You are on page 1of 9
_ SHAPOORIJI PALLONJI & CO. LTD. ENGINEERS & CONTRACTORS Date : 26/10/2007 (Clo All India Glass Works Pvt. Lid 326, Mathuradas Vasanji Road, Bail Bazaar, Kurla (W), Mumbai - 400070, Tel. ~25123053 / 89, Fax ~25121915. ANNEXURE - A Name of Contractor :- Sheetal Engineers & Contractors Name of work Providing & filling of poly sulphide selent in pqc Work Order No WAGR/276 Terms and Condition: 1. Billing at every 30 days & payment will be made within 30 days from the date of receipt of bill. 2. Duration: From 26/10/07 final date of completion will be 31/12/2007 3. Rate :- Rs. 78/- Per Rmt including filling material, labours & equipments DG set & diesel. 4. 5% Retention money will be deducted & will be release after completion of project. 5. Income Tax at the prevailing rate will be deducted. 6. You will observe all statutory laws including labour law and you will maintain adequate records. 7. SP has the right to decrease or terminate the scope of work or work order issued to you depending on performance. ‘Thanking you, ‘Yours faithful For Shapoorji Pallonji & Co-Ltd., fr. Patan Sharma sb ~ (Asst. General Mamas oye (Signature of Contractor) ae as oN ‘SUB-CONTRACT WORK ORDER ‘Sub Contractor Name : WO. Dati ‘SHEETAL ENGINEERS & CONTRACTORS 260112007 W.O, Number : WAGRI276 Work Order Selet Filing in POC Joint New india Moto Garage, Nawnath Colony, Shiphata, Khopot Sot ged Project Wotine4@-Gonstt adhere Gatopr Unk Ra Contact: M.Poven Shama Site Address: Shaper Palen & Co. A, MUP Se- Werk No Te No.2 '48-Constucton of Ancherl io Ghatkopar Link Fé, 1309980 FaxNo. Invoices must be submitted as per SHAPOORJI PALLONJI & CO. LTD. prescribed format. > Please refer to sub contract document for general and specific terms and conditions. > Allworks must be executed under strict compiiancy of spscificeticns and terms and ‘conditions > The above quantities may be approximate . Payment will be made based on actual work measured at site. = Vag A $25 = Tel. : (020) 26131711 - 14 166013261-64 Fax : (020) 26138885 Email : mail@aturindia.com Design & Execution Of Infrastructure Projects INDIA Sth Floor; Atur Chambers Pioneers Of Housing In Pune 2A Moledina Road, Pune 411 001 AI/PCMC/ AGS / SITE /153 Date 14/05/2008 To, Kale Construction (Civil Contractor), C/O New India Motor Garage, Naynath Colony, Old Mumbai-Pune Highway NH-4, Shilphata, Khopoli, Tal.-Khalapur, Dist.-Raigad, ‘Name of work: - Construction of Grade Separator at Khandoba Chowk, Akurdi on Mumbai ~ Pune Road. Sub: - Work Order for PQC groove cutting & joint filling in the same. Ref: - Your Quotation dated 29.02.2008. Dear Sir, With reference to above, we are pleased to give you work order for the subjected work for our Akurdi Grade Separator Project PQC groove cutting & joint filling with filler materials, cleaning the joints before filling, including loading, unloading, transporting etc. complete as per approved drawing, MORTH Section 600 specification & as directed by project management consultants and, or , EMC officials. The rate is inclusive of all taxes (VAT, Service Tax as applicable), transportation, loading, unloading, all tools, plants, equipments, materials & labours ete. Income tax will be deducted from the bills. The security Deposit 5% will be kept from the bills. The defects liability will be 5 years after completion of the project. During this period defects if any shall be made good by you without any extra cost. Item | Item of Work Size Rate per Rit. (Rs.) 1 | Tnitiat Groove Cuttin 3x 110mm | 22.00 2 | Widening Cutting $x30mm_| 18.00 3 | Cleaning the joints before filling, | 8x 12mm | 63.00 filling joints with filler materials, Thanking you, Yours Faithfully, For ATUR INDIA PVT LTD. Accepted. hy:me XS -S.MASALI eee RESIDENT ENGINEER, _ Kale Construction (Civil Contractor), C.C.- Head Office. ATUR INDIA PVT. LTD. AN ISO-9001-2000 CONSTRUCTION COMPANY Registered Office : Atur House, 87, Dr. Annie Besant Rd, Worli, Mumbai -400 018. Tel. : (022) 24938561-62 Fax : (022) 24938323 ® Website : www.aturindia.com CHOKSEY TO WHOMSOVER IT MAY CONCERN This is to certify that Mr. Kale of M/s. Kale Construction ~ Khopoli is representing ‘our Company M/s. Choksey Chemicals Pvt. Ltd. for application of Polysulphide Sealant to the Road Project of M/s. B G Shirke at NPT, Navi Mumbai. The rate which includes cleaning of joints, primer application, Sealant application along with all the necessary tools and tackle except material like primer and Sealant is done @ Rs.20/- for 8mm x 12mm groove size, and Rs.22/- for 12mm x 15mm groove size by M/s. Kale Construction. His workmanship is found satisfactory and as per the specifications and so far no complaints regarding the same are received to us. This letter is issued on request. For CHOKSEY CHEMICALS PVT. LTD. SATISH GHANEKAR -R MEMBRANE & SEALANTS Date: September 24, 2008 nts, Admixt of & Protective Coatings Manufacturers of Construction Chemicals, Set India, An 180 9001-2000 Company. 117, Industrial Area, Sion (€), Mom 1127 Fax: 022-2407 2040 Email; contactBchoksoyshom.com Wabsite: www.cha yehom.com MODERN ROAD MAKERS PVT. LTD. REGD; OFFICE "IR8 COMPLEX. CHANDIVL! FARM, CHANDIVLI VILLAGE, ANDHERI €), MUMBA - 400 072 TELEPHONE : 91 22 6640 4220 » FAX: 9122 6875 1024 E-mail Address mhaiskar@bom?2 vsni.netin E RefNo.:. MRM/TBBOT/WO/006/00. Date: 15" March 2008 Fo, Mis. Kale Construction, “ivil Contractors, New India Motor Garage,Navnath Colony, hilphata, Khopoli, -al-Khalapur, dist. — Raigad. Mobile : 98234 27135. Improvement, Toll Collection and Operation, Maintenance of Thane Bhiwandi Bypass Project. Work order for Joint cutting & Joint filling of Concrete Pavement Dear Sir, With reference to your Quotation Dated 16/02/2008 & subsequent discussions you had with undersigned, we are pleased to place the Work Order for our part of said work with “Terms & Conditions as described hereunder and Item Rates mentioned herewith. Sr. \ ae Description of item Unit | Rate (Rs) Thitial Cutting Gmm. wide x 120mm deep | | Groove), cleaning with blower as specified | ot | including all manpower, machinery(including | Rmt 22.00 | fuel), all tools & tackles & transportation | complete. Final Cutting (8mm. wide x 30mm deep |__| Groove), cleaning with blower as specified | 02 | including all manpower, machinery(including | _Rmt 19.00 | | j fuel), all tools & tackles & transportation complete. ‘Sealing of joint with bitumen supplied by MRM including cleaning with blower as | 03 | specified iricluding all manpower, Rmt 12.00 |_| machinery(including fuel), all tools & tackles |__| & transportation complete. SCOPE OF WORK AND TERMS & CONDITIONS: 1. The work to be carried out strictly in accordance with the specification for Road and Bridge works (MORT&H). 2. Your scope of work includes as mentioned Bhiwandi Bypass Road as per the quan Incharge, the items on Toll Plaza at Thane ~ ies & locations given by our Engineer Page 1 of 3 ‘You should ensure proper quality control and progress of the work as per accepted schedule to the entire satisfaction of our engineer incharge or supervision authority. 4. All type of diesel, oil, lubricants required by you for this work will be procured and managed by you. If MRM issues the same material then the amount will be recovered from your RA Bill at Market rate. You should deploy 1 No. cutting machine on site. Water required for the work will be provided by MRM at free of cost. 6. You should make arrangement for stand by reserve tools and blades in the form of extra stock before commencement of work for the day. 7. No work will be allowed after 6.00pm under any circumstances but if required at emergency thEn the work should be carried out as per the instructions of site incharge. 8. No work will be done without prior information to engineer incharge. 9. we will supply you the required material like Bitumen at free of cost, but if any misuse. of material after auc ig is found the same will be recovered at the rate of double the cost of market rate, 10. The rates are inclusive of Manpower, Machinery, transportation, all tools & tackles. All the applicable taxes will be born by you and no additional amount will be paid for the same. 11. All tools, tackles & vehicles'etc are arranged by you & no extra payment shall be made for any kind of temporary works. 12, In case of repetition of works or rework due to non-execution of work as per MORT&H & IRC, it will be your responsibility to rectify the same at your own cost up to the satisfaction of supervising authority. Payment will be made only after approval of the particular work in all respects as per specifications. 13. Providing of all required resources and manpower for the said works will be purely 14, All material that will be used in the project shall confirm the requirements as per technical specifications of MORT&H & IRC. % 15, All your plants, material, labours staff etc. shall be insured with any of the insurance ‘as approved by the Govt. 16, You will manage and arrange to fulfill all safety compliances strictly. You will be fully responsible for safety precautions on sité. No any extra payment will be made for the same: 17, Measurements & payments: Measurements for completed works as certified by the Project Manager will qualify for payment. No measurements of work in progress will be paid payment for certified bills based on certified measurements will be made within a week after submission of bills. Necessary recoveries and deductions on account of advance, TDS as applicable or any others dues willbe made from your bill. In case of = discrepancy in any work due to poor workmanship, the affected item will not be considered for billing. 18. Escalation: Price quoted and accepted by you shall remain firm for the entire duration of the contract and no price variation / escalation will be payable. Page 2 of 3 19, After completion of the work in a particular stretch on a particular day you should clear site of all debris, unused material plant, machinery and‘tools -tackles etc. 20. You are required to comply with all prevailing statutory provisions, enforced in respect of all employees on the project labours, labour laws, minimum wages Act 1948, Clause 1970 insurances, payment of wages act 1936, Provisions of mines Act. W.C. Act, insurances etc. In any case you will have to comply with all statutory rules and regulation prevailing at any time. We shall be indemnified for the same at all the times during or after the completion of the Project. Employment of any person below 18 years of age is not allowed. 21. You have to provide E.P.F A/c. No. for Mumbai/Thane jurisdiction as per EPF act 1952. 22, Any disputed matter will be settling Mumbai jurisdiction only. 23.Necessary arrangement for accommodation for’ your manpower and labour is to be arranged by you at your cost. Provision of basic amenities in the labour camp, maintaining general and environmental cleanliness: and hygiene will be your respon . Required security and control of labour will. be your responsibility. If possible we will provide free accommodation to labour. 24.Quantity or stretch of work that will be allotted to you will totally depend upon your actual demonstration at site, achieving set targets working with quality etc. 251f itis found that due to one or other reasons you are continuously failing in achieving the set targets in terms of quantity and quality or maintaining safety precautions on site, then the contract will be terminated without any prior notice. In such case no extra payments will be made for demobilization or any sort of compensation in any regard. ‘We reserve the right to give any part of work undér your scope to any other agency if situation arises. Kindly send us duplicate copy of this Work Order duly singed by you as a taken of your acceptance. Thanking you, 9 Yours faithfully, For Modern Road Makers Pvt. Ltd M. We Sadake (Project Manager) : We hereby preety per the terms and conditions. Mis. Kale Construction. Page 3 of 3 \ SHIRKE / me UCTION TECHNOLOGY LIMITED HIRK Tel, 26870151, 26070152,26870232 Grams :* BUILDALL* 26870727) 2687086%,26870862 Fax. : (020) 26871812 25810969, 26617297 BSS SCTIINPTISHKC 06-07 Date: 14/10 20qgemerstmes vm WORK ORDER Amendment -1 sv Shilphata, ‘ four Lanng of NPT Package Projet = Groore Citing wore POC. ‘Our work order No. BGSCTLIPKG-IUWO/01, dated 05.05.2006, 1 quetation dated 2:09/2006 and subsequent discussions we had with you on 27.09.2006, » niased fo amend our*“Work Order” for Groove Cutting for PQC wark at Aanra Mare on JNPT. et The details are as under ~ PE OF WOR! Item of work Unit | Qy. Amount (Rs.) 5410.00 vial groove walling 3 mam wide x 117 mm | Rat | 3276000 | ispth with diamond Blade saw cutting machine udinal » unsverse / constructions ‘ove cutting 7 widening of longitudinal 7] Rat. | 3615000 [20.00 | 723000.00, ‘ns 8 / construction joints tothe sizes as per vnving amd specifications and as directed by Puginesr incharge 7 PMC / Client including ove by using air blowers or any jod to enable to receive back up rod | de-bonding strip and sealant (back-up rod, ‘bonding strip and sealant is not in your B 147H70.00 AERMS AND CONDITIONS nentioned quantities are tentative and may vary +/- 25%, cntioned above are inclusive of machine, blades, consumables, tools and ‘es trsnsportation of machines, labour, supervision etc. complete. 68 SHIRK socurity measures required during execution of work. You ike all safety fabours and their compensation in case of accidents. if yonsible for vour 1 J eutting machines well maintained with crew of operators ecution of work to met with daily targets. In case, if 1 site sufticient for J cou will deploy more machines when sufficient front is available to us in case issued to you from site in good condition, if finalized by i} vevarn all material ‘ai_of the same will be recovered trom you at the rates esponsible tor completion of entire job within 6 months or within 2 weeks ire hate of PQC casting by us, whichever is earlier. i vt aovide land for temporary accommodation of your labours at site and corto them All other arrangements like huts, transportation etc. will be nu You will be responsible to make site vacant as soon as the job allotted to ‘it he compteted ith be paid weekly on the basis of work executed by you at site 5% will be deducted from your each bill and will be retumed to you | »satistactory completion of work. Tow will be deducted at source, necessary certificate will be issued to that workmanship shall be oF highest quality and should be strictly as per ser: 2 our right to terminate this order in case =~ ~ poogress of work is not satisfactory / as per schedule. -wality is not maintained. vo are failed to implement instructions given by Project Manager. juested to commence the work at site immediately and report to our Shri JC Shri D.A. Khond. he Const, Tech, Ltd. el oS et ae ia Agreed &Kecepted. vecutive, 09 + j \

You might also like