CG - 107 CG - 107 CG - 107 CG - 107
15.68 m
7.26 m
5.43 m
0.04m FILL 0.71m FILL Z 97.95
40.16 m
Z 98.87 X 180.11 m X 179.87 m
. 0.27m FILL
.
0.35m CUT Y 241.18 m
.
Y 243.68 m
ACCESS TO THE ADJACENT ENTERTAINMENT COMPLEX: X 176.79 m 27.51 m X 176.76 m Z 100.07 Z 100.26 CONSULTING ENGINEERS
Y 71.11 m Y 101.77 m 0.69m CUT
Specialists in Structural and Civil Engineering
Z 97.93 Z 98.01
• THE ACCESS TO THE CONCRETE SLAB ON THE 0.40m FILL 0.06m FILL
PO BOX 453 TEL +27 11 822 5252
ASSEMBLY HALL PROPERTY NEEDS TO BE BEDFORDVIEW FAX +27 11 822 5272
CLOSED/DENIED BEFORE THE CONCRETE SLAB MAY 2008
BE DEMOLISHED/BROKEN DOWN FOR USE IN THE Email: info@mrhce.co.za
CONSTRUCTION OF THE FILL LAYERS. Website: www.mrhce.co.za
ASSEMBLY HALL PROPERTY AND THE OWNERS OF 0.13m FILL 0.24m FILL 0.24m FILL 0.67m FILL 0.45m FILL 0.85m CUT 1.55m CUT 1.80m CUT
± 73.30 m
X 158.52 m
Y 241.12 m
THE ENTERTAINMENT COMPLEX PROPERTY. Z 99.06
• THE LOCAL AUTHORITY CAN THEN BE APPROACHED X 124.51 m X 124.51 m X 124.51 m X 124.51 m X 124.51 m X 124.51 m X 124.51 m X 124.51 m X 124.51 m
Y 3.45 m Y 12.68 m Y 52.68 m Y 84.11 m Y 115.59 m Y 155.59 m Y 198.13 m Y 235.59 m Y 243.52 m
FOR THEIR STAMP OF APPROVAL WITH A Z 98.20 Z 98.45 Z 98.74 Z 98.80 Z 98.73 Z 98.75 Z 98.75 Z 99.44 Z 100.70
COMPREHENSIVE TRANSPORTATION DESIGN THAT 0.28m FILL 0.45m FILL 0.92m FILL 0.66m FILL 0.29m FILL 0.61m CUT 1.45m CUT 1.28m CUT
X 124.51 m
CATERS FOR THE NEEDS OF BOTH PROPERTY Y 241.02 m
X 116 m ZERO CUT / FILL LINE
OWNERS. Y 0.53 m 99.00 COUNTOUR Z 99.63
1.07m CUT
Z 99.00 Z 99.00
0.92m FILL ± 172.00 m 0.98m FILL
189.41 m
• CONCRETE "PIECES" LARGER THAN 20cm MUST BE ZERO CUT / FILL LINE
.
Existing Fibre
SPOILED AND MAY NOT BE USED IN FILL. 99.00 COUNTOUR Manhole
BE REMOVED TO SPOIL.
U INE
E
TO L L
R
UN FIL
• THE ENTIRE CLEARED AND GRUBBED SITE THAT WILL
CO T /
± 106.00 m
.0 C U
BE IN FILL MUST THEN BE COMPACTED TO 90% X 62.52 m X 62.52 m X 62.52 m X 62.52 m
99 O
Y 0.28 m Y 181.13 m Y 215.13 m Y 243.35 m
0
R
MAXIMUM DRY DENSITY (MDD) PRIOR TO
ZE
Z 99.00 Z 99.85 Z 99.87 Z 101.01
± 116.00 m
COMMENCING WITH ANY CUT / FILL OPERATIONS, TO 0.22m FILL 0.45m CUT 0.91m CUT
X 62.52 m
A DEPTH OF 150mm. Y 240.85 m
AUDITORIUMS AND IS MOSTLY TO BE CUT / FILLED CG - 107 CG - 107 D 30-11-2018 FOR COMMENT
15.87 m
± 23.40 m
X 2.64 m 1.10m CUT
Z 99.00 . .9
2.50 m
X 6.8 m
Y 2.51 m Y 12.68 m
2.5m NO CUT ZONE
Z 100.30 3.50 m
1.00m CUT
. X 4.66 m
12.30 m
Y 115.59 m
Z 99.00
Assembly Hall
.
Z 99.00 Y 84.11 m
0.80m CUT Z 100.01
0.65m CUT . X 2.85 m
Y 52.68 m
49.04 m Z 100.02
X 0.68 m X -6.44 m
S.O.P Y 12.68 m 44 .65 m Z 100.03 X -5.72 m X -5.31 m Y 240.65 m
Existing
Water Meter
Y 158.41 m Y 161.89 m Z 100.25
X 0m Z 99.67
Z 101.00 Z 99.00 1.15m CUT BAIRRO SAPU LOTE NO 13
3.5m NO
Y 0m 1.55m CUT X -9.55 m
X -10.19 m
Y 243.14 m
LVL 99.62m Y 220 m
Slurry seal using 6,7mm nominal. Z 101.47 SHEET TITLE:
18.69 m
Z 99.00
Stone size (11mm average thickness) 2.25m CUT .
CUT ZON
220ℓ / m³ of 60% emulsion & 1% Cement
1
X -20.19 m
ZONE BULK EARTHWORKS PLAN
.
CUT
4 1. 91 m
Y 163.66 m X -17.13 m
SCALE: 1 : 500 Y 181.13 m 3 .5m NO X -14.63 m
Z 99.00 Y 215.13 m
Z 99.00
3.50 m
G4 / G5 Material stabilized with 2%
1.75m CUT
2.15m CUT . Z 101.36
E
cement and compacted to 95% X -20.68 m 41.91 m
150 10
X -24.28 m
maximum dry density (MDD) Y 160.63 m Y 181.13 m
Z 100.75 Z 101.20
Layers to be added at a later phase
A B C D
Top of platform level CG - 107 CG - 107 CG - 107 CG - 107 SCALE:
As indicated
In-situ material from cut / fill operation. PROJECT No.
Compacted to 93% maximum dry
density (MDD) AGO0391 - B00 - 01
SUB - PROJECT No.
CG - 106 F