INDEX
INDEX ................................................................................................................................................................. 2
AMENDMENTS AND REVISIONS .................................................................................................................... 3
1. SCOPE OF DOCUMENT............................................................................................................................ 4
2. DEFINITIONS, ABBREVIATIONS AND ACRONYMNS ............................................................................ 4
2.1 DEFINITIONS AND ABBREVIATIONS .............................................................................................. 4
2.2 ACRONYMS ....................................................................................................................................... 4
3. REFERENCE RULES, CODES AND STANDARDS ................................................................................. 5
3.1 CODES AND STANDARDS ............................................................................................................... 5
3.2 COMPANY DOCUMENTS .................................................................................................................. 5
3.3 CONTRACTOR DOCUMENTS .......................................................................................................... 6
4. RESPONSIBILITIES ................................................................................................................................... 6
5. PROCEDURE DESCRIPTION ................................................................................................................... 6
5.1 GENERAL REQUIREMENTS............................................................................................................. 6
5.2 LIST OF EQUIPMENTS ...................................................................................................................... 6
5.3 DRAWINGS AND DOCUMENTS ....................................................................................................... 7
5.4 HSE ..................................................................................................................................................... 7
5.5 PRELIMINARY CHECKS ................................................................................................................... 7
5.6 LOOP PROCEDURE .......................................................................................................................... 8
6. DOCUMENTATION .................................................................................................................................... 9
6.1 SAUDI ARAMCO TEST REPORTS ................................................................................................... 9
6.2 PRECOMMISSIONING FORMS ......................................................................................................... 9
7. ATTACHED LOOP PACKAGE CONTENTS SAMPLE FORMAT ..........................................................10
UNCONTROLLED COPY
This document is CONFIDENTIAL and the sole property SAIPEM/SNAMPROGETTI/STAR CONSORTIUM. It shall not be shown to Third Parties nor used for purposes other than those for which it was
prepared.
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No.6600035841 (OOK) /
6600035823 (IK)
Amendment Contractor
Date Page Description
and revision Rep.
UNCONTROLLED COPY
This document is CONFIDENTIAL and the sole property SAIPEM/SNAMPROGETTI/STAR CONSORTIUM. It shall not be shown to Third Parties nor used for purposes other than those for which it was
prepared.
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No.6600035841 (OOK) /
6600035823 (IK)
1. SCOPE OF DOCUMENT
Loop checking ensures that all instrument components in a loop function correctly and accurately as per
Engineering documents / drawings. The purpose of this document is to explain the preliminary requirements that
should be followed before commencing loop checking activities and the generic procedures for loop checking of
field instrumentation. Project specific procedure shall be prepared based on vendor recommendation, site
condition and project specification.
This procedure serves as guideline to define the method of Instrument Loop Checking in achieving the quality
requirement for Saudi Aramco Projects in STAR Yard.
2.2 ACRONYMS
UNCONTROLLED COPY
This document is CONFIDENTIAL and the sole property SAIPEM/SNAMPROGETTI/STAR CONSORTIUM. It shall not be shown to Third Parties nor used for purposes other than those for which it was
prepared.
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No.6600035841 (OOK) /
6600035823 (IK)
UNCONTROLLED COPY
This document is CONFIDENTIAL and the sole property SAIPEM/SNAMPROGETTI/STAR CONSORTIUM. It shall not be shown to Third Parties nor used for purposes other than those for which it was
prepared.
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No.6600035841 (OOK) /
6600035823 (IK)
4. RESPONSIBILITIES
Loop checking will be carried out by a designated instrumentation team in conjunction with site responsible
contractor personnel and witnessed by QC inspector and Company representative.
5. PROCEDURE DESCRIPTION
Loops with punch items shall be return to the construction for rectification, closeout and handover to QC.
UNCONTROLLED COPY
This document is CONFIDENTIAL and the sole property SAIPEM/SNAMPROGETTI/STAR CONSORTIUM. It shall not be shown to Third Parties nor used for purposes other than those for which it was
prepared.
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No.6600035841 (OOK) /
6600035823 (IK)
Calibration cycle of all test equipment shall not exceed six (6) months as per schedule Q, Attachment IV, para
6.1.
Contractor shall provide backup equipment when primary equipment is being calibrated or tested as per
schedule Q Attachment IV, para 6.1.
Note: Test instruments shall be suitable for the Electrical Area classification, if the loop checking is being done in
a hazardous area or an operational facility.
5.4 HSE
• Ensure suitable work permit is obtained before commencing loop check activities.
• Ensure good house keeping during loop checking which may run concurrently with construction activities in
the adjacent areas.
• Possibility of any unsafe situation due to maloperation during loop checking shall be communicated to all
concerned personnel in the vicinity. Incase the loop checking is being done in an existing plant which is
operating special care is to be taken and the Instruments / devices used shall be suitable for the area
classification and necessary certification to that effect shall be available .
• During initial commissioning of the equipment for each system, the limits of the equipment shall be defined
and communicated to all the involved personnel.
UNCONTROLLED COPY
This document is CONFIDENTIAL and the sole property SAIPEM/SNAMPROGETTI/STAR CONSORTIUM. It shall not be shown to Third Parties nor used for purposes other than those for which it was
prepared.
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No.6600035841 (OOK) /
6600035823 (IK)
• Instrument installation and process orientation shall be verified using the P&ID. Ensure that all the
instruments are mounted correctly and are accessible for observing, adjusting, setting etc. and the relevant
ITR is attached to the loop folder.
• Ensure that all field measuring instruments and analog output devices are calibrated prior to installation in
the field and the relevant ITR is attached to the loop folder.
UNCONTROLLED COPY
This document is CONFIDENTIAL and the sole property SAIPEM/SNAMPROGETTI/STAR CONSORTIUM. It shall not be shown to Third Parties nor used for purposes other than those for which it was
prepared.
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No.6600035841 (OOK) /
6600035823 (IK)
6. DOCUMENTATION
Completed instrument loop checking as one complete system and its results need to be documented using
Saudi Aramco Test Report and Precom forms as follows.
UNCONTROLLED COPY
This document is CONFIDENTIAL and the sole property SAIPEM/SNAMPROGETTI/STAR CONSORTIUM. It shall not be shown to Third Parties nor used for purposes other than those for which it was
prepared.
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No.6600035841 (OOK) /
6600035823 (IK)