1 CTM 31.20-33.25
Form work & concreting side walls. 4-Jan-20
3 Tellhow yard
Material at site UPVC pipe Anton 4-Jan-20
4 Tellhow yard
R/f & conc. Cover slabs 4-Jan-20
7 CTM 57 to 67
Proctor compaction test 5-Jan-20
8 Tellhow yard
Material at site for solid cement blocks 5-Jan-20
10 A1-3 CTM 57 to 67
Soil Sample taken for proctor compaction testing. 7-Jan-20
11 CTM 57 to 67
Field density test. 7-Jan-20
12 Tellhow yard
Material at site for solid cement blocks. 7-Jan-20
13 CTM-23.75 to 25.75
Form work & concreting side walls. 8-Jan-20
15 CTM 57 to 67
Field density test on compacted base. 8-Jan-20
16 Tellhow yard
Material at site cmnt. Blocks CTM 01 to CTM 40 8-Jan-20
17 A1-3 CTM 57 to 67
Soil Sample taken for proctor compaction testing. 8-Jan-20
22 CTM-37.25 to 39.25
Reinforcement for base at cable trough. 10-Jan-20
23 CTM-37.25 to 39.25
Reinforcement & form work in permanent base. 10-Jan-20
26 CTM 23 to 23.25
Form work & concreting side walls. 13-Jan-20
28 CTM 19.75 to 21.75 Form work & concreting side walls. 13-Jan-20
29 CTM 23 to 23.25
Concreting side walls. 14-Jan-20
Concreting side walls.
30 CTM-19.75 TO 21.75 14-Jan-20
54 CTM 1 to 2 23-Jan-20
Reinforcement in base
55 CTM 1 to 2 23-Jan-20
Concreting & formwork in base
Reinforcements & form work cover slabs of PCS (T)-43 to 56,
56 Tellhow Yard 27-Jan-20
PCS(P) -10 to 12 , PCS (M) -10 to 12
Closed
Cancelled
Closed
Closed
Closed
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
Closed
Closed
Cancelled
Cancelled
Closed
Closed
Cancelled
Cancelled
Closed
Closed
Closed
Cancelled
Cancelled
Closed
Closed
Closed
Closed
Closed
Cancelled
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Cancelled
Cancelled
Closed
Closed
Closed
Closed
Closed
Cancelled
Closed
Closed
Closed
Closed
Cancelled
Closed
Closed
Closed
Closed
No
objection
No
objection