You are on page 1of 37

IRRIGATION DEPARTMENT ,PUNJAB

DAILY DISCHARGE DATA Date:-16.06.2016


last year Current Diff..from last year
Sr. No. DESCRIPTION UNIT DATA year DATA Level
1 BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1598.43 -1598.43
(Mini-R-level=1462')
ii)INFLOW CS 32377
iii)RELEASES CS 34000
iv)B.S.L.DIVERSION CS 8475
NANGAL DAM
i)Supply From Nangal Cs 34000
ii) Nangal Hydel Chhannel CS 12500
iii)Anandpur Sahib Hydel Chhannel CS 10150
iV)D/S Nangal CS 11350
2 PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1331.38 -1331.38
(Mini.-Reservior level=1260')
ii)INFLOW CS 5239
iii)RELEASES CS 9500
iv)SUPLLY IN Shah Nehar Group CS 777
3 RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 522.08 -522.08
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11156
iii)RELEASES CS 8891
4 MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 8876
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG Lkg
iii)KASHMIR CANAL (950 Cs) Cs 567
iv) CHAKANDER FEEDER CS 200
last year Current Current year
releases Indent/ releases
Demand
5 UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 6986
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS NIL 3600
iii)HEAD SALAMPUR Disty. CS 287 NIL
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK

( a) Total M.B. Link at Head CS 1036


(b) Silt Ejector 72000 CS 3587
Total Diversion ( a+b) = CS 4623
6 BML SYSTEM
i)SUPPLY AT HEAD BML CS 10911
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6093 5700
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3503
iv)PUNJAB ON BML. CS 1434
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 22580
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 11050
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 1350 NIl NIl
iv)D/S ROPAR HEAD WORKS CS 10180
8 HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS CS 19257
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 10445
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs 100 NIL NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 9450
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs 1920 NIL NIL
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 3300
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIl 20 20
ix) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIl NIl NIl
x) RELEASES D/S HARIKE H/WORKS CS 1500 Lkg
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS 500 NIL
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Irrigation Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iii) Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.

Excutive Engineer /Regulation,


Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
Sr. No. DAILY DISCHARGE DATA Date:-11.06.2016
Sr. No. DESCRIPTION UNIT last year Current Diff..from last year
DATA year DATA Level
1 BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1598.07 1573.11 -24.96
(Mini-R-level=1462')
ii)INFLOW CS 31422 32449
iii)RELEASES CS 29425 31930
iv)B.S.L.DIVERSION CS 8475 8482
NANGAL DAM
i)Supply From Nangal Cs 29500 32000
ii) Nangal Hydel Chhannel CS 12350 12140
iii)Anandpur Sahib Hydel Chhannel CS 10150 10150
iV)D/S Nangal CS 5700 9710
2 PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1331.22 1276.90 -54.32
(Mini.-Reservior level=1260')
ii)INFLOW CS 2864 3523
iii)RELEASES CS 2011 1500
iv)SUPLLY IN Shah Nehar Group CS 777 900
3 RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 521.74 505.72 -16.02
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11156 7429
iii)RELEASES CS 7717 4636
4 MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 7677 4709
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG LKg
iii)KASHMIR CANAL (950 Cs) Cs 440 525
iv) CHAKANDER FEEDER CS 100 NIL
last year Current Current year
releases Indent/ releases
Demand
5 UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 4726 1408 3965-3083=882
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 5100 5000 500
iii)HEAD SALAMPUR Disty. CS 150 NIL 219
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 2374 Lkg
(b) Silt Ejector 72000 CS 3237 3083
Total Diversion ( a+b) = CS 5611 3083
6 BML SYSTEM
i)SUPPLY AT HEAD BML CS 9579 9250 9314
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5708 6000 6055
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3773 3800 3852
iv)PUNJAB ON BML. CS 575 15 15
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 19000 22370
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 7300 9150 9150
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIl NIl NIl
iv)D/S ROPAR HEAD WORKS CS 11700 13220
8 HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS CS 18085 16277
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 9745 8945 8945
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL NIL NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 8140 8324 8324
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800 5264 5264
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs 800 1000 1000
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 3000 2020 2020
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIL 20 20
ix) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIL NIL NIL
x) RELEASES D/S HARIKE H/WORKS CS 200 500
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS 200 500 500
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL

SUBMITTED FOR KIND INFORMATION:-


i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Deffence
viii )Deffence
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:-17.06.2016
last year Current Diff..from last year
Sr. No. DESCRIPTION UNIT DATA year DATA Level
1 BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1598.20 -1598.20
(Mini-R-level=1462')
ii)INFLOW CS 31130
iii)RELEASES CS 34000
iv)B.S.L.DIVERSION CS 8490
NANGAL DAM
i)Supply From Nangal Cs 34000
ii) Nangal Hydel Chhannel CS 12500
iii)Anandpur Sahib Hydel Chhannel CS 10150
iV)D/S Nangal CS 11350
2 PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1331.05 -1331.05
(Mini.-Reservior level=1260')
ii)INFLOW CS 3980
iii)RELEASES CS 11011
iv)SUPLLY IN Shah Nehar Group CS 777
3 RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 522.17 -522.17
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11009
iii)RELEASES CS 8295
4 MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 7996
ii) RELEASES D/S Madhopur H/W ( Average) CS 62 Lkg
iii)KASHMIR CANAL (950 Cs) Cs 580
iv) CHAKANDER FEEDER CS 200 200
Current
last year Current year
Indent/
releases releases
Demand
5 UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 3485
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 2500 3600
iii)HEAD SALAMPUR Disty. CS 200
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 3669
(b) Silt Ejector 72000 CS 146
Total Diversion ( a+b) = CS 3815
6 BML SYSTEM
i)SUPPLY AT HEAD BML CS 11280
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5970
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3523
iv)PUNJAB ON BML. CS 1469
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 22507
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 11250
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 1450 NIl NIl
iv)D/S ROPAR HEAD WORKS CS 9807
8 HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS CS 20438
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 7000
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs 200 NIL NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 9500
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4850
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs 1920 NIL NIL
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 3320
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs 20 20 20
ix) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS 170 NIl NIl
x) RELEASES D/S HARIKE H/WORKS CS 1500 LKG
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS 500 NIl NIl
ii)RELEASES D/S FEROZEPUR H/WORKS CS 500 NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Irrigation Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iii) Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.

Excutive Engineer /Regulation,


Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:-12.06.2016
Sr. No. DESCRIPTION UNIT last year Current Diff..from last year
DATA year DATA Level
1 BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1598.57 1573.11 -25.46
(Mini-R-level=1462')
ii)INFLOW CS 36698 33708
iii)RELEASES CS 30458 33708
iv)B.S.L.DIVERSION CS 8600 8530
NANGAL DAM
i)Supply From Nangal Cs 30500 34000
ii) Nangal Hydel Chhannel CS 12350 12140
iii)Anandpur Sahib Hydel Chhannel CS 10150 10150
iV)D/S Nangal CS 8000 10710
2 PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1331.27 1276.67 -54.60
(Mini.-Reservior level=1260')
ii)INFLOW CS 5572 4139
iii)RELEASES CS 4507 6000
iv)SUPLLY IN Shah Nehar Group CS 702 905
3 RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 521.76 505.72 -16.04
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11156 6399
iii)RELEASES CS 10581 6326
4 MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 10244 5898
ii) RELEASES D/S Madhopur H/W ( Average) CS 1083 LKG
iii)KASHMIR CANAL (950 Cs) Cs 480 575
iv) CHAKANDER FEEDER CS 100 200

last year Current Current year


releases Indent/ releases
Demand
5 UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 5131 1408 4370-2750=1620
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 5100 5000 3100
iii)HEAD SALAMPUR Disty. CS 150 250 239
iii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 3400 714
(b) Silt Ejector 72000 CS 3721 2750
Total Diversion ( a+b) = CS 7121 3464
6 BML SYSTEM
i)SUPPLY AT HEAD BML CS 9812 9250 9316
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5778 6000 6055
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3813 3800 3819
iv)PUNJAB ON BML. CS 595 65 65
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 20087 23990
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 8000 9250 9250
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIL NIL NIL
iv)D/S ROPAR HEAD WORKS CS 12087 14740
8 HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS CS 18039 14309
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 9745 8945 8945
IIi)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL 150 150
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 8840 8444 8444
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800 5264 5264
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs 1500 1000 1000
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 3000 2020 2020
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIL 20 20
xi) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIL 120 120
x) RELEASES D/S HARIKE H/WORKS CS 200 500
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS 200 500 500
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL

SUBMITTED FOR KIND INFORMATION:-


i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Deffence
viii )Deffence
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB IRRIGATION DEPARTMENT
DAILY DISCHARGE DATA Date:-31.05.2016
Sr. last year Current Diff..from last year
No. DESCRIPTION UNIT year
DATA DATA Level Sr. No.

1 BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1600.54 1568.65 -31.89
(Mini-R-level=1462')
ii)INFLOW CS 26425 22139
iii)RELEASES CS 25000 15290
iv)B.S.L.DIVERSION CS 8515 6413
NANGAL DAM
i)Supply From Nangal Cs 25000 14850
ii) Nangal Hydel Chhannel CS 12350 9000
iii)Anandpur Sahib Hydel Chhannel CS 10150 5537
iV)D/S Nangal CS 2500 313
2 PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1330.84 1283.53 -47.31
(Mini.-Reservior level=1260')
ii)INFLOW CS 2937 2130
iii)RELEASES CS 4002 6009
iv)SUPLLY IN Shah Nehar Group CS 850 555
3 RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 521.55 504.28 -17.27
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11256 7932
iii)RELEASES CS 14858 4770
4 MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 14632 4302
ii) RELEASES D/S Madhopur H/W ( Average) CS 4500 Lkg
iii)KASHMIR CANAL (950 Cs) Cs 472 500
iv) CHAKANDER FEEDER CS 100 200

last year Current Current year


releases Indent/ releases
Demand
5 UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 4610 908 3594-3092=502
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 4500 3600 3600
iii)HEAD SALAMPUR Disty. CS 250 250 208
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 5000 LKG
(b) Silt Ejector 72000 CS 3800 3092
Total Diversion ( a+b) = CS 8800 3092
6 BML SYSTEM 6
i)SUPPLY AT HEAD BML CS 8545 6700 6600
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5855 2875 4147
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 2845 3825 3819
iv)PUNJAB ON BML. CS 25 15 15
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 15350 7411
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 6550 5950 5950
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 900 NIL NIL
iv)D/S ROPAR HEAD WORKS CS 7900 1461
8 HARIKE HEAD WORKS 8
I)SUPPLLY AT U/S HARIKE H/WORKS CS 19031 11805
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11245 5145 5145
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL NIL NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 7040 6660 6660
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800 4900 4900
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs NIL NIL NIL
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 2800 1720 1720
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIL 20 20
ix) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIL NIL NIL
x) RELEASES D/S HARIKE H/WORKS CS LKG Lkg
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS NIL NIL NIL
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Irrigation Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iii) Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.

Excutive Engineer /Regulation,


Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB IRRIGATION DEPA
DAILY DISCHARGE DATA Date:-13.06.2016
Sr. last year Current Diff..from last year
DESCRIPTION UNIT year Sr. No.
No. DATA DATA Level
1 BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1598.81 1573.08 -25.73
(Mini-R-level=1462')
ii)INFLOW CS 33795 33649
iii)RELEASES CS 30800 33961
iv)B.S.L.DIVERSION CS 8440 8520
NANGAL DAM
i)Supply From Nangal Cs 31100 34000
ii) Nangal Hydel Chhannel CS 12350 12140
iii)Anandpur Sahib Hydel Chhannel CS 10150 10150
iV)D/S Nangal CS 8600 11710
2 PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1331.53 1276.54 -54.99
(Mini.-Reservior level=1260')
ii)INFLOW CS 6544 4456
iii)RELEASES CS 1005 5508
iv)SUPLLY IN Shah Nehar Group CS 802 900
3 RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 521.82 505.68 -16.14
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11156 6105
iii)RELEASES CS 9240 6640
4 MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 9084 6279
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG Lkg
iii)KASHMIR CANAL (950 Cs) Cs 480 600
iv) CHAKANDER FEEDER CS 100 200
last year Current Current year
releases Indent/ releases
Demand
5 UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 5327 1508 4800-2737=2063
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 5300 5500 4400
iii)HEAD SALAMPUR Disty. CS 263 250 250
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 3014 629
(b) Silt Ejector 72000 CS 3800 2737
Total Diversion ( a+b) = CS 6814 3366
6 BML SYSTEM 6
i)SUPPLY AT HEAD BML CS 9928 9400 9470
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5747 6000 6078
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3819 3800 3819
iv)PUNJAB ON BML. CS 538 325 325
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i))SUPPLLY AT U/S ROPAR HEAD WORKS CS 20627 23730
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 8500 9750 9750
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 800 NIL NIL
iv)D/S ROPAR HEAD WORKS CS 11327 13980
8 HARIKE HEAD WORKS 8
I)SUPPLLY AT U/S HARIKE H/WORKS CS 18785 15658
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 9745 7445 7445
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL 250 250
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 8840 8512 8512
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800 5264 5264
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs 1500 1020 1020
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 3000 2020 2020
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIL 20 20
xi) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIL 168 168
x) RELEASES D/S HARIKE H/WORKS CS 200 500
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS 200 500 500
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL

SUBMITTED FOR KIND INFORMATION:-


i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Deffence
viii )Deffence
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB IRRIGATION DEPARTMENT ,PUN
DAILY DISCHARGE DATA Date:-27.05.2016
last year Current Diff..from last
DESCRIPTION UNIT DATA year DATA year Level Sr. No.

BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1600.55 1567.66 -32.89
(Mini-R-level=1462')
ii)INFLOW CS 27137 18560
iii)RELEASES CS 25000 17522
iv)B.S.L.DIVERSION CS 8477 5244
NANGAL DAM
i)Supply From Nangal Cs 25000 17700
ii) Nangal Hydel Chhannel CS 12350 11500
iii)Anandpur Sahib Hydel Chhannel CS 10150 5887
iV)D/S Nangal CS 2500 313
PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1331.12 1284.93 -46.19
(Mini.-Reservior level=1260')
ii)INFLOW CS 5278 2965
iii)RELEASES CS 4000 6502
iv)SUPLLY IN Shah Nehar Group CS 775 630
RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 522.12 504.16 -17.96
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11420 8888
iii)RELEASES CS 14854 4778
MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 14627 4461
ii) RELEASES D/S Madhopur H/W ( Average) CS 4521 LKG
iii)KASHMIR CANAL (950 Cs) Cs 230 500
iv) CHAKANDER FEEDER CS 50 100

last year Current Current year


releases Indent/ releases
Demand
UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 4693 608 3811-3229=582
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 4600 3600 3600
iii)HEAD SALAMPUR Disty. CS 200 150 150
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 4983 NIL
(b) Silt Ejector 72000 CS 3800 3229
Total Diversion ( a+b) = CS 8783 3229
BML SYSTEM 6
i)SUPPLY AT HEAD BML CS 8368 9250 9314
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5793 5700 5901
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 2769 3825 3872
iv)PUNJAB ON BML. CS 15 15 15
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 15257 8098
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 7150 6250 6250
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 580 NIL NIL
iv)D/S ROPAR HEAD WORKS CS 7527 1848
HARIKE HEAD WORKS 8
I)SUPPLLY AT U/S HARIKE H/WORKS CS 17539 11651
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11245 4445 4445
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL NIl NIl
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 7040 6460 6460
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800 4900 4900
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs NIL NIL NIL
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 2800 1520 1520
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIl 20 20
ix) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIl NIl NIl
x) RELEASES D/S HARIKE H/WORKS CS LKG Lkg
FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS NIL NIL NIL
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Irrigation Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iii) Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB IRRIGATION DEPARTM
DAILY DISCHARGE DATA Date:-14.06.2016
DESCRIPTION UNIT last year Current Diff..from last Sr. No.
DATA year DATA year Level
BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1598.50 -1598.50
(Mini-R-level=1462')
ii)INFLOW CS 27764
iii)RELEASES CS 31633
iv)B.S.L.DIVERSION CS 8490
NANGAL DAM
i)Supply From Nangal Cs 31500
ii) Nangal Hydel Chhannel CS 12350
iii)Anandpur Sahib Hydel Chhannel CS 10150
iV)D/S Nangal CS 9000
PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1331.63 -1331.63
(Mini.-Reservior level=1260')
ii)INFLOW CS 4143
iii)RELEASES CS 2012
iv)SUPLLY IN Shah Nehar Group CS 802
RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 521.93 -521.93
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11156
iii)RELEASES CS 7902
MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 8046
ii) RELEASES D/S Madhopur H/W ( Average) CS 433 Lkg
iii)KASHMIR CANAL (950 Cs) Cs 460
iv) CHAKANDER FEEDER CS 100 200

last year Current Current year


releases Indent/ releases
Demand
UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 5143
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 6300 5000
iii)HEAD SALAMPUR Disty. CS 288
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 1722
(b) Silt Ejector 72000 CS 2913
Total Diversion ( a+b) = CS 4635
BML SYSTEM 6
i)SUPPLY AT HEAD BML CS 9928
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5924 6000
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3916 3800
iv)PUNJAB ON BML. CS 50 15
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 20010
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 10150
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIL NIL NIL
iv)D/S ROPAR HEAD WORKS CS 8660
HARIKE HEAD WORKS 8
I)SUPPLLY AT U/S HARIKE H/WORKS CS 19785
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 10445
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL NIL NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 8840
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800 5264 5264
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs 1500 NIL NIL
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 3300 2020 2020
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIL 20 20
ix) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIL NIL NIL
x) RELEASES D/S HARIKE H/WORKS CS 500 Lkg
FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS 500 NIL NIL
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIl NIL

SUBMITTED FOR KIND INFORMATION:-


i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Deffence
viii )Deffence
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:-28.05.2016
last year Current Diff..from last
DESCRIPTION UNIT DATA year year Level
DATA
BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1600.52 1567.47 -33.05
(Mini-R-level=1462')
ii)INFLOW CS 24449 16110
iii)RELEASES CS 24876 18083
iv)B.S.L.DIVERSION CS 8518 8153
NANGAL DAM
i)Supply From Nangal Cs 25000 18100
ii) Nangal Hydel Chhannel CS 12350 11500
iii)Anandpur Sahib Hydel Chhannel CS 10150 6287
iV)D/S Nangal CS 2500 313
PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1331.07 1284.55 -46.52
(Mini.-Reservior level=1260')
ii)INFLOW CS 3446 2177
iii)RELEASES CS 4511 6512
iv)SUPLLY IN Shah Nehar Group CS 825 905
RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 522.00 504.17 -17.83
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11420 5798
iii)RELEASES CS 15066 5620
MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 14840 5204
ii) RELEASES D/S Madhopur H/W ( Average) CS 4700 LKG
iii)KASHMIR CANAL (950 Cs) Cs 230 568
iv) CHAKANDER FEEDER CS 50 200

last year Current Current year


releases Indent/ releases
Demand
UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 4710 908 4420-3463=957
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 4600 3600 3600
iii)HEAD SALAMPUR Disty. CS 200 250 217
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 5000 LKg
(b) Silt Ejector 72000 CS 3800 3463
Total Diversion ( a+b) = CS 8800 3463
BML SYSTEM
i)SUPPLY AT HEAD BML CS 8261 9250 9283
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5778 5700 6001
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 2465 3825 3892
iv)PUNJAB ON BML. CS 15 15 15
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 15407 8685
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 7300 6450 6450
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 580 NIL NIL
iv)D/S ROPAR HEAD WORKS CS 7527 2235
HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS CS 18285 11838
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11245 4445 4445
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL NIL NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 7040 6460 6460
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800 4900 4900
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs NIL NIL NIL
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 2800 1520 1520
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIl 20 20
ix) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIL NIL NIL
x) RELEASES D/S HARIKE H/WORKS CS LKG LKg
FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS NIL NIL NIL
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIl NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Irrigation Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iii) Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:-15.06.2016
Current
DESCRIPTION UNIT last year year Diff..from last
DATA DATA year Level
BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1598.56 -1598.56
(Mini-R-level=1462')
ii)INFLOW CS 34166
iii)RELEASES CS 33417
iv)B.S.L.DIVERSION CS 8525
NANGAL DAM
i)Supply From Nangal Cs 34000
ii) Nangal Hydel Chhannel CS 12350
iii)Anandpur Sahib Hydel Chhannel CS 10150 10150
iV)D/S Nangal CS 11500
PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1331.58 -1331.58
(Mini.-Reservior level=1260')
ii)INFLOW CS 3943
iii)RELEASES CS 5008
iv)SUPLLY IN Shah Nehar Group CS 812
RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 521.99 -521.99
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 11156
iii)RELEASES CS 9558
MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 9067
ii) RELEASES D/S Madhopur H/W ( Average) CS 142 Lkg
iii)KASHMIR CANAL (950 Cs) Cs 480
iv) CHAKANDER FEEDER CS 100 200

last year Current Current year


releases Indent/ releases
Demand
UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 6864
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 6900 5000
iii)HEAD SALAMPUR Disty. CS 300
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 1281
(b) Silt Ejector 72000 CS 3475
Total Diversion ( a+b) = CS 4756
BML SYSTEM
i)SUPPLY AT HEAD BML CS 10889
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6024 6000
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3642 3800
iv)PUNJAB ON BML. CS 1184
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 22517
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 10750
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 1200 NIl NIl
iv)D/S ROPAR HEAD WORKS CS 10567
HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS CS 18293
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 10445
iii)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL NIL NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 8840
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 4800 5264 5264
vi) SUPLLY IN EASTERN CANAL (3197Cs)from FZR Feeder Cs 1500 NIL NIL
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 3300 2020 2020
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIL 20 20
ix) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIL NIL NIL
x) RELEASES D/S HARIKE H/WORKS CS 500 Lkg
FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL from FZR Head Works CS 500 NIL NIL
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL

SUBMITTED FOR KIND INFORMATION:-


i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii) Deffence
viii )Deffence
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:- 03.09.2015

last year Current Diff..from


Sr. No. DESCRIPTION UNIT DATA year DATA last year Sr. No.
Level

1 BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1672.31 1677.90 5.59
(Mini-R-level=1462')
ii)INFLOW CS 23430 31008
iii)RELEASES CS 24208 24392
iv)B.S.L.DIVERSION CS 8023 8422
NAGAL DAM
i) Nangal Hydel Chhannel CS 12500 12500
ii)Anandpur Sahib Hydel Chhannel CS 10150 10150
iii)D/S Nangal CS 1700 1750
2 PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1363.95 1386.71 22.76
(Mini.-Reservior level=1260')
ii)INFLOW CS 7450 10180
iii)RELEASES CS 19010 9850
3 RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=524.91M) M 512.52 518.75 6.23
Permissible limit=524.91/ Minimum R-level=487.00M
ii)INFLOW CS 5572 6593
iii)RELEASES CS 11247 19606
4 MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 11166 19390
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG 5025
iii)KASHMIR CANAL (950 Cs) Cs 869 649
iv) CHAKANDER FEEDER CS 269 269
Current Current
last year Indent/ year
releases Demand releases

5 UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 7389 5616 8016-2400=5616
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 6900 6100 6100
iii)HEAD SALAMPUR Disty. Cs 300 200 200
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 2608 5500
( b) Silt Ejector 72000 CS 2096 2438
Total Diversion ( a+b) = CS 4704 7938
6 BML SYSTEM 6
i)SUPPLY AT HEAD BML CS 11280 11250 11225
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5970 5800 5970
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3439 3500 3506
iv)PUNJAB ON BML. CS 1925 1749 1749
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i)SUPPLLIY IN SIRHIND CANAL (12622) CS 11300 10900/11400 11090
ii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 1000 1400 1400
iii)D/S ROPAR HEAD WORKS CS 1074 LKg/300
8 HARIKE HEAD WORKS 8
i)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445 11745 11745

ii)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 10021 10637 10037


iii) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 5264 5000 5000
iv) SUPPLY IN BEkANER CANAL (2720 cs) CS 2220 2820 1820
v) RELEASES D/S HARIKE H/WORKS CS 1700 1300
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL (3197Cs) CS 1700 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
viii)Defence
Executive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
Sr. No.

9
IRRIGATION DEPARTMENT ,PUNJAB IRRIGATION DE
DAILY DISCHARGE DATA Date:- 04.09.2015

last year Current year Diff..from last year


DESCRIPTION UNIT DATA DATA Level Sr. No.

BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1672.30 1678.07 5.77
(Mini-R-level=1462')
ii)INFLOW CS 23202 28023
iii)RELEASES CS 23397 24714
iv)B.S.L.DIVERSION CS 8600 8432
NANGAL DAM
i) Nangal Hydel Chhannel CS 12500 12500
ii)Anandpur Sahib Hydel Chhannel CS 10150 10150
iii)D/S Nangal CS 300 2250
PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1363.73 1386.61 22.88
(Mini.-Reservior level=1260')
ii)INFLOW CS 8423 11725
iii)RELEASES CS 14203 14700
RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 512.45 518.30 5.85
Permissible limit=524.91/ Minimum R-level=487.00M
ii)INFLOW CS 7544 7699
iii)RELEASES CS 9204 20147
MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 9176 19917
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG 5552
iii)KASHMIR CANAL (1050 Cs) Cs 861 649
iv) CHAKANDER FEEDER (292) CS 269 269

last year Current Indent/ Current year


releases Demand releases

UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 7280 5816 8016-2200=5816
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 6900 6100 6100
iii)HEAD SALAMPUR Disty. Cs 298 200 200
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 737 5500
b) Silt Ejector 72000 CS 2821 2233
Total Diversion ( a+b) = CS 3558 7733
BML SYSTEM 6
i)SUPPLY AT HEAD BML CS 11280 11250 11225
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6055 5800 5963
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3465 3500 3519
iv)PUNJAB ON BML. CS 1895 1749 1749
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i)SUPPLLIY IN SIRHIND CANAL (12622) CS 9400 11400/11800 11330
ii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 1000 1400 1400
iii)D/S ROPAR HEAD WORKS CS 2580 Lkg/300
HARIKE HEAD WORKS 8
i)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445 11745 11745

ii)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 6981 10637 10037


iii) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 3764 5000 5000
iv) SUPPLY IN BEkANER CANAL (2720 cs) CS 2820 2820 2220
v) RELEASES D/S HARIKE H/WORKS CS 1400 1300
FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL (3197Cs) CS 1400 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS CS NIL NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
viii)Defence
Executive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB P
DAILY DISCHARGE DATA Date:- 07.09.2015
DESCRIPTION UNIT last year Current year Diff..from last year Sr. No.
DATA DATA Level
BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1673.81 1678.27 4.46
(Mini-R-level=1462')
ii)INFLOW CS 26000 23412
iii)RELEASES CS 13545 24385
iv)B.S.L.DIVERSION CS 8592 8483

NANGAL DAM
i) Nangal Hydel Chhannel CS 12050 12500
ii)Anandpur Sahib Hydel Chhannel CS 500 10150
iii)D/S Nangal CS 300 1850
PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1364.86 1386.01 21.15
(Mini.-Reservior level=1260')
ii)INFLOW CS 22262 7167

iii)RELEASES CS 1506 14010


RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 516.43 516.75 0.32
Permissible limit=524.91/ Minimum R-level=487.00M
ii)INFLOW CS 34961 6513
iii)RELEASES CS 4261 19317
MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 3853 18853
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG 4588
iii)KASHMIR CANAL (1050 Cs) Cs 499 649
iv) CHAKANDER FEEDER (292) CS NIL 269
last year Current Indent/ Current year
releases Demand releases
UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 2733 6116 8016-1900=6116
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 3000 6100 6100
iii)HEAD SALAMPUR Disty. Cs NIL 100 100
iv)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 621 5500
b) Silt Ejector 72000 CS 2571 1900
Total Diversion ( a+b) = CS 3192 7400
BML SYSTEM 6

i)SUPPLY AT HEAD BML CS 9730 11250 11175


ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 5947 5800 5886
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3829 3500 3462
iv)PUNJAB ON BML. CS 225 1910 1910
7
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i)SUPPLLIY IN SIRHIND CANAL (12622) CS 350 11450/11800 11450
ii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIL 1430 1430
iii)D/S ROPAR HEAD WORKS CS 4104 Lkg/300
8
HARIKE HEAD WORKS
i)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445 11745 11745

ii)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 540 10637 10037


iii) SUPLLY IN SIRHIND FEEDER (5264 cs) CS NIL 5000 5000

iv) SUPPLY IN BEkANER CANAL (2720 cs) CS 500 2820 2220


v) RELEASES D/S HARIKE H/WORKS CS 7600 1300
FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL (3197Cs) CS 500 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS CS 10056 NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
viii)Defence
Executive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB IRRIGATIO
DAILY DISCHARGE DATA Date:- 05.09.2015

last year Current year Diff..from last year


DESCRIPTION UNIT DATA DATA Level Sr. No.

BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1672.60 1678.22 5.62
(Mini-R-level=1462')
ii)INFLOW CS 24128 277722
iii)RELEASES CS 18290 24803
iv)B.S.L.DIVERSION CS 8460 8447
NANGAL DAM
i) Nangal Hydel Chhannel CS 12500 12500
ii)Anandpur Sahib Hydel Chhannel CS 3500 10150
iii)D/S Nangal CS 300 1950
PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1363.69 1386.49 22.80
(Mini.-Reservior level=1260')
ii)INFLOW CS 12954 9733
iii)RELEASES CS 14005 13303
RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 513.70 517.81 4.11
Permissible limit=524.91/ Minimum R-level=487.00M
ii)INFLOW CS 31456 7736
iii)RELEASES CS 4202 20648
MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 4415 20415
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG 6129
iii)KASHMIR CANAL (950 Cs) Cs 797 649
iv) CHAKANDER FEEDER CS 269 269
Current
last year Indent/ Current year
releases Demand releases

UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 3313 6016 8016-2000=6016
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 3500 6100 6100
iii)HEAD SALAMPUR Disty. Cs 125 100 121
iii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 180 5500
b) Silt Ejector 72000 CS 2200 2108
Total Diversion ( a+b) = CS 2380 7608
BML SYSTEM 6
i)SUPPLY AT HEAD BML CS 10432 11250 11225
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6024 5800 5986
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3505 3500 3511
iv)PUNJAB ON BML. CS 865 1664 1664
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i)SUPPLLIY IN SIRHIND CANAL (12622) CS 4800 11450 11450
ii)SUPPLY IN BIST DOAB CANAL(1452cs) CS 500 1430 1430
iii)D/S ROPAR HEAD WORKS CS 3795 Lkg/300
HARIKE HEAD WORKS 8
i)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445 11745 11745
ii)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 5217 10637
iii) SUPLLY IN SIRHIND FEEDER (5264 cs) CS 2000 5000 10037
iv) SUPPLY IN BEkANER CANAL (2720 cs) CS 2820 2820 5000
v)hd. CS 4500 2220
v) RELEASES D/S HARIKE H/WORKS CS 4500 1300
FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL (3197Cs) CS NIL 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS 4399 NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
viii)Defence
Executive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATIO
DAILY DISCHARGE DATA Date:- 08.09.2015
DESCRIPTION UNIT last year Current year Diff..from last year Sr. No.
DATA DATA Level
BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1674.51 -1674.51
(Mini-R-level=1462')
ii)INFLOW CS 25920
iii)RELEASES CS 12298
iv)B.S.L.DIVERSION CS 8628
NANGAL DAM
i)SUPPLY AT U/S Nangal Cs 13078
ii) Nangal Hydel Chhannel CS 11770 12500
iii)Anandpur Sahib Hydel Chhannel CS NIL 10150
iV)D/S Nangal CS 300 1950
PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1365.54 -1365.54
(Mini.-Reservior level=1260')
ii)INFLOW CS 19372
iii)RELEASES CS 1506
iv)SUPLLY IN Shah Nehar Group CS NIL
RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 516.98 -516.98
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 18082
iii)RELEASES CS 4661
MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 4317
ii) RELEASES D/S Madhopur H/W ( Average) CS 137
iii)KASHMIR CANAL (950 Cs) Cs 538 649
iv) CHAKANDER FEEDER CS NIL 269
last year Current Current year
releases Indent/ releases
Demand
UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 2825 8016-2000=6016
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 3200 6100 6100
iii)HEAD SALAMPUR Disty. Cs NIL
iii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 817
b) Silt Ejector 72000 CS 2625 0
Total Diversion ( a+b) = CS 3442 0
BML SYSTEM 6

i)SUPPLY AT HEAD BML CS 9463


ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6001
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3472
iv)PUNJAB ON BML. CS 225
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 4374
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 1200
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIL
iv)D/S ROPAR HEAD WORKS CS 3174 Lkg/300
HARIKE HEAD WORKS 8
I)SUPPLLY AT U/S HARIKE H/WORKS Cs 16134
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445
IIi)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 540
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS NIL
vi) Maiwah+ Sodinagar + HariHar Disty. =Total Cs NIL
vii) SUPLLY IN EASTERN CANAL (3197Cs) Cs NIL
viii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 500
ix) SUPPLY IN Kaniawali Disty. (22 Cs) CS NIL
viii) RELEASES D/S HARIKE H/WORKS CS 4149 1300
FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL CS NIL 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS 3771 NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
viii)Defence
Executive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:- 06.09.2015

last year Current Diff..from last


DESCRIPTION UNIT DATA year DATA year Level

BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1673.17 1678.32 5.15
(Mini-R-level=1462')
ii)INFLOW CS 25770 26546
iii)RELEASES CS 14677 24600
iv)B.S.L.DIVERSION CS 8613 8460
NANGAL DAM
i) Nangal Hydel Chhannel CS 12350 12500
ii)Anandpur Sahib Hydel Chhannel CS 1500 10150
iii)D/S Nangal CS 300 1950
PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1364.07 1386.24 22.17
(Mini.-Reservior level=1260')
ii)INFLOW CS 14647 6765
iii)RELEASES CS 4663 14202
RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 515.09 517.30 2.21
Permissible limit=524.91/ Minimum R-level=487.00M
ii)INFLOW CS 32591 7033
iii)RELEASES CS 1369 19654
MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 2220 19748
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG 5483
iii)KASHMIR CANAL (950 Cs) Cs 252 649
iv) CHAKANDER FEEDER CS NIL 269
Current
last year Indent/ Current year
releases Demand releases

UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 1749 6116 8016-1900=6116
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 1700 6100 6100
iii)HEAD SALAMPUR Disty. Cs 17 100 100
iii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 202 5500
b) Silt Ejector 72000 CS 1500 1942
Total Diversion ( a+b) = CS 1702 7442
BML SYSTEM
i)SUPPLY AT HEAD BML CS 9911 11250 11150
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6424 5800 5816
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3974 3500 3587
iv)PUNJAB ON BML. CS 374 1924 1924
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i)SUPPLLIY IN SIRHIND CANAL (12622) CS 350 11450 11450
ii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIL 1430 1430
iii)D/S ROPAR HEAD WORKS CS 7175 LKG/300
HARIKE HEAD WORKS
i)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445 11745 11745

ii)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 540 10630 10037


iii) SUPLLY IN SIRHIND FEEDER (5264 cs) CS NIL 5000 5000
iv) SUPPLY IN BEkANER CANAL (2720 cs) CS 500 2820 2220
v) RELEASES D/S HARIKE H/WORKS CS 10447 1300
FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL (3197Cs) CS NIL 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS CS 11941 NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
viii)Defence
Executive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:-0.09.2015
DESCRIPTION UNIT last year Current Diff..from last
DATA year DATA year Level
BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1674.51 -1674.51
(Mini-R-level=1462')
ii)INFLOW CS 25920
iii)RELEASES CS 12298
iv)B.S.L.DIVERSION CS 8628
NANGAL DAM
i)SUPPLY AT U/S Nangal Cs 13078
ii) Nangal Hydel Chhannel CS 11770 12500
iii)Anandpur Sahib Hydel Chhannel CS NIL 10150
iV)D/S Nangal CS 300 1950
PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1365.54 -1365.54
(Mini.-Reservior level=1260')
ii)INFLOW CS 19372
iii)RELEASES CS 1506
iv)SUPLLY IN Shah Nehar Group CS NIL
RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 516.98 -516.98
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 18082
iii)RELEASES CS 4661
MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 4317
ii) RELEASES D/S Madhopur H/W ( Average) CS 137
iii)KASHMIR CANAL (950 Cs) Cs 538 649
iv) CHAKANDER FEEDER CS NIL 269
last year Current Current year
releases Indent/ releases
Demand
UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 2825 8016-2000=6016
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 3200 6100 6100
iii)HEAD SALAMPUR Disty. Cs NIL
iii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 817
b) Silt Ejector 72000 CS 2625 0
Total Diversion ( a+b) = CS 3442 0
BML SYSTEM

i)SUPPLY AT HEAD BML CS 9463


ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6001
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3472
iv)PUNJAB ON BML. CS 225
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 4374
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 1200
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIL
iv)D/S ROPAR HEAD WORKS CS 3174 Lkg/300
HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS Cs 16134
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445
IIi)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 540
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS NIL

vi) SUPLLY IN EASTERN CANAL (3197Cs) Cs NIL

vii) SUPPLY IN BEkANER CANAL (2720 cs) CS 500


viii) RELEASES D/S HARIKE H/WORKS CS 4149 1300
FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL CS NIL 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS 3771 NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
viii)Defence
Executive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:- 08.09.2015
Sr. No. DESCRIPTION UNIT last year Current year DATA Diff..from last year Sr. No.
DATA Level
1 BHAKRA DAM 1
i)R.L.(Maximum Reservior level=1680') FT 1674.51 1678.29 3.78
(Mini-R-level=1462')
ii)INFLOW CS 25920 24929
iii)RELEASES CS 12298 24540
iv)B.S.L.DIVERSION CS 8628 8519
NANGAL DAM
i)SUPPLY AT U/S Nangal Cs 13078 21668
ii) Nangal Hydel Chhannel CS 11770 12500
iii)Anandpur Sahib Hydel Chhannel CS NIL 10150
iV)D/S Nangal CS 300 1850
2 PONG DAM 2
i)R.L.(Maximum Reservior level=1390') FT 1365.54 1385.77 20.23
(Mini.-Reservior level=1260')
ii)INFLOW CS 19372 7063
iii)RELEASES CS 1506 14203
iv)SUPLLY IN Shah Nehar Group CS NIL 1109
3 RANJIT SAGAR DAM 3
i)R.L(.Maximum Reservoir level=527.91M) M 516.98 516.17 -0.81
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 18082 5053
iii)RELEASES CS 4661 18608
4 MADHOPUR HEAD WORKS 4
i) INFLOW ( Average) CS 4317 18875
ii) RELEASES D/S Madhopur H/W ( Average) CS 137 4625
iii)KASHMIR CANAL (950 Cs) Cs 538 649
iv) CHAKANDER FEEDER CS NIL 269
last year Current Indent/
releases Demand Current year releases

5 UBDC SYSTEM 5
i)U.B.D.C.atHead(8200cs)( Average) CS 2825 5916 8016-2100=5916
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS 3200 6100 6100
iii)HEAD SALAMPUR Disty. Cs NIL 150 146
iii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 817 5439
b) Silt Ejector 72000 CS 2625 2125
Total Diversion ( a+b) = CS 3442 7564
6 BML SYSTEM 6
i)SUPPLY AT HEAD BML CS 9463 11250 11125
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6001 5800 5832
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS 3472 3500 3481
iv)PUNJAB ON BML. CS 225 1920 1920
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM) 7
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 4374 13060
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 1200 11400/11800 11330
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIL 1430 1430
iv)D/S ROPAR HEAD WORKS CS 3174 Lkg/300
8 HARIKE HEAD WORKS 8
I)SUPPLLY AT U/S HARIKE H/WORKS Cs 16134 23374
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445 11745 11745
IIi)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL 292 292
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs) CS 540 10637 10037
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS NIL 5000 5000
vi) SUPLLY IN EASTERN CANAL (3197Cs) Cs NIL 2420 2420
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 500 2820 2220
ix) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIL 20 20
vii) SUPPLY IN Maiwah +Sodhi Nagar+ Hari Har Disty CS NIL 357 357
viii) RELEASES D/S HARIKE H/WORKS CS 4149 1300
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS 9
i) SUPLLY IN EASTERN CANAL CS NIL 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS CS 3771 NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:-08.09.2015
DESCRIPTION UNIT last year Current Diff..from last year
year
DATA DATA Level
BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 1674.51 1678.29 3.78
(Mini-R-level=1462')
ii)INFLOW CS 25920 24929
iii)RELEASES CS 12298 24540
iv)B.S.L.DIVERSION CS 8628 8519
NANGAL DAM
i)Supply From Nangal Cs 13078 24500
ii) Nangal Hydel Chhannel CS 11770 12500
iii)Anandpur Sahib Hydel Chhannel CS NIL 10150
iV)D/S Nangal CS 300 1850
PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 1365.54 1385.77 20.23
(Mini.-Reservior level=1260')
ii)INFLOW CS 19372 7063
iii)RELEASES CS 1506 14203
iv)SUPLLY IN Shah Nehar Group CS NIL 1109
RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 516.98 516.17 -0.81
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS 18082 5053
iii)RELEASES CS 4661 18608
MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS 4317 18875
ii) RELEASES D/S Madhopur H/W ( Averag CS 137 4625
iii)KASHMIR CANAL (950 Cs) Cs 538 649
iv) CHAKANDER FEEDER CS NIL 269
last year Current
releases Indent/ Current year releases
Demand
UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS 2825 5916 8016-2100=5916
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Aver CS 3200 6100 6100
iii)HEAD SALAMPUR Disty. Cs NIL 150 146
iii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
( a) Total M.B. Link at Head CS 817 5439
b) Silt Ejector 72000 CS 2625 2125
Total Diversion ( a+b) = CS 3442 7564
BML SYSTEM
i)SUPPLY AT HEAD BML CS 9463 11250 11125
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS 6001 5800 5832
iii)SUPPLY IN NARWANA BR.at RD1,60,000 CS 3472 3500 3481
iv)PUNJAB ON BML. CS 225 1920 1920
ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs 4374 13060
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS 1200 11400/11800 11330
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS NIL 1430 1430
iv)D/S ROPAR HEAD WORKS CS 3174 Lkg/300
HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS 16134 23374
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS 11445 11745 11745
IIi)SUPPLY IN MAKHU CANAL (292 Cs) Cs NIL 292 292
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs CS 540 10637 10037
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS NIL 5000 5000
vi) SUPLLY IN EASTERN CANAL (3197Cs) Cs NIL 2420 2420
vii) SUPPLY IN BEkANER CANAL (2720 cs) Cs 500 2820 2220
ix) SUPPLY In KANIAWALI Disty (22Cs ) Cs NIL 20 20
vii) SUPPLY IN Maiwah +Sodhi Nagar+ Hari CS NIL 357 357
viii) RELEASES D/S HARIKE H/WORKS CS 4149 1300
FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) SUPLLY IN EASTERN CANAL CS NIL 1300 1300
ii)RELEASES D/S FEROZEPUR H/WORKS CS 3771 NIL
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Chief Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab.
iii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iv) Secretary,Deptt.of Irrigation,Govt. of Punjab.
v)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
vi)Chief Engineer/Drainage, Irrigation Works, Punjab, Chd.
vii)Defence,Engg.br.West.Comnd. Chandi Mandir
Excutive Engineer /Regulation,
Office of Chief Engineer/Canals,
Irrigation Works Pb. Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:-10.11.2015
Sr. No. DESCRIPTION UNIT last year Current year Diff..from last
DATA DATA year Level
1 BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 0.00
(Mini-R-level=1462')
ii)INFLOW CS
iii)RELEASES CS
iv)B.S.L.DIVERSION CS
NANGAL DAM
i)Supply From Nangal Cs
ii) Nangal Hydel Chhannel CS
iii)Anandpur Sahib Hydel Chhannel CS
iV)D/S Nangal CS
2 PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 0.00
(Mini.-Reservior level=1260')
ii)INFLOW CS
iii)RELEASES CS
iv)SUPLLY IN Shah Nehar Group CS
3 RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 0.00
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS
iii)RELEASES CS
4 MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG
iii)KASHMIR CANAL (950 Cs) Cs
last year Current Indent/ Current year
releases Demand releases
5 UBDC SYSTEM
i)U.B.D.C.atHead(8200cs)( Average) CS
iv) CHAKANDER FEEDER
iii)HEAD SALAMPUR Disty.
Utilisation at madhopur i+ii+iii
ii)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS
iii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
6 BML SYSTEM
i)SUPPLY AT HEAD BML CS
ii)SUPLLY IN BML at RD3,90,000 (6772Cs) CS
iii)SUPPLY IN NARWANA BR.at RD1,60,000 (4022Cs) CS
iv) Total utilisation at Haryana ii+iii
7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)
i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs
ii)SUPPLLIY IN SIRHIND CANAL (12622) CS
iii)SUPPLY IN BIST DOAB CANAL(1452cs) CS
iv)PUNJAB ON BML. CS
v) Total utilisation Punajb at Ropar ii+iii+iv
vi)D/S ROPAR HEAD WORKS CS
8 HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS CS
ii)SUPLLY IN RAJASTHAN FEEDER(18500cs) CS
iii) SUPPLY IN BEkANER CANAL (2720 cs)
iv) Total utilisation Rajasthan ii+iii
v) SUPLLY IN SIRHIND FEEDER (5264 cs) CS
vi) SUPLLY IN EASTERN CANAL (3197Cs) Cs
vii) Shah Nehar Canal group
viii) SUPPLY In KANIAWALI Disty (22Cs ) Cs
ix) Makhu Canal Group CS
x) Total utilisation Punjab at Harike
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs)
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) u/s Ferozepur H/W CS
ii)RELEASES D/S FEROZEPUR H/WORKS CS
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Irrigation Minister, Punjab.
ii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.
iii) Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
Excutive Engineer /Regulation, Office of the
Chief Engineer/canals Irrigation Works, Punjab,
Chandigarh.
IRRIGATION DEPARTMENT ,PUNJAB
DAILY DISCHARGE DATA Date:-19.02.2016
Sr. last year Current year Diff..from last
DESCRIPTION UNIT
No. DATA DATA year Level
1 BHAKRA DAM
i)R.L.(Maximum Reservior level=1680') FT 0.00
(Mini-R-level=1462')
ii)INFLOW CS
iii)RELEASES CS
iv)B.S.L.DIVERSION CS
NANGAL DAM
i)Supply From Nangal Cs
ii) Nangal Hydel Chhannel CS
iii)Anandpur Sahib Hydel Chhannel CS
iV)D/S Nangal CS
2 PONG DAM
i)R.L.(Maximum Reservior level=1390') FT 0.00
(Mini.-Reservior level=1260')
ii)INFLOW CS
iii)RELEASES CS
iv)SUPLLY IN Shah Nehar Group CS
3 RANJIT SAGAR DAM
i)R.L(.Maximum Reservoir level=527.91M) M 0.00
Permissible limit=524.91M/ Minimum R-level=487.00M
ii)INFLOW CS
iii)RELEASES CS
4 MADHOPUR HEAD WORKS
i) INFLOW ( Average) CS
ii) RELEASES D/S Madhopur H/W ( Average) CS LKG
iii)KASHMIR CANAL (950 Cs) Cs
APPROVED IN Current Indent/ Current year
TCM Demand releases
5 UBDC SYSTEM
Utilisation Punjab at Madhopur (UBDC + SLPD +
CKDR) - (SILT EJ 72000+134000)
i)HYDEL CHANNEL AT P.H.1(7200CS)( Average) CS
ii)Avg.DIVERSION FROM RIVER RAVI to BEAS
INCLUDING M.B. LINK
6 BML SYSTEM
i)SUPPLY AT HEAD BML CS
ii) Total Utilisation at Haryana (RD390 BML +
RD160NB)

7 ROPAR HEAD WORKS ( SIRHIND CANAL SYSTEM)


i))SUPPLLY AT U/S ROPAR HEAD WORKS Cs
ii) Total Utilisation Punajb at Ropar (SC + BDC +
PUNJAB BML)
8 HARIKE HEAD WORKS
I)SUPPLLY AT U/S HARIKE H/WORKS CS
ii) Total Utilisation Rajasthan (RF+BC+TSF)
i) SUPLLY IN SIRHIND FEEDER (5264 cs) CS
ii) SUPLLY IN EASTERN CANAL (3197Cs) Cs
iii) Shah Nehar Canal group
iv) SUPPLY In KANIAWALI Disty (22Cs ) Cs
v) Makhu Canal Group CS
x) Total Utilisation Punjab at Harike i/c SNG
iv)SUPLLY IN FEROZEPUR FEEDER(11192cs)
9 FEROZEPUR ( HUSSANIWALA)HEAD WORKS
i) u/s Ferozepur H/W CS
ii)RELEASES D/S FEROZEPUR H/WORKS CS
SUBMITTED FOR KIND INFORMATION:-
i)Hon'ble Irrigation Minister, Punjab.

ii)Hon'ble Irrigation Minister, Punjab ,# 951,Sec.-39-A,CHD.


iii) Secretary,Deptt.of Irrigation,Govt. of Punjab.
iv)Chief Engineer/Canals, Irrigation Works, Punjab, Chd.
Executive Engineer/Regulation
For Chief Engineer Canals IW Punjab
Chandigarh