GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT &
HIGHWAYS.
Parivahan Bhavan
1, Sansad Marg
New Delhi-110001
No. NH-15017/36/2016-P&M(SPZ) Date: July 12, 2016
To
1. The Engineer-in-Chief and Chief Engineers of PWDs of States/UTs dealing
with National Highways, other Centrally Sponsored Schemes,
- The Chairman, NHAI, G-5&6, Sector-10, Dwarka, New Delhi-110075
. Director General (BR), Seema Sadak Bhawan, Ring Road, New Delhi-
110010
4. Managing Director, NHIDCL, 3" Floor, PTI Building, 4, Parliament Street,
New Delhi-110001
wp
Subject:- Standardization of reporting responsibility of Independent Engineers
(LEs.) / Authority Engineers (A.Es.) for NH Projects.
Monitoring and supervision of construction, operation and maintenance of
PPP and EPC Projects is undertaken through Independent Engineers and Authority
Engineers respectively. The Independent Engineer / Authority (IE / AB) plays a
pivotal role in supervising, tracking, and reporting projects progress, thereby
highlighting important issues and areas of concern that need to be addressed. The
IE / AE is an important link between the Authority and the Concessionaire /
Contractor, and is contractually obligated to submit a Monthly Progress Report
detailing various aspects of the projects progress.
2. With different IE / AE preparing reports for different projects, the sections
included and the level of details in the report vary considerably, Hence, it becomes
imperative that reports across various projects are standardized to ensure
consistency and comparability.
Contd. on page 2pg
2
23
3. It has been decided that the Monthly Progress Report to be submitted by
Independent Engineers / Authority Engineers shall invariably contain an Executive
Summary of the report. A sample format of the Executive Summary to be included
in the Monthly Report (separate for Independent Engineer and Authority
Engineer) has been prepared by the Ministry and is uploaded on Ministry's
Website (www.morth.nic.in). It may be ensured that the Monthly Progress Report
to be submitted by Independent Engineers for all PPP Projects and Monthly
Progress Report to be submitted by Authority Engineers for EPC Projects costing
more than 100 crores should include the Executive Summary as per format starting
from the month of August, 2016.
Yours aay,
Ae bdo
(DS. Pathania)
Under Secretary to the Government of India
Copy to:
- PPS to Secretary (RT&H) ~ for kind information,
All the Technical Officers of MoRTH
All ROs and ELOs of MoRTH
Tech, Circular File of SPZ Section
NIC with a request to upload this circular along with standard format for
Executive Summary Report to be submitted by IE/AE.
vee