H.

W1: Two generators with ratings 100 MW and 300 MW operate at 50Hz
frequency. The system load increases by 100 MW when both the generators are
operating at about half of their capacity. The frequency then falls to 49.5Hz. If the
generators are to share the increased load in proportion to their ratings what should
be the individual regulations? What should be regulations if expressed in, per unit
Hertz/per unit megawatt?
Solution:
proportion to rating
𝐺1 = 25 𝑀𝑊
𝐺2 = 75 𝑀𝑊
𝑓2 − 𝑓1
𝑅=
𝑃𝑔𝑅
0.5
𝑅 𝑓𝑜𝑟 𝐺1 = = 0.02 𝐻𝑧/𝑀𝑊
25
0.5
𝑅 𝑓𝑜𝑟 𝐺2 = = 0.0066 𝐻𝑧/𝑀𝑊
75
(𝑓2 −𝑓1 )/𝑓𝑅
𝑅𝑢 = 𝑝𝑒𝑟 𝑢𝑛𝑖𝑡
𝑃𝑔𝑅 /𝑆𝑅

(𝑓2 −𝑓1 )/𝑓𝑅 0.5/50


𝑅𝑢 𝑓𝑜𝑟 𝐺1 = = = 0.04 𝑝𝑒𝑟 𝑢𝑛𝑖𝑡
𝑃𝑔𝑅 /𝑆𝑅 25/100

(𝑓2 −𝑓1 )/𝑓𝑅 0.5/50


𝑅𝑢 𝑓𝑜𝑟 𝐺2 = = = 0.04 𝑝𝑒𝑟 𝑢𝑛𝑖𝑡
𝑃𝑔𝑅 /𝑆𝑅 75/300