Main Barrages Portion

Down Stream Piles:


• These are placed at the end of the d/s concrete floor and their main function is to
check the exit gradient. Their depth should be greater than the maximum possible
scour.
Shutters or Gates:
• Weirs are provided either with shutters or counter balanced gates to maintain pond
level. A shuttered weir is relatively cheaper but locks in speed. Better control is
possible in a gated weir (barrage). Their function is
• To maintain pond level.
• To raise the water level during low supplies.
• In case of higher floods, shutters are dropped down and overflow takes place while
in case of gated weir, gates are raised during floods.