Q.1 (a) What is the meant by unbundling of power system? What is the motivation behind it? 07
List its benefit.
(b) Draw and discuss the structure of deregulated power industry. 07
Q.2 (a) List the ancillary services required to maintain secure power system operation. 07
(b) Define TTC, TRM, CBM, PTDF 07
OR
(b) Discuss the various model of the competition in electrical power industry. 07
Q.3 (a) What is the ATC? Discuss the any method of calculation of ATC. 07
(b) What is the congestion management? Explain any method of congestion management. 07
OR
Q.3 (a) Discuss transmission line congestion and its impact on electrical power 07
industry.
(b) What is security in terms of electrical power system? Discuss factors affecting 07
it.
Q.4 (a) Explain the postage stamp and MW-mile method for transmission pricing in restructure 07
market.
(b) Explain pro rata and incremental method for loss allocation calculation. 07
OR
Q.4 (a) Discuss the Marginal Participation Factor method for transmission pricing. 07
(b) Discuss the power flow tracing based loss allocation method with suitable example. 07
Q.5 (a) Discuss the role of NLDC. 07
(b) What is rolled in transmission pricing paradigm? Explain it with block diagram. 07
Enlist commonly practiced methods of rolled in transmission pricing paradigm.
OR
Q.5 (a) Explain four pillars of market design. 07
*************