TABLE OF CONTENTS
SECTION 1 INTRODUCTION
1.1 PURPOSE 4
1.2 SCOPE 4
1.3 OBJECTIVE 5
1.4 ORGANIZATION CHART 5
1.5 SCOPE OF WORK 7
1.6 TERMINOLOGY AND DEFINITIONS 7
SECTION 2 LEADERSHIP AND COMMITMENT 9
2.1 LEADERSHIP AND COMMITMENT 9
2.2 HSE MANAGEMENT SYS0TEM 9
SECTION 3 POLICY AND OBJECTIVE 12
3.1 HSE POLICY 12
3.2 HSE OBJECTIVES 12
SECTION 4 ORGANIZATION, RESOURCES AND COMPETENCE 16
4.1 HSE ORGANIZATION 16
4.2 RESPONSIBILITIES 17
4.3 HSE COMMUNICATION PARTICIPATION AND CONSULTATION 22
4.4 HSE MEETING 22
4.5 HSE PROMOTION AND AWARENESS 23
4.6 EMPLOYEE ORIENTATION PROGRAMME 23
4.7 DAILY SAFETY TALK (TOOL BOX TALK) 24
4.8 HSE COMPETENCE REQUIREMENT 24
4.9 HSE TRAINING 25
SECTION 5 EVALUATION AND RISK MANAGEMENT 27
5.1 OBJECTIVE 27
5.2 GENERAL REQUIREMENTS 27
5.3 IDENTIFICATION OF HSE ASPECTS/HAZARDS AND IMPACTS /RISKS 28
5.4 EVALUATING & CLASSIFICATION OF HSE ASPECTS/HAZARDS 29
5.5 RISK CONTROL TO ACCEPTABLE LEVELS 33
5.6 REVIEW OF RISK ASSESSMENTS 33
5.7 HAZARDOUS MATERIALS/ CHEMICALS DATA SHEETS 33
5.8 WASTE MANAGEMENT 34
SECTION 6 PLANNING, STANDARDS, AND PROCEDURES 36
6.1 SITE PLANNING AND LAYOUT 36
6.2 IN – BUILT SAFETY MEASURES AND SAFE WORKING PROCEDURES 36
6.3 SAFETY AND EMERGENCY TRAINING 41
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
SECTION 1. INTRODUCTION
1.1 PURPOSE
The Project Health, Safety and Environmental Plan are presented to lay down the arrangement for to
identify the strategy and devise mechanism which is directed towards the better management of Health,
Safety and Environment (HSE) matters for the Design, Construction, supply, Installation, Testing,
Commissioning & Maintenance of Three Units of Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island. This HSE Plan makes references to Utico FZC’s own
procedures, Plans and DEWA Procedures for working safely at the Project. The implementation of this Plan
will create a mindset, intolerant of any accident, injury and damage, regardless of severity. We are totally
committed to a policy of prevention, reduction and elimination of all undesired events that could result in
loss and of protecting the interests of our Client & stack holders at all times.
1.2 SCOPE
The scope of this Project HSE Plan is to establish, specify and identify the HSE management system to be
implemented during the project activities associated with the project. This HSE Plan details the procedures
and Standard work Procedures that shall apply to all activities coming under Utico’s scope of work at the
Project including the subcontractor(s) employed by the contractor.
The scope of work shall be executed by supplying the designated materials, baseline manpower, temporary
facilities, baseline equipment / tools, consumables, testing and inspection facilities and other services
necessary to complete the scope of work.
The Scope of Work is detailed herein after in section 1.5
The HSE Management System will ensure that the HSE service quality at Project sites results in the successful
completion of all operations in accordance with the requirements of the following primary documents:
Contract Documents for Design, Construction, supply, Installation, Testing, Commissioning &
Maintenance of Three Units of Reverse Osmosis Plant with 100,000 IGPD Capacities per Unit and
Associated Works at Al Yassat Island.
Utico FZC’s HSE Management Systems Documents,
Utico FZC’s HSE Manual and Procedures,
Client/ End User HSE Requirements
The plan is founded on existing HSE system, which covers specific requirements as well as give instruction to
personnel and project management in HSE matters. Additional works will have Risk Assessments carried out
on obtaining full information of work scope and locations.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
1.3 OBJECTIVE
The Management of Utico FZC believes that pursuit of high standard of health, safety and a positive
approach towards protecting environment is an integral part of efficient management in the construction
industry.
The purpose of this Health, Safety and Environment Plan is to define the methodology related to how to
progress the risk assessment for the entire steps of the Scope of Work and outlines project requirements
related to HSE, to minimize the risk during the engineering planning, design and project operations.
To ensure the performance of HSE duties, in accordance with all recognized standards and with applicable
regulations currently in force
To establish clear performance targets to control losses, minimize waste and ensure effective
communications between the Contractor and the Client in the context of HSE-related matters.
To create HSE awareness among every individual person associated with the project execution.
To formulate and effectively maintain the accident prevention program during entire construction activity.
These activities are considered important and have been integrated into the work as a whole to minimize
risks of accidents and increased costs through all the phases of the Project. The system for risk control is
described in relevant procedures.
To promote continuous awareness in HSE system to achieve the Goal of “NOT TO INJURE ANY PERSON OR
DAMAGE ANY EQUIPMENT OR ENVIRONMENT”
ORGANISATION CHART
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Risk Assessment: process of evaluating the risk(s) arising from a hazard(s), taking into account the adequacy
of any existing controls, and deciding whether or not the risk(s) is acceptable
Ill health: identifiable, adverse physical or mental condition arising from and/ or made worse by a work
activity and/or work-related situation
Tool Box Talk: A talk on a typical health and safety related subject, given by a Safety Officer/Engineer/
Foreman to the personnel for whom he is responsible before starting work.
Safety: Freedom from unacceptable risk of harm
Audit: A systematic and documented examination of objectively obtaining and evaluating evidence to
determine whether an organization's activities and related results conforms to the planned arrangements
and as per audit criteria set by the organization, and whether these arrangements are implemented
effectively as suitable to the organizations policy.
Objective: Overall goals, arising from the HSE policy, that an organization sets itself to achieve, and which is
qualified where practicable in terms of HSE performance.
HSE Policy: Statement by the organization of its intentions and principles in relation to its overall process
HSE performance which provides a framework for safe and healthy work atmosphere and for the setting of
its HSE objectives and targets.
Targets: Detailed performance requirement, quantified where practicable, applicable to the organization or
parts thereof, that arises from the Q and HSE objectives and that needs to be set and met in order to achieve
those objectives.
Organization: Company, corporation, firm, enterprise, authority or institution, or part or combination
thereof, whether incorporated or not, public or private, that has its own functions and administration.
Non Conformance: Non fulfillment of requirement. Any deviation from work standards, practices,
procedures, regulations, management systems performance etc which could directly or indirectly lead to
product failure, deviations from documented system, injury, illness, property damage, damage to
environment or combination of these.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Visible leadership
Communicating the importance of HSE considerations in all business decisions
Demonstrating commitment to implementing the HSE MS
Communicating HSE expectations with employees
Communications with stakeholders
Management is expected to foster the active involvement of employees and contractors in improving HSE
performance by encouraging a positive HSE culture through the following key beliefs in safety:
The health and safety of people has first priority in achieving Utico FZC excellence goals.
All injuries and occupational illnesses can be prevented.
Top management must be committed to safety excellence through visible personal involvement.
Safety is an integral part of every job and every employee has a responsibility for safety.
Utico FZC conducts annual employee surveys, and requests feedback on the company’s (Contractor) ability
to provide a safe and healthy workplace. This framework facilitates the structured management of HSE
hazards and effects associated with the business, and ensure that mitigation methods are in place for
properly controlling the hazards.
The HSE Management System model exposes the liability to the following interrelated components on
continual improvement basis: Commitment, leadership and accountability setting out the policies and
objectives organization, resources, responsibilities and competence Hazards, Evaluation and Risk
Management.
Utico FZC’s Health, Safety and Environment (HSE) management system provides the framework for
managing all aspects of the organizational development. The plan–do–check–act cycle is a four-step model
for carrying out change. Just as a circle has no end, the PDCA cycle should be repeated again and again for
continuous improvement.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
The HSE MS Plan covers most of the project activities and requirements, and is provided as a guide to site
HSE personnel to ensure that all areas are covered. It is organized into subsections roughly correlating with
the requirements of the specification OHSAS 18001:2007; certain additions and modifications to the
structure have been made to ensure complete coverage of the specific activities taking place on the project
site.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
To avoid all personal injuries and Targeting Zero LTI during the execution of the Project.
To ensure that all personnel employed on the Project are competent to carry out their designated tasks
safely.
To create positive health, safety and environment attitudes and perceptions at all levels of the Project
organization, and to raise health safety and environmental awareness in general.
To implement a training program that supports the achievement of personnel competency in relation to
Health, Safety, and the Environment.
Hazard identification and risk assessment will be carried out on regular basis and necessary control
measures will be implemented. This will be done first on a project basis and once system matures, all
activities will be subject to risk assessment.
All accidents/ incidents and near miss will be investigated and reported to Management, Client and
where applicable, to the Government Authorities. Analysis shall identify accidents/incidents impact on
HSEMS for implementation of modification as necessary.
To complete the Project without incurring any significant property damage to permanent equipment, or
temporary facilities.
To complete the Project with minimum avoidable impact upon the surrounding environment.
To introduce a method of motivating good safety and environmental performance this shall include the
use of commendation, as well as correction techniques.
To continually monitor and improve HSE performance
To promote continuous awareness in HSE system to achieve the Goal of -
“NOT TO INJURE ANY PERSON OR DAMAGE ANY EQUIPMENT OR ENVIRONMENT”
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Safety in Planning
Safety planning shall ensure that all work is carried out on correct time by complying the applicable legal and
other requirements. Utico FZC shall adopt safe work procedures to ensure effective control of risks by
adopting a systematic approach to the identification of hazards and the assessment of risk. The purpose of
proper planning cycle is to provide a planning framework to review, plan and submit performance results
and future strategies.
HSE Targets
HSE targets are based on developing a good safety culture that positively influences human behavior at
work, leading to reduced errors and violations. The Targets for improving safety standards will be set, in
accordance with the company’s ‘Zero Accident Philosophy’.
Safety in Design
Through safety and environmental analysis, hazards can be uncovered at an early stage and subsequently be
corrected, thus reduce the risk of accidents / incidents.
Furthermore, if the problems or weaknesses related to safety are uncovered during the design phase they
can be corrected, and thus reduce costs compared to the unexpected expenses that arise when such
problems are uncovered during the operational phase.
Evaluation of safety and environmental aspects is therefore an important part of the activities in Project
planning stage.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
The responsible person for the design tasks shall decide the extent of the evaluation/analysis required, as
well as who shall conduct them. Within projects this responsibility is allocated to the HSE, who will co-
ordinate and ensure that such evaluation / analysis are implemented in the design criteria's.
Familiarization
The Project Manager or his nominated Deputy, will during or prior to project mobilization, ensure that all
personnel are familiarized with the different job tasks, and that the familiarization programme is adequate
for the individual groups of personnel. The familiarization programme will cover worksites and shall apply for
project personnel, visitors and subcontractors. This familiarization program shall include the following:
Education
In order to ensure safe execution of work and operations contractor has established a system to ensure
relevant education for the various personnel groups. Engineers are selectively trained on safety courses and
when forming the project team we are include those peoples in major roles in our project site organization.
Our HSE officer will conduct the periodic in-house training for our site staff and work force according to the
project requirements.
HSE officer will ensure the Induction training for all staffs and work force, including visitors and suppliers/
subcontractors on site. Site supervisor/ Foremen/ Site Engineer shall give the tool box talk on daily basis
before staring the activities on site. The subject of tool box talks will be the current activities on site. HSE
officer will organize the tool box talks on site.
Monitoring
It is our organizations aim to achieve an effective health and safety culture through the development of
employees, providing adequate levels of competent supervision and the close monitoring of performance.
Project/Site Managers/Engineers and Supervisors shall undertake regular workplace inspections in line with
the company’s policy or such client/ Consultant/ principal contractor requirements.
In addition, the contractor appointed Health and Safety Engineer shall carry out regular formal safety
inspections to check the application of the contractor health and safety arrangements on site and monitor
the effectiveness of their application, and shall also undertake regular internal health and safety audits of
the contractor Health and Safety Management System and its application.
Emergency Plans
Affix the emergency plans with detailed emergency numbers shall be displayed on different areas of the site.
The HSE Officer is responsible for conducting the Emergency drills on site. The Emergency exit and necessary
details shall be included on induction talk. Emergency plan of the client will be in force at all times during site
work, if applicable. The project Manager is responsible for all emergency procedures on site and HSE officer
will look after and schedule the events like Emergency preparedness training and awareness training.
ON NOTIFICATION
OF EMERGENCY
INITIATE EMERGENCY
RESPONSE PROCEDURE
INFORM EMERGENCY
RESPONSE TEAM AND
FIRST AID TEAM
TAKE CONTROL
OF EMERGENCY
IF NECESSARY
INFORM CIVIL
EMERGENCY EVACUATE ALL
DEFENSE/
CONTROLLED PERSONAL TO A SAFE
POLICE
LOCATION
The Project organization as well as the individual safety related functions shall be established and included in
job responsibilities section. HSE is a line management responsibility and fully committed by the contractor
General Manager and all other top managements. The HSE responsibility is based on the principle of line
responsibility, which shall be focused and introduced to project involved personnel.
The Project/ Site Manager will establish a system for frequent HSE meetings in co ordination with Safety
officer. The Project/ Site engineer, Foreman/Supervisor shall attend these meetings with the aim to identify
the critical HSE areas.
The Project HSE officer reports to the Project Manager on a day-to-day basis. The Project HSE officer shall
ensure that all HSE related activities are in accordance with the stated requirements. He shall plan and
execute the project HSE meetings according to plans.
Other typical HSE work areas for the Project HSE officer are;
Corporate Support
The HSE Unit Head shall review the Monthly Progress Report and provides support and resources required
for effective implementation of HSE at project level. HSE issues are a part of Management Review Meetings
and Incidents are critically analyzed at the corporate level and prompt action taken to minimize work related
risks.
Internal Interfaces
Organization supports the project on HSE related matters through the HSE unit head. This support is
conducted through the Project HSE officer on a day-to-day basis. HSE unit head will guide the HSE officer to
better movement on site according to the requirement of client/ consultant.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Sub-contractor Interface
To maintain and follow up sub-contractors with regards to HSE matters, the Project Manager will exercise
control at various stages of procurement and subcontracting to ensure that HSE requirements are met. Sub-
contractor shall have their own system taking care of all HSE aspects which may be verified during approval
of sub-contractors
The monitoring of the HSE performance of the subcontractors on regular basis and adherence of rules,
regulations and HSE system is enhanced.
4.2 RESPONSIBILITIES
HSE awareness and competence shall be ensured by establishing HSE organization, allocating roles /
responsibilities / inter relationships and regularly reviewing their efficiencies to meet the overall HSE
objectives.
PROJECT MANAGER
Effectively implements our HSE & Quality Policy and ensure that all Provision of appropriate and
adequate resources for effective execution of HSE plan
Communicate with the HSE officer about HSE plan and reporting and monitor the functionality of
HSE system, define deficiencies and generate feasible solutions.
Discuss and review with Project/ construction team / subcontractors for effective HSE MS
deployment and improvements
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Ensure evolution of HSE awareness among contractor staff and assign HSE responsibilities at all
levels and track implementation.
Ensure that workforce has received adequate HSE training, which is commensurate with the work
being carried out within awarded contracts prior to commencement of work.
Ensure that requirements related to each parameter are established. Ensure the provision and use of
suitable safety equipment and protective equipments during the execution.
Ascertain that all HSE requirements are identified at the initial stage of the project including risk
control measures.
Report and notify promptly to client’s HSE personnel / concerned authority in the event of any
accident to life, property, and environment in coordination with site safety officer.
Coordinate with HSE officer for assessing the HSE performance and discuss corrective / preventive
actions and ensure all HSE activities are reported and documented as per contractor HSE plan.
Ensure that provision of a tidy and well organized safe working environment.
Ensure that the employees, under his control, are adequately trained for the work in hand.
Issue clear, specific and regular instructions on HSE requirements, when directing operations.
Monitor emergency response exercises, Participate in HSE meetings, Liaison and communicate with
the company’s HSE Department.
Set and maintain a personal example at all times. Take part in Investigation and reporting of
incidents, Site HSE Audits, Site hygiene inspections and all HSE meetings.
PROJECT ENGINEER
Ensure the provision and use of suitable safety equipment and protective Equipments.
Apply safety precautions before commencement of work and clear the same before cancellation of
permits.
Ensure that plant, vehicles and equipments are suitable, regularly maintained, correctly operated
and not misused.
Ensure that all accidents and unsafe acts and conditions are reported and investigated.
Define resources (personnel, materials, equipment and tools) required and discuss with Project
Manager to develop & agree on action plan & budget.
Supervise HSE reporting as per clients on daily, weekly & monthly basis.
Ensure that plant, vehicles and equipments are suitable, regularly maintained, correctly operated
and not misused.
Ensure that all accidents and unsafe acts and conditions are reported and investigated and ensure
that all 'First Aid' facilities are in place and maintained.
Coordinate with Site safety officer for Emergency Response Planning and its implementation.
Maintaining safe working environment and Ensuring a clean and tidy workplace at all times.
Conducting daily visual and weekly formal work site inspections as per schedule.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Analyzing all work activities under their control to ensure that hazards have been identified and
controlled and those only safe systems of work are undertaken.
Ensuring that all materials, gears and equipment (including personal protective equipment) needed
to carry out the job safely is provided prior to commencing work.
Ensuring that suitably qualified and trained personnel carry out all work.
Reporting, recording and investigating all accidents, incidents within their work area.
Investigate all HSE hazards and implementing measures to control or eliminate such hazards.
Ensuring that the requirements identified during the development of the work method statement
and risk assessment are adequate in terms of detail and are being effectively followed.
PROCUREMENT ENGINEER
Provide Material Safety Data Sheet to HSE officer.
Inspect the purchased material to apply to the requirements.
Investigating any HSE hazards and implementing measures to control or eliminate such hazards.
Reporting, recording and investigating all accidents, incidents within their work area.
Coordinate with Safety Officer in all site activities.
SAFETY OFFICER
Ensuring the compliance of all personnel on the site with project HSE requirements.
Monitor the work site and report to the HSE Unit Head/ Project Manager.
Conduct the frequent site inspections and ensuring that concerned personal are informed in writing;
securing their written agreement to implement remedial measures.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
FOREMAN
Execute site activities in compliance with contractor safety plan.
Ensure all safety precautions have been taken before commencement of work and the same have
been cleared prior to apply for cancellation of permits.
Coordinate with Safety Officer in all site activities.
Coordinate with Site engineer for Emergency Response Planning.
Maintaining safe working environment and Ensuring a clean and tidy workplace at all times.
Conducting daily visual and weekly formal work site inspections as per schedule.
Analyzing all work activities under their control to ensure that hazards have been identified and
controlled and those only safe systems of work are undertaken.
Monitor labours and provide instructions such as tool box talks etc.
Labours under their supervision are wearing suitable protective clothing (PPE) and using safe tools
and equipment regularly checked and inspected.
Warning signs, lights, barricades and flags are placed in hazardous places and situations to prevent
hazardous accidents.
Foremen will share responsibility with Site Engineers to ensure that a documented inspection of all
equipment is provided prior to plant being put into service.
Identified the Hazards on their work areas and Assist HSE Accident/Incident Investigation Team.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
WORKFORCE
Observing and obeying HSE rules, operating procedures, cautionary instructions and safety signs and
symbols.
Reporting all Near misses/Accidents to their superiors immediately.
Ensuring the potential hazards of the work are well understood and working safely and responsibly
Wearing all necessary PPE and maintaining it in Good Condition.
Using the tools and equipment properly.
Discarding defective PPE and Tools safely and replacing with new ones.
Keeping their work area clean & safe.
Remaining alert in case of Emergencies and following Emergency response procedures.
All ways following the instructions of supervisors and safety personals.
All personals are encouraged to make suggestions to improve Health, safety and Environmental
protection to their Supervisors and Project HSE Representatives.
Maintain good housekeeping
Use PPE (personal protective equipment) inside the work place
Report injuries to the team leader or the foreman
Ensure and control that drivers and all passengers wear seat belts while driving.
All workforces shall learn the importance of identifying, reporting near misses and advising on how to reduce
work related HSE risks. The contractor management shall guarantee that all applicable requirements are
kept current, shared and communicated to the relevant personnel to comply.
Regular HSE meetings at various levels, at all locations are to be held to ensure the communication and
feedback to HSE issues. Clear & simple communication methodology need to be defined and applied to avoid
confusion & misunderstanding. The objective for HSE communications is to ensure that HSE knowledge is
received, transferred to the appropriate parties within the contractor and that all HSE information learned
are documented, reviewed and communicated.
The safety officer observes and make sure that the working environment is safe and all the running activities
are safe. He shall report any incident and stop any unsafe activity and inform the Project Engineer and the
project manager of any violation against HSE and report to the HSE Unit Head according the severity. Utico
FZC shall motivate the work force to report more number of near miss and they will participate the incident
investigation team. Every worker in Utico FZC is encouraged to stop the job, if he observes an unsafe
condition, correct the situation and proceed to the Risk monitoring reporting.
Management HSE meeting to be held by Project Manager with HSE Officer, Project Engineer, Site Engineer
and supervisors to discuss the HSE issues and how to improve the implementation.
Weekly safety meeting to be held by the safety officer with the working personnel (labours, foremen,
engineers) on weekly basis to discuss RMRs , near misses , and accidents and discuss how to prevent similar
occurrences in order to increase the awareness.
Daily Morning Meeting (Tool Box Talk) shall be held by the safety officer with the working personnel to
increase awareness about the possible hazards that they might face in their activities and how to take
precautionary preventive actions and also introduce them to the recovery and emergency plan, evacuation
procedure and the muster point.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
To develop the HSE awareness, current level of awareness, performance and suggestions for planned
awareness drives shall be reviewed. Awareness strategy shall be established in coordination with project
managers and department heads, and there after requirements to be identified. HSE promotion is to be
presented to Division management for approval and to be followed by implementation. To insure efficiency
of HSE, feedback from different sections shall be collected and reviewed, necessary adjustments to HSE
awareness campaign strategy to be made accordingly it is the responsibility of project manager to ensure
the HSE awareness for the site staff.
Prior to commencement of work, it should be insured that concerned personnel are equipped with
knowledge and adequate training appropriate to their assigned roles for the particular contract. The
information earned should be conveyed / shared to the workforce by means of HSE inductions, seminars,
and on-job internal training, toolbox talks and safety induction training.
Expatriates and locals will be oriented in a separate group to understand the orientation clearly. After the
orientation a separate “Induction Sticker” with Utico FZC logos shall be stick to all the employees Helmet to
identify them separately in the project.
A record shall be maintained on all employees stating that they have received the safety training and fully
understood the rules and regulations. This form will be signed and dated by each employee and kept on file
in safety Department for auditing and other relevant purposes.
for using equipment and tools, Particular hazardous conditions and precautions to be taken, Workmen’s
health hazards associated with the work, Environmental hazards and other required information.
A written record shall be maintained on all employees stating that they have received the safety training and
fully understood the rules and regulations. This form will be signed and dated by each employee and kept on
file in safety Department for auditing and other relevant purposes.
The Project safety officer is responsible for maintaining employees’ project oriented training records.
Appropriate records are monitored and reviewed on a scheduled basis. We uses assessment questionnaire
and training feedback after each training course to measure the level of comprehensibility of training for
attendees and the level of perception of training material by attendees. The Job oriented training shall
includes but not limits to; the compliance to main HSE rules and procedures, Level of work performers
awareness on HSE requirements specific to the nature of a task being performed, PPE compliance, Employee
Awareness on Waste Segregation, Awareness on hazardous substances and Safe Systems of Works etc
All staff, related to the site work shall undergo the Basic fire prevention & fire fighting and basic First Aid
training courses as a prerequisite by accredited centre. In addition to that Utico HSE Dept shall conduct the
following trainings for every site personals Basic Electrical safety, Personal Protective Equipment (PPE)-Use
and Selection, Necessity of Incident Reporting and Investigation, Manual Handling of Materials, General
Environmental Awareness, and Emergency Preparedness & Response etc.
The whole project tem shall attend the HSE in-house training as per the Training matrix for the project.
Training needs is to be identified to ensure that concerned personnel have received sufficient training to
fulfill their roles. HSE Engineers, in coordination with Sections managers shall recognize training
requirements in line with company needs and prepare Company’s HSE Training Matrix and Company
management shall allocate necessary budget also. HSE unit head in coordination with PM will select
adequate training programs, organize schedules, select training institutes and evaluate process upon
completion.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Utico shall propose competent HSE Engineer / Officer for the project with sufficient training and/or
experience to enable him to effectively carry out his duties on site as per the client requirements.
The specialized training needs have been identified and appropriate training shall carried out by a
competent third party firm.
The Site HSE Engineer/Officer shall ensure that Safety Induction Training is provided to all staff and
employees upon mobilization or transfer to site. All personnel entering the site shall attend Safety
Induction Training before being allowed to proceed to the workplace.
Safety Induction Training shall be recorded on the ”Safety Induction Training Session Attendance
Form” and helmet stickers, signed and dated by the HSE Officer, shall be issued to all attendees as an
aid to quick visual identification of Safety Induction Training having been completed. Following the
completion of the Safety Induction Training, all attendees shall sign the “Acknowledgement of Safety
Instructions “form as documented evidence of their attendance and to record their agreement to
comply with the training content and site Safety requirements.
“Tool Box Talks” shall be given to direct labour employees. Topics shall be appropriate to the nature
of work under way at the time. The talks may be given by the site HSE officer, his duty (ies) or the
concerned foreman for the activity. The talks shall be planned in advance using the "Toolbox Talk
Schedule" and attendance recorded on the "Toolbox Talk / Safety Meeting Attendance Record".
Topics for typical activities have been prepared in advance and may be used as a guide by the person
giving the talk. These topics are prepared on the standard format “Toolbox Talk Topic Outline" and
shall be available for use on site
Site Safety Notice board or boards shall be posted in prominent locations to promote awareness.
A Site Safety Rules signboard shall be posted at each entrance to the site so as to be clearly visible to
any personnel entering the site either walking or driving. It shall be at least 2 meters high by 1 meter
wide and contain graphic representation of site safety requirements as well as emergency telephone
numbers.
A notice informing all new personnel to report to the Safety officer for Safety Induction Training. This
sigh shall be in at least English, Arabic, Urdu, Hindi and Malayalam.
A Site Safety Statistics signboard shall be maintained in a prominent location, showing the number of
man-hours worked the number of LTIs and the cumulative severity rate and frequency rate for the
project. This shall be maintained on a monthly basis by the site HSE officer.
Assembly Point shall be identified and the necessary sign boards shall be fixed. The emergency
layout also fixed on site as required.
The Site HSE Engineer/ Officer shall ensure that suitable safety signs are displayed on site for safety
awareness. These signs shall include, but not be limited to, signs to enforce the use of PPE such as
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
helmets, safety footwear, hand gloves, goggles etc,; signs to indicate the presence of hazardous
situations such fire electric shock risk, and direction or guidance signs to indicate the location of
facilities related to safety on site.
The requirements outlined above shall be incorporated into a Safety Training program for all personnel on
site, which shall be established at the beginning of the project. Reference is made to the “HSE Training
Matrix” attached on Appendix 02.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
This examination will identify the three main elements of risk (i.e. Consequences, Exposure and Probability)
and ascertain if existing controls are adequate or if additional controls need to be enforced.
g. The Risk Assessment shall be reviewed as required and when the following conditions apply as
applicable;
Changes of work procedures or practices
Introducing new plants, equipments, materials or substances
After incidents/ Accidents (including near misses)
when applicable legislative obligation change
The site activities (Including both routine and non routine) of all personnel having access to the
workplace including sub contractors (if any) and visitors
Past incidents/accidents to be examined to see what happened and whether the incident/accident could
happen again.
Identify the hazards originating outside the workplace, which can make adversely affects the health and
safety of persons within the workplace.
Information about equipment (e.g. plant, operating instructions) and Material Safety Data Sheets to be
reviewed and to see what is said about safety precautions.
Any changes that may have a significant impact/ Risk on existing system.
Methods for identifying workplace risks and predicting potential damage include a combination of
several activities, which are further described below.
Hazard Inspections: A planned and formal walk through survey using a simple checklist can identify
sources of hazards on work place.
Past Records of Injury / incident occurrences and near miss records shall be analysed to identify areas
where problems are more expected.
Project Team Consultation: The Project execution Team along with the Dept managers (as required) and
technical engineers who knows or involving the work activities or work environment has been sitting
down and using the brainstorming principal & together listing the hazards and risks faced by the scope of
work.
Product Information: Material Safety Data Sheets (MSDS), Product Labels, Manufacturers and Suppliers
are essential sources of information regarding the hazards associated with chemical substances.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
External Specialists and Expert Judgments: Specialists Consultants from the Industry are a valuable
source of information and may be utilized for critical reviews as Third Party Verifications of proposed
procedures and methodologies (if required).
The establishment of risk criteria against which risk levels can be compared is fundamental to ranking of risk
exposures and determining priorities for management action. The purpose of risk evaluation is to make
decisions, based on the outcomes of risk analysis, about which risks need treatment and treatment
priorities. Risk evaluation involves comparing the level of risk found during the analysis process with risk
criteria established when the context was considered. The objective of the nominated entity and extent of
opportunity that could result shall be considered. Decision shall take account of the wider context of the risk
and include consideration of the tolerability of the risks borne by parties other than the entity that benefit
from it, for example the community. In some circumstances, the risk evaluation may lead to a decision to
undertake further analysis.
The relative risk score estimated enables definition between those risks that are significant, and those that
are of a lesser nature. This allows a better understanding of latest probable events with high consequence
against the highly probable low consequence events. Having established the comparative risk level
applicable to individual impacts, it is possible to rank those risks. Four risk categories are to be used:
Extreme, High, Moderate, and Low.
The matrix as depicted in Figure (below) facilitates quick reference and assignment of risk levels for each of
the four risk categories (Extra high, High, Medium, and Low). Thus hazards identified during audits,
inspections, reviews, accident/incident investigation, qualitative risk assessment etc. may be assessed using
this matrix.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Probability of occurrence
The probability of occurrence shall be estimated as below, which provides likelihood ratings with
descriptions for estimating the likelihood of each occurrence.
Depending upon the magnitude of risks and the potential consequences of hazards, the Risk Assessment
shall be periodically reviewed by competent staff as required. Based on the above "Risk Classification matrix,
the formula can be simplified as;
By considering the above criteria, degree of hazards/impacts can be determined with an appropriate control
measure to each identified hazard. The results of the hazard/aspects identification and risk classification will
be recorded using Hazard Identification/Risk Assessment & Risk Control Format.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of Reverse
Osmosis Plant with 100,000 IGPD Capacities Per Unit And
Associated Works at Al Yassat Island
Evaluating Control
Risk control options should be evaluated on the basis of the level of risk reduction and the level of benefits
or opportunities created. A number of risk control options may be considered and applied either individually
or in combination.
The general principal is that the adverse impact of risk should be made (ALARP) As Low as Reasonably
Practicable.
Health Safety Environment
Safety
Reputation of
Health Effects Safety and Human Health Production Loss Assets Loss Land Based Ecosystem Atmosphere/ Water/ Others
organization
Insignificant-
Insignificant
Minor injuries which may Slight/ Insignificant impact by temporary
impacts/ Slight/ Insignificant
require self administrated first Incident event nuisance from noise, odor, dust, other air
exposure on Slight damage environmental impact.
aid facilities. Injured personnel without causing Slight Impact. emissions, greenhouse gases, vibration.
1
Serious injuries requiring offsite Production loss creation of noise, odor, dust, other
emission or flora fauna populations
treatment by medical or delay on Local / Limited controlled / uncontrolled air emissions,
discharge that Considerable and habitats. Disruption to
practitioner. Potential long- execution damage to the greenhouse gases, and vibration at
impacts on Impact. or some death/
term or permanently disabling activities. (from 1 assets. significant nuisance levels Results in the
surrounding permanent damage of
effects. week to 1 generation of significant quantities of Non
population. rear flora / fauna.
month). Hazards/ Hazardous wastes.
Continuous and serious
Major – long term damage by erosion or to
Major Production
health effects flora/ fauna. Major
Major-4
RISK CONTROL:
Design: Allows hazards to be designed out, and control measures to be designed in.
Elimination: Modification to process method or material to eliminate the hazard completely.
Substitution: Replacing the material, substance or process with a less hazardous one.
Redesign: Redesigning plant or work process to reduce or eliminate risk.
Separation: Isolating the hazards from persons by safeguarding, or by space or time separation.
Administration: Adjusting the time or conditions of risk exposures / probation / training.
PPE: Using the appropriately designed and properly fitting equipment where other
controls are not practicable.
UTICO FZE will carry out formal periodic risks and impacts assessment for the following criteria:
o Identify hazards and aspects, and risks and impacts in the workplace and provide
information to affected personnel (i.e., employees, clients, contractors.)
o Eliminate, control or minimize risks and impacts in the workplace.
o Documenting the recommendations resulting from the assessment and the extent to which
each have been implemented.
o Satisfy legal, business, and client requirements.
Risks and impacts assessments are also required for non-routine tasks, new tasks, or when
process changes occur.
Before starting any Site activity, a specified Method of Statement including the associated risk
assessment shall be prepared and submitted to the Client for their review and approval.
1.1 The HSE Register of Health and Safety Hazards and Environmental Aspects form, is a tool used by
management to evaluate and prioritize risk and impacts of all processes.
1.2 Each site or operation is required to develop and maintain this register in accordance with the
following:
List all processes on the Registers Workbook, and conduct a pre-assessment ranking
(by completing columns “priority ranking” and “processes”.)
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Conduct risk and impact assessment as outlined in the preceding sections of this element.
Reprioritize based on risk and impact score.
Complete the remaining fields on the register form.
Update when changes occur to any of the fields listed on the register.
2.1 List all processes and conduct a pre-assessment ranking to determine which are to be assessed
for risks and impacts. After the initial pre-assessment is complete, conduct a risk and impact
assessment based on the risk and impact score and reprioritize the register. Processes are
ranked on the HSE Register of Health and Safety Hazards and Environmental Aspects form,
according to the following criteria:
3.1 Risks and impacts assessment teams conduct assessments for the process tasks documented on
the register form. The assessment team is comprised of any or all of the employees with the
following functions:
Task manager or supervisor: assists in identifying the equipment used, procedures to complete
the task, length of task, and potential hazards and aspects associated with the task.
Task operator and worker: identify the task steps and associated hazards and aspects of the
process.
Other personnel: (engineering, maintenance, management, etc.) may be required to assist with
the assessment to offer expertise on particular areas of the task and assist with the completion
of the assessment.
3.2 The risks and impacts assessments are documented using the HSE Risks and Impacts Assessment
form. When conducting a risk and impact assessment, complete the entire form.
4.1 The basic steps in completing a risks and impacts assessment are:
1. Break the process into tasks, then break the tasks down into a sequence of steps and discuss
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
2. Identify existing or potential hazards and aspects and their types (be sure to make reference to
the hazard and aspect types on the HSE Risks and Impacts Assessment form.)
4. Determine the risks and impacts score based on consequence and frequency.
5. Recommend additional controls to reduce or eliminate the risk and impact (refer to the Risks
and Impacts Assessment Criteria and Control sections.)
6. Determine the controlled risks and impacts score based on the recommended controls.
7. Eliminate, control or minimize the risks and impacts to the extent practicable.
10. Update the HSE Register of Health and Safety Hazards and Environmental Aspects form.
11. The following information may also be required for each task:
5.1 The highest risk and impact scores are addressed first. The objective is to reduce risk and impact
scores through increased controls until no longer reasonably practicable, in terms of cost and
benefit, to control risk and impact further.
5.2 The risks and impacts assessment matrix, located below, is used to evaluate relative risk and
impacts; with scores ranging from 1 to 4, categorized as low; 5 to 9 medium; and 10 to 25 high
(Refer to risks and impacts assessment matrix).
6.1 Engineering solutions, where feasible, are the preferred method of elimination or control of
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
workplace hazards and aspects. The following hierarchy of controls should be used:
o Eliminate the hazards or aspects (i.e., substitute less hazardous substances, automation.)
o Incorporate engineered safety devices (i.e., guards, lockout devices, secondary
containment.)
o Incorporate warning devices, signs, etc.
o Employ procedures, training and administrative controls, and emergency response plans.
o Use personal protective equipment (PPE).
7.1 Risks and impact assessments are reviewed periodically and when:
o A process change occurs,
o Equipment or materials changes,
o An incident occurs, or
o Legal, business, and client requirements dictate.
7.2 The HSE Risks and Impacts Assessment form and the HSE Register of Health and Safety Hazards
and Environmental Aspects form are monitored and updated as appropriate, at least annually.
The Material Safety Data Sheets (MSDS) gives information on how to store, use and what kind of protective
means the user shall be equipped with while using such Materials / Chemicals. The Data
Sheets also identify how to respond if an accident with such materials should occur with suitable first aid
methods protection.
RESPONSIBILITY:
a. The Project manager shall be responsible for the implementation of reduction on waste
generation and its proper disposal during the execution of the project.
b. The Training/ Awareness of the site personals and onsite posting of sign boards are the
responsibility with HSE dept.
c. The project / Site Engineer shall be responsible for reduction Plan and monitor the wastage in
coordination with the execution team.
d. Frequent/ Regular Inspection on the site locations to be carried out and prepared the report by
the HSE officer.
e. The General Foreman is responsible for the effective waste segregation and storage on site.
f. In addition to other requirements specified herein it is a requirement for the work of this
project that the contractor comply with the applicable federal, state and local waste disposal
requirements.
REGULATORY REQUIREMENTS
Comply with all applicable requirements/ laws of Abu Dhabi Environmental Agency, DEWA, Dubai
Municipality, client/ company and all applicable local ordinances and regulations.
WASTE MINIMIZATION
Utico FZC shall maintain a stringent set of guidelines to control the amount of construction waste and
debris disposed in a landfill. The project Manager will be responsible for developing the suitable work plan
with minimum waste generation and he will emphasis these requirements during internal meetings with
Project team and Suppliers/Subcontractors and documented. The following points shall be considered;
a. Utico FZC has considered that this Project shall generate the least amount of waste possible
and that processes that ensure the generation of as little waste as possible due to error, poor
planning, breakage, mishandling, contamination, or other factors shall be employed.
b. Of the waste that is generated, as many of the waste materials as economically feasible shall be
reused, salvaged, or recycled.
c. Waste disposal in landfills or incinerators shall be minimized, thereby reducing disposal costs.
d. Nonhazardous wastes such as demolition/ construction wastes including wooden wastes,
concrete wastes, different wastes from Electrical devices, Switchgear, panel boards,
Transformers etc shall be. Salvage and recycle as much as possible.
e. The waste generated during the construction activities are documented on controlled
document format on monthly and Yearly basis in order to develop the control plan for the
waste reduction.
f. Necessary Sign boards with containers and/ or areas will be plainly marked.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
g. Conducts the awareness programs for the intent of this project with respect to reduction of
waste and recycling.
h. To be included the Waste management points in Induction Training and Tool Box talks.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Roads, car parks, material storage areas shall be constructed for the duration of the construction
work at site.
Cooking of food in office units is prohibited, unless the unit is designed for such a purpose.
Temporary construction facilities such as offices, fabrication shops, etc. shall be constructed at site
and shall be assessable via temporary roads.
Toilets, washing facilities shall be provided at site.
All electrical connections will be provided with ELCB. ELCB shall be provided on all outlets.
Diesel Generators shall be located away from office/ accommodation to minimize noise and
nuisance.
All fixed electrical equipment in office units shall be of approved standard; no occupant shall modify
or interfere with installed electrical equipment.
Chairs, tables and shelves shall not be used as a means for climbing. Proper type ladders or other
safe supports shall be used to reach material at high elevations.
Desk drawers, cabinet doors and files should be closed while not being used.
Heavy materials should not be placed on top of file cabinets.
Sharp burrs on metal file cabinet should be reported so that they may be eliminated.
Broken glass, pins, bits of metal or their sharp edged objects shall not be placed in waste paper
baskets without first being heavily wrapped.
Arrange telephone, computer and other electric machine cords so that they will not present a
tripping hazard.
Paper cuts and punctured wounds such as those caused by pens, pencils, pins, etc., must receive
first aid at once.
Gummed strips of envelopes should be moistened with suitable device, not with tongue. Avoid
opening envelopes with fingers and sliding hands along edges of paper.
Messenger carriages, trolleys or similar vehicles must not be left in front of elevators, doors or at
blind corners or hallways so that these will not constitute a hazard.
Separate smoker’s area shall be provided. Smoking materials or matches shall not be discarded in
wastebaskets.
Electrical power supply shall be provided 24 hours for lighting, refrigeration and air-conditioning.
Water coolers shall be provided at various locations of the camp nearest to the workers caravans &
junior staff caravans, in addition to these a small shop of cold drinks and juices shall be made
available for the benefit of all employees.
A Camp Boss shall be appointed to supervise camp hygiene, and to carry out regular inspection of
the camp.
Each portable cabin will be provided with appropriate fire extinguisher and related accessories.
All electrical connections will be provided with ELCB. ELCB shall be provided on all outlets.
A fire fighting system with water pump pipe line lay out, water storage tanks / pumps; hose reels
etc. will be laid throughout the accommodation as per client/ Company requirements.
6.2.3 STORES
A layout demarcating areas for stacking, storing and disposing the materials is made.
The materials are stacked with passage to reach them. The aisle is marked. Materials should not
protrude beyond the marked area posing tripping hazard.
Name boards shall be displayed to mention the names for every item.
The racks installed must be supported well to prevent from falling.
To reach the rack top, person should not climb on the rack shelf. A ladder should be used.
Vertical stacking of materials should not exceed the prescribed norms, posing falling hazard
because of imbalance.
Flammable materials like Dissolved-acetylene, paints etc should be stored under well-ventilated
shed.
All Gas cylinders shall be kept vertical and secured individually all the times. Trolleys shall be used
to transport the gas cylinders and at work place. Electrical connection in these locations should be
of spark proof and maintained well such that they do not cause short circuit.
Smoking or any other open fire causing material shall be strictly prohibited in these areas.
Sufficient fire extinguishers are kept at conspicuous places and the path to reach them shall not be
blocked at any time
Toxic materials are labeled and kept at designated storage place and only authorized persons shall
handle them. MSDS (Material Safety Data Sheet) of the chemicals shall be posted in the storage
area.
Training programs shall be conducted for all store personals to handle the hazardous materials.
Oils, greases and paints shall not be openly stored at any time and shall be stored under cover in a
dyke. Adequate fire extinguishers shall be kept near to the storage area.
The scrap pile and junk material shall be kept as orderly as conditions permit. Extreme care shall be
taken in handling scrap material to prevent personal injury.
Storage should be preferably on hard standing in the open air under a shelter, but if interior storage
is necessary, rooms must be well ventilated. All Gas cylinders (Full or Empty) shall be kept vertical
and secured individually all the times.
Trolleys shall be used to transport the gas cylinders. No cylinder shall be kept at site without the
Trolley.
Acetylene and oxygen are either kept at a minimum distance of 20 feet away or a wall is
constructed in between them to resist the fire for 1-½ hours.
Acetylene & Oxygen cylinders, whether full or empty, should always be kept upright and secured.
Signboards shall be placed in the storage area.
Cylinders should be shielded from direct sunlight or other heat to avoid the build –up of excess
internal pressure, which might lead to gas leakage or eventual bursting of the cylinder walls. Some
protection should be provided in ice and snow conditions to avoid a reduction in pressure, which
would lead to difficulties in operation.
Storage compounds should be sited well away from risk areas and all oxygen cylinders especially
should be kept off oil and grease since these will ignite violently in an oxygen concentration.
NO SMOKING signs shall be displayed.
Adequate illumination of walkways and access routes during hours of darkness if night works to
occur.
Floors clean and free of oil, grease, dirt, refuse, water etc. Where spillage occurs it is cleaned up
promptly.
Floors around machinery are level and in good condition. Free of chips, loose material and not
slippery.
When areas are constantly wet and in use by personnel for walking and work purposes, then non -
slip surfaces should be provided.
Floor openings, pits, trap holes securely fenced or covered.
Sufficient escape routes available to allow prompt escape. Clearly marked. No locks or fastenings
fitted which may hinder escape. Approaches and escape routes unobstructed. Flammables not
present in escape routes. Doors opened outwards onto a level landing / floor.
Adequate and suitable access to deep excavation shall be ensured
All earth moving equipments, cranes, trucks, trailers, bob cats, JCBs, etc will be fitted with flashing
amber lights.
The pedestrians, drivers must follow the Road safety rules framed for the purpose.
Respect the road/ driving ethics and Discipline should be maintained at roads.
Deployment of traffic signal man during entry / exit of mobile plant and equipment.
Road Safety sign boards, temporary traffic signals, barricading, reduce speed sign boards shall be
made available & used wherever required.
All Subcontractors working within the project sites shall comply with Utico FZC’s and Client HSE regulations
and any other local Government legislation applicable to work being carried out. During the presence of the
subcontractor, the project manager, of the site concerned, is responsible for liaison with the Subcontractor
prior to the commencement of and during their work.
Subcontractors shall comply with the HSE policy of Utico FZC and Client/Main Cont HSE policy.
Weekly report to the project manager and the General Manager about the subcontractor HSE
performance and the HSE meetings attendance.
In case of HSE violation, the site engineer shall report to the project manager and inform the safety
officer. The Safety Officer shall take a remedial action and report to the HSE engineer.
HSE engineer shall inform the sub-contractor management about the violation and arrange meeting
and run an investigation if necessary.
HSE engineer shall report to the General Manager about any violation from the sub-contractor side.
Action to be taken against the sub-contractor regarding to the violation type which can reach sub-
contract cancellation.
Respiratory Equipment:
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Whenever possible, engineering controls such as modification of industrial processes, fume hoods, or
proper ventilation should be used to prevent occupational exposure to air contaminated with harmful
dusts, mists, fumes, gases, vapors, or radioactive or toxic particles.
If engineering controls are infeasible or inadequate, respirators will be required.
If an industrial hygienist has determined that the permissible exposure limit (PEL) is exceeded, or it is
anticipated that the limit will be exceeded, employees must have appropriate personal respiratory
protection.
If personal respiration protection is required, employees must be medically cleared and fit tested.
Approved respiratory equipment shall be worn when the worker is exposed to toxic chemicals or dusts,
spray painting, or other inhalation hazards
Protective Clothing
Protective clothing helps shield people from hazardous chemicals and physical agents and must be worn
when it may help prevent injury. Cryogenic work, welding operations, and hazardous waste handling are
tasks that typically require protective clothing.
Hearing Protection
Exposure to excessive noise in the workplace may cause permanent or temporary hearing loss, tinnitus
(ringing of the ears), impaired verbal communication, fatigue, work errors, and various stress reactions such
as an increase in blood pressure. Noise may also cause annoyance or difficulty in communicating or working
effectively and safely. To avoid the potential harmful effects by using proper Ear Plugs or Ear muffs. But the
suitability shall be depends up on the nature of work.
Jewellery:
The wearing of rings or other jewelry is not recommended on the job, particularly if working around moving
or rotating parts.
Helmets used at site will be colour coded as follows:
Utico FZC Staff – White
Sub-Contractor Staff – White
Workmen – Yellow
Testing Team/ Electrician – RED
Safety Team – Green
- Safety warning signs shall be places to provide adequate warning of hazards. Sign shall be removed or
covered when the hazards no longer exist.
Warning signs shall indicate the cautions to be observed regarding the hazards concerned and the
necessary information and, also, actions employees are required to initiate.
It is recommended that safety signs on the Project conform with the current national colour codes
Signs shall be in English & Local language where located near public highways and facilities.
Signs understood by the majority of the workforce will also be put at conspicuous places.
Sign required to be seen at night should be of fluorescent material.
Exit sign boards will be posted once the building takes shape, to show the routes towards staircases,
ramps, hoists.
The maximum capacities of lifting machines like in hoists will be displayed.
Emergency Numbers will be listed and displayed at conspicuous places.
Safety Posters shall be placed in the work area to create awareness to the workmen.
The purchase and / or equipment Co-coordinator who is purchasing or renting goods, machinery etc. for
the projects shall ensure that sub vendors have implemented a system for ensuring good quality of the
equipment that shall be used in the project worksites to avoid accidents.
In addition to third party certification, effective in-house inspection shall be conducted by the competent
person before the operations organized by the site safety dept. Only the vehicles and operator having the
fitness/competent certificate can proceed the execution on site. Subcontractor shall have the same system
or procedure shall obey.
6.8.2 OBJECTIVES:
To make the person who is ultimately responsible for the work, consider all possible hazards and remove
them or nullify them before allowing work to proceed.
To inform the personnel carrying out the work of particular procedures and precautions they must use in
order to carry out the work safely.
To minimize the risk of unauthorized persons of entry in the restricted areas
6.8.3 APPLICATION:
This procedure shall be used when construction, maintenance or repair work is done on or in the vicinity
where the following procedures or conditions apply:
Excavation of deep trenches where electrical, piping lines etc., may expect to cross.
Entering in a confined space where possibility of less oxygen, and presence of hazards/ explosive
gases in the working places e.g. tanks, manholes, vessels, ducts or trenches etc.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Burning, welding, grinding or other hot work on or near the systems containing any flammable
gases.
Electrical, mechanical or process equipment has to be isolated or locked-out when work is being
done on it or a related item of plant or equipment.
To work in an operation area. (Eg: Oil/Gas Pipe Lines, Live Utilities)
To carry out dangerous operations like Radio grapy works, working in a Holiday and rest days.
Road closing activities. / Removal of Grills from the floor.
Work permit will be issued for excavation, hot work and confined space entry. However the safety Dept and
site project team will confirm the necessity during the review meeting. Whenever any hot work takes place
close to the existing plant, Safety dept will issue a hot work permit after inspecting the respective area for
the required safety measures, fire fighting arrangement, fire watches etc.
No work shall be carried out at operational area without obtaining a permit/approval and the PTW holder
shall be approved by the client/ company as required.
Utico shall identify and obtain all necessary permits, consents and licenses from the Legal authorities, other
statutory authorities with the assistance of the Consultant / Company prior to the execution. We shall
comply with all conditions or restrictions imposed by any such consents.
The client PTW shall be followed as required during eth execution of project. Any work within 30 meters of
Gas or Oil Pipeline requires shall be mandatory follow the Authority (Oil & Gas Companies) permits as
required.
6.9 HOUSEKEEPING
Housekeeping' means an orderly arrangement of operating tools, equipment, storage facilities and supplies
and not just cleanliness. Housekeeping should be planned at the beginning of the job and carefully
supervised until the final hand over. It is a practical method of increasing production, reducing accident and
improving employee morale and public relations. Housekeeping should be the concern of all supervisors
and engineers in their area of work and not left for the cleanup crew. Housekeeping should be a part of
daily routine & clean up a continuous process.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
In all cases where groundwater may be encountered, adequate measures shall be implemented to
remove any water ingress into the excavation. Depending on the nature of the water and the presence
of any contamination, the water may require sedimentation and/ or filtering before disposal.
Safety barriers shall be installed around excavation to prevent entry of unauthorized person. Safety
signpost warning deep excavation shall be placed around excavation where it can be easily seen. Heavy
vehicle shall not pass near edge of excavation as it may cause collapse of edge and vehicle. Employee
shall wear appropriate PPE for working inside excavation.
Safe access to excavation shall be provided for employees prior to commencing any work in the
excavation. Material shall not be stacked on the edge of excavation as it may slide into excavation and
causing damage to material and harm to employee. Material shall be stacked with safe distance from
edge of excavation as engineer recommendation.
All open excavation shall be illuminated well (Eg: warning Lights) during night to prevent fall of persons
into the pits or to avoid similar accidents. Wherever manual removal of earth is involved, soil shall be
removed from the top by maintaining a proper slope equal to the angle of repose of the earth
Abide by Client/ Abu Dhabi Municipality, Excavation/ trench and civil specifications, Provide barricades
around every excavation area; Keep visual warnings (cones, tape, and other items providing no physical
protection1.5 m from the excavation).
overheating is not occurring. Extension cords cannot be used for fixed wiring, and should never
be tacked, stapled, tied, hidden under rugs or draped over pipes or other supports, fastened to
or through woodwork, ceilings or walls. When there is a permanent need of an electrical outlet,
one should be installed.
g. Be sure all electrical equipment is properly grounded. If any evidence is found of frayed,
cracked or damaged wiring or electrical outlets, the equipment affected should be taken out of
service until repairs are made.
Visual Inspection & Testing for all Fire extinguishers is to be held every month.
Because of their hazardous nature, lifting and mechanical handling activities can and do result in serious
harm to personnel, damage to plant, equipment or the environment, and business loss.
Planning
A lift plan is required for every lift. If the lift deviates from the plan, make safe and stop the job.
Hazard identification and risk assessment are an integral part of planning a lift
An assessment of the lift and determination of the lift method, equipment and number of people
required are • critical to planning of the lift.
Control
One person in the lift team shall be designated as the person in charge of the lifting operation
(named as lifting supervisor-Competent person).
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
The Lifting supervisor shall review the lift plan and ensure that the required controls are in place
and the lift is carried out following the plan.
The Lifting supervisor ensures that the lift team has tested and understood visual or radio
communications prior to the lift.
All personnel involved in the lifting operation shall have their individual responsibilities clearly
allocated.
All people shall be kept clear of overhead loads and areas of potential impact.
Manual load handling shall not be used to stop a swinging load and shall only be performed below
shoulder height.
Competence
All persons involved in planning/performing lifting and maintaining lifting equipment shall be
trained and competent for their role.
Refresher training and periodic assessment is necessary to assure competence.
Equipment
Equipment shall be fit for its intended purpose and operating conditions and shall be designed to a
recognized standard.
Equipment shall be fitted with appropriate safety devices.
Any safety devices installed on lifting equipment shall be operational and not over-ridden.
Inspection, maintenance and certification
Equipment integrity shall be maintained, supported by an equipment register.
Lifting devices and equipment shall undergo detailed/thorough examination by a competent person
at least every 12 months, and at least every 6 months for equipment used to lift people.
All lifting devices and equipment shall be visually examined before use.
Load integrity and stability
Load shall not exceed dynamic and/or static capacities of the lifting equipment
The integrity and stability of loads shall be verified before lifting,
Lifting of personnel
Lifting of personnel shall be avoided unless the risk has been demonstrated as being as low as is
reasonably practicable.
Lifting of personnel shall be according to a specific personnel lift plan for that lift.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Lifted personnel shall be properly secured with lanyards unless written procedures and risk
assessment require otherwise. Before starting the lifting operation the following points shall be
considered.
Size up the load; do not attempt to lift a load alone if you have any doubt of your ability to lift it.
Always make sure your footing is secure.
Place feet close to the base of the object to be lifted.
Get a goo es; keep your back straight.
Keep the load close to the body.
object; with a two-person carry, both should carry from the same side, be it right or left.
When putting down a load, take care and reverse the lifting procedures.
Do not attempt to use hand trucks to move objects weighing in excess of 50kgs.
Before moving a load, make sure your intended pathway is clear. Be aware of other potential
problems such as class changes, lunch periods, etc.
When carrying, turn your whole body, including your feet. Never twist shoulders and hips before
moving your feet.
To prevent injury from oversize loads, workers should seek help in the following:
When a load is so bulky that employees cannot properly grasp or lift it,
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Inspection of components of material handling equipment will be carried out as per our checklist &
inspection reports. Method of slinging and calculating load carrying capacity of slings & wire ropes at
various angles will be taken in to consideration before lifting loads. The tools & tackles used for the same
will be checked also day to day basis.
are involved, is to bond the objects together so that one solid stack is made. The following guidelines are
applicable:
Provide a level floor which is capable of sustaining the load of stacked material and the articles in a
single row should be consistently of the same size, shape and weight.
Removing of articles from a stack shall take place only from the topmost row or part of a row.
Under no circumstances may any article be removed from any underlying row without first removing all
items from above it.
Whenever workmen work on stacks they should avoid contact with moving machinery and electrical
conductors.
If a workman wishes to climb onto a stack, he should use a ladder and a competent supervisor should
be present whenever stacks are built or broken down.
Everything in its proper place, neat and orderly. Clear visibility of items for accounting purposes.
Unobstructed access to firefighting equipment and electrical switchboxes.
Materials that are stored on pallets are cross tied and Oil drums choked with drum stoppers (wedges)
parallel to the floor.
Corrosive materials (acid and alkalis) stored in ventilated areas and away from combustibles and acids
and alkalis shall not be stored together.
Oxidizing agents and flammable liquids stored in fire resistance storage areas .Kept cool.
Oxidizing agents stored separately from flammable liquids and organic chemicals.
Compressed gas cylinders stored securely and vertically.
Protected against corrosion
Away from heat sources, stairs and exits
Adequate ventilation present in storage areas
Oxygen kept away from oil.
Small quantities of flammable liquids stored in approved spill-proof containers.
Crates free of protruding nails and splinters. Empty creates removed from storage area
Circular items (drums, wheels, tyres) secured with triangular block of wood. Piled in shape of pyramid.
Cotton waste stored in sealed containers and Rubber stored away from sunlight and artificial lighting.
Bagged material cross tied with mouth of bag towards the inside of the pile. Neat. No overhangs.
Pipe and other round materials piled in layers with strips of wood or iron between layers.
Abrasive wheels handled carefully. Stored vertically in dry area. Hand and portable power tools stored
on wall racks or in bins
Detailed drawings showing the type of protection, supports to be used and other information related to
cable crossing works should be submitted for approval prior to commencement of excavation.
No machine excavation is permitted in the vicinity of cables. Only manual excavation is allowed.
No heavy machinery of equipment is permitted to run over the site of buried cables or cross over during
the process of works.
No machinery will be allowed to cross under any overhead power lines unless a suitable clearance
remains between the highest point on the machine and the lowest sag point of H.T. Overhead lines.
Ducts may be required under new roads, footpaths, parking areas for future use. Split ducts will be
required as protection and maintenance requirement for existing cables.
Adapt this list of reminders to your working environment. Be sure to consider company policies and
local, state and Federal codes before establishing a writing electrical safety program.
Plan every job and think about what could go wrong.
Use the right tools for the job.
Use procedures, drawings and other documents to do the job.
Isolate equipment from energy sources.
Identify the electric shock and arc flash as well as other hazards that may be present.
Test every circuit and every conductor every time before you touch it.
Use personal protective equipment (PPE) as a last line of defense in case something goes wrong.
Be sure you are properly trained and qualified for the job.
Work on electrical equipment and conductors only when de-energized, unless procedures and
safeguards have been established to ensure zero exposure for the worker and other people in the area.
Lockout / tag out and ground (where appropriate) before working on equipment.
Treat de-energized electrical equipment and conductors as energized until lock out / tag out test and
ground procedures (where appropriate) are implemented.
Wear protective clothing and equipment and use insulated tools in areas where there are possible
electrical hazards.
De-energize and visibly guard (where possible) whenever contact with non-insulated overhead power
lines is possible.
Check and double check safety regulations when a ladder or parts of any vehicle or mechanical
equipment structure will be elevated near energized overhead power lines. Call your local electrical
utility for assistance. People standing on the ground may be particularly vulnerable to possible injury.
Hand Tools
Insulated or non-conducting tools should be used when working near energized electrical circuits. Tool
handles shall be tightly fitted. The concerned supervisor/ individual shall be conducted the visual inspection
prior to the usage. The necessary awareness training shall be conducted.
Power Tools
Power tool accidents are caused by improper handling or poor maintenance. The following shall apply to all
types of power tools.
Only authorized personnel shall be permitted to operate or repair power tools. All worn or damaged tools
shall be promptly repaired or replaced. All tools shall be cleaned, tested and inspected regularly. Power
tools shall be used with suitable PPE and by applying sufficient safety measures such as shields, guards etc.
Employees using tools under conditions that expose them to the hazards of flying objects or harmful dusts
shall be provided with the required personal protective equipment.
All electrically powered tools shall be properly grounded. Portable grinders shall be provided with hood
type guards with side enclosures. Bench grinders shall be equipped with deflector shields and side covers
guards. All hand-held power drills, tapes, fastener drivers, horizontal, vertical and angle grinders, disc
sanders, belt sanders, reciprocating saws, saber saws and all other similarly operating powered tools shall
be equipped with a momentary contact on-off control switch/trigger. A competent person shall inspect and
approve the usage of equipment in the project area. The internal inspections can be ensured by fixing the
inspection stickers on tools and equipments on site.
By reduce the risk of electrical shocks while using electrical equipment is to limit the supply voltage to the
lowest needed to get the job done, such as portable tools are readily available which are designed to be run
from a110 volts as applicable to the safe work execution.
Welding
A suitable fire extinguisher shall be available for instant use in locations where welding work is done.
Screens, shields or other safeguards shall be provided for the protection of personnel or materials below or
otherwise exposed to sparks, slag, falling objects or the direct rays of the arc. The welder shall wear
approved eye and head protection. Persons assisting the welder shall wear protective glasses. Electric
welding equipment, including cable, shall meet the requirements of applicable regulations.
Burning or Cutting
When gas cylinders are stored, moved or transported, the valve protection cap shall be in place. When
cylinders are hoisted, they shall be secured and upright in an approved cage or basket. All cylinders shall be
stored, transported, and used in an upright position. If the cylinder is not equipped with a valve wheel, a
key shall be kept on the valve stem while in use. Suitable fire extinguisher shall be readily available in on
site near by the storage area. Appropriate personal protective equipment, such as burning glasses, shields
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
and/or gloves must be used during the work execution. The following points shall be ensured during the
Welding & Cutting activities.
Ensure that fire extinguishers are provided. Gas or electric welding shall be done by qualified
welder under close observation of supervisor.
Ensure that cables and connections are correct, welding machines are properly earthed, working
areas are fully ventilated.
Hoses will not be wrapped around cylinders and regulators will be checked for leaks using soap and
water solutions.
Torches will be cleaned regularly and adequate purging before use.
Ensure adequate ventilation while doing welding & cutting operations and provide suitable sign
boards.
All welders, cutters, helpers and attendants must wear approved goggles or face shields during the
welding operation.
All the first aid cases shall be informed to Safety Officer, Project Manager/Engineer and client/
Consultant (according to severity) shall be immediately informed.
All major injuries shall be taken to the Nearby Hospital and report to the site/project Management/
client without delay.
The content of first aid box shall be followed as per the Local Legislation and client requirements. The
check list also used to ensure the items.
We will utilize our vehicles if the person is able to travel otherwise ambulance facilities of the Police
department will be called in to handle major injury cases.
The emergency contact numbers shall be fixed on key areas of site.
The safety officer will be responsible for registering the occurrence logging the incident in the safety
record log, and take immediate steps to reduce the possibility of a further occurrence of the same
nature.
Utico FZC management is bound to take appropriate disciplinary actions on any Violations of statutory
requirements, rules & regulations, and non-compliance of its HSE policy and procedures. All personal at site
have the rights to point out the violation of rules & Regulations.
In case of precaution against failure of lights, barricades will be equipped with suitable reflecting
material. Barricade will be made to indicate the construction boundary.
Prior to starting the activities on site, necessary safety tool Box Talk or Brief shall be conducted.
Prior to using any machines/equipment at site, ensure that they will be inspected and certified by
qualified person.
Periodic Preventive Maintenance will be made on all equipment and machines.
Operators and drivers are to be equipped with valid driver’s/operator’s license or permit from
concerned government agency. Working in the night time and/or during rain will not be allowed.
Only authorized signalman will be assigned together with the operator or driver.
Personal Protective Equipment (PPE including mask gas filter type) will be issued to all workers such as
safety shoes, hardhat, working gloves, safety goggles (if required)
Regularly check that safe working condition is obtained prior to working.
Construction waste will be disposed of in an appropriate manner. There will be no dumping of garbage,
waste, construction debris, motor oils, etc., on the site or on the adjoining vegetated areas. Ensure that
all damages accompanying transportation of the excavated material will be at Contractor responsibility.
The transportation path from site to the dumping area will always keep clean and free from soil , waste
matter that may falling down during transportation.
Any potentially dusty material being transported from work sites will be securely contained.
Transporting vehicles, etc., will be monitored to prevent overloading and over-filling
Seat Belt:
All employees and sub-contractors must wear seat belts at all times when driving and they must ensure
that all other vehicle occupants are also wearing seat belts prior to vehicle movement. This includes/
applicable for non-Utico Vehicles such as utility vehicles, forklifts, and mobile yard cranes etc working on
our project execution areas. The following points shall be followed.
The use of mobile phone is prohibited during driving with exception of using headset.
Speed limits to be respected by all drivers.
Maximum Cumulative driving hours per day should not exceed 10 hours.
All traffic local regulations to be respected by all drivers.
Max driving speed in working site is 20 Km/h.
The client advises shall be followed on /off road drives
Substance Abuse:
Driving a vehicle while under the influence of alcohol or any drugs or narcotics, is strictly prohibited and
subject to disciplinary action including termination of employment and handover to police.
Unauthorized Passengers:
Unauthorized passengers shall not be carried in Utico vehicles, except in case of emergency or
requisition by local authorities. At no time shall drivers stop for a hitchhiker, unless it is extremely
evident that it is a genuine emergency and should inform the management.
While re-fuelling
Stop the vehicle and apply the hand brake.
Switch off the engine and avoid the usage of mobile phone.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Safety of Passengers
Where a vehicle is only provided with one seat (tractor, dump truck etc.) then only the driver may be
present and seated on the vehicle.
Vehicle seat belts shall be used at all times if they are fitted to the vehicle.
Passengers and insecure goods / materials cannot travel together within the same compartment.
A DCP Fire extinguisher of minimum 2 Kg shall be provided in every passenger vehicle. Fire extinguisher
of higher capacity shall be provided in larger vehicles.
Maintenance
Vehicles must be maintained in an efficient and safe condition.
The driver is responsible for communicating any defect to the mechanic who will then arrange its
repair.
The mechanic establishes a system for periodic maintenance of all vehicles. Where specific standards
require tests / examination / servicing of specialized equipment such as cranes etc, the mechanic shall
be responsible for its control
Drivers are not permitted to do their own maintenance on vehicles.
Each vehicle must be properly registered and display the registration number in the manner as
required. This also includes security pass attached to the windscreen and the logo of the user
organization.
In addition all personnel are to be made aware of the location of their personal life saving equipment and
instruction given as to the correct fitting, operation and use of such equipment.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Particular attention shall be paid to emergencies involving chemicals, fumes, Electric Shock and fire. On all
worksites the Emergency Plan of the client shall be implemented unless specified otherwise.
This Emergency Plan shall form the basis for a training or exercise programme made specific for each
worksite, and the responsibility for the creation, implementation and maintenance of such programme
rests with the Project Manager nominated deputy on the specific worksite.
The Utico FZC shall prepare and implement the detailed emergency response procedure as per the
requirements and condition of site. And he is responsible for implementing the necessary arrangements on
site also. Below mentioned the emergency response flow chart and the site safety officer shall described
the points during the induction as well as the daily tool box talk by foreman/supervisor. The emergency
Preparedness procedures are attached on Appendix. 05
Control exposure through engineering means such as the use of exhaust ventilation etc.
Hazardous materials shall be stored in places that can be locked, to avoid unforeseen contact.
Use of PPE to eliminate the residual personal risks
All hazardous materials purchased for the project shall be supplied with the MSDS (Materials Safety Data
Sheets). All MSDS together with the central register of all hazardous substances on the work site shall be
held available on site by the storekeeper and the register copy will be submitted to the HSE department.
The safety officer assigned for the project shall identify the detailed Hazard register along with its suitable
control measures. The preliminary Hazard/ Substance register format is attached below.
Drinking Water
Utico FZC shall provide thermos for a crew of five peoples and concerned supervisor/Site Engineer shall
provide the facilities for the drinking water on site. A supply of wholesome drinking water shall be provided.
Where possible, it shall be supplied direct from the mains. The stored water shall be protecting from the
possible contamination. It shall be kept it on clean Thermos and clearly mark it as drinking water. Provide
cups or other drinking vessels along with thermos, which can be drunk easily.
Toilet Facilities
A sufficient number of portable toilet facilities (as per ADM code of practice, separate lockable facilities)
shall be provided on site execution area. The facilities are to be cleaned regularly and toilet paper provided
and replaced as necessary.
When employees are subjected to sound levels exceeding those limits, feasible administrative or
engineering controls shall be utilized. If such controls fail to reduce sound levels, PPE shall be provided
and used to reduce sound levels to within the level set out.
Hearing protection shall be made available to all workers if exposed to noise hazard and the work being
performed. Adequate hearing protection shall be provided as pr the industrial standards.
Workmen should wear full body harness safety belt with lanyard for works above 1.8m high.
On horizontal movements the lanyard is to be hooked to a static line.
Workers shall carry the bolts, nuts and tools in a bag / secured method. No loose materials shall be
kept at higher elevation.
The erection area will be cordoned and caution boards shall be displayed to prevent trespassers.
Proper working scaffold / access scaffold will be made with tag wherever required.
Proper lashed ladder or staircase will be made available for an access to reach height.
Employees deployed for height works shall be selected persons who are experienced and screened
by the site management.
Proper access and working platform should be provided to reach the work spot.
No materials shall be dropped from height. They should be lowered by a headline. An employee
should be posted at ground level to clear and caution person from coming under the lowering
material.
For areas where scaffolding has to be prepared for height works, the same has to be inspected. All
findings have to be recorded. ‘Scafftag’ system for recording inspection to all scaffolding shall be
strictly implemented.
No employee shall consume alcohol on or off the premises during working hours, and if found in breach of
this will be subject to disciplinary action.
The use of illegal substances at any time is not permitted and any person contravening this will be subject
to disciplinary action.
Any person found or suspected of being under the influence of alcohol or drugs in the workplace will be
immediately required to vacate the site or premises by the site project management.
Wear adequate shoes with full protection of the heel and toes and slip-resistant soles. Never wear
shoes with worn heels or shoes that are open.
When parking a vehicle into a confined area, always have another adult as a guide
Before beginning the work day, check all lights and tires on the vehicle.
Seatbelts must be worn while operating a district vehicle.
Make sure you know where fire extinguishers are located and are fully charged and operational.
Emergency exits must be kept clear at all times.
Never park or stack anything in front of fire extinguishers, electrical panels, and / or fire doors.
Use a proper height ladder or stool (not a box, desk or chair) to reach high places and avoid, if possible,
carrying material up or down ladders. Put light items on higher shelves.
Never pour flammable liquids down drains or sewers.
Dispose of all flammable waste rags in metal containers with lids and in an approved area.
Change your clothing immediately should they become soaked with any flammable liquid.
Always wear comfortable and adequate clothing on the job. This includes not only well fitting clothing,
but adequate shoes to protect your feet from hazardous materials. Protective gear should be worn at
all times, in all areas, indoor or outdoor in hazardous jobs.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
our work force and staffs on site. The Project/ site Engineer and other staff on site are responsible for the
investigation of HSE accidents in co-operation with the HSE officer and follow up investigations.
Health hazards will be analyzed and include the control measures in risk assessment and which will
emphasis on our daily tool box meetings. HSE performance records shall be readily available and used to
provide feedback/review/discussions at HSE meetings. Disciplinary measures shall be enforced, resulting
from non- conformance with HSE rules and regulations.
Safety awards shall be issued to deserving workers for outstanding and lasting contribution to HSE in the
course for our different projects. Employees can nominate any other employee for an award or recognition
for outstanding achievement or participation in HSE activities. Monitoring includes:
Active monitoring, which includes:
o information in the absence of any incident
o progress against plans
o reviewing the effectiveness of the HSE management system
o proactive safety measures
o job observation
Reactive monitoring, which provides information on incidents, including near miss incidents, and
insights for future prevention.
The below monitoring aspects of the project HSE plan also include in review meetings:
Regularly monitoring progress towards objectives and targets.
Regularly inspecting, according to specific performance criteria, the facilities, plant and equipment
Regularly analyzing discharges, emissions and waste disposal
Systematically observing the work practices and behaviors of workers to assess compliance with
procedures and instructions
Remedial and other improvement action recommendations resulting from performance analysis shall be
reviewed, selected, prioritized and the resources authorized by top management. The HSE Unit head shall
update the HSE plan, prepare revised awareness sessions and training as necessary to deploy the revised
plan effectively.
7.3 REPORTING
A. Objectives
To define the proper reporting procedure of an Accident/ incident regardless of its magnitude and
potential loss by a systematic procedure.
To ensure compliance with Contractor and ADWEA/ FEWA/ UTICO Policy and to comply with local and
federal legislation with regard to reporting of incidents.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
C. Investigation Procedure
The Incident/ Accident/ Near Miss Investigations must be constructive, credible and on time. The
investigator should try to figure out what happened and how to prevent similar situations. The success of
an investigation is often accomplished in the first few moments after the incident. A lot of critical things
happen in quick order. The Supervisor/ witness/ responsible person should work on reducing the extent of
loss on safely and get the investigation started immediately. The following preliminary steps to be followed
as appropriate:
Take control at the scene by directing personnel to act safely and properly
Ensure first aid facility and call for emergency services (if required).
Control potential secondary incidents by taking the proper measures to control the situation and
prevent aftermath mishaps.
Identify sources of evidence at the scene and Preserve evidence from alteration or removal
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Investigate to determine the loss potential and Notify concerned Supervisor(s)/Head(s) of Service and
HSE Unit.
The witnesses' statements to be collected as soon as possible away from the scene of incident.
At the earliest possible moment, photographs shall be taken and accurate notes and sketches of the
salient points made.
D. Objectives of Investigation
The objectives to investigate a workplace accident include:
most importantly, to find out the cause of accidents and to prevent similar accidents in the future
to fulfill any legal requirements
to determine the cost of an accident
to determine the level compliance with applicable safety regulations
to process workers' compensation claims
The goal of accident/incident investigations can be summarized in one word prevention. The effective steps
for accident investigation can be summarized below.
Describe what happened: Through investigation, the Investigator can arrive at site and he can
collect an accurate statement of what really happened.
Determine the underlying HSE deficiencies and other factors that might be causing or contributing
to the occurrence of incident: Reviewing the immediate cause(s) will eventually lead to the basic
cause(s) of the incident.
Decide the risks: The investigation can evaluate the loss potential of an incident. i.e. loss severity
potential and probable recurrence rate.
Develop Controls (corrective actions): Adequate controls (corrective actions) will minimize or
eliminate the problems.
Identify opportunities for preventive action: adequate investigation will give a chance to identify the
cause and adopt preventive actions for non-occurrence.
Identify opportunities for continual improvement.
Demonstrate Management Concern: Prompt and objective investigations along with action to
reduce or eliminate the possibility of recurrence would help to encourage and aid employee
relations.
Proper training and a clear understanding of roles and responsibilities is essential to the investigation
process. All employees and people that will be involved in an incident investigation should be aware of
what their role is in the process and how to perform their assigned responsibilities during an investigation
process.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
E. Gathering Information
The investigator shall always look over the scene of the incident and surrounding environment in order to
get a clear picture that will allow him to determine what elements are involved: i.e. people, equipment,
materials and environment.
Statement of facts from witnesses and observation reports shall be collected as soon as possible after
the incident/ accident
Conduct the investigation requires a look at the tools, equipment and materials that people were using
on the accident/ Incident area
In order to determine the basic causes of incidents, the investigator should check procedures, sketches,
maps, photos, maintenance records, etc.
Photos of the incident scenes shall be taken for further references. They can reveal much about the
incident and save hours of note-taking and drawing
The Records related to pre-accident conditions, accident sequence and post-accident conditions shall
be collected accordingly. In addition, document the location of victims, witnesses, machinery, energy
sources, and hazardous materials shall also collected. According to the information received during the
investigation stage shall be analyzed and prepare the incident/ accident report on client format. the
necessary corrective and preventive action shall be identified and the related risk assessments shall be
reviewed.
We shall:
Dust control: -
Excavation works to be managed to control the dust. Wet the earth by water spray and limiting the
height of the material dumping.
All vehicles engaged at site shall follow the speed limit 20 KPH.
Water spray on the roads shall be done to control the dust.
Materials which shall fly due to wind shall be properly covered.
Accumulation of flying materials shall be avoided.
Spill Control:-
Fuel, oil storage shall be done to prevent leak of oil, penetration to ground.
Maintenance of vehicle shall be done in the designated area.
Oil, waste etc, shall be disposed as per the environmental norms.
Sewage shall be browsed as per the Dubai Municipality regulations.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
Noise:-
Utico FZC shall determine noise levels on all work sites which are under its control. Where noise levels
exceed 85db (A) in such areas, Taisei shall place Ear Protection Signs in the applicable areas.
All personnel, working within zones identified as above, shall be required to wear hearing protection.
The use of hearing protection shall be monitored. Where Utico FZC brings plant or machinery onto
Client / Consultant premises they shall ensure that the noise levels produced are as low as reasonably
practicable so that all reasonable precautions can be taken to protect personnel.
Utico FZC shall advise Client / Consultant if any excessive noise levels are anticipated from their
operations.
All the storage of chemicals and diesel / oil, paint, etc will be done in such a way to avoid any direct spillage
to the ground. Drip trays or any form of protection bunds will be provided as per client requirements. All
contamination remediation will be undertaken in accordance with local regulatory guidelines as outlined in
Environmental Management Regulation.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
8.2 AUDITING:
To establish procedures for planning and documenting the Internal Quality, Health, Safety and
Environmental (HSE) systems audits conducted to verify the implementation, maintenance and
effectiveness of the HSE systems. The ultimate goal of the audits is to attain effective discharge of
responsibilities and to promote effective management and control at reasonable cost through the provision
of information with analysis, appraisals, recommendations and pertinent comments concerning the
activities reviewed. The reviews also help to ensure that contractor resources are used efficiently and
effectively while working towards helping the company achieve its mission, as directed by the
management. It is the intention of the Internal Audit to perform this service with professional care and with
minimal disruption to contactor operations. Internal auditing shall be done by the HSE unit as per the
schedule on quarterly basis to the work site and report shall be forward to the project manager for his
compliance. The following points will emphasis on the time of audits.
HSE systems and procedures are communicated and understood by the Project Manager, senior level
management at site.
HSE Plan implementation follow ups
Contractual HSE specifications.
HSE document, Method Statements, Safety systems and implementation.
HSE inspections and reviews.
Training, Safety statistics etc.
Scope of the procedure is the planning, management, conduct and documenting of internal audits against
the standards in order to verify that they are effectively implemented and maintained and to identify areas
for improvement. The audit shall cover all the activities pertaining to the HSE System of the Contract.
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
The Non-conformance is not of the severity indicated by the definition of Major Non-conformance.
Auditor(s) shall write down their findings in a clear, concise, and brief summary of facts. It is important to
document both the good and bad observations. Documenting positive findings can be an effective tool in
reinforcing good performance. These documented facts must be truthful, objective, apply to the scope of
the audit, and must be written in a way that all parties involved can understand them. The findings must
simply show that they comply with the requirements of the standards or they do not.
UNPLANNED AUDIT
Utico FZC Management representative shall authorize unplanned audits in the following cases:
Where a complaint or appeal requires an audit to be performed
Where a trend in non-conformances has been identified that warrants an audit across the organization
with respect to a specific procedure or process
Where the Audit Team requires an investigation into a failure or specific event. (This may be based on a
suggestion from the Project management / General Manager / Specific Authorities).
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
SECTION 9. APPENDIX – 1
ISO CERTIFICATES
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
APPENDIX – 2
TRAINING MATRIX
Design, Construction, supply, Installation, Testing ,
Commissioning & Maintenance of Three Units of
Reverse Osmosis Plant with 100,000 IGPD Capacities Per
Unit And Associated Works at Al Yassat Island
APPENDIX – 3
COLOUR CODING SYSTEM FOR LOOSE LIFTING TACKLE/GEAR
APPENDIX – 4
RISK ASSESSMENT
Utico
Project No: 2131200027 Prepared by: HSE Officer Doc No: U T /HSE/RA/001
Project Name : Al Yassat Island - DEWA Reviewed by: HSE E Rev: 00
Approved BY: PM Rev. Date: 27.05.2012
Risk Evaluation Risk Evaluation
Condition that develop Risk Level Risk Level
S.No Hazard / Aspect Consequences / Impact (BEFORE) Recommended Control Measures (AFTER)
Hazard
P S E/H/M/L P S E/H/M/L
Activity: Excavation
Sides of excavation, deeper than 2m to be stepped 1m
Weather change, Heavy Suffocation H 3 5 E H 1 2 L
increments with 45 degree slope or suitably shored. Support
vehicles movement, no slope, sides in suitable way. Heavy vehicle will be diverted from near
1 Collapse of trench sides
Soil structure, Shoring etc.
Collapse of trench,
S 2 5 H S 1 2 L
engulfment excavation, every day inspection of the excavation.
- E - - - E - - -
Provide guard rails, Do not keep any material close to
H 2 5 H H 1 3 L
Suffocation, Fatality, Major or excavation, W arning tape to be placed around all excavations
Materials falling onto people Spoil / material
2 Minor Injury, Trapping, material less than 1.2 meters deep, Metal or wooden barriers to be
working in the excavation accumulation near S 2 4 H S 1 3 L
damage placed around all excavations deeper than
trench edge.
E - - - 1.2 meters E - - -
fatality, Bone fracture, major or H 2 4 H stop blocks to prevent vehicles over-running, Keep vehicles H 1 2 L
NO edge protection,
minor injuries away from excavations , prevent vehicles over- running, stop
People & vehicles falling into signages, flush light etc. S 2 4 H S 1 2 L
3 signs, Metal or wooden barriers to be placed around all
excavation vision condition, work at night, land contamination due to excavations deeper than 2 meters, flush light will be provided.
fog spillage of diesel or engine E 2 3 M E 1 2 L
oil.
H 2 4 H High visibility PPE, Keep workers separate from moving plant, H 1 2 L
People being struck by plant vision condition, work at night, fatality, Major or minor injury Make proper awareness. Ensure the reverse alarm, revolving
4 fog, unsafe act S 2 4 H lights for machineries, constant supervision, competent plant S 1 2 L
- E - - - operator E - - -
fatality due to electric shock, Use cable locators, trial pit to trace any services, Existing
old inundated drawings, no H 2 5 H services to be located and clearly marked before beginning H 1 3 L
Contact with underground submerged, fire etc.
checking of existing cable excavations, Approved existing services layout drawing to be
6 services (Existed pipelines,
through detector, trial pit and Utility damage etc. S 2 5 H distributed to all concerned parties through controlled S 1 3 L
existed live cables)
marker post. document distribution. Do manual excavation very near to live
- E - - - utilities. E - - -
H 2 5 H H 1 3 L
Accidental interaction with
9 Animal bite those animals(Animals like fatality, rash, minor injures etc S Provide proper PPE. Will obey local law in this respect. S
snake, lizard, rat etc)
E E
Asphyxiation H 2 4 H H 1 3 L
10 Fumes from vehicles/plant Avoid petrol or diesel engine near the trench or use any
(C02) vehicle location S _ _ _ other suitable methods. vehicles' check/ Regular Inspection. S _ _ _
CO2 emission E 2 3 M E 2 2 M
Asthma developing, Breathing H 2 3 M use masks, safety glasses, Pro active Medical checku ps, H 1 1 L
weather condition, wind, difficulty awareness.
13 Excavating using excavator S 2 3 M S 1 1 L
Loose sand
Air pollution E 2 2 M Use water to prevent blowing sand by air E 1 2 L
H 2 2 M H 1 2 L
NIHL, Temporary threshold
Increase distance and reduce exposure to noise, implement
working near excavator and Noise Hazards, Age, distance shifting
14 S 2 3 M shift duty, use ear muffs, use less noisy excavators, do the S 1 2 L
other heavy vehicles or tools from machine
regular inspection and Maintenance.
noise pollution E 2 3 M E 1 2 L
Project No: 2131200027 Doc No: U T /HSE/RA/003
Utico
Prepared by: HSE Officer
- E - - - - E - - -
NIHL H 3 2 M H 1 2 L
More Exposure time, noisy Increase distance and reduce exposure to noise, use ear
machine, malfunctioning of temporary threshold shifting S 3 2 M muffs, awareness, PPE, Use less noisy excavator and do S 1 2 L
Working near excavator
machine, no safe distance regular inspection and maintenance. Work area will be
machine working
from machine, congested barricaded, signal man will be provided along with constant
place supervision. E 1 2 L
Noisy Environment E 2 2 M
clear the loading area, Barricaded well and ensure the Sign
fatality or Major Injury H 4 4 E Boards. And ensure the PPE also. Cranes to be inspected H 1 2 L
failure of lifting gear, Using & tested by approved third party.
Unsafe Rigging and lifting
2 unrated or uncertified All lifting gear and operator to be certified by 3rd party Safe
operations. property damage S 3 4 H S 1 2 L
equipment, unsecured hooks working load (SWL) should be clearly marked on crane and
lifting gear.
E _ _ _ E _ _ _
E _ _ _ E _ _ _
E _ _ _ E _ _ _
Electrocution , Fatality, Burn H 3 4 H Rigging and rigging plans checked by competent person prior H 2 1 L
to use and ensure the Lifting area is free from those hazards.
Sling or Boom may Hit on Unsafe crane operation near
8 Fire, Property damage S 4 3 H Use standard crane hand signals for safe lifting. Banks men S 1 2 L
Electrical lines/ Other utilities live cable
and crane operator to be fully familiar with crane hand
Smoke E 4 2 H signals E 2 1 L
Project No: 2131200027
Utico
Prepared by: HSE Officer Doc No: U T QHSE/RA/005
Project Name : Al Yassat Island - DEWA Reviewed by: HSE E Rev: 00
Approved BY: PM Rev. Date: 27.05.2012
Risk Evaluation Risk Evaluation
Condition that develop Risk Level Risk Level
S.No Hazard / Aspect Consequences / Impact (BEFORE) Recommended Control Measures (AFTER)
Hazard
P S E/H/M/L P S E/H/M/L
Activity: M a nua l Handling.
Back strain and slipped The manual handling of all loads must be avoided or minimized
H 3 4 H H 1 2 L
discs whenever possible wherever possible. Mechanical aids should
Nature of load, Un known be used when available for transporting loads. The selection of
Attempt for lifting
weight of the material to be S 3 4 H persons to carry out manual handling tasks must be made on S 1 3 L
1 excessive weight
lifted the basis of physical capabilities and the level of training
received by that person.
E _ _ _ E 1 2 L
Major/ Minor Injuries H 4 4 E Ensure the relevant PPE's. Inform/ make proper awareness H 1 3 L
regarding the load which wants to shift. All employees should
Lifting of loads with sharp or personal injury, Nature &
3 be trained in Safer Manual Handling Techniques if deemed
awkward edges Shape of Load property damage S 3 4 H S 1 2 L
necessary by their assigned duties.
E _ _ _ E _ _ _
Major/ Minor Injuries H 3 4 H Ensure the relevant PPEs in order to avoid any injuries.(Eg : H 1 2 L
Trapping hand, Directing Hand Gloves), assign more manpower for the operation.
4 unbalanced/ heavy load property damage S 4 3 H S 1 3 L
load by hands Consider the personal factors while assigning the task.
E _ _ _ E _ _ _
Major/ minor Injury H 4 3 H Use proper PPE's. Ensure Proper Material stacking, implement H 2 1 L
proper housekeeping. Ensure the route before doing the
Poor House Keeping and property damage S 3 4 H manual handling. The carrying of loads up or down stairs by S 1 3 L
Slip, Trip, Fall Hazards
Material stacking individuals is to be avoided unless the load is very small or
5 (Obstacles on route)
management light. Lifts should be used for transporting large or awkward
loads. Ensure proper lighting while doing the manual handling.
E _ _ _ E _ _ _
Major/ Minor Injuries H 4 3 H Adequate space must be maintained in areas where lifting H 1 2 L
Hitting/ striking by objects, occurs to ensure sufficient room for safe manual handling.
un planned manual Lifting
6 load may hit employees or This should be borne in mind when selecting areas for the
operations. property damage S 3 4 H S 1 3 L
materials storage of materials, especially those materials of a relatively
heavy weight.
E _ _ _ E _ _ _
Project No: 2131200027 Prepared by: HSE Officer Doc No: U T /HSE/RA/006
High dosage may cause for Maintain safe Distance, check device regularly, take all the
H 2 4 H H 1 1 L
cancer precautions according to the equipment safety
using X-Ray in testing
4 leakage, radiation - S - - - requirements, Awareness training, Ensure PPE S - - -
equipments
requirements, Sign Boards, no entry or entry restricted only
- E - - - for authorized persons E - - -
- H - - - H - - -
Check current leakage and ensure Proper earthling, ensure proper
PPE's, implement permit to work system, assign the competent
3 Disconnecting the earthling Humidity, electricity leak electrical shock S 2 5 H S 1 1 L
person to do such works, use good and appropriate tools or
equipments. The necessary calibration shall be ensured as required.
- E - - - E - - -
back injury,backpain H 2 3 M The manual handling of all loads must be avoided or minimized H 1 2 L
whenever possible wherever possible. Mechanical aids should be
Hazards related to
age, lifting or moving used when available for transporting loads. The selection of persons
5 manual handling. (Heavy
heavy objects, Property Damage S to carry out manual handling tasks must be made on the basis of S
testing Equipments)
switch physical capabilities and the level of training received by that person.
training for manual handling, peer group help, Necessary PPE.
E E
P S E/H/M/L P S E/H/M/L
E E
E E
E E
Major injuries,Fatality H 3 5 E H 1 3 L
Crane must be on level and plane ground
Improper lifting Lack of
Over turning, Over loading and Ground/ Soil Conditions
knowledge Ignorance Property Damage S 2 5 H S 1 2 L
4 uneven Surface out-rigger must be checked, check the capacity use
proper ways of lifting, Spill kits
Oil and fuel spills/ land
E 2 1 L E 1 1 L
contamination
Project No: 2131200027
Utico
Prepared by: HSE Officer Doc No: U T /HSE/RA/010
P S E/H/M/L P S E/H/M/L
Activity: Grinding
E E
E E
cuts, punctures H 3 4 H H 1 1 L
poor maintenance, ejected pieces Periodical maintenance, guarded equipment, instructions,
Cutting, stabbing and puncturing of material, sharp flying objects safe work practice, Awareness and training programs,
3 S PPE S
E E
E E
E E
Injuries, Burns H 2 3 M H 1 3 L
guarded equipment, work shifts, Training, Supervision,
work pressure, no rest and PPE, Job Rotation, suitable working
Fatigue, Job Ergonomics,
continuous work, ergonomic platform or place.
contact with the moving parts Property damage S 2 3 M S 1 1 L
6 factors
E E
H H
Adequate lighting, first aid facilities, awareness training,
Striking to the moving objects, inadequate Lighting and unsafe act,
closed supervision, PPE
unexpected movement of on object, lack of tools safely guard etc.
Major/ Minor Injuries S 2 3 M S 1 2 L
7 with out guard
E E
H maintain good housek eeping and cable management, dry H
poor house keeping, material
surfaces, clean work area, supervision, PPE
Slips, trips, falls Hazards stacking, cable management,
injuries, sprains or fractures S 2 3 M S 1 1 L
8 slippery surface
E E
E E
E E
Utico
Project No: 2131200027 Prepared by: HSE Officer Doc No: U T /HSE/RA/011
Project Name : Al Yassat Island - DEWA Reviewed by: HSE E Rev: 00
Approved BY: PM Rev. Date: 27.05.2012
Risk Evaluation Risk Evaluation
Condition that develop hazard/ Risk Level Risk Level
S.No Hazard / Aspect Consequences (BEFORE) Recommended Control Measures (AFTER)
Aspect
P S E/H/M/L P S E/H/M/L
Activity: Environmental Aspects/Impacts
H _ _ _ H _ _ _
Storage and transfer operations are carried out with more attention. Provide the
Spillage during storage and
1 Storage of chemicals & oils drip tray. Make sure the availability of Spill Kit, Availability of MSDS and its
Transportation Fire Hazard S 2 4 H S 1 2 L
awareness, closed supervision and proper work plan, No idling vehicles on site.
Soil Contamination E 2 4 H E 1 3 L
H _ _ _ H _ _ _
fuel filling operations are carried out with more attention. Ensure the availability of
2 Vehicle refueling Spillage during filling fuels Suitable fire extinguishers, safety sign boards. Make sure the availability of Spill Kit,
Fire Hazard S 2 4 H S 1 3 L
Availability of MSDS, first aid measures and awareness.
Soil Contamination E 2 5 H E 1 3 L
Hearing impairment H 2 4 H H 1 2 L
Statutory Can be use Enclosures, silencers, Proper maintenance schedule must be
3 nuisance, Noise S _ _ _ followed, required PPE,s, regular noise monitoring, awareness programs, job S _ _ _
Nuisance can prejudice health
pollution rotation etc.
E _ _ _ E _ _ _
dust, Carbon air emissions Asthma, Lung Cancer, H 2 4 H Dust can be suppressed by water spraying, Proper maintence of vehicles, Use an H 1 2 L
causing ozone developing Breathing difficulty energy-conserving (EC) grade motor oil, Store solvents in air-tight containers. Drive
4 Air Pollution S 2 4 H slowly on unpaved roads, All vehicles to switch off engines while they are not working S 1 2 L
depletion. Nuisance can prejudice
health Toxic Gases E _ _ _ E - - -
H _ _ _ Prevent the discharge of oils, chemical, biological, radioactive to Ground. Store all H _ _ _
Land effected by contamination liquid chemicals and waste in spill-proof containers, Use a drip tray to collect
5 Contamination of Land (oils, chemical, biological, S _ _ _ engine oil, avoid the contact of Human Body and use proper PPE's. S _ _ _
radioactive)
Soil contamination E 1 4 M E 1 3 L
Limit the Hazardous waste generation, storage, transportation, treatment and
Major/ Minor Health Hazards H 2 5 H disposal by replacing or implementing the safe alternate methods; For disposal H 1 3 L
Usage or storing Hazardous Waste emissions to air and possible assign approved agencies. X-ray operations, asbestos materials must be handled
6 / Materials releases to land. S _ _ _ and disposed by experienced and peoples or firms. use proper PPE's, awareness S _ _ _
programs.
- E _ _ _ E - - -
H 2 3 M Minimize the use of fertilizers, pesticides, and herbicides etc. Properly store and H 1 2 L
chemicals/substances are prejudicing health,
dispose of chemicals and other Hazardous materials. The disposal of sewage on
7 Water Pollution causative of biological damage; inflammation, fatality, Property S _ _ _ S _ _ _
proper way and by an approved firm. Toxic products like paints, automobile oil,
local water quality may impacted Damage
polishes, and cleaning products should be stored and disposed off properly
E 2 4 H E 1 2 L
H 2 5 H H 1 3 L
Accidental interaction with those
Provide proper PPE. Awareness Programs, Availability of suitable first Aid
9 Insect/ Animal bite animals while working on remote fatality, rash, minor injuries etc S _ _ _ S _ _ _
Facilities, Avoid Lonely Working, arrangements for Suitable Medical assistance.
areas
E _ _ _ E _ _ _
H _ _ _ H _ _ _
Print and photocopy on both sides of the paper. Use e-mail whenever you can and
10 Waste paper management only print out if absolutely necessary. Review drafts and include comments on screen,
Resource Depletion S _ _ _ S _ _ _
and return them electronically. Use internet publishing and electronic forms to reduce
paper copies. Order paper supplies in bulk to minimize packaging waste.
Utico
Project No: 2131200027 Prepared by: HSE Officer Doc No: U T /HSE/RA/012
Practice good personal hygiene, prevent contact, Make awareness, Clean and
H 2 3 M H 1 2 L
parasitic worms that enter the disinfect work surfaces often. Clean up spills immediately, Handle and dispose of all
Biological hazards: Rubbish and body when their eggs are bio-hazardous waste materials safely, In the event of an injury or bleeding, every
bacterial/ Fungal/ Viral diseases
12 waste Drains/sewers Leptospirosis ingested and there by infection S - - - individual should be handled in a way that minimizes exposure to blood and body S - - -
may happen fluids. Wear personal protective equipment (e.g. gloves, masks), where appropriate
E - - - E - - -
H 2 3 M H 1 1 L
irritation if inhaled, aggravation all photocopier/printer toner is disposed by resealing containers with screw-top lids or
Pollution if not disposed of
Photocopier toner disposal of asthma and other sensitive placing the toner in robust plastic bags which are securely sealed and handed over
13 correctly
respiratory symptoms
S
to the proper disposing agency.
S
E 2 3 M E 1 2 L
H _ _ _ H _ _ _
Management of potential Land Pollution; if not Implementation of Waste segregation, Waste recycling process, re use the possible
wood, metals, plastic bottles, disposed of according to S _ _ _ items, waste handed over to the certified or approved agency. Awareness regarding S _ _ _
14 cardboard wastes regulations. the proper waste segregation and disposal. Regular waste removal etc.
Land Contamination E 2 3 M E 1 2 L
H _ _ _ H 1 _ _
Cause for ozone depleting Routine site maintenance controls, frequency of planned maintenance, Awareness
Usage of Air Conditioning Producing Heat S 2 3 M S 1 2 L
15 substances programs, Use good Quality of Equipments, Use Eco Friendly equipments etc.
APPENDIX – 5
PROJECT HSE FORMATS
HSE RISKS AND IMPACTS ASSESSMENT FORM
Facility/ Location: Department: Process:
Assessment team: Date Conducted:
Notes: Review the Risk and Impact Assessment continuously at periodic interval
Note: Multiple hazards/ aspects for a step rquire separate row for each hazard/ Aspect. Scores of 5 for Consequence and Frequency indicate the greatest severity and likelyhood,
while scores of 1 indicates the least
Prepared by : MX Simon Safety officer Form: HSE- 31 - 02 - 1 Rev A
ACCIDENT / INCIDENT INVESTIGATION FORM
Location:
Report No:
Section 1 – Incident Details
Classification of Incident (Check in relevant box)
FAC MTI LTI F
Date & Time
T of incident T T T
Incident location
y (Actual place on they site/ installation): y y
Date & Time
p reported to Supervisor:p p p
Reported eby: e e e
Description of Incident:
a a a a
q q q q
u u u u
o o o o
t t t t
e e e e
f f f f
r r r r (Continue in section 5 if required)
o o o o
Section 2m
– Injured Person’s Details
m(if applicable) m m
t t t t
h h h h
e e e e
Reported to first aider (Y/N): Date: Time: First aiders Name:
Basic details of Injury:
Medics Signature:
Disposition of Injured Person:
Return to work Rest & Return to work Medically Incapacitated
(Click appropriate box)
Legend : (i) NM – Near Miss, (ii) FAC – First Aid Case, (iii) MTI – Medical Treatment Injury, (iv) LTI – Lost Time Injury, (v) F – Fatality.
Name of Injured Person & Occupation:
Name of Employer (UTICO FZE or Client/Customer):
Date of Birth: Age: Sex: Nationality:
Section 5
Site Manager/Engineer:
Signature:
Date:
Page____ of _____
Training Requirements: All assigned employees are required to familiarize themselves with the contents of this AHA before starting a work activity and
review it with their Supervisor during their Daily Safety Huddle.
Competent Person Acknowledgement Form
Definition
A competent person is a person who has the ability to recognize existing and predictable hazards and has the
authority to correct them.
Responsibility
The designated competent person is responsible for recognizing and correcting safety risks/hazards. This person
has the authority to stop work in the event of any potential safety concern on the job site. This representative is
considered the contact person for the Project Manager/Superintendent on this Project.
This form must be completed by the supervisor/foreman of contractor’s designated competent person(s). Where a
subcontractor is responsible for multiple crafts, it may be necessary to maintain additional designated competent
persons and forms. This form should be completed and submitted to the Project Manager/Superintendent prior to
beginning this work and updated any time there is a change in the designated representative(s).
Acknowledgment
I, _____________________________________representing, __________________________________ Contractor
Supervisor/Foreman Name of Employer
assigned _______________________________to be the competent person in the areas indicated and I
Name of Competent Person acknowledges that this individual has been thoroughly trained and is experienced in
hazard recognition and has the authority to stop work and correct hazards in the event of a potential hazardous or
imminent danger situation.
__________________________________ _____________________
Supervisor/ Foreman (Signature) Date
I, ____________________________ acknowledge that I have been thoroughly trained and have the experience to
Competent Person (Signature) perform the duties as the ________________________________ competent
person in the areas marked below and
Name of Employer
Any items that have been found deficient must be corrected before work or use.
This checklist includes, but is not limited to, the following:
Description Yes No
Safe Access and Workspace
Are safe access and adequate space for movement available for:
Emergencies
Work area
Walkways and passageways
Are ladders, stairways, and elevators properly located and functioning?
Is protection provided for floor and roof openings?
Is overhead protection provided for all areas of exposure?
Is lighting adequate?
Planning Work for Safety
Are employees provided with all required protective equipment?
Have other contractors and trades been coordinated with to prevent congestion and avoid
hazards?
Is all temporary flooring, safety nets, and scaffolding provided where required?
Utilities and Services Identification
High-voltage lines
Have all been identified by signs?
Have high-voltage lines been moved or de-energized, or barriers erected to prevent
employee contact?
Sanitary Facilities
Drinking water
Are toilet facilities adequate?
Work Procedures – Materials Handling
Is material handling space adequate?
Is material handling equipment adequate and proper?
Is material handling equipment in good condition?
Other (e.g., tunnels, excavations, shafts)
Comments:
Employee Acknowledgment Form
Name of Employee:
Subject:
Project:
_______________________________________________________________________________________________
Date of hire/assignment:
I, , hereby certify that I have received training as described above in the following areas:
The potential occupational hazards in general in the work area and associated with my job assignment.
General safety requirements indicate the safe work conditions, safe work practices and personal protective
equipment equired for my work.
The hazards of any chemicals to which I may be exposed and my right to information contained on material safety
data sheets for those chemicals, and how to understand this information.
My right to ask questions, or provide any information to the employer on safety either directly or anonymously
without any fear of reprisal.
Disciplinary procedures the employer will use to enforce compliance with general safety requirements.
I understand this training and agree to comply with general safety requirements for my work area.
Facility/Project: Date:
Contractor Name:
Location:
Attention:
on (date) ____________________,reported by .
Personal Protective
Confined Space Entry Lockout/Tagout Hot Work Equipment
Environmental/Hazardous
Assembly locations Fall Protection Scaffolding Material Storage
Other:
Under conditions of this enforcement procedure check all items that apply. Notices of Noncompliance with H & S
Regulations can result in termination of the contract.
1. You are being notified of this violation and should take corrective action to prevent a reoccurrence.
The corrective action shall be documented and submitted to the Project Manager or representative
immediately.
2. You must submit a plan for compliance to the Project Supt. within one day of receipt of this letter. The
compliance plan must include the means or methods of compliance and the date that the requirements
for compliance will be completed. Failure to comply will result in disciplinary action against your
Company.
3. You are required to review the stated procedures with the Project Supt. Work may not commence on
the site until the corrective action is complete and the procedure is fully understood by your workers.
4. You are required to review the stated procedures with the Project Manager or representative. Work
may not commence on the site until the review is complete and you must confirm formally the
disciplinary action to be taken against the supervisor and employees.
5. All work on the site will stop until the Project Manager/ representative reviews all the facts and
determines if the contract between the parties will be terminated.
Sincerely,
___________________________
Project Superintendent
__________________________________
Construction Company
cc: Project Manager
Project Manager
Program Safety Manager
NOTICE OF HEALTH AND SAFETY VIOLATIONS
1. Instructions are written in Red in this template. Please delete upon writing Notice of Violation
2. Safety Violations listed can be edited electronically as needed.
3. OSHA Standard need not be quoted, just referenced.
This letter officially notifies you that the following Safety Violations were noted during our job site inspection.
Awareness of Warning
Alarms Fall Protection Scaffolding
Violation Descriptions:
1. Violation
2. Violation
Please respond in writing within ____days after the receipt of this Notice as to the disposition of
these violations and the corrective actions implemented to ensure that a safe workplace is
maintained at all times.
OSHA First Aid List
1904.7 (b)(5)(ii) What is “first aid”?
For the purposes of Part 1904, “first aid” includes the following:
A Using a nonprescription medication at nonprescription strength (for medications available in both prescription
and nonprescription form, a recommendation by a physician or other licensed health care professional to use a
nonprescription medication at prescription strength is considered medical treatment for recordkeeping
purposes)
B Administering tetanus immunizations (other immunizations, such as hepatitis B or rabies vaccine, are
considered medical treatment)
C Cleaning, flushing, or soaking wounds on the surface of the skin
D Using wound coverings such as bandages, Band-Aids™, or gauze pads; or using butterfly bandages or Steri-
Strips™ (other wound-closing devices such as sutures or staples are considered medical treatment)
E Using hot or cold therapy
F Using any non-rigid means of support, such as elastic bandages, wraps, or back belts (devices with rigid stays
or other systems designed to immobilize parts of the body are considered medical treatment for recordkeeping
purposes)
G Using temporary immobilization devices while transporting an accident victim (e.g., splints, slings, neck
collars, back boards)
H Drilling a finger- or toenail to relieve pressure, or draining fluid from a blister
I Using eye patches
J Removing foreign bodies from the eye using only irrigation or a cotton swab
K Removing splinters or foreign material from areas other than the eye by irrigation, tweezers, cotton swabs, or
other simple means
L Using finger guards
M Using massage (physical therapy or chiropractic treatment are considered medical treatment)
N Drinking fluids to relieve heat stress
This is a complete list of all treatments considered first aid for Part 1904 purposes.
Preconstruction Safety Meeting
Date: Project/Location:
Subcontractor Project
Representative: Manager:
Phone: Phone:
Subcontractor Safety
Safety Rep: Manager:
Phone: Phone:
The following items were identified and reviewed with the subcontractor.
Environmental Hazards
Other
Additional Notes/Comments:
Pre-Mobilization Safety Meeting
The following project site safety, health and security requirements, procedures, and hazards have been identified and
reviewed with the above contractors.
Electrical Excavations/Trenching
. .
Other Attendees:
Name Title Company
Name Title Company
Identified Risks/Exposures/Hazards:
Control Measures:
Subcontractors Mobilizing/Demobilizing:
Audit/Inspections Scheduled:
Planned Orientation/Training :
Recommendations/Comments/Concerns:
Note: This information should be incorporated into the Safety Meeting Minutes.
Safety Meeting Agenda/Minutes
Agenda:
Review of minutes of last safety meeting: Approved? Yes No
Corrections:
Unfinished business from last meeting:
Any hazards or safety concerns reported during this time period? Status of any corrective action reports?
Any accident investigations conducted since the last meeting? Describe identification of the cause and corrective
action(s)?
Is your accident and illness prevention program working? Yes No
If no, describe any recommendations to improve it.
Is your safety awareness program working? Yes No
If no, describe any recommendations to improve it
What other safety-related topics were covered in this meeting?
Health and safety concerns for the next period?
Subcontractor Name:_________________________
Please answer the following questions.
1. ___ Yes ___ No Do you have a written safety program? If yes, provide a copy of the table of contents and a copy
of your firm’s policy statement.
2. ___ Yes ___ No Do your safety procedures comply with government agency requirements? If yes, provide name
of agency/agencies.
3. ___ Yes ___ No Do you require and use site-specific safety plans?
4. ___ Yes ___ No Does your worker’s compensation carrier provide site audits on a regular basis?
5. ___ Yes ___ No Does your company have a written drug/substance abuse policy?
6. ___ Yes ___ No Do you have an orientation program for new hires?
7. ___ Yes ___ No If you have an orientation program for new hires, does it include subcontractors?
9. ___ Yes ___ No Do you hold site safety meetings for field supervisors?
How often? Weekly ___ Biweekly ___ Monthly ___ Daily
10. ___ Yes ___ No Do you hold craft toolbox safety meetings?
How often? Weekly ___ Biweekly ___ Monthly ___ Daily
11. ___ Yes ___ No Have you been inspected by OSHA or received any OSHA citations in the past 3 years? If yes,
provide an attachment describing the outcome of the inspection along with copies of citations
received. Provide a description of the actions taken to abate the citations as an attachment to this
application. Respond to any open citations shown on the OSHA website (www.osha.gov).
12. Identify below by name, phone number, and title the person in your firm directly responsible for the firm’s Safety
Program management and attach a copy of his or her resume to this application.
13. How do you conduct project safety inspections, and how often are they performed?
14. Describe your firm’s program to motivate, encourage, and monitor safe work performance.
_________________________________________________________________________________________________
__________________________________________________________
Questionnaire for Subcontractor
Contractors are to provide all relevant details and documents as indicated.
\\
Provide accident statistics record of last three (3) major projects undertaken (if available). Information on statistics should include man-hours worked,
7. accident free man-hours, no. of accidents, first aid cases, man-days or man-hours lost, causes and nature of injuries and location of injuries (part of
body injured).
10. Provide details on quantity, trade, skill level, job experience (to related trade) and skill training (to provide document proof where possible).
Prepared by:________________________
SUPERINTENDENT/ FOREMAN/ INSPECTOR DAILY CHECK LIST
HOUSEKEEPING
FIRE PROTECTION
19 Eye protection
21 Head protection
23 Safety shoes
TOOLS
ELECTRICAL EQUIPMENT
31 Adequacy of lighting
HAZARDOUS SUBSTANCE
37 MSDS available
38 Correct PPE
STORAGE AREA
41 Accessibility
52 Clothing storage
NCs
Inspected by Signature
SAFETY ORIENTATION / INDUCTION ATTENDANCE REPORT
Project: Date:
Contractor:
REF
NAME OF EMPLOYEE EMP NO. DESIGNATION SIGNATURE
NO.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
HOUSEKEEPING
Are containers for trash and scrap supplied?
Are combustible trash and scrap removed regularly?
Are separate bins available for different classification of wastes?
Are the floors slippery?
Is the area cleaned and waste segregated properly?
ELECTRICAL
Are any faulty wires present?
Are any electrical powers boards open?
Is access to electrical panels &other electrical shut off unobstructed?
Are any ignition sources present?
Are electrical equipments properly grounded?
GENERAL WORKSHOPS
Are machine guards in place?
Are belts in good condition?
Are machine operators trained / competent?
Are machines free of debris?
Are power switches unobstructed?
No tripping hazard present?
Are power cords properly secured, intact insulation?
Machines are anchored to the floor?
Is general housekeeping good?
VENTILLATION
Are local exhaust used, if needed?
Page - 2
GENERAL LABELING
Are chemicals properly labeled?
Is safety warning signs properly labeled and clearly visible?
Are fire extinguishers properly tagged?
Are “HIGH VOLTAGE” signs properly labeled and clearly visible?
COMMENTS: ___________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
Remarks:
9 Checked by
10 Approved By
11 Date of Inspection
12 Remarks
PORTABLE POWER TOOLS
This inspection is to be carried out monthly by a qualified electrician ?
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
SL.NO CHECK POINTS YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Is there is provision for earthing the body Provided
1
(If it is not double insulated)
9 Checked by
10 Approved By
11 Date of Inspection
12 Remarks
LIFTING EQUIPMENTS
This inspection is to be carried out every fortnihtly by a qualified mechanic authorised by Mechinery in Charge
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
SL.NO CHECK POINTS YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO
12 Checked by
13 Approved By
14 Date of Inspection
15 Remarks
Date of Next
Sl No. Extinguisher Type Extinguisher Serial No Location Weight Condition & Charge Level Date of Last Inspection Inspected by Comments
Inspection Required
The master of this procedure is held on the Qshare Application. Hard copies can be printed but will not be updated. If you are working from a hard copy and in doubt of whether it is current, please refer to Qshare Application for the latest revision.
HSE-46-01-04-2 Rev. A
Document Number:
HSE-46-01-07-1
Revision Number:
FIRST AID BOX CHECKLIST AND DEVIATIONS A
Page Number:
Page 1 of 2
Do Not "tick" Write "OK" or use legend
Site: Year: 2012
number.
ID No. Check List
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Location of Box
1 Eye Lotion 1
2 Deep Heat Spray 2
3 Herbal and Natural Ointment 15 grams 3
4 Antiseptic solution for wounds & abrasions(Mercurochrome) 4
5 Panadol 24 tablets 5
6 PIC 3 Box with 3 towelettes 6
7 Ammonium Hydroxide 4%, 3 hygenic soap pouches 7
8 Adhesive plaster roll M 1 X 2 CM 8
9 Guaze bandages 5 CM 9
10 Guaze bandages 7 CM 10
11 Packs of Sterile Gauze CM 10 X 10 X 25
12 Cotton wool packs 50 Gram
13 Pair of Scissors CM 10
14 Safety Pins Legend
15 Pair of Gloves A Box not completely stocked.
The master of this procedure is held on the Qshare Application. Hard copies can be printed but will not be updated. If you are working from a hard copy and in doubt of whether it is current,
please refer to Qshare Application for the latest revision.
Document Number:
HSE-46-01-07-1
Revision Number:
FIRST AID BOX CHECKLIST AND DEVIATIONS A
Page Number:
Page 2 of 2
MONTH Description of deviations noted Action by whom Target Date Complete Y/N
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
The master of this procedure is held on the Qshare Application. Hard copies can be printed but will not be updated. If you are working from a hard copy and in doubt of whether it is current,
please refer to Qshare Application for the latest revision.
APPENDIX – 6
COMPANY HEALTH & SAFETY POLICY
APPENDIX – 7
FIRST AID BOX CONTENT LIST
Permanent Address: Building No. 128,
City 778 - Hadjar Ediss El Boune
Annaba Algeria
Present Address: Ras-Al-Khaimah
Tel: +971 50 1964029
Email: Sizar.ms@live.fr
PERSONAL DATA
EDUCATION
B.Sc. Electro-mechanic Engineering
spicialization: industrial maintenance University Badji Mokhtar
Annaba - Algeria
IOSH management safely
OHSAS 18001/2007 LEAD AUDITOR
Basic first aid
Fire fighting
General safety &health awareness
ISO 14001/2007 environmental management system ( MR) by I I C
ISO 18001/2007OHSAS Occupation Health and Safety management
system ( MR) by I I C
Engineering Training:
(Jan 2007 – Jun 2007) ASMIDAL, Annaba, Algeria
PROFETION EXPERIENCE:
……………………………………………………………………………
Safety manager in AL KARMEL BUILDING CONTRACTING:
Job description :
Maintain and control daily EHS practices with regular inspection for site’s
works, ensure that hazards are identified; precautionary measures are taken
and feed the supervision about HSE harms.
Liaise with members of EHS Departments on a regular basis to ensure that all
local/state/federal HSE requirements are monitor and control implementation
of procedures related to maintenance and effectiveness of safety, lifesaving
and emergency equipment, inspect work activities, equipments and ensure
correct operation procedures are implemented. Ensure that effective records
are kept and updated for all equipment under control.
Promote safe working system and procedures. Monitor and advice on proper
application of “PERMIT TO WORK” system, participating in actual “ JOB
WATCH” as and where necessary; such as hot tapping. Mechanical
sealing/plugging, entry into danger confined spaces and ensuring that all
safety regulation and practices are being complied as per JAFZA EHS&DM
rules and regulations.
Coordinate and practice in the provision of HSE awareness courses. Prepare
programs, arrange participation in conjunction with line management and give
lectures using specialized audio visual equipment, hands-out and practical
demonstration.
Participate as a leader/member of an emergency situation team, provide first
line decisions concerning containment of emergency assist the one scene
commander and participate in detailed first aid emergency action dictated by
situation, provide reports on situations, provide reports on situations existing
at the time of such incidents and present comments on causes and possible
remedies.
Investigate all industrial and non-industrial incidents and accidents involving
personnel, plant and equipment including dangerous occurrences. Analyze
causes, determine future action to reduce these occurrences, prepare the
related periodic reports, highlighting and analyzing problems areas and
recommending preventive measures.
Ensure that health, Safety and environmental programs/procedures are
communicated and understood by all on-site personnel and participate in
giving lectures and talks on such activities.
Ensure that all workers are complying with the safety plan along with
(JAFZA) EHS rules and regulations.
Report any unsafe/condition through daily report/Non conformance Report
(NCR).
Submit daily report for the supervision and monthly report for the consultant.
Ensure that all the fire extinguisher are in good condition, ready to be used in
case of fire accidents and inspected on monthly basis.
Attend progress meetings, conduct safety way to achieve the ZERO
ACCIDENT.
Update the risk assessments for undertaken activity any sit ensure that all site
people are complying with the safety plan and risk assessment.
Ensure that all the permits required are in place such as hot work permit,
confined space permit and excavation permit…etc.
Daily inspect the site and ensure that the safety, health and environment are
implemented.
Conduct weekly toolbox talks and concentrate on the major undertaken
activities on site.
Induct each new operator/worker enter the site, ensure that they are safe to be
use and as per EHS rules and regulations.
Co- operate the consultant and respond for the given advises/instruction.
Report any violation repeated on site as Default Notice order to prevent
recurrence and take the disciplinary actions.
Ensure closing out all the pending safety issues as soon as required.
Ensure that all the activities undertaken are complying with the proper and
approved method statement.
Ensure that all the evacuation plans are being in place band approved by
consultant.
1- Maintenance Engineer (Mettal Steel Annaba) (Januay 2007
to june 2007) Annaba -- Algeria
Description of Job Duties
Maintenance and repair machinery in a factory iron and steel (Mettal
Steel Annaba)
2-Responsible for transport and maintenance operations in (Algeria
Telecom) (November 2007 to june 2008) Annaba -- Algeria
Description of Job Duties:
Responsible for transportation Maintenance and repair of heavy
machinery In a company Algeria Telecom
3-Maintenance Engineer in (AL KARMEL Building cont LLC
RAK) August 2008 to Present Ras-Al-Khaimah – UAE
Description of Job Duties:
Responsible for transportation
Maintenance and repair of heavy equipmen the value of 4.000.000DH
Responsibilities Included:
Responsible for the planning and execution of routine and
preventive maintenance of equipment and provide spare parts
Expenditure is within budgetary limits