Service Bulletin Priority IV

Power Technique Service

1. General information

Title Size II Interstage pipe housing bolts unsatisfied torque


error

Publication Number : SB WUX0033


Priority : IV
Applicable to : OEM XRHO1550; XRXS1210; XRYS1150; XRVS1300; XRVS1350; XRXS1275;
XRXS1240; XRXS567; XRVS617; XRVS647; XRXS607; OTMXRHO1550; XRHS1550;
Y1260; Y1200; Y1300; X1300; V1200; XRHS1150; OTM XRHO1150; XRVS1050;
XRVS487; XRHS527; OTM XRVS1050; XRHS930E; XRVS960E; XRHS1150E;
OTM960E; XRHE1300; OTM XRYE1050
PGC : 414
Responsible person : Li Hua Luo

2. Document overview

This document describes the following:


1. General information ........................................................................................................................................................ 1
2. Document overview ........................................................................................................................................................ 1
3. Revision History.............................................................................................................................................................. 1
4. Reason for this bulletin ................................................................................................................................................... 2
5. Description ..................................................................................................................................................................... 2
6. Application ...................................................................................................................................................................... 2
7. Required parts ................................................................................................................................................................ 2
8. Planning ordering parts at distribution centre ................................................................................................................. 2
9. Reimbursement criteria .................................................................................................................................................. 2
10. Reporting ........................................................................................................................................................................ 2
11. Safety precautions .......................................................................................................................................................... 2

REVISION DATE REVISION SUMMARY AUTHOR

0001 06/13/2019 Size II Interstage pipe housing bolts unsatisfied torque Li Hua Luo

3. Revision History

This is an Atlas Copco internal document. It is not to be shared with distributors, dealers or customers!
05/13/2019 Page 1 of 3
4. Reason for this bulletin

All machines of using interstage pipe housing (1626090300) with risk of bolts loosen due to unsatisfied torque. It might
cause oil leakage from element.

5. Description

Tighten the housing bolts to 80 Nm (totally: 6)

6. Application

OEM XRHO1550; XRXS1210; XRYS1150; XRVS1300; XRVS1350; XRXS1275; XRXS1240; XRXS567; XRVS617;
XRVS647; XRXS607; OTMXRHO1550; XRHS1550; Y1260; Y1200; Y1300; X1300; V1200; XRHS1150; OTM XRHO1150;
XRVS1050; XRVS487; XRHS527; OTM XRVS1050; XRHS930E; XRVS960E; XRHS1150E; OTM960E; XRHE1300;
OTM XRYE1050

7. Required parts

No required parts.

8. Planning ordering parts at distribution centre

No required parts

9. Reimbursement criteria

Within warranty period: Standard warranty procedure & conditions


Out of warranty period: No coverage

10. Reporting

To be reported via standard warranty procedure.

11. Safety precautions

The operator must employ safe working practices and observe all related local work safety requirements and regulations.

This is an Atlas Copco internal document. It is not to be shared with distributors, dealers or customers!
05/13/2019 Page 2 of 3
• Maintenance must only be performed by authorized and trained personnel.
• Before starting any work on the equipment, stop the equipment, switch off the voltage, and press the emergency
button. In addition, the power isolating switch must be opened and locked.
• Refer to the Instruction book and/or workshop manual for any additional safety precautions
• Disconnect any remote start controller
• A ‘Work in progress; do not start’ warning sign shall be attached to the starting equipment.
• All maintenance work shall only be undertaken when the equipment has cooled down.
• Effectively isolate the machine from all sources of pressure and / or electrical power and relieve the entire system of
pressure.
• Use only the correct tools for maintenance and repair work.
• Observe cleanliness during maintenance and repair. Cover parts and exposed openings.
• Make sure that no items are left behind in or on the equipment.
• All regulating and safety devices shall be maintained to ensure correct functionality.
They will not be put out of service.
• Always wear personal protective equipment (Work clothing, safety shoes, safety goggles, ear protection, safety
gloves,…)

This is an Atlas Copco internal document. It is not to be shared with distributors, dealers or customers!
05/13/2019 Page 3 of 3