You are on page 1of 3

<Company Name>

<Address>
<Address>

COMPANY
<Contact Number>
<Website URL>
JOB ESTIMATE TEMPLATE
LOGO
ESTIMATE NUMBER DATE

963467 <mm/dd/yyyy>
CUSTOMER NAME PREPARED BY
<Customer Name> <Prepared By>
ADDRESS JOB NUMBER
<Address> <Job Number>
CONTACT PERSON CONTACT NUMBER JOB NAME
<Contact Person> <Contact Number> <Job Name>
EMAIL ADDRESS JOB LOCATION
<Email Address> <Job Location>
JOB DESCRIPTION
<Describe work to be performed here>

Material Qty Unit Amount Labor Hours Rate Amount


Price
UG Waste Pipe 2" 30 14.9 447.00 Remove Basement Flooring 10 150 1,500.00
UG Waste Pipe 4" 127 20.5 2,603.50 Trenching & Excavations 20 150 3,000.00
UG Waste Pipe 4-3-4 T 1 96 96.00 Layout & Install Piping 16 200 3,200.00
UG Waste Pipe 2" 45 Degrees 2 60 120.00 Backfill Trenches 10 150 1,500.00
UG Waste Pipe 2" 90 Degrees 4 60 240.00 Backfill Excavations 10 150 1,500.00
UG Waste Pipe 4" 45 Degrees 2 71 142.00 Install Basement Flooring 20 200 4,000.00
UG Waste Pipe 4" 90 Degrees 4 85 340.00

Miscellaneous Amount
Material Dump Fees 500.00
Work Permits 350.00

This is an estimate, not a contract. This estimate is for


completing the job as described above. It is based on our
evaluation and does not include additional expenses
which may be required should unforeseen problems arise
work has started.

SUMMARY
PREPARED BY DATE Material 3,988.50
Labor 14,700.00
Miscellaneous 850.00
REVIEWED & APPROVED BY DATE TOTAL 19,538.50
© TemplateLab.com

You might also like