AL-RASHID & AL-MANGOUR CO
( 1 ) WATER DEMAND
Prepared By Checked By
SL.# DESCRIPTION
A-3 Flow rate through the piping system to the farthest point.
A-5 Conclusion of the hydrolic calculations for potable water booste pumps.
B-3 Flow rate through the piping system to the farthest point.
B-5 Conclusion of the hydrolic calculations for flush water booste pumps.
Booster pump capacity 211.5 gpm ( Assuming three pumps with 70 gpm )
48.00 m3/h
13.33 l/s
Shower
Laundry
Bath tub
Water Bidet
Janitor Sink
Service sink
Kitchen sink
Hose for W.C
3 5 10 1 1.5 0 1 1.5 1.5 1.5 1.5 0.75 0.75 0.75 0.75 3 6 cold
0 0 0 1 1.5 1 1.5 1.5 1.5 1.5 0.75 0.75 0.75 0.75 0 0 hot
Load
PRIVATE
3 5 10 1.5 2 1 1 2 2 2 2 1 1 1 1 3 6 Total
0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 Add
T.Fix.
p-o
Total
0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0
1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 Total f.u
PROJECT NAME : TAIF UNIVERSITY HOUSING (MALE).
0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 Add
T.Fix.
o-n
Total
0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0
3 3 0 0 0 0 0 0 0 0 2 0 0 1 0 0 0 0 Total f.u
0 0 0 0 0 0 0 0 1 1 0 Add
T.Fix.
Total
n-m
0 0 0 0 0 0 0 0 1 0 0 2 1 0 0 0
4 5 0 0 0 0 0 0 0 0 2 0 0 2 1 0 0 0 Total f.u
0 0 0 0 0 0 0 1 2 1 0 Add
T.Fix.
m-l
Total
0 0 0 0 0 0 0 0 2 0 0 4 2 0 0 0
8 10 0 0 0 0 0 0 0 0 4 0 0 4 2 0 0 0 Total f.u
0 0 0 0 0 0 2 4 2 0 Add
l-k
T.Fix.
Total
0 0 0 0 0 0 0 0 4 0 0 8 4 0 0 0
14 20 0 0 0 0 0 0 0 0 8 0 0 8 4 0 0 0 Total f.u
0 0 0 0 0 0 0 2 4 2 0 Add
k-j
T.Fix.
Total
0 0 0 0 0 0 0 0 6 0 0 12 6 0 0 0
20 30 0 0 0 0 0 0 0 0 12 0 0 12 6 0 0 0 Total f.u
0 0 0 0 0 0 0 2 4 2 0 Add
j-i
T.Fix.
Total
0 0 0 0 0 0 0 0 8 0 0 16 8 0 0 0
25 40 0 0 0 0 0 16 16 8 0 Total f.u
0 0 0 0 0 0 0 2 0 0 4 2 0 0 0 Add
Fixture type : PRIVATE
T.Fix.
i-h
Total
0 0 0 0 0 0 0 0 10 0 0 20 10 0 0 0
29 50 0 0 0 0 0 0 0 0 20 0 0 20 10 0 0 0 Total f.u
0 0 0 0 0 0 5 0 0 0 Add
T.Fix.
h-g
Total
0 0 0 0 0 0 5 0 10 0 0 20 10 0 0 0
32 60 0 0 0 0 0 0 10 0 20 0 0 20 10 0 0 0 Total f.u
0 0 0 0 0 0 10 20 10 0 0 0 Add
T.Fix.
g-f
Total
0 0 0 0 0 0 5 0 20 0 0 40 20 0 0 0
0 0 0 0 0 0 10 20 10 0 0 0 Add
T.Fix.
f-e
Total
0 0 0 0 0 0 5 0 30 0 0 60 30 0 0 0
0 0 0 0 0 0 20 39 20 0 0 0 Add
T.Fix.
e-d
Total
0 0 0 0 0 0 5 0 50 0 0 99 50 0 0 0
0 0 0 0 0 0 6 45 93 48 0 0 0 Add
T.Fix.
d-c
Total
0 0 0 0 0 0 11 0 95 0 0 192 98 0 0 0
0 0 0 0 0 0 5 50 99 50 0 0 0 Add
T.Fix.
c-b
Total
0 0 0 0 0 0 25 5 0 45 0 0 93 48 0 0 0 Add
T.Fix.
b-a
Total
Accumulative Pressure
ID Pipe Inner diameter
RE Reynolds number
DN Nominal diameter
V Mean Velocity
GH Static head
0.3 elbow ( 45 leg.)
0.3 elbow ( 90 leg.)
DH Total loss
L Pipe length
Q Flow rate
2.0 Strainer
0.5 reducer
0.9 tee
no. DN mm m mm GPM l/s 1/1 m m/s 1/1 1/1 m m m m m m
A TO B 110 PVC 93.6 8 0.01 211 13.3 1 0 0 1 0 1 4 0 6.1 1.93606 181215.29 0.01672 3.41 0.27 1.165 1.44 1.44 1.438
B TO C 110 PVC 93.6 27 0.01 172 10.8 1 1 1 1.4 0 1.5718 147120.87 0.01731 2.33 0.63 0.176 0.81 0.81 2.243
C TO D 90 PVC 76.6 10 0.01 125 7.9 1 0 1 0 1.1 0 1.71377 131274.65 0.01779 3.48 0.35 0.165 0.51 0.51 2.756
D TO E 90 PVC 76.6 11 0.01 77 4.84 0 1 1 1.4 0 1.04992 80423.528 0.01943 1.43 0.16 0.079 0.24 0.24 2.991
E TO F 75 PVC 63.8 20 0.01 57 3.59 1 1 1 1.7 0 1.12327 71664.627 0.01997 2.01 0.4 0.109 0.51 0.51 3.503
F TO G 63 PVC 53.6 6 0.01 46 2.88 1 1 1.4 0 1.27736 68466.319 0.02027 3.14 0.19 0.116 0.31 0.31 3.808
G TO H 63 PVC 53.6 3.5 0.01 32 2.02 1 0.9 0.89345 47889.01 0.02172 1.65 0.06 0.037 0.09 0.09 3.903
H TO I 50 PVC 42.6 7 0.01 29 1.83 1 3 1 1 2.5 1.28183 54605.837 0.02133 4.19 0.29 0.209 0.5 0.5 4.405
I TO J 40 PVC 34 3.5 0.01 25 1.56 3 1 3.2 1.72086 58509.102 0.02127 9.44 0.33 0.483 0.81 0.81 5.219
J TO K 40 PVC 34 3.5 0.01 20 1.26 2 1.8 1.38779 47184.76 0.02214 6.39 0.22 0.177 0.4 0.4 5.619
K TO L 40 PVC 34 3.5 0.01 14 0.88 2 1.8 0.97145 33029.332 0.02376 3.36 0.12 0.087 0.2 0.2 5.824
L TO M 32 PVC 27.2 3.5 0.01 8 0.5 2 1 2.3 0.86737 23592.38 0.0257 3.62 0.13 0.088 0.21 0.21 6.039
M TO N 25 PVC 21.2 1.5 0.01 4 0.26 1 1 2 1 2.8 0.74365 15765.348 0.02831 3.76 0.06 0.079 0.14 0.14 6.174
N TO O 25 PVC 21.2 2 0.01 3 0.16 1 0.9 0.44619 9459.2089 0.03198 1.53 0.03 0.009 0.04 0.04 6.214
O TO P 20 PVC 17 2.5 0.01 1 0.05 3 1 1.4 0.2313 3932.0633 0.04052 0.65 0.02 0.004 0.02 0.02 6.234
J = l . V² / ( 2 g D ) ………..…………………………………………………………….. (3)
1 k 2.51
= - 2 x log [ + )
sqr(l) 3.7 x D Re x sqr( l )
RE = V x D / n …………………………………………………………………………. ( 5 )
V = Q/A ………………………………………...………………………………………. ( 6 )
1 1E-05 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.094 181215.3 x sqr( l )
l= 0.01672
HS2 = SUM ZE . V ² / ( 2 . g )
1.9361 X 1.9361
HS(2) = SUM ZE.x V² / ( 2 g ) = 6.1 x = 1.1654 m
2 x 9.81
RMC
AL-RASHID & AL-MANGOUR CO
( 1 ) WATER DEMAND
Prepared By Checked By