item location descibtion date

1 CTM 31.20-33.25
Form work & concreting side walls. 4-Jan-20

2 CTM 19.75 to 21.75


Form work &concreting side walls. 4-Jan-20

3 Tellhow yard
Material at site UPVC pipe Anton 4-Jan-20

4 Tellhow yard
R/f & conc. Cover slabs 4-Jan-20

5 CTM 11.50 to 13.50


Form work & conc. For side walls. 4-Jan-20

6 CTM 22 & 23 pull pit


F/W & conc.side walls of cable pull pit. 4-Jan-20

7 CTM 57 to 67
Proctor compaction test 5-Jan-20

8 Tellhow yard
Material at site for solid cement blocks 5-Jan-20

9 CTM 22 & 23 pull pit


F/W & conc. side walls of cable pull pit. 7-Jan-20

10 A1-3 CTM 57 to 67
Soil Sample taken for proctor compaction testing. 7-Jan-20

11 CTM 57 to 67
Field density test. 7-Jan-20

12 Tellhow yard
Material at site for solid cement blocks. 7-Jan-20

13 CTM-23.75 to 25.75
Form work & concreting side walls. 8-Jan-20

14 CTM 25.25 to 23.25


Reinforcement for side walls at cable trough 8-Jan-20

15 CTM 57 to 67
Field density test on compacted base. 8-Jan-20

16 Tellhow yard
Material at site cmnt. Blocks CTM 01 to CTM 40 8-Jan-20

17 A1-3 CTM 57 to 67
Soil Sample taken for proctor compaction testing. 8-Jan-20

18 CTM 22 & 23 pull pit


F/W & conc. side walls of cable pull pit. 8-Jan-20
19 CTM 19.75 to 21.75
Form work & concreting for side walls. 9-Jan-20

20 CTM 19.75 to 21.75


Reinforcement & form work for side wallls. 9-Jan-20

21 CTM 37.25 to 39.25


Reinforcement for side walls. 9-Jan-20

22 CTM-37.25 to 39.25
Reinforcement for base at cable trough. 10-Jan-20

23 CTM-37.25 to 39.25
Reinforcement & form work in permanent base. 10-Jan-20

24 CTM 37.25 TO 39.25


Surface inspection of concrete area. 12-Jan-20

25 CTM 19.75 TO 21.75


Form work for side walls. 12-Jan-20

26 CTM 23 to 23.25
Form work & concreting side walls. 13-Jan-20

27 CTM-37.25 to 39.25 Surface inspection of concreting area 13-Jan-20

28 CTM 19.75 to 21.75 Form work & concreting side walls. 13-Jan-20

29 CTM 23 to 23.25
Concreting side walls. 14-Jan-20
Concreting side walls.
30 CTM-19.75 TO 21.75 14-Jan-20

31 CTM-1 to 3.50 14-Jan-20


Screed concrete
Form work & concreting side walls.
32 CTM-37.25 to 39.25 15-Jan-20

33 CTM-1 to 3.50 15-Jan-20


Screed concrete
Reinforcement for base
34 CTM-3 to 4.75 16-Jan-20

Form work & concreting permanent base.


35 CTM-3 to 4.75 16-Jan-20

Reinforcement for side walls


36 CTM-03 to 4.75 17-Jan-20
Surface inspection
37 CTM 19.75 to 21.75 17-Jan-20

PCS(T) 1-14, PCS(P)1-


38
3, PCS(M) 1-3 Reinforcement & form work cover slabs. 18-Jan-20
PCS(T) 1-14, PCS(P)1-
39
3, PCS(M) 1-3 Concreting cover slabs of cable trough. 18-Jan-20

40 CTM 37.25 to 39.25


Surface inspection afterv removing f/w. 20-Jan-20
Reinforcement & formwork cover slabs of PCS (T )- 15 to 29
41 Tellhow Yard 20-Jan-20
, PCS (P) - 4 to 6 , PCS (M) -4 to 6

Concreting cover slabs of PCS (T )- 15 to 29 , PCS (P) - 4 to


42 Tellhow Yard 20-Jan-20
6 , PCS (M) -4 to 6
Surface inspection of cable trough.
43 CTM-37.25 to 40 21-Jan-20

Surface inspection of cable trough.


44 CTM-21.25 to 37.25 21-Jan-20

Surface inspection of cable trough


45 CTM 4.75 to 19.75 21-Jan-20

Reinforcements & form work cover slabs of PCS (T )- 29 to 41


46 Tellhow Yard 21-Jan-20
, PCS (P) - 7 to 9 , PCS (M) -7 to 9

Concreting cover slabs of PCS (T )- 29 to 41 , PCS (P) - 7 to


47 Tellhow Yard 21-Jan-20
9 , PCS (M) -7 to 9
Field density test.
48 CTM-54 to 67 21-Jan-20

Blinding concrete under the permanent structure.


49 CTM 58 to 62.50 22-Jan-20

Reinforcements & form work cover slabs of PCS (T )- 29 to 42


50 Tellhow Yard 22-Jan-20
, PCS (P) - 7 to 9 , PCS (M) -7 to 9

Concreting cover slabs of PCS (T )- 29 to 42 , PCS (P) - 7 to


51 Tellhow Yard 22-Jan-20
9 , PCS (M) -7 to 9

52 CTM 3 to 3.25 22-Jan-20


Form work &concreting base
Blinding concrete under the permanent structure.
53 135 23-Jan-20

54 CTM 1 to 2 23-Jan-20
Reinforcement in base
55 CTM 1 to 2 23-Jan-20
Concreting & formwork in base
Reinforcements & form work cover slabs of PCS (T)-43 to 56,
56 Tellhow Yard 27-Jan-20
PCS(P) -10 to 12 , PCS (M) -10 to 12

Concreting cover slabs of PCS (T)-43 to 56, PCS(P) -10 to 12 ,


57 Tellhow Yard 27-Jan-20
PCS (M) -10 to 12
Reinforcement for side walls.
58 CTM 1 to 2 27-Jan-20

Reinforcement for side walls.


59 CTM 1 to 2 28-Jan-20

Reinforcements & form work cover slabs of PCS (T)-57 to 70,


60 Tellhow Yard 29-Jan-20
PCS(P) -13 to 15 , PCS (M) -13 to 15

Concreting cover slabs of PCS (T)-57 to 70, PCS(P) -13 to 15 ,


61 Tellhow Yard 29-Jan-20
PCS (M) -13 to 16
Surface inspection of cable trough
62 CTM 13 to 22 29-Jan-20

Field density test.


63 CTM 54 to 57 30-Jan-20

64 CTM 65 to 67 Field density test. 30-Jan-20


status

Closed

Cancelled

Closed

Closed

Closed

Cancelled

Cancelled

Cancelled

Cancelled

Cancelled

Cancelled

Cancelled

Closed

Closed

Cancelled

Cancelled

Closed

Closed
Cancelled

Cancelled

Closed

Closed

Closed

Cancelled

Cancelled

Closed

Closed

Closed

Closed

Closed

Cancelled

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Cancelled

Cancelled

Closed

Closed

Closed

Closed

Closed

Cancelled

Closed
Closed

Closed

Closed

Cancelled

Closed

Closed

Closed

Closed

No
objection

No
objection

You might also like