Main Barrages Portion

Crest:
• Crest is the weir surface at the required height above the floor at which gates rest at
its closed position.

Impervious Floor:
• It prevents scouring under
the impervious floor.
• To serve as inverted filter.

• To check scour downstream.


• To withstand high velocities
d/s of the hydraulic jump.