Professional Documents
Culture Documents
CLOSURE TRIM
2-K
2-J
2-i
2-H
2-G
CLOSURE TRIM
CLOSURE TRIM
2-F
2-E
FOR APPROVAL
In order to schedule this 'APPROVED AS IS'
project in an efficient
manner, kindly return 'APPROVED AS NOTED'
these drawings with your
comments marked in RED 'RESUBMIT AS NOTED'
2-D as soon as possible.
Any changes made after the Approver : ____________
approval of these drawings
may delay the fabrication
schedule and subsequently Signature : ____________
the delivery of the building.
Please Tick mark only one
2-C of the following. Date : ____________
2-B
REV. DATE DESCRIPTION BY