You are on page 1of 1

TRANSVERSE FRAME A3 - G3

35.93kn
A B

153.71kn
C D E F G H

3.40m
120.71kn

J K L M N O P

3.40m
160.95kn

Q R S T U V W
3.

40m
39.20kn X Y Z A' B' C' D'

3.80m

E' F' G' H' I' J' K'

PORTAL METHOD: SUMM.FH=0]


CONSIDER THE 5TH FLOOR, SOLVING FOR COLUMN SHEAR.
35.93=VAC+VBD
35.93KN
A B
BUT, VAC=VBD
35.93=VAC+VAC

THEREFORE,VAC=VBD=17.97KN
VAC VBD

PAC PBD

THEREFORE,
35.93kn CONSIDER 4TH FLOOR:
VCJ=153.71/12=15.80KN
A B
BUT, VCJ=VIP VIP=15.80KN
THERFORE, VDK=VEL=VFM=VGN=VHO=2VCJ=2VIP VDK=15.80(2)=31.6KN
SUMM.FH=0]
VEL=15.80(2)=31.6KN
35.93KN+153.71KN=VCJ+2VCJ+2VCJ+2VCJ+2VCJ+2VCJ+VCJ VFM=15.80(2)=31.6KN
189.64KN=12VCJ
VGN=15.80(2)=31.6KN
VHO=15.80(2)=31.6KN
153.71kn
C D E F G H I

1.7m

V 2V 2V 2V 2V 2V V

PCJ PDK PEL PFM PGN PHO PIP

You might also like