DELIVERED. CS 9525
v)PUNJAB ON BML (SHARE/UTILIZATION). CS 1857
vi) BMB (TOHANA HEAD) CS NR
vii) PUNJAB SHARE FROM BMB (TOHANA HEAD) CS NR
5 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)(RL=873.50 FT)
i))SUPPLLY AT U/S ROPAR HEAD WORKS CS 22790
ii)SUPPLLIY IN SIRHIND CANAL (12622 CS) CS 10400
iii)SUPPLY IN BIST DOAB CANAL(1452CS) CS 1450
iv)D/S ROPAR HEAD WORKS CS 10940
v) PUNJAB SHARE/DELIVERED (S. C. G'S+BDC+PB ON BML) CS 13707
6 SHAH NEHAR BARRAGE
i)MUKERIAN HYDEL CHANNEL CS NR
ii) SHAH NEHAR CS 425
iii) KANDI CANAL CS 150
iv) LBC (HP) CS 100
v) RBC (HP) CS 200
vi) TOTAL DELIVERED SHAH NEHAR GROUP ( I/C Hazipur+Chingerwan) CS 915
7 HARIKE HEAD WORKS (RL=690.50FT) R. L. Today
A. I)SUPPLLY AT U/S HARIKE H/WORKS CS 21573
iII)SUPLLY IN FEROZEPUR FEEDER(11192CS) CS 292
ii)SUPPLY IN MAKHU CANAL (292 CS) CS 10301
Iv) SUPLLY IN SIRHIND FEEDER (5264 CS) CS 5264
v) SUPLLY IN EASTERN CANAL (3197CS)FROM FZR FEEDER CS 2420
vi) SUPPLY In KANIAWALI Disty (22CS ) CS 20
vii) SUPPLY IN MIAWAH +SODHI NAGAR+ HARI HAR DISTY CS 357
SHARE AT HARIKE/DELIVERED (iito vii)
x) RELEASES D/S HARIKE H/WORKS CS 1000
UTILISATION OF RAJASTHAN
i)SUPLLY IN RAJASTHAN FEEDER(18500CS) CS 10000
ii) SUPPLY IN BEkANER CANAL (2720 CS) CS 2820
RAJASTHAN SHARE/DELIVERED (i+ii) CS 12820
8 FEROZEPUR ( HUSSANI WALA)HEAD WORKS (RL=648.50 FT)
i) SUPLLY IN EASTERN CANAL FROM FZR H/W CS 1000
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL
iii) TOTAL PUNJAB APPROVED SHARE AT HARIKE/DELIVERED (-) TSF CS 9893

Executive Engineer/Regulation,
Office of Chief Engineer/Canals,
SUBMITTED FOR KIND INFORMATION:- Irrigation Works Pb. Chandigarh.
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii) Chief Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi) Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Defence I
viii) Defence II
IRRIGATION DEPARTMENT ,PUNJAB
SECTION C : - DAILY CANAL DATA DATE :- /06/2016
last year
Sr. No. DESCRIPTION UNIT DATA INDENT

1 MADHOPUR H/W
i) KASHMIR CANAL (1050 CS) CS
2 UBDC SYSTEM
i) CHAKANDAR FEEDER CS
ii) U.B.D.C. AT HEAD(8200CS AVG) CS
Iii) HEAD SALAMPUR DISTY. CS
iv)SILET EJECTOR RD- 72000CS( AVG) CS
PUNJAB INDENT/DELIVERED (UBDC+CKDR FDR+SLP) (-) S.E. 72000)At Madhopur
AVG. DIVERSION FROM RIVER RAVI TO BEAS INCLUDING M.B. LINK
( a) TOTAL M.B. LINK AT HEAD CS
(b) SILT EJECTOR 72000 CS
TOTAL DIVERSION ( A+B) = CS
3 NANGAL DAM (RL=1150 FT)
i) SUPPLY FROM NANGAL CS
ii) NANGAL HYDEL CHANNEL CS
iii) ANANDPUR SAHIB HYDEL CHANNEL CS
iv) D/S NAGAL DISCHARGE CS
4 BML SYSTEM
i)SUPPLY AT HEAD BML (12500 CS) CS
ii)SUPLLY IN BML AT RD3,90,000 (6772CS) CS
iii)SUPPLY IN NARWANA BR.AT RD1,60,000 (4022CS) CS
iv) TOTAL HARYANA SHARE/DELIVERED. CS
v)PUNJAB ON BML (SHARE/UTILIZATION). CS
vi) BMB (TOHANA HEAD) CS
vii) PUNJAB SHARE FROM BMB (TOHANA HEAD) CS
5 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)(RL=873.50 FT)
i))SUPPLLY AT U/S ROPAR HEAD WORKS CS
ii)SUPPLLIY IN SIRHIND CANAL (12622 CS) CS
iii)SUPPLY IN BIST DOAB CANAL(1452CS) CS
iv)D/S ROPAR HEAD WORKS CS
v) PUNJAB SHARE/DELIVERED (S. C. G'S+BDC+PB ON BML) CS
6 SHAH NEHAR BARRAGE
i)MUKERIAN HYDEL CHANNEL CS
ii) SHAH NEHAR CS
iii) KANDI CANAL CS
iv) LBC (HP) CS
v) RBC (HP) CS
vi) TOTAL DELIVERED SHAH NEHAR GROUP ( I/C Hazipur+Chingerwan) CS
7 HARIKE HEAD WORKS (RL=690.50FT) R. L. Today
A. I)SUPPLLY AT U/S HARIKE H/WORKS CS
iII)SUPLLY IN FEROZEPUR FEEDER(11192CS) CS
ii)SUPPLY IN MAKHU CANAL (292 CS)
Iv) SUPLLY IN SIRHIND FEEDER (5264 CS) CS
v) SUPLLY IN EASTERN CANAL (3197CS)FROM FZR FEEDER CS
vi) SUPPLY In KANIAWALI Disty (22CS )
vii) SUPPLY IN MIAWAH +SODHI NAGAR+ HARI HAR DISTY CS
SHARE AT HARIKE/DELIVERED (iito vii)
x) RELEASES D/S HARIKE H/WORKS CS
UTILISATION OF RAJASTHAN
i)SUPLLY IN RAJASTHAN FEEDER(18500CS) CS
ii) SUPPLY IN BEkANER CANAL (2720 CS) CS
RAJASTHAN SHARE/DELIVERED (i+ii) CS
8 FEROZEPUR ( HUSSANI WALA)HEAD WORKS (RL=648.50 FT)
i) SUPLLY IN EASTERN CANAL FROM FZR H/W CS
ii)RELEASES D/S FEROZEPUR H/WORKS CS
iii) TOTAL PUNJAB APPROVED SHARE AT HARIKE/DELIVERED (-) TSF CS

Executive Engineer/Regulation,
Office of Chief Engineer/Canals,
SUBMITTED FOR KIND INFORMATION:- Irrigation Works Pb. Chandigarh.
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii) Chief Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi) Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Defence I
viii) Defence II
IRRIGATION DEPARTMENT ,PUNJAB
01/07/2017 SECTION C : - DAILY CANAL DATA DATE :- 02/07/20

Current year Sr. No. DESCRIPTION UNIT last year


DATA DATA

1 MADHOPUR H/W
i) KASHMIR CANAL (1050 CS) CS 649
2 UBDC SYSTEM
i) CHAKANDAR FEEDER CS 269
ii) U.B.D.C. AT HEAD(8200CS AVG) CS 6618
Iii) HEAD SALAMPUR DISTY. CS 500
iv)SILET EJECTOR RD- 72000CS( AVG) CS 300
PUNJAB INDENT/DELIVERED (UBDC+CKDR FDR+SLP) (-) S.E. 72000)At Madhopur
AVG. DIVERSION FROM RIVER RAVI TO BEAS INCLUDING M.B. LINK
( a) TOTAL M.B. LINK AT HEAD CS 4249
(b) SILT EJECTOR 72000 CS 500
TOTAL DIVERSION ( A+B) = CS 4749
3 NANGAL DAM (RL=1150 FT)
i) SUPPLY FROM NANGAL CS 34000
ii) NANGAL HYDEL CHANNEL CS 12500
iii) ANANDPUR SAHIB HYDEL CHANNEL CS 10150
iv) D/S NAGAL DISCHARGE CS 11350
4 BML SYSTEM
i)SUPPLY AT HEAD BML (12500 CS) CS 11225
ii)SUPLLY IN BML AT RD3,90,000 (6772CS) CS 5924
iii)SUPPLY IN NARWANA BR.AT RD1,60,000 (4022CS) CS 3352
iv) TOTAL HARYANA SHARE/DELIVERED. CS 9400
v)PUNJAB ON BML (SHARE/UTILIZATION). CS 1611
vi) BMB (TOHANA HEAD) CS NR
vii) PUNJAB SHARE FROM BMB (TOHANA HEAD) CS NR
5 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)(RL=873.50 FT)
i))SUPPLLY AT U/S ROPAR HEAD WORKS CS 22777
ii)SUPPLLIY IN SIRHIND CANAL (12622 CS) CS 10000
iii)SUPPLY IN BIST DOAB CANAL(1452CS) CS 1450
iv)D/S ROPAR HEAD WORKS CS 11327
v) PUNJAB SHARE/DELIVERED (S. C. G'S+BDC+PB ON BML) CS 13061
6 SHAH NEHAR BARRAGE
i)MUKERIAN HYDEL CHANNEL CS NR
ii) SHAH NEHAR CS 425
iii) KANDI CANAL CS 150
iv) LBC (HP) CS 100
v) RBC (HP) CS 200
vi) TOTAL DELIVERED SHAH NEHAR GROUP ( I/C Hazipur+Chingerwan) CS 915
7 HARIKE HEAD WORKS (RL=690.50FT) R. L. Today
A. I)SUPPLLY AT U/S HARIKE H/WORKS CS 20101
iII)SUPLLY IN FEROZEPUR FEEDER(11192CS) CS 292
ii)SUPPLY IN MAKHU CANAL (292 CS) CS 10301
Iv) SUPLLY IN SIRHIND FEEDER (5264 CS) CS 5264
v) SUPLLY IN EASTERN CANAL (3197CS)FROM FZR FEEDER CS 2420
vi) SUPPLY In KANIAWALI Disty (22CS ) CS 20
vii) SUPPLY IN MIAWAH +SODHI NAGAR+ HARI HAR DISTY CS 357
SHARE AT HARIKE/DELIVERED (iito vii)
x) RELEASES D/S HARIKE H/WORKS CS 1000
UTILISATION OF RAJASTHAN
i)SUPLLY IN RAJASTHAN FEEDER(18500CS) CS 10000
ii) SUPPLY IN BEkANER CANAL (2720 CS) CS 2820
RAJASTHAN SHARE/DELIVERED (i+ii) CS 12820
8 FEROZEPUR ( HUSSANI WALA)HEAD WORKS (RL=648.50 FT)
i) SUPLLY IN EASTERN CANAL FROM FZR H/W CS 1000
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL
iii) TOTAL PUNJAB APPROVED SHARE AT HARIKE/DELIVERED (-) TSF CS NR

eer/Regulation, Executive Engineer/Regulatio


ngineer/Canals, Office of Chief Engineer/Cana
Pb. Chandigarh. SUBMITTED FOR KIND INFORMATION:- Irrigation Works Pb. Chandiga
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii) Chief Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi) Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Defence I
viii) Defence II
IRRIGATION DEPARTMENT ,PUNJAB
/06/2016 SECTION C : - DAILY CANAL DATA DATE :- /06/201
Current year last year
DATA Sr. No. DESCRIPTION UNIT DATA

1 MADHOPUR H/W
0 i) KASHMIR CANAL (1050 CS) CS
2 UBDC SYSTEM
0 i) CHAKANDAR FEEDER CS
0 ii) U.B.D.C. AT HEAD(8200CS AVG) CS
0 Iii) HEAD SALAMPUR DISTY. CS
0 iv)SILET EJECTOR RD- 72000CS( AVG) CS
PUNJAB INDENT/DELIVERED (UBDC+CKDR FDR+SLP) (-) S.E. 72000)At Madhopur
0 AVG. DIVERSION FROM RIVER RAVI TO BEAS INCLUDING M.B. LINK
0 ( a) TOTAL M.B. LINK AT HEAD CS
0 (b) SILT EJECTOR 72000 CS
0 TOTAL DIVERSION ( A+B) = CS
3 NANGAL DAM (RL=1150 FT)
0 i) SUPPLY FROM NANGAL CS
0 ii) NANGAL HYDEL CHANNEL CS
0 iii) ANANDPUR SAHIB HYDEL CHANNEL CS
0 iv) D/S NAGAL DISCHARGE CS
4 BML SYSTEM
0 i)SUPPLY AT HEAD BML (12500 CS) CS
0 ii)SUPLLY IN BML AT RD3,90,000 (6772CS) CS
0 iii)SUPPLY IN NARWANA BR.AT RD1,60,000 (4022CS) CS
0 iv) TOTAL HARYANA SHARE/DELIVERED. CS
0 v)PUNJAB ON BML (SHARE/UTILIZATION). CS
0 vi) BMB (TOHANA HEAD) CS
0 vii) PUNJAB SHARE FROM BMB (TOHANA HEAD) CS
5 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)(RL=873.50 FT)
0 i))SUPPLLY AT U/S ROPAR HEAD WORKS CS
0 ii)SUPPLLIY IN SIRHIND CANAL (12622 CS) CS
0 iii)SUPPLY IN BIST DOAB CANAL(1452CS) CS
0 iv)D/S ROPAR HEAD WORKS CS
0 v) PUNJAB SHARE/DELIVERED (S. C. G'S+BDC+PB ON BML) CS
6 SHAH NEHAR BARRAGE
0 i)MUKERIAN HYDEL CHANNEL CS
0 ii) SHAH NEHAR CS
0 iii) KANDI CANAL CS
0 iv) LBC (HP) CS
0 v) RBC (HP) CS
0 vi) TOTAL DELIVERED SHAH NEHAR GROUP ( I/C Hazipur+Chingerwan) CS
7 HARIKE HEAD WORKS (RL=690.50FT) R. L. Today
0 A. I)SUPPLLY AT U/S HARIKE H/WORKS CS
0 iII)SUPLLY IN FEROZEPUR FEEDER(11192CS) CS
ii)SUPPLY IN MAKHU CANAL (292 CS)
0 Iv) SUPLLY IN SIRHIND FEEDER (5264 CS) CS
0 v) SUPLLY IN EASTERN CANAL (3197CS)FROM FZR FEEDER CS
0 vi) SUPPLY In KANIAWALI Disty (22CS )
0 vii) SUPPLY IN MIAWAH +SODHI NAGAR+ HARI HAR DISTY CS
SHARE AT HARIKE/DELIVERED (iito vii)
0 x) RELEASES D/S HARIKE H/WORKS CS
UTILISATION OF RAJASTHAN
0 i)SUPLLY IN RAJASTHAN FEEDER(18500CS) CS
0 ii) SUPPLY IN BEkANER CANAL (2720 CS) CS
0 RAJASTHAN SHARE/DELIVERED (i+ii) CS
8 FEROZEPUR ( HUSSANI WALA)HEAD WORKS (RL=648.50 FT)
0 i) SUPLLY IN EASTERN CANAL FROM FZR H/W CS
0 ii)RELEASES D/S FEROZEPUR H/WORKS CS
0 iii) TOTAL PUNJAB APPROVED SHARE AT HARIKE/DELIVERED (-) TSF CS

eer/Regulation, Executive Engineer/Regulatio


ngineer/Canals, Office of Chief Engineer/Cana
Pb. Chandigarh. SUBMITTED FOR KIND INFORMATION:- Irrigation Works Pb. Chandiga
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii) Chief Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi) Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Defence I
viii) Defence II
IRRIGATION DEPARTMENT ,PUNJAB
DATE :- 02/07/2017 SECTION C : - DAILY CANAL DATA

INDENT Current year Sr. No. DESCRIPTION UNIT


DATA

1 MADHOPUR H/W
i) KASHMIR CANAL (1050 CS) CS
2 UBDC SYSTEM
i) CHAKANDAR FEEDER CS
ii) U.B.D.C. AT HEAD(8200CS AVG) CS
Iii) HEAD SALAMPUR DISTY. CS
iv)SILET EJECTOR RD- 72000CS( AVG) CS
PUNJAB INDENT/DELIVERED (UBDC+CKDR FDR+SLP) (-) S.E. 72000)At Madhopur
AVG. DIVERSION FROM RIVER RAVI TO BEAS INCLUDING M.B. LINK
( a) TOTAL M.B. LINK AT HEAD CS
(b) SILT EJECTOR 72000 CS
TOTAL DIVERSION ( A+B) = CS
3 NANGAL DAM (RL=1150 FT)
i) SUPPLY FROM NANGAL CS
ii) NANGAL HYDEL CHANNEL CS
iii) ANANDPUR SAHIB HYDEL CHANNEL CS
iv) D/S NAGAL DISCHARGE CS
4 BML SYSTEM
i)SUPPLY AT HEAD BML (12500 CS) CS
ii)SUPLLY IN BML AT RD3,90,000 (6772CS) CS
iii)SUPPLY IN NARWANA BR.AT RD1,60,000 (4022CS) CS
iv) TOTAL HARYANA SHARE/DELIVERED. CS
v)PUNJAB ON BML (SHARE/UTILIZATION). CS
vi) BMB (TOHANA HEAD) CS
vii) PUNJAB SHARE FROM BMB (TOHANA HEAD) CS
5 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)(RL=873.50 FT)
i))SUPPLLY AT U/S ROPAR HEAD WORKS CS
ii)SUPPLLIY IN SIRHIND CANAL (12622 CS) CS
iii)SUPPLY IN BIST DOAB CANAL(1452CS) CS
iv)D/S ROPAR HEAD WORKS CS
v) PUNJAB SHARE/DELIVERED (S. C. G'S+BDC+PB ON BML) CS
6 SHAH NEHAR BARRAGE
i)MUKERIAN HYDEL CHANNEL CS
ii) SHAH NEHAR CS
iii) KANDI CANAL CS
iv) LBC (HP) CS
v) RBC (HP) CS
vi) TOTAL DELIVERED SHAH NEHAR GROUP ( I/C Hazipur+Chingerwan) CS
7 HARIKE HEAD WORKS (RL=690.50FT) R. L. Today
A. I)SUPPLLY AT U/S HARIKE H/WORKS CS
iII)SUPLLY IN FEROZEPUR FEEDER(11192CS) CS
ii)SUPPLY IN MAKHU CANAL (292 CS)
Iv) SUPLLY IN SIRHIND FEEDER (5264 CS) CS
v) SUPLLY IN EASTERN CANAL (3197CS)FROM FZR FEEDER CS
vi) SUPPLY In KANIAWALI Disty (22CS )
vii) SUPPLY IN MIAWAH +SODHI NAGAR+ HARI HAR DISTY CS
SHARE AT HARIKE/DELIVERED (iito vii)
x) RELEASES D/S HARIKE H/WORKS CS
UTILISATION OF RAJASTHAN
i)SUPLLY IN RAJASTHAN FEEDER(18500CS) CS
ii) SUPPLY IN BEkANER CANAL (2720 CS) CS
RAJASTHAN SHARE/DELIVERED (i+ii) CS
8 FEROZEPUR ( HUSSANI WALA)HEAD WORKS (RL=648.50 FT)
i) SUPLLY IN EASTERN CANAL FROM FZR H/W CS
ii)RELEASES D/S FEROZEPUR H/WORKS CS
iii) TOTAL PUNJAB APPROVED SHARE AT HARIKE/DELIVERED (-) TSF CS

Executive Engineer/Regulation, Executive Eng


Office of Chief Engineer/Canals, Office of Chie
rrigation Works Pb. Chandigarh. SUBMITTED FOR KIND INFORMATION:- Irrigation Wor
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii) Chief Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi) Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Defence I
viii) Defence II
IRRIGATION DEPARTMENT ,PUNJAB
DATE :- /06/2016 SECTION C : - DAILY CANAL DATA
Current year
INDENT DATA Sr. No. DESCRIPTION UNIT

1 MADHOPUR H/W
0 i) KASHMIR CANAL (1050 CS) CS
2 UBDC SYSTEM
0 i) CHAKANDAR FEEDER CS
0 ii) U.B.D.C. AT HEAD(8200CS AVG) CS
0 Iii) HEAD SALAMPUR DISTY. CS
0 iv)SILET EJECTOR RD- 72000CS( AVG) CS
PUNJAB INDENT/DELIVERED (UBDC+CKDR FDR+SLP) (-) S.E. 72000)At Madhopur
0 AVG. DIVERSION FROM RIVER RAVI TO BEAS INCLUDING M.B. LINK
0 ( a) TOTAL M.B. LINK AT HEAD CS
0 (b) SILT EJECTOR 72000 CS
0 TOTAL DIVERSION ( A+B) = CS
3 NANGAL DAM (RL=1150 FT)
0 i) SUPPLY FROM NANGAL CS
0 ii) NANGAL HYDEL CHANNEL CS
0 iii) ANANDPUR SAHIB HYDEL CHANNEL CS
0 iv) D/S NAGAL DISCHARGE CS
4 BML SYSTEM
0 i)SUPPLY AT HEAD BML (12500 CS) CS
0 ii)SUPLLY IN BML AT RD3,90,000 (6772CS) CS
0 iii)SUPPLY IN NARWANA BR.AT RD1,60,000 (4022CS) CS
0 iv) TOTAL HARYANA SHARE/DELIVERED. CS
0 v)PUNJAB ON BML (SHARE/UTILIZATION). CS
0 vi) BMB (TOHANA HEAD) CS
0 vii) PUNJAB SHARE FROM BMB (TOHANA HEAD) CS
5 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)(RL=873.50 FT)
0 i))SUPPLLY AT U/S ROPAR HEAD WORKS CS
0 ii)SUPPLLIY IN SIRHIND CANAL (12622 CS) CS
0 iii)SUPPLY IN BIST DOAB CANAL(1452CS) CS
0 iv)D/S ROPAR HEAD WORKS CS
0 v) PUNJAB SHARE/DELIVERED (S. C. G'S+BDC+PB ON BML) CS
6 SHAH NEHAR BARRAGE
0 i)MUKERIAN HYDEL CHANNEL CS
0 ii) SHAH NEHAR CS
0 iii) KANDI CANAL CS
0 iv) LBC (HP) CS
0 v) RBC (HP) CS
0 vi) TOTAL DELIVERED SHAH NEHAR GROUP ( I/C Hazipur+Chingerwan) CS
7 HARIKE HEAD WORKS (RL=690.50FT) R. L. Today
0 A. I)SUPPLLY AT U/S HARIKE H/WORKS CS
0 iII)SUPLLY IN FEROZEPUR FEEDER(11192CS) CS
ii)SUPPLY IN MAKHU CANAL (292 CS)
0 Iv) SUPLLY IN SIRHIND FEEDER (5264 CS) CS
0 v) SUPLLY IN EASTERN CANAL (3197CS)FROM FZR FEEDER CS
0 vi) SUPPLY In KANIAWALI Disty (22CS )
0 vii) SUPPLY IN MIAWAH +SODHI NAGAR+ HARI HAR DISTY CS
SHARE AT HARIKE/DELIVERED (iito vii)
0 x) RELEASES D/S HARIKE H/WORKS CS
UTILISATION OF RAJASTHAN
0 i)SUPLLY IN RAJASTHAN FEEDER(18500CS) CS
0 ii) SUPPLY IN BEkANER CANAL (2720 CS) CS
0 RAJASTHAN SHARE/DELIVERED (i+ii) CS
8 FEROZEPUR ( HUSSANI WALA)HEAD WORKS (RL=648.50 FT)
0 i) SUPLLY IN EASTERN CANAL FROM FZR H/W CS
0 ii)RELEASES D/S FEROZEPUR H/WORKS CS
0 iii) TOTAL PUNJAB APPROVED SHARE AT HARIKE/DELIVERED (-) TSF CS

Executive Engineer/Regulation, Executive Eng


Office of Chief Engineer/Canals, Office of Chie
rrigation Works Pb. Chandigarh. SUBMITTED FOR KIND INFORMATION:- Irrigation Wor
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii) Chief Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi) Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Defence I
viii) Defence II
NJAB IRRIGATION DEPARTMENT ,PUNJAB
DATE :- 03/07/2017 SECTION C : - DAILY CANAL DATA
last year INDENT Current year Sr. No. DESCRIPTION
DATA DATA

1 MADHOPUR H/W
649 i) KASHMIR CANAL (1050 CS)
2 UBDC SYSTEM
269 i) CHAKANDAR FEEDER
6716 ii) U.B.D.C. AT HEAD(8200CS AVG)
138 Iii) HEAD SALAMPUR DISTY.
300 iv)SILET EJECTOR RD- 72000CS( AVG)
PUNJAB INDENT/DELIVERED (UBDC+CKDR FDR+SLP) (-) S.E. 72000)At Madhopur
AVG. DIVERSION FROM RIVER RAVI TO BEAS INCLUDING M.B. LINK
4829 ( a) TOTAL M.B. LINK AT HEAD
138 (b) SILT EJECTOR 72000
4967 TOTAL DIVERSION ( A+B) =
3 NANGAL DAM (RL=1150 FT)
34000 i) SUPPLY FROM NANGAL
12500 ii) NANGAL HYDEL CHANNEL
10150 iii) ANANDPUR SAHIB HYDEL CHANNEL
11350 iv) D/S NAGAL DISCHARGE
4 BML SYSTEM
10301 i)SUPPLY AT HEAD BML (12500 CS)
5978 ii)SUPLLY IN BML AT RD3,90,000 (6772CS)
2438 iii)SUPPLY IN NARWANA BR.AT RD1,60,000 (4022CS)
8400 iv) TOTAL HARYANA SHARE/DELIVERED.
2103 v)PUNJAB ON BML (SHARE/UTILIZATION).
NR vi) BMB (TOHANA HEAD)
NR vii) PUNJAB SHARE FROM BMB (TOHANA HEAD)
5 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)(RL=873.50 FT)
23040 i))SUPPLLY AT U/S ROPAR HEAD WORKS
10650 ii)SUPPLLIY IN SIRHIND CANAL (12622 CS)
1450 iii)SUPPLY IN BIST DOAB CANAL(1452CS)
10940 iv)D/S ROPAR HEAD WORKS
14203 v) PUNJAB SHARE/DELIVERED (S. C. G'S+BDC+PB ON BML)
6 SHAH NEHAR BARRAGE
NR i)MUKERIAN HYDEL CHANNEL
450 ii) SHAH NEHAR
150 iii) KANDI CANAL
120 iv) LBC (HP)
200 v) RBC (HP)
960 vi) TOTAL DELIVERED SHAH NEHAR GROUP ( I/C Hazipur+Chingerwan)
7 HARIKE HEAD WORKS (RL=690.50FT) R. L. Today
20847 A. I)SUPPLLY AT U/S HARIKE H/WORKS
292 iII)SUPLLY IN FEROZEPUR FEEDER(11192CS)
10301 ii)SUPPLY IN MAKHU CANAL (292 CS)
5264 Iv) SUPLLY IN SIRHIND FEEDER (5264 CS)
2420 v) SUPLLY IN EASTERN CANAL (3197CS)FROM FZR FEEDER
20 vi) SUPPLY In KANIAWALI Disty (22CS )
357 vii) SUPPLY IN MIAWAH +SODHI NAGAR+ HARI HAR DISTY
SHARE AT HARIKE/DELIVERED (iito vii)
1000 x) RELEASES D/S HARIKE H/WORKS
UTILISATION OF RAJASTHAN
10000 i)SUPLLY IN RAJASTHAN FEEDER(18500CS)
2820 ii) SUPPLY IN BEkANER CANAL (2720 CS)
12820 RAJASTHAN SHARE/DELIVERED (i+ii)
8 FEROZEPUR ( HUSSANI WALA)HEAD WORKS (RL=648.50 FT)
1000 i) SUPLLY IN EASTERN CANAL FROM FZR H/W
NIL ii)RELEASES D/S FEROZEPUR H/WORKS
NR iii) TOTAL PUNJAB APPROVED SHARE AT HARIKE/DELIVERED (-) TSF

Executive Engineer/Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh. SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii) Chief Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi) Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Defence I
viii) Defence II
NJAB IRRIGATION DEPARTMENT ,PUNJAB
DATE :- /06/2016 SECTION C : - DAILY CANAL DATA
last year Current year
DATA INDENT DATA Sr. No. DESCRIPTION

1 MADHOPUR H/W
0 i) KASHMIR CANAL (1050 CS)
2 UBDC SYSTEM
0 i) CHAKANDAR FEEDER
0 ii) U.B.D.C. AT HEAD(8200CS AVG)
0 Iii) HEAD SALAMPUR DISTY.
0 iv)SILET EJECTOR RD- 72000CS( AVG)
PUNJAB INDENT/DELIVERED (UBDC+CKDR FDR+SLP) (-) S.E. 72000)At Madhopur
0 AVG. DIVERSION FROM RIVER RAVI TO BEAS INCLUDING M.B. LINK
0 ( a) TOTAL M.B. LINK AT HEAD
0 (b) SILT EJECTOR 72000
0 TOTAL DIVERSION ( A+B) =
3 NANGAL DAM (RL=1150 FT)
0 i) SUPPLY FROM NANGAL
0 ii) NANGAL HYDEL CHANNEL
0 iii) ANANDPUR SAHIB HYDEL CHANNEL
0 iv) D/S NAGAL DISCHARGE
4 BML SYSTEM
0 i)SUPPLY AT HEAD BML (12500 CS)
0 ii)SUPLLY IN BML AT RD3,90,000 (6772CS)
0 iii)SUPPLY IN NARWANA BR.AT RD1,60,000 (4022CS)
0 iv) TOTAL HARYANA SHARE/DELIVERED.
0 v)PUNJAB ON BML (SHARE/UTILIZATION).
0 vi) BMB (TOHANA HEAD)
0 vii) PUNJAB SHARE FROM BMB (TOHANA HEAD)
5 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)(RL=873.50 FT)
0 i))SUPPLLY AT U/S ROPAR HEAD WORKS
0 ii)SUPPLLIY IN SIRHIND CANAL (12622 CS)
0 iii)SUPPLY IN BIST DOAB CANAL(1452CS)
0 iv)D/S ROPAR HEAD WORKS
0 v) PUNJAB SHARE/DELIVERED (S. C. G'S+BDC+PB ON BML)
6 SHAH NEHAR BARRAGE
0 i)MUKERIAN HYDEL CHANNEL
0 ii) SHAH NEHAR
0 iii) KANDI CANAL
0 iv) LBC (HP)
0 v) RBC (HP)
0 vi) TOTAL DELIVERED SHAH NEHAR GROUP ( I/C Hazipur+Chingerwan)
7 HARIKE HEAD WORKS (RL=690.50FT) R. L. Today
0 A. I)SUPPLLY AT U/S HARIKE H/WORKS
0 iII)SUPLLY IN FEROZEPUR FEEDER(11192CS)
ii)SUPPLY IN MAKHU CANAL (292 CS)
0 Iv) SUPLLY IN SIRHIND FEEDER (5264 CS)
0 v) SUPLLY IN EASTERN CANAL (3197CS)FROM FZR FEEDER
0 vi) SUPPLY In KANIAWALI Disty (22CS )
0 vii) SUPPLY IN MIAWAH +SODHI NAGAR+ HARI HAR DISTY
SHARE AT HARIKE/DELIVERED (iito vii)
0 x) RELEASES D/S HARIKE H/WORKS
UTILISATION OF RAJASTHAN
0 i)SUPLLY IN RAJASTHAN FEEDER(18500CS)
0 ii) SUPPLY IN BEkANER CANAL (2720 CS)
0 RAJASTHAN SHARE/DELIVERED (i+ii)
8 FEROZEPUR ( HUSSANI WALA)HEAD WORKS (RL=648.50 FT)
0 i) SUPLLY IN EASTERN CANAL FROM FZR H/W
0 ii)RELEASES D/S FEROZEPUR H/WORKS
0 iii) TOTAL PUNJAB APPROVED SHARE AT HARIKE/DELIVERED (-) TSF

Executive Engineer/Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh. SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii) Chief Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi) Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Defence I
viii) Defence II
UNJAB
DATE :- 04/07/2017
Current
UNIT last year INDENT year
DATA
DATA

CS

CS
CS
CS
CS

CS
CS
CS

CS
CS
CS
CS

CS
CS
CS
CS
CS
CS
CS

CS
CS
CS
CS
CS

CS
CS
CS
CS
CS
CS

CS
CS

CS
CS

CS

CS

CS
CS
CS

CS
CS
CS

Executive Engineer/Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
UNJAB
DATE :- /06/2016
Current
last year
UNIT DATA INDENT year
DATA

CS 0

CS 0
CS 0
CS 0
CS 0

0
CS 0
CS 0
CS 0

CS 0
CS 0
CS 0
CS 0

CS 0
CS 0
CS 0
CS 0
CS 0
CS 0
CS 0

CS 0
CS 0
CS 0
CS 0
CS 0

CS 0
CS 0
CS 0
CS 0
CS 0
CS 0

CS 0
CS 0

CS 0
CS 0
0
CS 0

CS 0

CS 0
CS 0
CS 0

CS 0
CS 0
CS 0

Executive Engineer/Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.

You might also like