You are on page 1of 6
ZA ara Jute Genter AW vningon Sect Gta Fu 000 Fr (12) 740-205 ‘rw beciespo.com toe Wome Ccloter 13,2018 Daron Ramey Neer Salton, Ine 2248. Mebigen Ave, 7H Fr Chicago, e608 eare9.5a73 sansev@nntoiaslvonscon Re: Taskorder Cortact Number: SI86 Task Order Number: 04635-P51896-912001 Prot Name: (PD LPR insiatons Serica: ‘sto Tralag Use Agency: (five of Emergeny Manaperent and Communicator Death Rensay- ‘Tho Pable Euliing Comnission of Chicago arcopts Moola Solos, Inc. Task Order Propose ated Ap 1, 2046 TO812001-Aitional Trang $5200 _Lump Sum Fee Basle Serves as dasa ne star proposal Theva fhe task ore for a tl amount of $5.20. This procs suc to the tems ‘ad corals In Contact P1836, The oloning Comissin Represeréave wil be srg Notion to Poon: ‘Proc Manager Name: ohn Pty ‘+ Projet Manager Telephon 32-74-8053, Tho Natee Proceed auoraee Motaola Solus, Inc. to preeed withthe Soope of Servis dss in the proposal, ‘The above rerened sence have been approved by he Executive Director of the Publ Bing Commission of Cheapo, : ge Fen A Detaight Dede of Procrement ei5fve Date _sone72016_ Daron Raney Date sora Salton, oan ae Paetatt osteo Tre Peo Tox arena iu i WZ chard J. Daley Genter Sow inaengton See (eta raiace Fax (12) 7448005 Brome a tear 8, 2018 Daron Ramsay ato Slatons, 2248. ihigan Ave, th le Chicago I. 60st 47-7098778, ‘taneenolorascains com RE: OENG-cP UT#TO4 Project amber: 0535) PS1896 lice te Proceed: Task Order 912.001 - Adena Teling Raa, ease seach erecated TO 912.001 and regards corespondnce to Motorola Solon ashe Note fo Proeed wih the scope cle clin the tached task oder othe Undarting #104 project We ok ‘wa fo wering wth your fim on this projet Sst, Join Perak Project anager Fe cafe oon 03341049 OEMC TASK ORDER SCOPE AUTHORIZATION FORM tur on oa | 20 ay Ca 0 en Se oe 5 Cen Ne 29 400 ecco Date: September 29, 2016 _ Task Order Ne fe Neanbe” ame ® TO 912-001 - LPR Training anita" |UT 104 CPD LPRs 2016 [Task Order Cost: [$5,200 Estimated Completion Date: _|41 0-41-16 : Brie Scope Owner requested adatonal raining on LPRs of police personel Overview: The attached task order, dated 09/20/2016 , has been reviewed, n deta, and is approved, without modification by the Office of Emergoncy Management Communication (OEMC). The signatory below is familar wih the project and is authorized to approve the scope and gricng as described within the proposal ‘The Public Bulding Commission of Chicago (PBC) is hereby authorized to direct Motorola to complete the services described herein atthe price as descried inthe proposal (OEMC REPRESENTATIVE Sigature aks ee Alicia Tate-Nadeau Name Executive Director - OEMC The ‘tachment: ‘OENCUSE ONLY ;, T0.912-001 pomp eqioNSa2 ‘Adlon Notes 2. Invoice due no late than 1117/97 Release #208 . 05720108156 5705 15N5320400.000| o-220400 Change Order 912201 POCIOEMC Canara ntstucte Program CPDLPR Emancemens Change Order 912-001 CPD LPR Enhancements ‘This Change Order calls for providing additional LPR training services to the base Task Order. The PBC/OEMC and Motorola Solutions Inc. mutually agree to modify the Task Order 912 as described below. Reason for Change Order Request: Motorola has provided professional services for LPR support and training in addition to ‘what was requested in the base task order. Proposed Scope: Motorola will complete additional professional services to perform in-person training for Chicago Police Department (CPD), Ilinois State Police and National Crime Information Center personnel. The following will be added to the base task order: ‘Provide training on the process to add stolen vehicle license plates to the LPR system hotlist ‘+ Provide training to patroller personnel on the operation ofthe patroller LPR system ‘with the new hotlist ‘+ Provide support to verify new hotlists with stolen vehicle license plates; ensure the new hotlists are correctly downloaded, configured, and operational Glarificato Schedule Impact: None Responsibilities: Please refer to Task Order 912 for responsibilities, Equipment: None Pricing Summary: Resource, Rate Hours Total ‘Network Engineer | Additional training from base task order ‘$5,200 © woromota socuTions ‘ 202018 change Order 912001 PBCIOEMC Conera fasrucure Progam (CPDLPR Enhancements ‘MOVBE a cnn nett wees Date ‘September 20, 2016 sees Estimate = 5.200 ae tte foes Not: rif Deseripton of Serie Eectd by Change Orr [ Motooia professional services - Taal a Sibconascer Patipation Scheduled Sern for MIWBE content Total WBE Subcontractor Parcipation Scheduled © 0%, tor “Total MIWBE Subcontractor Participation Scheduled 30] om com EEE Total MBE Aican American Subcontractor Partpaton Total MBE Hispanic Subconractor Parcipation 3 [Total MBE Asian Subcontaeor Partcpation 80 o% Trades—S: Subcodtactor Mi Material Supper [[MnWBe's—r Minority: W Women; N: Noo-MWWBE * The pricing elements incuckd above ae ested pir to project compilation Darron Ramsey ‘Name (printed) \ ) Vem — Mowsy ‘Name (signed) Soptomber 20,2016 Dae © moroncia socuTins sn2018 Tea 71 punbonceennCh ts tay on + Snattatga nl Coma menets eM eresscen, ZZ CONTRACT INFORMATION Pr ome Fopate [ose Contains —[OENCGPUTION-LPREmanenaie 16 [Onto _|roetaza es Gore rent i000 Force Art sae] Ow Ow nena Seis | LP ern ni tation pein aig CP pear [MWBE UTILZATION PLAN ae Cntr “ork = = SS Tete eon (owoe Gn oppo lo00% —_ fo.oo% waiver Wiiertenetet | Om @w | Wownwoe Ore Om Om vie pot ‘ese wont, Ove Ow Dh i. oe ate 108, cu, MINER SDA a eas hol Carton oe Nowa wi poi ans sind ess progeny o Cag Pal Depot (FD ens Sa Fol Raine tomar ater pore Th i rele ME perp pe

You might also like