You are on page 1of 18

BOXMAN STUDIOS

12140 Vance Davis Drive

Charlotte, NC 28269

704-333-3733
3 12
TO BUY OR TO RENT? MINI CASE STUDY: GOOGLE

Determine which route is best


for your project needs…
13
4
DEPLOY
DESIGN
After designing and building
Every environment is a your project, we take it to your
customized work of art… activation site…

7 15
MINI CASE STUDY: IMG MINI CASE STUDY:
HYUNDAI

8 17
DEVELOP
CONCLUSION
We gather all of the information
from the design process and get
to work…
WE ARE WITH YOU EVERY STEP OF
THE PROCESS

2
BUYING RENTING

IDEAL IF YOU NEED A PURPOSE-BUILT KEEPS YOUR INVENTORY LEAN


OR CUSTOMIZED EXPERIENCE

WORKS FOR OPEN-ENDED REQUIRES LESS COMMITMENT FOR A


ENGAGEMENTS FIRST EVENT

PERFECT FOR ONGOING OR REPEAT IDEAL FOR SHORT-TERM OR ONE-


EVENTS TIME EVENT

SAVES MONEY IN THE LONG RUN COSTS LESS FOR A ONE-TIME EVENT

CAN BE STORED WITH BOXMAN CAN SUPPLEMENT YOUR OWNED Renting or buying won’t change the fact
STUDIOS UNTIL DEPLOYMENT SPACE
that we’ll help you to create a one-of-a-
kind brand experience with a customized
shipping container structure.

*The amount of design time depends on whether buying or renting is the best route for
your project.

3
THE SECRET CODE

05
Although a large portion of the design
process centers on the art of creating your
ideal event space, there's plenty of science
that goes into it, too. Every environment
that leaves Boxman Studios is a customized
work of art that represents your brand.

4
We are committed to
transparency, which means
you’ll always know what you’re
paying for and why you’re
paying for it.

BRANDING DESIGN TIME MECHANICAL, ELECTRICAL & PLUMBING

From vinyl graphics to fabric We charge an hourly fee for Our engineers make sure your space suits your needs
panels, you can choose design. Based on the scope of and meets state and/or local code requirements. For
branding options that are eye- your project, design time may example, if your container needs HVAC, running water,
catching and within your take anywhere from 3 – 50 or outlets for TVs, you will have to undergo MEP
budget. hours. engineering review.

5
Our conceptual and design
engineers are experts at making
sure your container design is as
practical as it is impressive. We
design fully-customized spaces
with large screen TVs, concert
stages, and viewing decks so
cool, your audience never even
THINKS about how strong and
safe the structure really is.

Success is when careful


consideration meets
extremely cool creative.

6
THE CHALLENGE

Highly mobile, highly durable, but still stylish and upscale.

Design must include both the practical and the artistic side
of things. IMG asked us to design a large scale (up to 250
person occupancy) event space that would exude
hospitality and enjoyment. Because the container would be
traveling across North America, it would also have to be
highly mobile, extremely durable, and able to withstand any
and all weather conditions from coast to coast.

THE SOLUTION

Collaborative evolution.

IMG was thrilled with our original design, but after a series
of one-on-one meetings, we were able to get a more
detailed idea of their needs and vision. The original design
morphed into something entirely different – bigger and
sleeker than the original. The design process has to be
allowed to evolve naturally – all while exceeding the client’s
expectations.
7
“Fabricators work with their hands.
Craftsmen work with their hands and
head. Artists work with their hands, head
and heart.”

8
Stamped engineered drawings
ensure that your project meets
or exceeds codes and
regulations.

TIME & MATERIALS QUALITY CONTROL

Time and material pricing varies depending Because our process is completely in-house and
on whether we are creating a purpose-built turnkey, you don’t have to outsource the work
environment, or working with an existing to multiple contractors and vendors. This means
shipping container. Our estimates include all you save money and have an end-product that is
the pieces, parts and fabrication that go into ensured to be up to Boxman standards and
making the final product. quality.

9
The development phase is when weld
hits metal and your structure starts to
take shape. To help you through the
process, our first-class project
managers help you work out the
details including:

• Lean Process LEED Certification

• Full Fabrication and Electrical

• Welding and Plumbing

• ETO/MTO programming

• 3rd Party Review

• MEP Certification and Stamping

• Certified Modular Builder Status

• Life Safety Architectural Review and


Compliance
10
We look for materials that are light,
waterproof, recycled, and innovative.
Unorthodox materials often solve our
biggest challenges, so we keep an open
mind when it comes to incorporating new
materials.

11
THE CHALLENGE

Tons of people, limited space.

Boxman Studios was challenged to build a cool space


large enough to accommodate a ton of attendees at the
TED conference. The catch was that the structure
needed to fit into a limited footprint outside the Long
Beach Convention Center.

THE SOLUTION

Build up, not across.

We used five shipping containers to create three iconic


spaces that reached 24-feet into the air. The 3,000-
square-foot space provided visitors with a cool place to
hang out and embodied the innovation and creativity
that Google is known for.

12
THE SECRET CODE

05
Once development is complete, Boxman’s
logistics team transports and activates
your project.

13
Our commitment to safety
means we carefully consider
the best tools and equipment
for your activation process.

TRANSPORTATION & ACTIVATION CAMPAIGN SCALE & SCOPE

Whether your project is going to one or The duration of the campaign, the distance
multiple locations, our team of highly-trained between events, and the required equipment on
activators will be there to make the process site all factor into the price of your project.
as smooth as possible. We operate our own
transportation and logistics program, keeping
costs low and ensuring quality workmanship.

14
THE CHALLENGE

25 college football games, two simultaneous tours, six


containers.

Hyundai wanted to maintain their status as #1 in


customer loyalty by showcasing new vehicles and
providing a fun environment to enjoy activities and
watch pre-game coverage.

THE SOLUTION

Custom-built units for maximum flexibility.

Each Field House was finished with Wi-Fi access, 6 High-


Definition screens, leather couches, bean bags, and bar
stools for 1500 square feet of college football fandom.
They allowed for interchangeable branding, so a Florida
tailgate one week could easily change into an Ohio State
tailgate the next week. Full-throttle logistics and
planning was essential to activating at various campuses
in a timely and efficient manner. 15
16
Whatever your needs, we can design,
develop, and deploy a space that meets
your business goals, provides authentic
experiences, and leaves a lasting
impression on your clients .

17

You might also like