◆ Chapter 1 Outline
◆ Chapter 2 General Plan
◆ Chapter 3 Electrical Design
◆ Chapter 4 Civil engineer
◆ Chapter 5 Fire protection
◆ Chapter 6 Environmental Protection
A4-3 - 32
Chapter 1 Outline
1. Summary
A4-3 - 33
2. Scale of construction and Designing Scope
Scale of Construction
No. Item
2 PV
V Module
odu e 220wp
0wp 45600
5600
Designing Scope
2. Site introduction
2.1 Natural condition
The PV station is located in the east exit of Golmud City, 11 KM
away from Golmud City. National highway No. 109 pass through
the site with convenient transportation.
p The terrain is pplain and
open in general. Geographic environment is good. Situated in the
south side of the Chaidamu Basin, which is defined as Gobi
Desert with a stable geographic strike. The site is 562 meters long
from east to west, 503 meters wide from south to north, with the
total area of 282686 square meters. According to the 30 years
statistics recorded by the weather station ranged from 1971 to
2000, the total radiation of this area could reach to 1806~
1806~
2077kWh/square
q meters,, the average
g annual radiation could reach
to 1944.5kWh/m2.
A4-3 - 34
2.2 Engineering geology
The site is located in the flood alluvial plain of Kunlun Mountain. The ground elevation is 2862.19~
2862.19~
2874.47m, relative elevation is 12.28m,high in west and low in east.
2.2.1 Above the site 0.3~0.5m, it is the loose eolian
eolian--sand which should be removed.
2.2.2 sand soil spread in the site with good mechanic property, could be used as the bearing layer. And
around No. 78, 112,113、
112,113、144 holes, the round sand could be used as the bearing layer. We suggest the
base of the facility should use the independent base . The associated equipment house could use strip
shaped base.
2.2.3 Due to the pretty deep location of the underground water , the impact could be neglected.
2.2.4 The seismic resistance is 7 degree, categorized to group 3. The designed basic seismic added value
is 0.10g, categorized to groupⅡ
groupⅡ, the designed characteristic cycle value is 0.45s. No earthquake in the
site happened. Breaking and factors influence the stability of the rock exists, belonging to ordinary site
for the construction.
2.2.5 The standard freezing depth in Golmud area is 1.05m, according to the result of analysis to the soil
sample taken from the site, the moisture content is 4.7~6.1%, averagely 5.4%. The minimum distance
between underground water to freezing ground is> is>1.50m, average frozen heave factor isη≤1, belong
to the grade 1 as non
non--froze layer
2.2.6 Resistivity of the site soil is 58~163Ω·m。
58~163Ω·m。
2 2 7 Sand storm happens in the site
2.2.7 site, which need the active protection from wind storm and sand storm
storm.
A4-3 - 35
2.3 Solar energy
Table 1-3 Main meteorological elements table of Golmud City (normal value of accumulated year)
A4-3 - 36
Chapter 2 General Plan
1. Briefing of the site
The site is located in Golmud City, 11 km away from the east toll gate, and 2 km away from the
national road with a convenient transportation. The total capacity is 10MWp. Generally, it is a matrix
layout. The station is composed with two parts of production area and management area. The entrance
and exit of the station is designed at the west and south side of the station, and connected with the road
outside. The management
g area is in the southwest. The total area of the station is 0.283k㎡
0.283k㎡, the area
for the management area is15824㎡
is15824㎡。
2. General layout
On the basis of full consideration of the site and condition, newly built comprehensive building is
located in the southwest of the site, adjacent to the distribution central control room in the west. The
comprehensive building is linked with the distribution central control room by the corridor. The
comprehensive
3. Vertical design
The superficial standard height is 2862.19~
2862.19~2874.47m, relative height is 12.28m, high in west and
low in east. Generally , the site is plain and broad. There are rise and fall in part of the area. On the
basis of the, road standard height refers to the current standard height of the site. The newly built
comprehensive building is 450mm higher than the surface outside of the building.
building
4. Transportation
The transportation system is a loop line with the array as the main part, connected with all buildings.
The average width of the road is 4 m, the minimum turning radius is 6 m.. It is a complete traffic
network with fire ring.
A4-3 - 37
Chapter 3 Electrical Design
1. PV site design
※
①
※②
※⑤
※③
③
※④
A4-3 - 38
1.2 PV array framework
Fixed support. The bearing angle of the array is south with the best
angle roll of 33 degree
1 3 PV array design
1.3
2 groups of solar energy group string (20 pieces of each string),
vertically settled and form them to 2 lines and 20 columns, i. e. 40
pieces of solar cell module is formed as an array.
Technical requirement
1. Module type BEST-220P-20, 40 pieces for each subarry
A4-3 - 39
Installation Diagram of PV Array Framework
Installation requirement:
Straightening the connecting rod before installation
All connecting parts need to be well ready and connection needs to be reliable.;
The back up plates will be requirement between the connection points for any necessary moment.
The material listed in the sheet are for one subarray (40 modules form for one subarray)
Strengthening brace is installed in the first shelves and sixth shelve, and fastened by the M16 bolt.
The beam is formed with the 6 C type steel numbered as I、II、III、IV、V、VI, Connection need to be
carried out orderly.
A4-3 - 40
According to the calculation, the power generation of the first year could reach to 17
17,,8658
million kWh, 20%
20% declining for 25 use of the system, the total output of 25 years could
reach to 406
406,,285 million kWh, the average output each year is 16 16,,2514 million kWh, the
output of 25 years is as following
following::
A4-3 - 41
2.1.2 Choice of Booster Station Site
A4-3 - 42
Floor Plan of Booster Station
A4-3 - 43
① Unit Transformer
American box transformer substation, outdoor installation.
② 35kV Switchboard
35kV switchboard takes KYN61-
KYN61-40.5GY Armoured removal AC closed high
tension switchgear. ZN85GY(VEM)-
ZN85GY(VEM)-40.5 vacuum cutout switch is inside with 25
ka drop
drop--out current. Metering point is settled in 35 kv metering cabinet of the
newly built 35 kv high tension switchgear. The metering point of the pass is
settled on the end of the line side. 2 inlet wire switch cabinets, 1 incoming cabinet,
1 capacitor box 1 voltage transformer cabinet will be
A4-3 - 44
①Function Needed for Electricity and Electric Power Collection
To meet requirement of commercial operation of grid, the following function will be needed:
a)System could receive and process the electricity quantity data and non
non--electricity quantity data sent
by pass or collection terminals.
b)The data pool could store more than 1 year of electric data period by period with the time mark:
including original data,
data partial middle result,
result the processing capability should be no less than 200 points.
points To
form the report sheet according to the requirement and printing or storing in other media.
c)Security and confidentiality, especially for the store and access data, the mode setting and remode of the
parameters, user permission and access condition, to prevent the illegal access.
d)File all operation from operators.
e)Good manman--computer interaction like warning , display of report sheet, timing, call print etc.
f)Supervision and automatic warning on the inefficiency of pass measurement and electric quantity
intervals and print the result.
g)Automatic recording when the phone is busy, breakdown of the passageway, wrong report and
transmission etc and could be displayed and checked on CRT.
h)Support application development.
i)Interface requirement should be available. When 4 wire line channel adopted, the modem should be
equipped.
②The measuring point will be settled in the 35kV measurement cabinet. The measurement loop
concludes 2 three phase automatic electric meters of 0.2 s class and 1 pressure loss timer. The CT
measurement adopts class 0.2s, 0.2 class for PT. The variable voltage measuring two loop is equipped
with 1 three phase four wire low voltage automatic electric meter of class 0.2s. Measuring CT adopts
class 0.2s, and installed in the cabinet of the secondary electric equipment. Cabinet.
a) The comprehensive automation system and interface circuit of the secondary electric equipment: the
abnormal signal of protection, automatic equipment, direct current of the equipment will both send
teleindication and display in the screen of each . The indication panel will not be installed in the
substation. If needed, the automation system could be available.
b) telecommunication and interface: the station control layer adopts Ethernet. The layer has a good
openness. Interval layer adopts industrial control network, which owns the enough transmission speed
and high efficiency. Each interval layer could telecommunicate directly. Network topology should adopts
bus type, ring type or star type, the physical connection between station control layer and interval layer
should adopt star.
c) Control voltage and reactive power regulation: Circuit breaker and all electric isolation switch could
be remote controlled. Voltage and reactive power could be remote controlled by hand; The reactive
power compensation equipment could automatically adjusted; The remote cast and reset, amendment of
protection constant value could be used for the protection equipment. The control way could be switched
and closed automatically.
d) Man
Man--computer interaction: The local monitoring host, display, panel and printer, data storage etc
could
ld be
b installed
i ll d in
i the
h substation
b i for f the
h convenient
i operation.
i
e) Other function like self
self--diagnosis and management etc.
A4-3 - 45
2.2 Configures of computer supervisory system
Computer supervisory system is composed with station control layer and interval control layer.
1) Station control layer
Substation takes single network structure, station control layer is directly connected with the interval
layer, mainly, includes 1 engineer working station, 1 telecontrol master station, 1 warning system, 1
printer and 1 set of timer, network system
Host computer and operator’s working station adopts the man man--computer interface of station control
layer to collect, process, store the data , and to record report sheet, event and warning display as well as
checking guiding,
checking, guiding explaining and transmitting the control orders.
orders
Telecontrol station directly receive data of I/0, and establish the data pool, and according to the
protocol of dispatch center, through special channel to connect to the equipment and transmits the
telecontrol information.
Station control layer is connected with the equipments by Ethernet, , station control layer will be set
screen and installed in the secondary electric equipment cabinet.
2) Interval control layer
Telemetry, teleindiation and remote control function could be conducted by the special measurement
and control equipment(
equipment(I/O measuring and controlling unit), which has the function of LED
measurement, Synchronous detection, emergent operation of on spot breaker and display of the
measurement figure etc. Each interval layer is independent, mainly used to collect , transfer, process
and
d transmits
i the
h iinformation
f i off theh equipment.
i
I/O measuring and controlling unit collect the real time data and upload to Ethernet which transmits
them to station control layer, at the same time, transmits the remote control , teleindication orders to
each I/O.
Station control layer is connected with interval control layer by LAN.
A4-3 - 46
2.3 Relay Protection and Automatic Device
2.3.1 Designing principle
On the basis of Technical Regulation of Relay Protection and Automatic Devices
GB14285--2006, with micro
GB14285 micro--computer
2.3.2 Deploy of relay protection and safety automatic device
a 35kV line protection
b Unit transformer protection
c SVG outline protection
d Stability control system
e wave recorder of breakdown of micro
micro--computer
f inverter protection
A4-3 - 47
3、 Station power
Load of the station includes the life power, lighting electricity of the
control room, operational power of all devices. According to the
statistics of the PV power loading, the transformer of the station is
250kVA, which is supplied with 0.4kV, which could meet the
requirement of the technical regulation. Duplicate supply will be
adopted for the power station, the main power supply is from T
connection of 35 KV line nearby, the backup power supply is from
35 KV generating line of the PV station
station.
A4-3 - 48
5. Lightening protection grounding
5.1 PV array
5.2 Booster overvoltage protection
5.3 Grounding system
A4-3 - 49
2. General layout
In general, the building is integrated with the surrounding and coherent with other buildings, with the
main building facing a good direction.
3. Single building designing
(1)Office: 460m square
The office is located in the southwest of site, east of central control cabinet with one floor. F6
dormitories, 3 offices, lobby, anteroom, corridor, dining room, operation room, storage room and
bathroom.
(2)Central Control Room: 413 m squareq
The central control room is located in the southwest of the site, west side of the office with one floor.
SGV compensation room, 35 kv switching room, transformer room, central control room and passage.
4. Architectural section
(1)Office : Story height is 3.3 meters
First Floor:
Floor: 3.3 meters
Height dispersion between inside and outside room: 0.45 meters
Total height: 3.75meters
(2)Central control room: story height is 4.8 meters (eaves height)
First floor: 4.8 meters (eaves height)
Height dispersion is 0.30
0 30 meters
Total height is 5.10 meters (eaves height)
5. Energy saving
(1)60 layer of extrusion
extrusion molding warmth keeping boards is put on the exterior wall above the floor.
(2)Good air tightness energy saving hollow glass is adopted in the exterior wall.
(3)Natural illumination is adopted for the main buildings.
(4)Door bucket is adopted for the main entrance
A4-3 - 50
Floor Plan of First Floor of Central Control Room and Distribution Room
3. Structure designing
(2)Natural condition
Table 3-2 Parametric loading of wind and snow
A4-3 - 51
(3)Designing evidence and requirement
Table 3-4 Standard, rules, regulations and procedures of the designing of the site
(4)Structure type
① Vertical structure system: single story building with the steel structure. The exterior wall is coal gangue
porous brick masonry
② Roofing system:
system:sandwich steel panel
③ Structure analysis
A overall analysis
Calculation and Drawing on Steel Concrete frame, Bent and Continuous Beam of Architecture
Science Institute of China is adopted. (2010 2010) )
B Calculation of the foundation
JCCAD Software on Foundation,
Foundation Strip Foundation
Foundation, Steel and Concrete Foundation Beam
Beam, Pile
Foundation and Raft Foundation of Architecture Science Institute of China is adopted.
(5)Main structure material
①Concrete earth Table 3-6 Density level of concrete component
Environment category:
category:Under earth belongs to category B; the rest belongs to Category A.
② Steel:
A、Steel for concrete structure
Concrete iron: фis HPB300 concrete iron ,Фis HRB335 concrete iron
Steel: Q235B。
Q235B。
③ Wall material: MU10coal gangue porous brick , mortar is M5 fixed mortar
A4-3 - 52
2. Briefing about office
Marshalling structure with total area of 460m2。
460m2。
(1)Security level and service life
Table 3-7 ecurity level of building and designed service life
(2)Nature condition
Table 3-8 Parametric loading of wind and snow
Basic wind pressure Toughness of ground surface Basic snow pressure
Wo=0.40kN/m² Category B So=0.20kN/m²
A4-3 - 53
(4) Structure type
① vertical structure system: single story building with marshalling structure
② roofing system: The cast-
cast-in-
in-place reinforced concrete roofing system
③ structure analysis
A. overall analysis
Based on Software of Calculation and Drawing of Steel Reinforced Concrete Frame, Bent, and
Continuous Beam of PK. PMCAD Engineering Department of China Architecture Science Institute
(2010)
B Calculation of the foundation
JCCAD Software on Foundation, Strip Foundation, Steel and Concrete Foundation Beam, Pile
Foundation and Raft Foundation of Architecture Science Institute of China is adopted
(5)Main structure material
① concrete
A. Intensity level of concrete member
No Name and range of component Density level of concrete Note
A4-3 - 54
4.4.3 Designing Scope
The designing includes: water supply and drainage system, indoor fire hydrant system,
outdoor hydrant system, extinguisher system of building
Drainage system is diversion of rain and sewage
(1)sewage: after processing in the digestion tank, it will be led to the absorbing well
which owns the diameter of DN300。
DN300。
Pipe material and interface: indoor pipe is UPVC spiral silent drainage pipe. The outdoor
drainage pipe is double wall corrupted pipe with rubber interface.
(2)Rain: The rain will be drained to outdoor manhole, together with the rain outside , flow
to rain pipe network of the site.
(3) Pipe deployment: The geology is Grade 2 self weight collapsibility loess. The pipe
within 6 meters of prevention distance will be deployed in the leak detection pipe ditch
which is mortared with the type C brick.
A4-3 - 55
4.5.4 Designing of heating and ventilation
(1)Heat radiator
We adopt antiseptic LXGL
LXGL--X/202-
X/202-600Steel aluminum composite radiator. (Under the
standard condition, the heating radiation is 130W/piece)
(2)Heating pipe
Welded steel ppipe
p with the diameter of ≥DN32, connected with flange,
g when diameter is <
DN32, connected with wire.
(3)Mechanical recycling heating radiation system
(4)Mechanical exhaust for deficiency of natural exhaust
(5)Mechanical ventilation system for deficiency of natural exhaust
(6)Mechanical ventilation for the bathroom
A4-3 - 56
4.6.2 Designing scope: the following electric equipment is included:
10/0.4kv distribution system, low voltage distribution system, illumination system, telephone, TV,
network, lightening protection, grounding system and other safety measurements.
4.6.3 Distribution system:
(1)Load rating: the illumination load is rate 3. Emergency lighting and escape lighting use storage
battery, the emergency hours is no less than 30 mins.
(2)Energy measurement: total measurement will be deployed at the side of high voltage
distribution system, meters set will be deployed at the side of high voltage system to measure the
power.
(3) Cable of 0.4kv line led the power source to building is YJV22 YJV22--1kv. Cable for low voltage is
directly buried underground.
4.6.4 Low voltage distribution system :
(1)Power source of the building are all connected by the AC screen of distribution cabinet of
central control office , in the way of radiation or trunk type , and lead to distribution closet of floor or
end distribution closet. Return circuit of lighting is protected by the circuit breaker. Outlet circuit is
protected by the leaking circuit breaker.
(2)Distribution system inside of the building adopts BV BV--0.5kv type cable。
cable。
(3) Panel switch, outlet adopt 86 series product. The wall is concealed installed. Distribution closet,
control closet, outlet closet all adopt ZJPR type or PZ30 type product. The wall is concealed installed.
44.6.6
6 6 Telephone,
Telephone TV and computer network system
Telephone circuit is connected with the public telephone, and distributed to single machine by telephone cable
box set .
Signal line of TV is connected with regional cable television network, and transfer, distribute to terminal users.
LAN system is set up in the office building, and is connected with the civil network. Network interface
according to the requirement of the clients is deployed in the office. Backbone network is optical one, the
branch uses 4 pairs of twisted copper cable of super category 5.
The weak line is all led to through the cement pipe outdoor, and KBG metal pipe indoor.
4.6.7 Lightening prevention, grounding and safety measurement
(1)Category 3 lightening prevention and protection of the building.
(2)Integrative grounding of lightening prevention and protection for all single building
(3)General equipotential connection is set up in all single building, including all metal protective cover,
metal cuticle, heating pipe, underground line etc.
(4)All kinds of strong or weak line led to the building will be set up a SPD at the end of the line.
A4-3 - 57
Chapter 5 Fire Protection
5.1 Designing evidence
Typical Fire Protection Rules of Electric Equipment DL5027
DL5027--93
Fire Protection of Thermal Power Plant and Substation Designing GB50229
GB50229--2010
Regulation on Fire Protection of Building GB50016
GB50016--2010
Designing Rules of Extinguisher of Building GBJ140
GBJ140--90
6.2 Water
We take water from the well, the amount of the life water is very less, so it will not
bring any negative impact to the underground water.
The sewage amount is 0.6m³/d( 219m³/a), the floor dust, together with the waste will
be disposed and filled in the landfill site regularly. The panel will be cleaned by the
wet cloth without and addictives once every month, except in winter. The cleaning
water is 60 m3/a, which could be used for the plants and floor.
6.3 Noise