CENTRAL ELECTRICITY AUTHORITY
FUEL MANAGEMENT DIVISION
DAILY COAL STOCK REPORT
COAL STOCK POSITION FOR COAL LINKAGE BASED THERMAL POWER STATIONS IN THE COUNTRY

Critical(*)/Super
PLF % PLF % Normative Requirement
Capacity Critical(**) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (June, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger level & other
2020) June,20) (Days) '000 Tonnes')
conditions

In '000 Tonnes' In Days

Indigenous Import Total

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Northern
Haryana

1 RAIL INDIRA GANDHI STPP JV 1500 0.0 0.0 25 13.4 816.49 136.09 952.58 71

2 RAIL MAHATMA GANDHI TPS P 1320 54.1 19.7 25 11.01 573.14 0 573.14 52

3 RAIL PANIPAT TPS S 710 3.1 6.5 25 5.99 455.05 0 455.05 76

4 RAIL RAJIV GANDHI TPS S 1200 50.2 16.8 25 15.86 451.69 0 451.69 28

5 RAIL YAMUNA NAGAR TPS S 600 12.0 30.2 25 7.06 446.92 0 446.92 63

Punjab
6 RAIL GH TPS (LEH.MOH.) S 920 25.8 8.5 30 12.6 277.31 0 277.31 22

7 RAIL GOINDWAL SAHIB TPP P 540 42.0 13.9 30 6.11 149.91 0 149.91 25

8 RAIL RAJPURA TPP P 1400 74.5 29.1 30 12.04 444.38 0 444.38 37

9 RAIL ROPAR TPS S 840 34.3 11.3 25 11.34 292.3 0 292.3 26

10 RAIL TALWANDI SABO TPP P 1980 48.6 16.0 25 26.78 437 0.18 437.18 16

Rajasthan

Total coal stock (Linkage + Captive) available with the plant as


11 RAIL CHHABRA TPP S 2320 70.2 71.4 30 19.91 34.04 0 34.04 2
on 31.05.2020 is 19,840 Tonnes.

12 RAIL KAWAI TPS P 1320 74.3 51.4 30 14.82 259.72 0 259.72 18

13 RAIL KOTA TPS S 1240 33.7 29.8 30 15.47 429.63 0 429.63 28


14 RAIL SURATGARH TPS S 2160 0.0 1.8 30 19.02 508.03 0 508.03 27
Uttar Pradesh

15 PITHEAD ANPARA C TPS P 1200 79.3 79.4 15 16.14 72.54 0 72.54 4 CIL Supply 105% of prorata ACQ.

16 PITHEAD ANPARA TPS S 2630 68.9 65.0 15 30.08 481.43 0 481.43 16

17 RAIL BARKHERA TPS P 90 24.8 10.6 25 0.77 20.69 0 20.69 27

18 RAIL DADRI (NCTPP) C 1820 15.7 15.6 30 16.19 704.93 13.67 718.6 44

19 RAIL HARDUAGANJ TPS S 605 59.0 37.4 25 6.54 261.38 0 261.38 40


20 RAIL KHAMBARKHERA TPS P 90 24.9 12.2 30 0.77 21.06 0 21.06 27

21 RAIL KUNDARKI TPS P 90 36.2 14.6 30 0.88 36.47 0 36.47 41

22 RAIL LALITPUR TPS P 1980 49.6 24.4 30 18.96 229.9 0 229.9 12

23 RAIL MAQSOODPUR TPS P 90 24.7 8.1 30 0.77 21.6 0 21.6 28

24 RAIL MEJA STPP JV 660 53.6 27.9 25 5.12 330.53 0 330.53 65

25 RAIL OBRA TPS S 1094 39.7 40.9 20 10.69 336.46 0 336.46 31

26 RAIL PARICHHA TPS S 1140 29.4 28.7 30 10.4 418.61 0 418.61 40

27 RAIL PRAYAGRAJ TPP P 1980 46.0 55.7 25 16.73 522.7 0 522.7 31

28 PITHEAD RIHAND STPS C 3000 97.4 95.3 15 33.95 81.21 0 81.21 2 CIL Supply to NTPC 93% of prorata ACQ.
29 RAIL ROSA TPP Ph-I P 1200 69.3 64.5 25 14.24 28.29 0 28.29 2 CIL Supply 92% of prorata ACQ.

30 PITHEAD SINGRAULI STPS C 2000 85.6 86.5 15 25.41 266.34 0 266.34 10

31 RAIL TANDA TPS C 1100 63.1 55.9 25 16.24 717.09 0 717.09 44

32 RAIL UNCHAHAR TPS C 1550 54.0 37.7 25 15.57 489.21 0 489.21 31

33 RAIL UTRAULA TPS P 90 36.3 31.5 30 0.96 31.72 0 31.72 33

Total of Northern Region 40669 22 431.82 10647.77 149.94 10797.71 25 0


Critical(*)/Super
PLF % PLF % Normative Requirement
Capacity Critical(**) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (June, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger level & other
2020) June,20) (Days) '000 Tonnes')
conditions

In '000 Tonnes' In Days

Indigenous Import Total

Western
Chhatisgarh

34 RAIL AKALTARA TPS P 1800 78.7 77.4 15 19.55 238.74 0 238.74 12

35 RAIL BALCO TPS P 600 63.8 65.0 15 5.48 175.81 0 175.81 32

36 ROAD BANDAKHAR TPP P 300 89.7 80.2 15 4.47 64.68 8.72 73.4 16

37 RAIL BARADARHA TPS P 1200 77.0 65.7 15 16.99 136.22 0 136.22 8

38 RAIL BHILAI TPS JV 500 77.0 48.0 20 7.22 381.12 0 381.12 53

39 RAIL BINJKOTE TPP P 600 37.2 28.8 20 6.15 60.7 0 60.7 10


40 RAIL DSPM TPS S 500 86.3 84.9 15 8.12 63.36 0 63.36 8

41 PITHEAD KORBA-III S 240 60.3 63.9 15 3.89 30.78 0 30.78 8

42 PITHEAD KORBA STPS C 2600 96.8 96.5 15 36.24 644.49 0 644.49 18

43 PITHEAD KORBA-WEST TPS S 1340 81.4 84.0 15 16.62 184.6 0 184.6 11

44 RAIL LARA TPP C 800 3.0 22.8 15 9.61 412.81 0 412.81 43


45 RAIL MARWA TPS S 1000 41.2 40.2 15 9.58 332.19 0 332.19 35

46 RAIL NAWAPARA TPP P 600 37.2 26.0 15 6.15 14.09 0 14.09 2 plant regulating coal supply

47 RAIL PATHADI TPP P 600 80.6 81.8 15 8.5 313.85 0 313.85 37

48 PITHEAD SIPAT STPS C 2980 97.5 95.2 15 45.39 631.45 0 631.45 14

49 RAIL TAMNAR TPP P 2400 35.5 31.9 20 24.46 82.48 0 82.48 3 Coal supply as per payment

50 RAIL UCHPINDA TPP P 1440 20.3 20.2 15 14.07 270.65 0 270.65 19


Gujarat
51 RAIL GANDHI NAGAR TPS S 630 0.0 0.0 30 5.62 212.82 0 212.82 38

52 RAIL SABARMATI (D-F STATIONS) P 362 30.6 16.9 30 2.61 15.93 106.24 122.17 9

53 RAIL UKAI TPS S 1110 31.7 39.4 30 9.52 222.65 0 222.65 23


54 RAIL WANAKBORI TPS S 2270 4.4 8.0 30 20.17 681.92 0 681.92 34

Madhya Pradesh

55 PITHEAD AMARKANTAK EXT TPS S 210 82.4 94.0 15 3.32 37.63 0 37.63 11
56 RAIL ANUPPUR TPP P 1200 48.8 49.7 25 12.71 201 0 201 16
57 RAIL BINA TPS P 500 63.6 24.5 25 4.67 98.13 0 98.13 21
58 RAIL GADARWARA TPP C 800 0.0 0.0 20 5.44 288.98 0 288.98 53

59 RAIL SANJAY GANDHI TPS S 1340 58.0 70.3 20 14.17 191.6 0 191.6 14

60 RAIL SATPURA TPS S 1330 29.3 30.7 20 12.71 291.67 0 291.67 23

61 RAIL SEIONI TPP P 600 63.3 59.7 20 8.17 174.56 0 174.56 21

62 RAIL SHREE SINGAJI TPP S 2520 3.9 9.7 20 23.45 869.77 0 869.77 37
63 PITHEAD VINDHYACHAL STPS C 4760 87.3 87.9 15 69.81 791.23 0 791.23 11

Maharashtra

64 RAIL AMARAVATI TPS P 1350 0.0 0.0 20 11.17 839.11 0 839.11 75

65 RAIL BHUSAWAL TPS S 1210 0.8 1.9 20 12.2 379.38 0 379.38 31

66 RAIL BUTIBORI TPP P 600 0.0 0.0 20 5.15 59.73 0 59.73 12


CHANDRAPUR(MAHARASHTRA)
67 RAIL S 2920 74.6 58.9 20 39.08 659.62 0 659.62 17
STPS
68 RAIL DAHANU TPS P 500 79.3 82.7 25 3.77 248.05 63.35 311.4 83

69 RAIL DHARIWAL TPP P 600 79.7 75.7 20 7.67 81.67 0 81.67 11

70 RAIL GMR WARORA TPS P 600 49.7 48.6 20 7.5 15.56 0 15.56 2 Coal Supply as per payment

71 RAIL KHAPARKHEDA TPS S 1340 76.8 68.4 25 15.03 397 0 397 26

72 RAIL KORADI TPS S 2400 8.3 14.8 25 23.63 503.28 0 503.28 21

73 RAIL MAUDA TPS C 2320 8.8 2.9 20 20.33 969.24 0 969.24 48

74 RAIL NASIK TPS S 630 0.0 0.0 25 6.75 223.28 0 223.28 33

75 RAIL PARAS TPS S 500 73.2 80.2 25 7.8 246.42 0 246.42 32

76 RAIL PARLI TPS S 750 0.5 5.5 25 7.67 240.76 0 240.76 31

77 RAIL SOLAPUR C 1320 0.0 0.0 25 11.26 532.94 189.39 722.33 64

78 RAIL TIRORA TPS P 3300 45.4 71.6 20 27.7 381.54 0 381.54 14

79 ROAD WARDHA WARORA TPP P 540 20.7 26.4 20 4.48 57.46 0 57.46 13

Total of Western Region 58012 29 646.05 13950.95 367.7 14318.65 22 0


Critical(*)/Super
PLF % PLF % Normative Requirement
Capacity Critical(**) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (June, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger level & other
2020) June,20) (Days) '000 Tonnes')
conditions

In '000 Tonnes' In Days

Indigenous Import Total

Southern
Andhra Pradesh

80 RAIL DAMODARAM SANJEEVAIAH TPS S 1600 74.4 45.8 20 13.6 259.36 168.79 428.15 27

81 RAIL Dr. N.TATA RAO TPS S 1760 36.1 22.9 20 18.96 150.28 0 150.28 8

82 RAIL PAINAMPURAM TPP P 1320 54.4 78.1 20 9.91 148.52 122.31 270.83 21

83 RAIL RAYALASEEMA TPS S 1650 2.4 7.9 25 16.77 468.72 0 468.72 28

84 RAIL SIMHADRI C 2000 37.9 43.1 25 18.61 912.74 3.73 916.47 49

85 RAIL VIZAG TPP P 1040 52.4 37.2 25 13.14 73.88 0 73.88 6 Coal supply as per court order dated 27.02.2019

Karnataka

86 RAIL BELLARY TPS S 1700 1.7 8.8 30 15.48 565.92 0 565.92 37

87 RAIL KUDGI STPP C 2400 3.6 4.8 30 17.11 678.86 32.64 711.5 42

88 RAIL RAICHUR TPS S 1720 20.8 47.8 30 16.28 669.13 0 669.13 41


89 RAIL YERMARUS TPP S 1600 7.2 24.3 30 13.73 208.11 0 208.11 15

Tamil Nadu

90 INTER MODAL METTUR TPS S 840 59.8 52.7 30 7.98 216.55 22.25 238.8 30

91 INTER MODAL METTUR TPS - II S 600 39.6 30.9 30 8.25 151.46 34.81 186.27 23

92 INTER MODAL NORTH CHENNAI TPS S 1830 58.8 38.1 30 17.1 329.57 12.1 341.67 20

93 INTER MODAL TUTICORIN (JV) TPP JV 1000 67.6 60.1 30 12.48 132.22 87.78 220 15

94 INTER MODAL TUTICORIN TPS S 1050 59.4 48.6 30 10.48 400.95 53.32 454.27 43
95 INTER MODAL VALLUR TPP JV 1500 14.5 16.0 30 14.81 423.38 0 423.38 29

Telangana

96 PITHEAD KAKATIYA TPS S 1100 47.6 56.8 15 9.57 338.19 0 338.19 35

97 RAIL KOTHAGUDEM TPS (NEW) S 1000 62.3 76.8 20 9.52 475.06 0 475.06 50

98 RAIL KOTHAGUDEM TPS (STAGE-7) S 800 97.0 78.6 20 8.5 225.56 0 225.56 27

99 PITHEAD RAMAGUNDEM STPS C 2600 71.5 63.2 15 34.11 603.9 0 603.9 18

100 RAIL SINGARENI TPP S 1200 5.5 52.6 15 10.23 420.77 0 420.77 41

Total of Southern Region 30550 24 296.62 7853.13 537.73 8390.86 28 0

Eastern

Bihar

101 RAIL BARAUNI TPS C 710 29.2 21.2 20 6.09 83.42 0 83.42 14

102 RAIL BARH II C 1320 60.3 45.6 20 11.76 781.56 0 781.56 66

103 PITHEAD KAHALGAON TPS C 2340 68.2 71.9 15 33.15 729.86 0 729.86 22
104 RAIL MUZAFFARPUR TPS JV 610 45.0 39.1 20 6.08 88.17 0 88.17 15

105 RAIL NABINAGAR STPP JV 660 87.9 81.0 20 8.59 108.7 0 108.7 13

106 RAIL NABI NAGAR TPP JV 750 53.9 53.4 20 6.48 596.21 0 596.21 92

Jharkhand

107 RAIL BOKARO `B` TPS C 210 0.0 0.0 20 1.8 110.23 0 110.23 61

108 RAIL BOKARO TPS `A` EXP C 500 80.3 63.0 20 5.96 95.62 0 95.62 16

109 RAIL CHANDRAPURA(DVC) TPS C 500 75.3 53.0 20 6.32 387.97 0 387.97 61
110 RAIL KODARMA TPP C 1000 84.5 71.2 20 13.33 416.51 0 416.51 31

111 RAIL MAHADEV PRASAD STPP P 540 51.4 52.8 20 5.05 155.73 0 155.73 31

112 RAIL MAITHON RB TPP JV 1050 62.5 66.6 20 12.52 315.94 0 315.94 25

113 RAIL TENUGHAT TPS S 420 67.3 63.6 20 4.88 229.77 0 229.77 47

Odisha

114 RAIL DERANG TPP P 1200 27.8 52.4 20 12.99 599.49 0 599.49 46
115 PITHEAD IB VALLEY TPS S 1740 65.2 61.3 15 22.82 439.7 0 439.7 19

116 RAIL KAMALANGA TPS P 1050 70.6 57.1 20 10.75 15.77 0 15.77 1 CIL Supply 87% of prorata ACQ.

117 PITHEAD TALCHER (OLD) TPS C 460 92.6 93.5 15 9.38 301.31 3.67 304.98 33

118 PITHEAD TALCHER STPS C 3000 85.5 87.1 15 51.96 760.74 18.54 779.28 15
Critical(*)/Super
PLF % PLF % Normative Requirement
Capacity Critical(**) as per
Region/State Mode of Transport Name of Thermal Power Station Sector (June, (Apr- Stock Reqd. for the day (In Actual Stock Reasons for critical coal stock/Remarks
(MW) Trigger level & other
2020) June,20) (Days) '000 Tonnes')
conditions

In '000 Tonnes' In Days

Indigenous Import Total

West Bengal
119 RAIL BAKRESWAR TPS S 1050 79.2 72.1 20 13.28 292.13 0 292.13 22

120 RAIL BANDEL TPS S 330 15.7 12.2 20 3.8 147.65 0 147.65 39

121 RAIL BUDGE BUDGE TPS P 750 91.1 81.1 20 10.03 206.18 0 206.18 21

122 RAIL D.P.L. TPS S 550 61.9 55.4 25 5.75 152.47 0 152.47 27

123 RAIL DURGAPUR STEEL TPS C 1000 75.5 55.9 20 12.52 385.3 0 385.3 31

124 RAIL DURGAPUR TPS C 210 0.0 0.0 20 2.31 209.17 0 209.17 91

125 PITHEAD FARAKKA STPS C 2100 51.3 55.9 15 19.35 860.66 0 860.66 44

126 RAIL HALDIA TPP P 600 88.0 76.8 20 9.08 119.14 0 119.14 13

127 RAIL KOLAGHAT TPS S 1260 12.7 12.9 25 14.79 201.74 0 201.74 14

128 RAIL MEJIA TPS C 2340 49.2 37.7 20 21.65 845.76 0 845.76 39

129 RAIL RAGHUNATHPUR TPP C 1200 52.3 40.1 15 9.73 307.9 0 307.9 32

130 RAIL SAGARDIGHI TPS S 1600 73.3 53.2 20 15.83 296.49 0 296.49 19

131 RAIL SANTALDIH TPS S 500 58.3 67.0 20 6.85 324.39 0 324.39 47

132 RAIL SOUTHERN REPL. TPS P 135 0.0 0.0 20 1.23 49.55 0 49.55 40
133 RAIL TITAGARH TPS P 240 0.0 0.0 20 2.06 14.02 0 14.02 7

Total of Eastern Region 31925 18 378.17 10629.25 22.21 10651.46 28 0

North Eastern

Assam
134 RAIL BONGAIGAON TPP C 750 52.8 45.0 20 5.88 463.1 0 463.1 79

Total of North Eastern Region 750 20 5.88 463.1 0 463.1 79 0

Region-wise/All India total 161456 24 1758.54 43544.2 1077.58 44621.78 25 0

As per trigger level and


other conditions
Total Stock ('000 Total Stock
T) (in Days) Stock in Days
No. of Capacity Daily Req
Pithead Plants Mode (Critical/Super Number of Plants Capacity (MW)
Plants (MW) ('000 T) Critical)

(*) No. of plants with Critical Stock (<5 Days) 0 Pithead 17 34300 461.2 7278.3 16 0 day 0 0
1 day
(**) No. of plants with Super Critical Stock (<3 Days) 0 Non-Pithead 117 127156 1297.4 37343.5 29 1 1050
2 days
Non-Pithead TOTAL 134 161456 1758.5 44621.8 25 5 7720

(*) No. of plants with Critical Stock (<7 Days) 0 3 days 1 2400
(**) No. of plants with Super Critical Stock (<4 Days) 0 4 days 1 1200
Total 0 5 days 0 0
6 days 1 1040
Total 9 13410
NOTE:

(i) % Materialisation (including Deemed Delivery) as per CIL is for the period 01.04.2019 to 31.03.2020

(ii) Power Plants having less coal stock due to outstanding dues/ supply more than committed quantity/ not lifting offered coal/Bridge linkage/New Linkage are not shown as having critical /supercritical coal stock.

(iii) Daily coal requirement is based on the maximum of the requirement for average actual consumption of the plant for last 7 days or requirement for installed capacity of plant at 55%PLF.
(iv) Stock resticted to 70% Domestic and 30% Imported ratio.
C:Central Sector; S: State Sector; P: Private Sector; JV: Joint Venture