NOTE: 1. Timetable for Time Bound Assignment may be prepared based on this Timeline. In Case, if
there is no registration for a particular subject, then the Time Table may be advance. Accordingly, the
timeline will be advanced.
Timeline for conduct of Arrear Examinations for B.Sc (Nautical
Science)
NOTE: 1. Timetable for Time Bound Assignment may be prepared based on this Timeline. In Case, if there
is no registration for a particular subject, then the Time Table may be advanced. Accordingly, the timeline
for complete activity may be advanced.
Timeline for conduct of Arrear Examinations for B.Sc (Maritime
Science) / B.Sc (SBR)/ B.Tech (NAOE)/ M.Tech (NAOE)/M.Tech (DHE)/
M.Tech (MEM)/ M.Sc (CSL)
NOTE: 1. Timetable for Time Bound Assignment may be prepared based on this Timeline. In Case, if there
is no registration for a particular subject, then the Time Table may be advanced. Accordingly, the timeline
for complete activity may be advanced.
Timeline for conduct of Arrear Examinations for BBA(LRE), MBA
(ITLM & PSM) Programmes
1.* Opening of Portal for registration by the 01.07.2020 13.07.2020
students
2. Approval of applications by Campuses/ 14.07.2020 17.07.2020
Affiliated Institutes
3. Two days prior to the start of
Issue of Hall Ticket Time Bound Assignment -
Arrear examinations
4. Forwarding of Question Papers for Time
Bound Examination by COE to the HoDs/ On the day of Examination
Principals of IMU Campuses and Affiliated
Institutes respectively
5. Period for conduct of time bound 17.08.2020 2.9.2020
assessment by the Campuses/Affiliated
Institutes
6. Viva-voce* 3.09.2020 10.9.2020
7. Preparation of Scores by 05.9.2020 15.9.2020
Campuses/Affiliated Institutes
8. Opening of portal for uploading of marks by 10.09.2020 17.9.2020
HoD/Principal
9. Result Processing 18.9.2020 21.09.2020
10. Publication of results 22.09.2020
NOTE: Timetable for Time Bound Assignment may be prepared based on this Timeline. In Case, if there is
no registration for a particular subject, then the Time Table may be advanced. Accordingly, the timeline
for complete activity may be advanced.