needed 2. Splice all wires needed 3. Connect manual call point on Zone1 wire can be connected to terminal (+), (-). 4. Connect the EOL resistor. 5. Separate the base and head of the smoke detector. 6. Connect smoke detector base on Zone2 wire can be connected to terminal (+) and (-). 7. Connect the EOL resistor. 8. Connect the NAC on sound, wire can be connected to terminal (+) and (-). 9. Connect the EOL diode. 10. Connect the secondary power supply. 11. Connect the primary power supply. 12. Power On the primary supply and perform the following test. a) Perform a lamp test b) Put a fault on a zone c) Silence the internal buzzer d) Reset the panel e) Activate Manual call point f) Silence the NAC buzzer g)Reset and disassemble