ISBL Summary

Cumm. Prog on Weekly Progress Plan for Next


(10.01.2014 - 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Civil (Bldg & Equipment) Cum 55355 55355 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 55355 100.00% 0 Jul-13 0 Completed

Cable Trench Cum 1175 1175 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 1175 100.00% 0 Jul-13 0 Completed

CIVIL Slop Channel Cum 2727 2727 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 2727 100.00% 0 Jul-13 0 Completed

Paving Cum 9220 9220 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 9220 100.00% 0 Jul-13 0 Completed

Misc (Road, Drain etc.) Cum 12050 12050 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 12050 100.00% 0 Oct-13 0 Completed

Structure Fabrication MT 9605 9605 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 9605 100.00% 0 Jul-13 0 Completed
STRUCTURE
Structure Erection MT 9605 9605 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 9605 100.00% 0 Nov-13 0 Completed

EQUIPMENT Erection of Equipment MT 8745 8642 98.83% 0 25 0 0 0 0 34 25 73.10% 103 25 24.37% 26 103 0 8667 99.11% 78 Jan-14 26

Tankage Fabrication MT 4180 4180 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 4180 100.00% 0 Aug-13 0 Completed
TANKAGE
Tankage Erection MT 4239 4239 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 4239 100.00% 0 Sep-13 0 Completed

Piping Fabrication ID 446115 446115 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 446115 100.00% 0 Dec-13 0 Completed

Piping Erection IM 982758 982676 99.99% 0 0 0 0 0 0 27 0 0.00% 382 300 78.53% 27 382 0 982676 99.99% 82 Jan-14 27
PIPING
Piping Erection (Field ID 235528 235489 99.98% 0 0 0 0 0 0 13 0 0.00% 336 297 88.39% 13 336 0 235489 99.98% 39 Jan-14 13
Joints)

Hydro/Pneumatic Test Nos 1798 1778 98.89% 1 0 0 0 0 0 7 1 15.00% 21 2 9.52% 6 21 0 1779 98.94% 19 Jan-14 6

Electrical Transformer Nos 28 28 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 28 100.00% 0 May-12 0 Completed


installation
Electrical Cable Tray Mtr 44740 44696 99.90% 0 0 0 0 0 0 15 0 0.00% 44 0 0.00% 15 44 0 44696 99.90% 44 Jan-14 15
Laying

Electrical Cable Laying Mtr 526100 525993 99.98% 0 0 0 0 0 0 36 0 0.00% 259 152 58.69% 36 259 0 525993 99.98% 107 Jan-14 36

Electrical Earth Pits


Installation Nos 313 313 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 313 100.00% 0 Dec-13 0 Completed

ELECTRICAL Electrical Earth Strips Mtr 38200 38179 99.95% 0 0 0 0 0 0 7 0 0.00% 21 0 0.00% 7 21 0 38179 99.95% 21 Jan-14 7
Laying
Electrical Pannel Nos 482 482 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 482 100.00% 0 Jul-13 0 Completed
Installation

Junction Boxes Fixing Nos 616 578 93.83% 0 0 0 0 0 0 13 0 0.00% 38 0 0.00% 13 38 0 578 93.83% 38 Jan-14 13

Light Fixtures Fixing Nos 4431 4168 94.06% 0 0 0 0 0 0 88 0 0.00% 269 6 2.23% 88 269 0 4168 94.06% 263 Jan-14 88

Glanding & Termination Nos 6328 6241 98.63% 0 0 0 0 0 0 29 0 0.00% 93 6 6.45% 29 93 0 6241 98.63% 87 Jan-14 29

Instrumentation Pannel Nos 169 169 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 169 100.00% 0 Dec-13 0 Completed
Installation

Inst. Cable Tray Laying Mtr 47450 47285 99.65% 20 10 10 5 0 0 57 45 78.49% 212 92 43.40% 40 212 0 47330 99.75% 120 Jan-14 40

Inst. Cable Laying Mtr 807000 803241 99.53% 158 0 414 400 0 0 1253 972 77.57% 4085 1298 31.77% 929 4085 0 804213 99.65% 2787 Jan-14 929
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 4700 4700 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 4700 100.00% 0 May-13 0 Completed

Junction Boxes Fixing Nos 1197 1191 99.50% 0 1 0 0 0 0 2 1 50.00% 6 1 16.67% 2 6 0 1192 99.58% 5 Jan-14 2

Stanchions Installation Nos 2280 2193 96.18% 0 0 1 0 0 0 29 1 3.45% 88 2 2.27% 29 88 0 2194 96.23% 86 Jan-14 29

Instruments Installation Nos 5196 4760 91.61% 3 9 11 23 0 0 145 46 31.65% 503 113 22.47% 130 503 0 4806 92.49% 390 Jan-14 130

Loop Checking (Cold) Nos 9374 8516 90.85% 0 0 0 0 0 0 286 0 0.00% 1707 849 49.74% 286 1707 0 8516 90.85% 858 Jan-14 286

Inst. Impulse Tubing Nos 1208 1204 99.67% 0 0 0 0 0 0 1 0 0.00% 4 0 0.00% 1 4 0 1204 99.67% 4 Jan-14 1

Print Date: 10.01.2014


UNIT- Sub Station-1 (Mr R Sengupta)
Cumm. Prog on Weekly Progress Plan for Next
Monthly Prog.(Jan'14) Plan for Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on (10.01.2014 - 16.01.2014) next
Month
Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

CIVIL Civil (Bldg & Equipment) Cum 2950 2950 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2950 100.00% 0 Mar-13 0 Completed

Structure Fabrication MT 40 40 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 40 100.00% 0 Dec-11 0 Completed


STRUCTURE
Structure Erection MT 40 40 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 40 100.00% 0 Feb-12 0 Completed

Electrical Transformer Nos 16 16 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 16 100.00% 0 May-12 0 Completed


installation

Electrical Cable Tray Laying Mtr 3700 3700 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3700 100.00% 0 Oct-13 0 Completed

Electrical Cable Laying Mtr 75000 75000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 75000 100.00% 0 Dec-13 0 Completed

Electrical Earth Pits Nos 52 52 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 52 100.00% 0 Mar-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 6100 6100 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 6100 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 208 208 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 208 100.00% 0 Jun-13 0 Completed
Installation

Junction Boxes Fixing Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Light Fixtures Fixing Nos 338 300 88.76% 13 0 0.00% 38 0 0.00% 13 38 300 88.76% 38 Dec-12 13 Completed

Glanding & Termination Nos 1654 1654 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1654 100.00% 0 Dec-13 0 Completed

Instrumentation Panel Nos 10 10 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 10 100.00% 0 Jul-13 0 Completed


Installation

Inst. Cable Tray Laying Mtr 500 500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 500 100.00% 0 Jul-12 0 Completed

Inst. Cable Laying Mtr 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


INSTRUMENTATION

Inst. Cable Duct Erection Mtr 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Junction Boxes Fixing Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Stanchions Installation Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Instruments Installation Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Loop Checking (Cold) Nos 645 645 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 645 100.00% 0 Dec-13 0 Completed

Inst. Impulse Tubing Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Print Date: 10.01.2014


UNIT-Sub Station-2 (Mr R Sengupta)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

CIVIL Civil (Bldg & Equipment) Cum 1823 1823 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1823 100.00% 0 Mar-12 0 Completed

Structure Fabrication MT 40 40 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 40 100.00% 0 Dec-11 0 Completed


STRUCTURE
Structure Erection MT 40 40 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 40 100.00% 0 Feb-12 0 Completed

Electrical Transformer Nos 12 12 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 12 100.00% 0 Apr-12 0 Completed


installation

Electrical Cable Tray Laying Mtr 3640 3640 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3640 100.00% 0 Oct-13 0 Completed

Electrical Cable Laying Mtr 44000 44000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 44000 100.00% 0 Dec-13 0 Completed

Electrical Earth Pits Nos 36 36 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 36 100.00% 0 Jun-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 3500 3500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3500 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 163 163 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 163 100.00% 0 Jun-13 0 Completed
Installation

Junction Boxes Fixing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Light Fixtures Fixing Nos 219 187 85.39% 11 0 0.00% 32 0 0.00% 11 32 187 85.39% 32 Jan-14 11

Glanding & Termination Nos 1060 1060 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1060 100.00% 0 Dec-13 0 Completed

Instrumentation Pannel Nos 10 10 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 10 100.00% 0 Jul-13 0 Completed


Installation

Inst. Cable Tray Laying Mtr 500 500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 500 100.00% 0 Jul-12 0 Completed

Inst. Cable Laying Mtr 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


INSTRUMENTATION

Inst. Cable Duct Erection Mtr 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Junction Boxes Fixing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Stanchions Installation Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Instruments Installation Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Loop Checking (Cold) Nos 880 880 100.00% 0 0 #DIV/0! 24 24 100.00% 0 24 880 100.00% 0 Jan-14 0 Completed

Inst. Impulse Tubing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Print Date: 10.01.2014


UNIT-Control Room-1 (Mr A N Tiwari)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

CIVIL Civil (Bldg & Equipment) Cum 5920 5920 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 5920 100.00% 0 Jan-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation

Electrical Cable Tray Laying Mtr 1000 1000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1000 100.00% 0 Dec-13 0 Completed

Electrical Cable Laying Mtr 35000 35000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 35000 100.00% 0 Dec-13 0 Completed

Electrical Earth Pits Nos 20 20 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 20 100.00% 0 Jul-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 1600 1600 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1600 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 30 30 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 30 100.00% 0 Jun-13 0 Completed
Installation

Junction Boxes Fixing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Light Fixtures Fixing Nos 115 115 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 115 100.00% 0 Jul-13 0 Completed

Glanding & Termination Nos 332 332 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 332 100.00% 0 Dec-13 0 Completed

Instrumentation Pannel
Installation Nos 60 60 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 60 100.00% 0 Mar-13 0 Completed

Inst. Cable Tray Laying Mtr 330 330 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 330 100.00% 0 Jul-13 0 Completed

Inst. Cable Laying Mtr 1000 1000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1000 100.00% 0 Dec-13 0 Completed
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 250 250 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 250 100.00% 0 Jun-12 0 Completed

Junction Boxes Fixing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Stanchions Installation Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Instruments Installation Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Loop Checking (Cold) Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Inst. Impulse Tubing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Print Date: 10.01.2014


UNIT-Control Room-2 (Mr A N Tiwari)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

CIVIL Civil (Bldg & Equipment) Cum 3500 3500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3500 100.00% 0 Jul-13 0 Completed

Electrical Transformer Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation

Electrical Cable Tray Laying Mtr 600 600 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 600 100.00% 0 Dec-13 0 Completed

Electrical Cable Laying Mtr 35000 35000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 35000 100.00% 0 Dec-13 0 Completed

Electrical Earth Pits Nos 20 20 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 20 100.00% 0 Jul-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 1600 1600 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1600 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 10 10 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 10 100.00% 0 Jun-13 0 Completed
Installation

Junction Boxes Fixing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Light Fixtures Fixing Nos 93 79 84.95% 5 0 0.00% 14 0 0.00% 5 14 79 84.95% 14 Jan-14 5

Glanding & Termination Nos 346 327 94.51% 6 0 0.00% 19 0 0.00% 6 19 327 94.51% 19 Jan-14 6

Instrumentation Pannel
Installation Nos 87 87 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 87 100.00% 0 Jul-13 0 Completed

Inst. Cable Tray Laying Mtr 320 320 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 320 100.00% 0 Dec-13 0 Completed

Inst. Cable Laying Mtr 1000 1000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1000 100.00% 0 Dec-13 0 Completed
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 200 200 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 200 100.00% 0 Jul-12 0 Completed

Junction Boxes Fixing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Stanchions Installation Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Instruments Installation Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Loop Checking (Cold) Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Inst. Impulse Tubing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Print Date: 10.01.2014


UNIT-00 (Mr Palanivel Raj)
Cumm. Prog on Weekly Progress (10.01.2014 - Plan for Next
16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Civil (Bldg & Equipment) Cum 3465 3465 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3465 100.00% 0 Apr-13 0 Completed

Cable Trench Cum 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

CIVIL Slop Channel Cum 102 102 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 102 100.00% 0 Apr-13 0 Completed

Paving Cum 415 415 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 415 100.00% 0 May-13 0 Completed

Misc (Road, Drain etc.) Cum 8650 8650 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 8650 100.00% 0 Oct-13 0 Completed

Structure Fabrication MT 1578 1578 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1578 100.00% 0 Sep-12 0 Completed
STRUCTURE
Structure Erection MT 1578 1578 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1578 100.00% 0 Nov-13 0 Completed

Piping Fabrication ID 38675 38675 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 38675 100.00% 0 Sep-13 0 Completed

Piping Erection IM 189302 189302 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 189302 100.00% 0 Oct-13 0 Completed
PIPING
Piping Erection (Field ID 26784 26784 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 26784 100.00% 0 Oct-13 0 Completed
Joints)

Hydro/Pneumatic Test Nos 83 83 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 83 100.00% 0 Dec-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation

Electrical Cable Tray Laying Mtr 3550 3550 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3550 100.00% 0 Nov-13 0 Completed

Electrical Cable Laying Mtr 37500 37500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 37500 100.00% 0 Nov-13 0 Completed

Electrical Earth Pits Nos 5 5 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 5 100.00% 0 Jun-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 1500 1500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1500 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 4 4 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4 100.00% 0 Jul-13 0 Completed
Installation

Junction Boxes Fixing Nos 42 42 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 42 100.00% 0 Dec-12 0 Completed

Light Fixtures Fixing Nos 300 300 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 300 100.00% 0 Dec-13 0 Completed

Glanding & Termination Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Instrumentation Pannel Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


Installation

Inst. Cable Tray Laying Mtr 350 350 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 350 100.00% 0 Dec-13 0 Completed

Inst. Cable Laying Mtr 18000 17752 98.62% 83 0 0.00% 248 0 0.00% 83 248 17752 98.62% 248 Jan-14 83
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 1200 1200 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1200 100.00% 0 May-12 0 Completed

Junction Boxes Fixing Nos 23 23 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 23 100.00% 0 Jun-13 0 Completed

Stanchions Installation Nos 80 13 16.25% 22 0 0.00% 67 0 0.00% 22 67 13 16.25% 67 Jan-14 22

Instruments Installation Nos 195 175 89.74% 20 7 20 300.00% 60 60 100.00% 0 60 195 100.00% 0 Jan-14 0 Completed

Loop Checking (Cold) Nos 110 110 100.00% 0 0 #DIV/0! 80 80 100.00% 0 80 110 100.00% 0 Jan-14 0 Completed

Inst. Impulse Tubing Nos 20 20 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 20 100.00% 0 Oct-13 0 Completed

Print Date: 10.01.2014


UNIT-03, 51 & 54 (Mr V V Madhava Ram)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
Monthly Prog.(Jan'14) Plan for Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on - 16.01.2014) Month
Discipline Activities UOM % next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14 week date till date Compl. week
week 12.01.14 Plan Act % Plan Act % Jan'14 Feb'14

Civil (Bldg & Equipment) Cum 5840 5840 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 5840 100.00% 0 Jul-13 0 Completed

Cable Trench Cum 210 210 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 210 100.00% 0 Mar-13 0 Completed

CIVIL Slop Channel & Sluice Cum 840 840 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 840 100.00% 0 Mar-13 0 Completed
Trench

Paving Cum 680 680 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 680 100.00% 0 Apr-13 0 Completed

Misc (Road, Drain etc.) Cum 230 230 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 230 100.00% 0 May-13 0 Completed

Structure Fabrication MT 2920 2920 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2920 100.00% 0 Jul-13 0 Completed
STRUCTURE
Structure Erection MT 2920 2920 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2920 100.00% 0 Sep-13 0 Completed

EQUIPMENT Erection of Equipment MT 2513 2410.4 95.92% 25 34 25 73.10% 103 25 24.37% 26 103 2435 96.91% 78 Jan-14 26

Coal Bunker Fabrication MT 385 385 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 385 100.00% 0 Mar-13 0 Completed
Coal Bunkars
Coal Bunker Erection MT 385 385 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 385 100.00% 0 Apr-13 0 Completed

Piping Fabrication ID 56077 56077 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 56077 100.00% 0 Oct-13 0 Completed

Piping Erection IM 67832 67750 99.88% 27 0 0.00% 117 35 29.91% 27 117 67750 99.88% 82 Jan-14 27
PIPING
Piping Erection (Field ID 39800 39761 99.90% 13 0 0.00% 39 0 0.00% 13 39 39761 99.90% 39 Jan-14 13
Joints)

Hydro/Pneumatic Test Nos 302 284 94.04% 6 0 0.00% 18 0 0.00% 6 18 284 94.04% 18 Jan-14 6

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray Mtr 7800 7768 99.59% 11 0 0.00% 32 0 0.00% 11 32 7768 99.59% 32 Jan-14 11
Laying

Electrical Cable Laying Mtr 45000 45000 100.00% 0 0 #DIV/0! 152 152 100.00% 0 152 45000 100.00% 0 Jan-14 0 Completed

Electrical Earth Pits


Installation Nos 14 14 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 14 100.00% 0 Apr-13 0 Completed

ELECTRICAL Electrical Earth Strips Mtr 3500 3500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3500 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 9 9 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 9 100.00% 0 Jul-13 0 Completed
Installation

Junction Boxes Fixing Nos 82 76 92.68% 2 0 0.00% 6 0 0.00% 2 6 76 92.68% 6 Jan-14 2

Light Fixtures Fixing Nos 460 458 99.57% 1 0 0.00% 2 0 0.00% 1 2 458 99.57% 2 Jan-14 1

Glanding & Termination Nos 756 751 99.34% 2 0 0.00% 8 3 37.50% 2 8 751 99.34% 5 Jan-14 2

Instrumentation Pannel Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


Installation

Inst. Cable Tray Laying Mtr 12000 11928 99.40% 10 10 10 5 24 35 145.83% 107 70 65.42% 12 107 11963 99.69% 37 Jan-14 12

Inst. Cable Laying Mtr 330000 328768 99.63% 411 0 0.00% 1358 126 9.28% 411 1358 328768 99.63% 1232 Jan-14 411
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 230 230 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 230 100.00% 0 Mar-12 0 Completed

Junction Boxes Fixing Nos 421 421 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 421 100.00% 0 Aug-13 0 Completed

Stanchions Installation Nos 620 619 99.84% 0 0 0.00% 1 0 0.00% 0 1 619 99.84% 1 Jan-14 0

Instruments Installation Nos 1343 1049 78.11% 3 3 98 6 6.12% 314 26 8.28% 96 314 1055 78.56% 288 Jan-14 96

Loop Checking (Cold) Nos 3200 2736 85.50% 155 0 0.00% 546 82 15.02% 155 546 2736 85.50% 464 Jan-14 155

Inst. Impulse Tubing Nos 690 686 99.42% 1 0 0.00% 4 0 0.00% 1 4 686 99.42% 4 Jan-14 1

Print Date: 10.01.2014


UNIT-04 (Mr Vincent Govender)
Cumm. Prog on Weekly Progress Plan for Next
(10.01.2014 - 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Civil (Bldg & Equipment) Cum 2155 2155 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2155 100.00% 0 Mar-13 0 Completed

Cable Trench Cum 70 70 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 70 100.00% 0 Jan-13 0 Completed

CIVIL Slop Channel Cum 200 200 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 200 100.00% 0 Mar-13 0 Completed

Paving Cum 400 400 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 400 100.00% 0 May-13 0 Completed

Misc (Road, Drain etc.) Cum 100 100 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 100 100.00% 0 May-13 0 Completed

Structure Fabrication MT 631 631 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 631 100.00% 0 Apr-13 0 Completed
STRUCTURE
Structure Erection MT 631 631 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 631 100.00% 0 Nov-13 0 Completed

EQUIPMENT Erection of Equipment MT 1053 1053 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1053 100.00% 0 Jun-13 0 Completed

Piping Fabrication ID 22742 22742 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 22742 100.00% 0 Sep-13 0 Completed

Piping Erection IM 28008 28008 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 28008 100.00% 0 Sep-13 0 Completed
PIPING
Piping Erection (Field ID 12328 12328 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 12328 100.00% 0 Sep-13 0 Completed
Joints)

Hydro/Pneumatic Test Nos 84 84 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 84 100.00% 0 Sep-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray Mtr 2000 2000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2000 100.00% 0 Nov-13 0 Completed
Laying

Electrical Cable Laying Mtr 12000 12000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 12000 100.00% 0 Nov-13 0 Completed

Electrical Earth Pits Nos 7 7 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 7 100.00% 0 Mar-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 1700 1700 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1700 100.00% 0 Oct-13 0 Completed
Laying
Electrical Pannel
Installation Nos 4 4 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4 100.00% 0 Mar-13 0 Completed

Junction Boxes Fixing Nos 28 28 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 28 100.00% 0 Aug-13 0 Completed

Light Fixtures Fixing Nos 207 207 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 207 100.00% 0 Dec-13 0 Completed

Glanding & Termination Nos 156 156 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 156 100.00% 0 Dec-13 0 Completed

Instrumentation Pannel Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


Installation

Inst. Cable Tray Laying Mtr 2600 2600 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2600 100.00% 0 Nov-13 0 Completed

Inst. Cable Laying Mtr 28000 28000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 28000 100.00% 0 Dec-13 0 Completed
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 200 200 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 200 100.00% 0 May-13 0 Completed

Junction Boxes Fixing Nos 63 63 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 63 100.00% 0 Aug-13 0 Completed

Stanchions Installation Nos 65 65 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 65 100.00% 0 Jun-13 0 Completed

Instruments Installation Nos 210 208 99.05% 2 1 2 300.00% 2 2 100.00% 0 2 210 100.00% 0 Jan-14 0 Completed

Loop Checking (Cold) Nos 316 316 100.00% 0 0 #DIV/0! 7 7 100.00% 0 7 316 100.00% 0 Jan-14 0 Completed

Inst. Impulse Tubing Nos 25 25 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 25 100.00% 0 Sep-13 0 Completed

Print Date: 10.01.2014


UNIT-05 (Mr Vincent Govender)
Cumm. Prog on Weekly Progress (10.01.2014 - Plan for Next
16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Civil (Bldg & Equipment) Cum 5705 5705 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 5705 100.00% 0 Apr-13 0 Completed

Cable Trench Cum 55 55 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 55 100.00% 0 Apr-13 0 Completed

CIVIL Slop Channel Cum 810 810 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 810 100.00% 0 Jun-13 0 Completed

Paving Cum 1070 1070 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1070 100.00% 0 Jun-13 0 Completed

Misc (Road, Drain etc.) Cum 400 400 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 400 100.00% 0 Jun-13 0 Completed

Structure Fabrication MT 845 845 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 845 100.00% 0 Sep-12 0 Completed
STRUCTURE
Structure Erection MT 845 845 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 845 100.00% 0 Nov-13 0 Completed

EQUIPMENT Erection of Equipment MT 330 330 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 330 100.00% 0 Oct-13 0 Completed

Tankage Fabrication MT 956 956.00 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 956 100.00% 0 Aug-13 0 Completed
TANKAGE
Tankage Erection MT 972 972.00 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 972 100.00% 0 Sep-13 0 Completed

Piping Fabrication ID 46959 46959 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 46959 100.00% 0 Oct-13 0 Completed

Piping Erection IM 78590 78590 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 78590 100.00% 0 Nov-13 0 Completed
PIPING
Piping Erection (Field ID 31000 31000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 31000 100.00% 0 Nov-13 0 Completed
Joints)

Hydro/Pneumatic Test Nos 327 327 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 327 100.00% 0 Nov-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray Mtr 3100 3100 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3100 100.00% 0 Dec-13 0 Completed
Laying

Electrical Cable Laying Mtr 50000 50000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 50000 100.00% 0 Dec-13 0 Completed

Electrical Earth Pits


Installation Nos 30 30 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 30 100.00% 0 Mar-13 0 Completed

ELECTRICAL Electrical Earth Strips Mtr 2500 2500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2500 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 6 6 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 6 100.00% 0 Jul-13 0 Completed
Installation

Junction Boxes Fixing Nos 17 17 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 17 100.00% 0 Aug-13 0 Completed

Light Fixtures Fixing Nos 344 344 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 344 100.00% 0 Dec-13 0 Completed

Glanding & Termination Nos 410 410 100.00% 0 0 #DIV/0! 3 3 100.00% 0 3 410 100.00% 0 Jan-14 0 Completed

Instrumentation Pannel Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


Installation

Inst. Cable Tray Laying Mtr 4750 4744 99.87% 2 0 0.00% 6 0 0.00% 2 6 4744 99.87% 6 Jan-14 2

Inst. Cable Laying Mtr 47000 46550 99.04% 414 150 414 276.00% 650 614 94.46% 12 650 46964 99.92% 36 Jan-14 12
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 320 320 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 320 100.00% 0 Apr-12 0 Completed

Junction Boxes Fixing Nos 93 93 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 93 100.00% 0 May-13 0 Completed

Stanchions Installation Nos 211 210 99.53% 1 0 1 300.00% 1 1 100.00% 0 1 211 100.00% 0 Jan-14 0 Completed

Instruments Installation Nos 640 638 99.69% 2 1 2 300.00% 4 4 100.00% 0 4 640 100.00% 0 Jan-14 0 Completed

Loop Checking (Cold) Nos 607 607 100.00% 0 0 #DIV/0! 38 38 100.00% 0 38 607 100.00% 0 Jan-14 0 Completed

Inst. Impulse Tubing Nos 87 87 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 87 100.00% 0 Sep-13 0 Completed

Print Date: 10.01.2014


UNIT-06 (Mr Gopal Deakate)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Civil (Bldg & Equipment) Cum 5323 5323 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 5323 100.00% 0 Apr-13 0 Completed

Cable Trench Cum 70 70 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 70 100.00% 0 Apr-13 0 Completed

CIVIL Slop Channel Cum 370 370 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 370 100.00% 0 Apr-13 0 Completed

Paving Cum 1280 1280 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1280 100.00% 0 Jul-13 0 Completed

Misc (Road, Drain etc.) Cum 830 830 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 830 100.00% 0 Jul-13 0 Completed

Structure Fabrication MT 750 750 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 750 100.00% 0 Jan-12 0 Completed
STRUCTURE
Structure Erection MT 750 750 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 750 100.00% 0 Sep-13 0 Completed

EQUIPMENT Erection of Equipment MT 869 869 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 869 100.00% 0 Oct-13 0 Completed

Tankage Fabrication MT 897 897 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 897 100.00% 0 Apr-13 0 Completed
TANKAGE
Tankage Erection MT 912 912 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 912 100.00% 0 Sep-13 0 Completed

Piping Fabrication ID 44960 44960 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 44960 100.00% 0 Oct-13 0 Completed

Piping Erection IM 95975 95975 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 95975 100.00% 0 Nov-13 0 Completed
PIPING
Piping Erection (Field ID 29725 29725 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 29725 100.00% 0 Nov-13 0 Completed
Joints)

Hydro/Pneumatic Test Nos 253 253 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 253 100.00% 0 Nov-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray Mtr 4650 4650 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4650 100.00% 0 Nov-13 0 Completed
Laying

Electrical Cable Laying Mtr 47500 47500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 47500 100.00% 0 Aug-13 0 Completed

Electrical Earth Pits


Installation Nos 44 44 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 44 100.00% 0 Mar-13 0 Completed

ELECTRICAL Electrical Earth Strips Mtr 4200 4200 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4200 100.00% 0 Oct-13 0 Completed
Laying
Electrical Pannel Nos 13 13 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 13 100.00% 0 Jul-13 0 Completed
Installation

Junction Boxes Fixing Nos 122 122 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 122 100.00% 0 Dec-13 0 Completed

Light Fixtures Fixing Nos 557 532 95.51% 8 0 0.00% 25 0 0.00% 8 25 532 95.51% 25 Jan-14 8

Glanding & Termination Nos 334 334 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 334 100.00% 0 Dec-13 0 Completed

Instrumentation Pannel Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


Installation

Inst. Cable Tray Laying Mtr 5100 5100 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 5100 100.00% 0 Dec-13 0 Completed

Inst. Cable Laying Mtr 75000 75000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 75000 100.00% 0 Dec-13 0 Completed
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 250 250 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 250 100.00% 0 Apr-12 0 Completed

Junction Boxes Fixing Nos 125 125 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 125 100.00% 0 Jan-14 0

Stanchions Installation Nos 250 235 94.00% 5 0 0.00% 16 1 6.25% 5 16 235 94.00% 15 Jan-14 5

Instruments Installation Nos 500 497 99.40% 1 1 1 100.00% 3 1 33.33% 1 3 498 99.60% 2 Jan-14 1

Loop Checking (Cold) Nos 680 680 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 680 100.00% 0 Dec-13 0 Completed

Inst. Impulse Tubing Nos 67 67 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 67 100.00% 0 Nov-13 0 Completed

Print Date: 10.01.2014


UNIT-07 (Mr Naveen Ahlawat)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Discipline Activities UOM % next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14 week date till date Compl. week
week 12.01.14 Plan Act % Plan Act % Jan'14 Feb'14

Civil (Bldg & Equipment) Cum 1420 1420 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1420 100.00% 0 Sep-12 0 Completed

Cable Trench Cum 300 300 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 300 100.00% 0 Jul-13 0 Completed

CIVIL Slop Channel Cum 190 190 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 190 100.00% 0 May-13 0 Completed

Paving Cum 720 720 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 720 100.00% 0 Jul-13 0 Completed

Misc (DG,Road, Drain Cum 360 360 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 360 100.00% 0 Oct-13 0 Completed
etc.)

Structure Fabrication MT 398 398 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 398 100.00% 0 May-13 0 Completed
STRUCTURE
Structure Erection MT 398 398 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 398 100.00% 0 Jul-13 0 Completed

EQUIPMENT Erection of Equipment MT 460 460 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 460 100.00% 0 Apr-13 0 Completed

Piping Fabrication ID 35214 35214 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 35214 100.00% 0 Sep-13 0 Completed

Piping Erection IM 62568 62568 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 62568 100.00% 0 Oct-13 0 Completed
PIPING
Piping Erection (Field ID 23643 23643 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 23643 100.00% 0 Oct-13 0 Completed
Joints)

Hydro/Pneumatic Test Nos 246 246 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 246 100.00% 0 Dec-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray Mtr 2300 2300 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2300 100.00% 0 Nov-13 0 Completed
Laying

Electrical Cable Laying Mtr 28100 28100 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 28100 100.00% 0 Nov-13 0 Completed

Electrical Earth Pits


Installation Nos 6 6 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 6 100.00% 0 Jul-13 0 Completed

ELECTRICAL Electrical Earth Strips Mtr 2400 2400 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2400 100.00% 0 Oct-13 0 Completed
Laying
Electrical Pannel Nos 6 6 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 6 100.00% 0 Jul-13 0 Completed
Installation

Junction Boxes Fixing Nos 47 47 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 47 100.00% 0 Aug-13 0 Completed

Light Fixtures Fixing Nos 279 279 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 279 100.00% 0 Dec-13 0 Completed

Glanding & Termination Nos 286 286 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 286 100.00% 0 Dec-13 0 Completed

Instrumentation Pannel Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


Installation

Inst. Cable Tray Laying Mtr 4500 4500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4500 100.00% 0 Dec-13 0 Completed

Inst. Cable Laying Mtr 58000 58000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 58000 100.00% 0 Dec-13 0 Completed
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 354.5 354.5 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 355 100.00% 0 Mar-12 0 Completed

Junction Boxes Fixing Nos 98 98 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 98 100.00% 0 Jul-13 0 Completed

Stanchions Installation Nos 329 329 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 329 100.00% 0 Dec-13 0 Completed

Instruments Installation Nos 565 565 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 565 100.00% 0 Nov-13 0 Completed

Loop Checking (Cold) Nos 550 550 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 550 100.00% 0 Dec-13 0 Completed

Inst. Impulse Tubing Nos 69 69 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 69 100.00% 0 Sep-13 0 Completed

Print Date: 10.01.2014


UNIT-08 (Mr Malay Kumar)
Cumm. Prog on Weekly Progress (10.01.2014 - Plan for Next
16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Discipline Activities UOM % next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Civil (Bldg & Equipment) Cum 8148 8148 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 8148 100.00% 0 Apr-13 0 Completed

Cable Trench Cum 400 400 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 400 100.00% 0 Jul-13 0 Completed

CIVIL Slop Channel Cum 150 150 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 150 100.00% 0 Jul-13 0 Completed

Paving Cum 1000 1000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1000 100.00% 0 Jul-13 0 Completed

Misc (Road, Drain etc.) Cum 260 260 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 260 100.00% 0 Aug-13 0 Completed

Structure Fabrication MT 400 400 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 400 100.00% 0 Jun-12 0 Completed
STRUCTURE
Structure Erection MT 400 400 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 400 100.00% 0 Sep-13 0 Completed

EQUIPMENT Erection of Equipment MT 2947 2947 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2947 100.00% 0 Oct-13 0 Completed

Piping Fabrication ID 53099 53099 100.00% 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 53099 100.00% 0 Oct-13 0 Completed

Piping Erection IM 106016 106016 100.00% 0 0 0 #DIV/0! 265 265 100.00% 0 265 106016 100.00% 0 Jan-14 0 Completed
PIPING
Piping Erection (Field ID 35000 35000 100.00% 0 0 0 #DIV/0! 297 297 100.00% 0 297 35000 100.00% 0 Jan-14 0 Completed
Joints)

Hydro/Pneumatic Test Nos 239 237 99.16% 1 1 1 150.00% 3 2 66.67% 0 3 238 99.58% 1 Jan-14 0

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray Mtr 3900 3888 99.69% 4 0 0.00% 12 0 0.00% 4 12 3888 99.69% 12 Jan-14 4
Laying

Electrical Cable Laying Mtr 23500 23393 99.54% 36 0 0.00% 107 0 0.00% 36 107 23393 99.54% 107 Jan-14 36

Electrical Earth Pits Nos 7 7 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 7 100.00% 0 Oct-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 2500 2479 99.16% 7 0 0.00% 21 0 0.00% 7 21 2479 99.16% 21 Jan-14 7
Laying
Electrical Pannel
Installation Nos 12 12 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 12 100.00% 0 Jul-13 0 Completed

Junction Boxes Fixing Nos 149 117 78.52% 11 0 0.00% 32 0 0.00% 11 32 117 78.52% 32 Jan-14 11

Light Fixtures Fixing Nos 556 404 72.66% 51 0 0.00% 158 6 3.80% 51 158 404 72.66% 152 Jan-14 51

Glanding & Termination Nos 352 289 82.10% 21 0 0.00% 63 0 0.00% 21 63 289 82.10% 63 Jan-14 21

Instrumentation Pannel Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


Installation

Inst. Cable Tray Laying Mtr 6700 6647 99.96% 10 20 10 50.00% 65 22 33.85% 14 65 6657 99.36% 43 Jan-14 14

Inst. Cable Laying Mtr 97000 96389 99.37% 204 0 0.00% 611 0 0.00% 204 611 96389 99.37% 611 Jan-14 204
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 190 190 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 190 100.00% 0 Jul-13 0 Completed

Junction Boxes Fixing Nos 134 128 95.52% 1 2 1 50.00% 6 1 16.67% 2 6 129 96.27% 5 Jan-14 2

Stanchions Installation Nos 250 247 98.80% 1 0 0.00% 3 0 0.00% 1 3 247 98.80% 3 Jan-14 1

Instruments Installation Nos 600 577 96.17% 5 6 3 8 14 182.61% 28 19 67.86% 3 28 591 98.50% 9 Jan-14 3

Loop Checking (Cold) Nos 980 590 60.20% 130 0 0.00% 838 448 53.46% 130 838 590 60.20% 390 Jan-14 130

Inst. Impulse Tubing Nos 100 100 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 100 100.00% 0 Dec-13 0 Completed

Print Date: 10.01.2014


UNIT-09 (Mr Dipankar Sengupta)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Discipline Activities UOM % next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14 week date till date Compl. week
week 12.01.14 Plan Act % Plan Act % Jan'14 Feb'14

Civil (Bldg & Equipment) Cum 2230 2230 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2230 100.00% 0 Jan-12 0 Completed

Cable Trench Cum 5 5 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 5 100.00% 0 Jan-12 0 Completed

CIVIL Slop Channel Cum 65 65 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 65 100.00% 0 Sep-12 0 Completed

Paving Cum 750 750 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 750 100.00% 0 Mar-13 0 Completed

Misc (Road, Drain etc.) Cum 200 200 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 200 100.00% 0 Mar-13 0 Completed

Structure Fabrication MT 454 454 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 454 100.00% 0 Apr-12 0 Completed
STRUCTURE
Structure Erection MT 454 454 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 454 100.00% 0 May-12 0 Completed

EQUIPMENT Erection of Equipment MT 416 416 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 416 100.00% 0 Oct-13 0 Completed

Piping Fabrication ID 31731 31731 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 31731 100.00% 0 Oct-13 0 Completed

Piping Erection IM 45078 45078 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 45078 100.00% 0 Nov-13 0 Completed
PIPING
Piping Erection (Field ID 20488 20488 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 20488 100.00% 0 Nov-13 0 Completed
Joints)

Hydro/Pneumatic Test Nos 195 195 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 195 100.00% 0 Dec-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray Mtr 3500 3500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3500 100.00% 0 Dec-13 0 Completed
Laying

Electrical Cable Laying Mtr 42000 42000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 42000 100.00% 0 Dec-13 0 Completed

Electrical Earth Pits


Installation Nos 15 15 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 15 100.00% 0 Sep-12 0 Completed

ELECTRICAL Electrical Earth Strips Mtr 2100 2100 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2100 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 4 4 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4 100.00% 0 Jul-13 0 Completed
Installation

Junction Boxes Fixing Nos 68 68 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 68 100.00% 0 Aug-13 0 Completed

Light Fixtures Fixing Nos 334 334 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 334 100.00% 0 Nov-13 0 Completed

Glanding & Termination Nos 248 248 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 248 100.00% 0 Dec-13 0 Completed

Instrumentation Pannel Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


Installation

Inst. Cable Tray Laying Mtr 5300 5266 99.36% 11 0 0.00% 34 0 0.00% 11 34 5266 99.36% 34 Jan-14 11

Inst. Cable Laying Mtr 95000 93782 98.72% 158 400 406 558 137.44% 1218 558 45.81% 220 1218 94340 99.31% 660 Jan-14 220
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 185 185 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 185 100.00% 0 Apr-12 0 Completed

Junction Boxes Fixing Nos 139 139 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 139 100.00% 0 Sep-13 0 Completed

Stanchions Installation Nos 330 330 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 330 100.00% 0 Sep-13 0 Completed

Instruments Installation Nos 680 611 89.85% 23 0 0.00% 69 0 0.00% 23 69 611 89.85% 69 Jan-14 23

Loop Checking (Cold) Nos 780 780 100.00% 0 0 #DIV/0! 170 170 100.00% 0 170 780 100.00% 0 Jan-14 0 Completed

Inst. Impulse Tubing Nos 90 90 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 90 100.00% 0 Sep-13 0 Completed

Print Date: 10.01.2014


UNIT-91 (Mr A N Tiwari)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Discipline Activities UOM % next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14 week date till date Compl. week
week 12.01.14 Plan Act % Plan Act % Jan'14 Feb'14

Civil (Bldg & Equipment) Cum 5826 5826 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 5826 100.00% 0 Mar-13 0 Completed

Cable Trench Cum 45 45 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 45 100.00% 0 Mar-13 0 Completed

CIVIL Slop Channel Cum 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Paving Cum 2905 2905 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2905 100.00% 0 Jul-13 0 Completed

Misc (Road, Drain etc.) Cum 1020 1020 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1020 100.00% 0 Oct-13 0 Completed

Structure Fabrication MT 1141 1141 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1141 100.00% 0 Mar-12 0 Completed
STRUCTURE
Structure Erection MT 1141 1141 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1141 100.00% 0 Apr-13 0 Completed

EQUIPMENT Erection of Equipment MT 46 46 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 46 100.00% 0 Oct-13 0 Completed

Tankage Fabrication MT 1942 1942 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1942 100.00% 0 Aug-13 0 Completed
TANKAGE
Tankage Erection MT 1970 1970 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1970 100.00% 0 Sep-13 0 Completed

Piping Fabrication ID 23640 23640 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 23640 100.00% 0 Nov-13 0 Completed

Piping Erection IM 54344 54344 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 54344 100.00% 0 Nov-13 0 Completed
PIPING
Piping Erection (Field ID 15760 15760 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 15760 100.00% 0 Nov-13 0 Completed
Joints)

Hydro/Pneumatic Test Nos 69 69 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 69 100.00% 0 Nov-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray
Laying Mtr 4400 4400 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4400 100.00% 0 Nov-13 0 Completed

Electrical Cable Laying Mtr 42500 42500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 42500 100.00% 0 Nov-13 0 Completed

Electrical Earth Pits Nos 47 47 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 47 100.00% 0 Jun-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 4800 4800 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4800 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 13 13 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 13 100.00% 0 Jul-13 0 Completed
Installation

Junction Boxes Fixing Nos 51 51 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 51 100.00% 0 Dec-13 0 Completed

Light Fixtures Fixing Nos 536 536 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 536 100.00% 0 Dec-13 0 Completed

Glanding & Termination Nos 354 354 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 354 100.00% 0 Nov-13 0 Completed

Instrumentation Pannel
Installation Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Inst. Cable Tray Laying Mtr 4200 4200 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 4200 100.00% 0 Dec-13 0 Completed

Inst. Cable Laying Mtr 55000 55000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 55000 100.00% 0 Dec-13 0 Completed
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 1321 1321 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1321 100.00% 0 Feb-12 0 Completed

Junction Boxes Fixing Nos 91 91 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 91 100.00% 0 Sep-13 0 Completed

Stanchions Installation Nos 125 125 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 125 100.00% 0 Oct-13 0 Completed

Instruments Installation Nos 319 318 99.69% 1 0 1 300.00% 1 1 100.00% 0 1 319 100.00% 0 Jan-14 0 Completed

Loop Checking (Cold) Nos 626 622 99.36% 1 0 0.00% 4 0 0.00% 1 4 622 99.36% 4 Jan-14 1

Inst. Impulse Tubing Nos 60 60 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 60 100.00% 0 Oct-13 0 Completed

Print Date: 10.01.2014


UNIT-92 (Mr S S Rathi)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14 week date till date Compl. week
week 12.01.14 Plan Act % Plan Act % Jan'14 Feb'14

Civil (Bldg & Equipment) Cum 1050 1050 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1050 100.00% 0 Jul-13 0 Completed

Cable Trench Cum 20 20 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 20 100.00% 0 Jul-13 0 Completed

CIVIL Slop Channel Cum 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Paving Cum 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Misc (Road, Drain etc.) Cum 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Structure Fabrication MT 408 408 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 408 100.00% 0 May-13 0 Completed
(Derrick & Riser)
STRUCTURE
Structure Erection MT 408 408 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 408 100.00% 0 Sep-13 0 Completed
(Derrick & Riser)

EQUIPMENT Erection of Equipment MT 111 111 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 111 100.00% 0 Oct-13 0 Completed

Piping Fabrication ID 6000 6000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 6000 100.00% 0 Sep-13 0 Completed

Piping Erection IM 9040 9040 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 9040 100.00% 0 Oct-13 0 Completed
PIPING
Piping Erection (Field ID 1000 1000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1000 100.00% 0 Dec-13 0 Completed
Joints)

Hydro/Pneumatic Test Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Dec-13 0 Completed

Electrical Transformer Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0


installation
Electrical Cable Tray Mtr 600 600 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 600 100.00% 0 Dec-13 0 Completed
Laying

Electrical Cable Laying Mtr 9000 9000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 9000 100.00% 0 Dec-13 0 Completed

Electrical Earth Pits Nos 10 10 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 10 100.00% 0 Dec-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 200 200 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 200 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0
Installation

Junction Boxes Fixing Nos 10 10 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 10 100.00% 0 Dec-13 0 Completed

Light Fixtures Fixing Nos 93 93 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 93 100.00% 0 Dec-13 0 Completed

Glanding & Termination Nos 40 40 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 40 100.00% 0 Dec-13 0 Completed

Instrumentation Pannel Nos 2 2 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2 100.00% 0 Dec-13 0 Completed


Installation

Inst. Cable Tray Laying Mtr 300 300 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 300 100.00% 0 Dec-13 0 Completed

Inst. Cable Laying Mtr 2000 2000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 2000 100.00% 0 Dec-13 0 Completed
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Junction Boxes Fixing Nos 10 10 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 10 100.00% 0 Dec-13 0 Completed

Stanchions Installation Nos 20 20 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 20 100.00% 0 Dec-13 0 Completed

Instruments Installation Nos 144 122 84.72% 7 0 0.00% 22 0 0.00% 7 22 122 84.72% 22 Jan-14 7

Loop Checking (Cold) Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Jan-14 0

Inst. Impulse Tubing Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Jan-14 0

Print Date: 10.01.2014


OSBL (Mr S N Swain / Mr Ashish Jena)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Discipline Activities UOM % next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Ash Handling System Cum 7216 7216 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 7216 100.00% 0 May-13 0 Completed

Cooling Tower Cum 3867 3867 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 3867 100.00% 0 May-13 0 Completed

Circulating Pump House Cum 2535 2535 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 2535 100.00% 0 Apr-13 0 Completed

Side Stream Filter Cum 300 300 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 300 100.00% 0 Mar-13 0 Completed

CIVIL FWHS & Compressor Cum 1446 1446 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 1446 100.00% 0 Apr-13 0 Completed
Foundation

Bio ETP & Cable Trench Cum 16440 16440 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 16440 100.00% 0 Mar-13 0 Completed

Chemical House (ETP) Cum 230 230 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 230 100.00% 0 Mar-13 0 Completed

MCC Control Room (ETP) Cum 590 590 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 590 100.00% 0 Feb-13 0 Completed

Utility Sub Station Cum 1060 1060 100.00% 0 0 #DIV/0! 0 #DIV/0! 0 1060 100.00% 0 Apr-13 0 Completed

Print Date: 10.01.2014


OSBL (Mr S S Rathi)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
Monthly Prog.(Jan'14) Plan for Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on - 16.01.2014) Month
Discipline Activities UOM % next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Fabrication (FWHS) MT 220 220 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 220 100.00% 0 Jan-12 0 Completed

Erection (FWHS) MT 220 220 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 220 100.00% 0 Dec-12 0 Completed

Fabrication (CWPH) MT 118 118 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 118 100.00% 0 Jan-12 0 Completed

Erection (CWPH) MT 118 118 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 118 100.00% 0 Dec-12 0 Completed
STRUCTURE
Fabrication (Ash MT 120 120 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 120 100.00% 0 Mar-13 0 Completed
Handling System)
Erection (Ash Handling MT 120 120 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 120 100.00% 0 Mar-13 0 Completed
System)
Fabrication (Utility Sub
Station) MT 160 160 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 160 100.00% 0 Nov-12 0 Completed

Erection (Utility Sub


Station) MT 160 160 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 160 100.00% 0 Jan-13 0 Completed

Erection of Equipment Nos 25 25 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 25 100.00% 0 May-13 0 Completed


(FWHS)
Erection of Equipment Nos 24 24 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 24 100.00% 0 Sep-13 0 Completed
(CWPH)

EQUIPMENT Erection of Equipment Nos 12 12 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 12 100.00% 0 Sep-13 0 Completed
(Side Stream Filter)
Erection of Equipment Nos 108 108 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 108 100.00% 0 Sep-13 0 Completed
(Bio-ETP)
Erection of Equipment Nos 14 14 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 14 100.00% 0 Aug-13 0 Completed
(Ash Handling)
Piping Fabrication ID 9850 9850 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 9850 100.00% 0 Feb-13 0 Completed
(CWPH)
Piping Erection IM 34000 34000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 34000 100.00% 0 Feb-13 0 Completed
(CWPH)
Hydro/Pneumatic Test Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Apr-13 0 Completed
(CWPH)
Piping Fabrication ID 8000 8000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 8000 100.00% 0 Aug-13 0 Completed
(Ash Handling)
Piping Erection
(Ash Handling) IM 25000 25000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 25000 100.00% 0 Aug-13 0 Completed

Hydro/Pneumatic Test
(Ash Handling) Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Sep-13 0 Completed

Piping Fabrication ID 9600 9600 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 9600 100.00% 0 Apr-13 0 Completed
(FWHS)

PIPING Piping Erection IM 9400 9400 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 9400 100.00% 0 Apr-13 0 Completed
(FWHS)
Hydro/Pneumatic Test Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Apr-13 0 Completed
(FWHS)
Piping Fabrication ID 900 900 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 900 100.00% 0 Aug-13 0 Completed
(Cooling Tower)
Piping Erection IM 7600 7600 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 7600 100.00% 0 Sep-13 0 Completed
(Cooling Tower)
Hydro/Pneumatic Test Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Sep-13 0 Completed
(Cooling Tower)
Piping Fabrication
(Bio-ETP) ID 13000 13000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 13000 100.00% 0 Sep-13 0 Completed

Piping Erection
(Bio ETP) IM 42000 42000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 42000 100.00% 0 Oct-13 0 Completed

Hydro/Pneumatic Test Nos 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Oct-13 0 Completed


(Bio ETP)
Electrical Transformer Nos 13 13 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 13 100.00% 0 May-13 0 Completed
installation
Electrical Cable Tray Mtr 6500 6500 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 6500 100.00% 0 Dec-13 0 Completed
Laying

Electrical Cable Laying Mtr 201000 201000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 201000 100.00% 0 Dec-13 0 Completed

Electrical Earth Pits Nos 80 80 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 80 100.00% 0 Nov-13 0 Completed
Installation

ELECTRICAL Electrical Earth Strips Mtr 6000 6000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 6000 100.00% 0 Dec-13 0 Completed
Laying
Electrical Pannel
Installation Nos 61 61 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 61 100.00% 0 Nov-13 0 Completed

Junction Boxes Fixing Nos 20 8 40.00% 4 0 0.00% 12 0 0.00% 4 12 8 40.00% 12 Jan-14 4

Light Fixtures Fixing Nos 450 182 40.44% 89 0 0.00% 268 0 0.00% 89 268 182 40.44% 268 Jan-14 89

Glanding & Termination Nos 1050 1050 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1050 100.00% 0 Dec-13 0 Completed

Instrumentation Pannel Nos 3 3 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3 100.00% 0 Jun-13 0 Completed


Installation

Inst. Cable Tray Laying Mtr 900 900 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 900 100.00% 0 Dec-13 0 Completed

Inst. Cable Laying Mtr 6000 6000 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 6000 100.00% 0 Dec-13 0 Completed
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Junction Boxes Fixing Nos 7 7 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 7 100.00% 0 Dec-13 0 Completed

Stanchions Installation Nos 15 15 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 15 100.00% 0 Dec-13 0 Completed

Instruments Installation Nos 448 411 91.74% 12 0 0.00% 37 0 0.00% 12 37 411 91.74% 37 Jan-14 12

Loop Checking (Cold) Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Jan-14 0

Inst. Impulse Tubing Nos 30 30 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 30 100.00% 0 Jan-14 0


Print Date: 10.01.2014
Under Ground / Fire Water Piping (Mr Palanivel)
Cumm. Prog on Weekly Progress Plan for Next
(10.01.2014 - 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Discipline Activities UOM % next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Piping Fabrication ID 62748 62748 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 62748 100.00% 0 Sep-13 0 Completed
(Under Ground)
Piping Erection (Under IM 190385 190385 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 190385 100.00% 0 Sep-13 0 Completed
Ground)
Hydro/Pneumatic Test Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Sep-13 0 Completed
(Under Ground)
PIPING
Piping Fabrication (Fire ID 24270 24270 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 24270 100.00% 0 Nov-13 0 Completed
Water)
Piping Erection (Fire IM 55620 55620 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 55620 100.00% 0 Nov-13 0 Completed
Water)
Hydro/Pneumatic Test
(Fire water) Nos 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Nov-13 0 Completed

Print Date: 10.01.2014


Work-Shop & Office Building (Mr Ashis Jena)
Cumm. Prog on Weekly Progress Plan for Next
Monthly Prog.(Jan'14) Plan for Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on (10.01.2014 - 16.01.2014) Month
Discipline Activities UOM % next Prog. till % Balance for rate per
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Office Building Cum 360 360 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 360 100.00% 0 May-13 0
CIVIL
Work Shop Building Cum 483 483 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 483 100.00% 0 Jul-13 0

Fabrication (Office MT 335 335 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 335 100.00% 0 Jul-13 0
Building)

Erection (Office Building) MT 335 335 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 335 100.00% 0 Aug-13 0
STRUCTURE
Fabrication (Work Shop) MT 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Erection (Work Shop) MT 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0

Print Date: 10.01.2014


Fire Proofing (Mr Selvaraj)
Cumm. Prog on Weekly Progress Monthly Prog.(Jan'14) Plan for Next
(10.01.2014 - 16.01.2014) Plan for Month Cumm. Cumm. Target Asking
Discipline Unit / Area UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
week 12.01.14 Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week

Lloyd /
Unit-00 Cum 105 33 31.43% 2 2 2 2 24 8 33.33% 83 19 22.89% 21 83 41 39.05% 64 Jan-14 21 Carboline

Unit-03 Cum 360 360 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 360 100.00% 0 Nov-13 0 Lloyd

Unit-04 Cum 45 45 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 45 100.00% 0 Sep-13 0 Lloyd

Unit-05 Cum 250 250 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 250 100.00% 0 Jul-13 0 Carboline

Unit-06 Cum 140 140 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 140 100.00% 0 Mar-13 0 Lloyd
Fire Proofing
Unit-07 Cum 90 90 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 90 100.00% 0 Feb-13 0 Lloyd

Unit-08 Cum 10 10 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 10 100.00% 0 Jul-13 0 Lloyd

Unit-09 Cum 130 130 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 130 100.00% 0 May-13 0 Carboline

Equipments Cum 150 150 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 150 100.00% 0 Jul-13 0 Lloyd

Total Cum 1280 1208 94.38% 2 2 2 2 0 0 24 8 33.33% 83 19 22.89% 21 83 0 1216 95.00% 64 21

Print Date: 10.01.2014


Equipment Insulation (Mr Selvaraj)
Cumm. Prog on Weekly Progress Monthly Prog.(Jan'14) Plan for Next
(10.01.2014 - 16.01.2014) Plan for Month Cumm. Cumm. Target Asking
Discipline Unit / Area UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
week 12.01.14 Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week

Unit-00 SQM 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 Mar-13 0 Kaefer Punj

Unit-03 SQM 656 656 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 656 100.00% 0 Dec-13 0 Kaefer Punj

Unit-04 SQM 481 481 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 481 100.00% 0 Oct-13 0 Kaefer Punj

Unit-05 SQM 3380 3380 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 3380 100.00% 0 Nov-13 0 Kaefer Punj

Unit-06 SQM 1932 1932 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1932 100.00% 0 Aug-13 0 Kaefer Punj

Insulation Unit-07 SQM 1211 1211 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1211 100.00% 0 Aug-13 0 Lloyd

Unit-08 SQM 6960 6388 91.78% 70 70 80 80 191 300 157.34% 1142 870 76.18% 91 1142 6688 96.09% 272 Jan-14 91 Lloyd

Unit-09 SQM 1010 1010 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 1010 100.00% 0 Apr-13 0 Lloyd

Unit-91 SQM 155 155 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 155 100.00% 0 Mar-13 0 Kaefer Punj

Equipments SQM 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Total SQM 15785 15213 96.38% 70 70 80 80 0 0 191 300 157.34% 1142 870 76.18% 91 1142 0 15513 98.28% 272 91

Print Date: 10.01.2014


Piping Insulation (Mr Selvaraj)
Cumm. Prog on Weekly Progress Monthly Prog.(Jan'14) Plan for Next
(10.01.2014 - 16.01.2014) Plan for Month Cumm. Cumm. Target Asking
Discipline Unit / Area UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
week 12.01.14 Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week

Unit-00 SQM 7840 7645 97.51% 65 0 0.00% 195 0 0.00% 65 195 7645 97.51% 195 Jan-14 65 Lloyd

Unit-03 SQM 6470 6085 94.05% 40 100 35 40 128 215 167.53% 585 415 70.94% 57 585 6300 97.37% 170 Jan-14 57 Kaefer Punj

Unit-04 SQM 2250 2250 100.00% 0 0 #DIV/0! 25 25 100.00% 0 25 2250 100.00% 0 Jan-14 0 Kaefer Punj

Unit-05 SQM 6660 6183 92.84% 45 50 40 159 135 84.91% 477 135 28.30% 114 477 6318 94.86% 342 Jan-14 114 Kaefer Punj

Unit-06 SQM 3385 3073 90.78% 30 104 30 28.85% 342 60 17.54% 94 342 3103 91.67% 282 Jan-14 94 Kaefer Punj

Insulation Unit-07 SQM 3622 3438 94.92% 15 5 61 20 32.61% 184 20 10.87% 55 184 3458 95.47% 164 Jan-14 55 Lloyd

Unit-08 SQM 9550 5148 53.91% 120 170 120 130 1467 540 36.80% 4832 970 20.07% 1287 4832 5688 59.56% 3862 Jan-14 1287 Lloyd

Unit-09 SQM 3140 2935 93.47% 10 20 15 68 45 65.85% 240 80 33.33% 53 240 2980 94.90% 160 Jan-14 53 Lloyd

Unit-91 SQM 1730 1160 67.05% 140 110 190 250 131.58% 1270 950 74.80% 107 1270 1410 81.50% 320 Jan-14 107 Kaefer Punj

Equipments SQM 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Total SQM 44647 37917 84.93% 220 365 355 295 0 0 2243 1235 55.05% 8150 2655 32.58% 1832 8150 0 39152 87.69% 5495 1832

Print Date: 10.01.2014


Packages & Tier-II Equipment Insulation (Mr Selvaraj)
Cumm. Prog on Weekly Progress Monthly Prog.(Jan'14) Plan for Next
(10.01.2014 - 16.01.2014) Plan for Month Cumm. Cumm. Target Asking
Discipline Unit / Area UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
week 12.01.14 Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week

Unit-00 SQM 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Unit-03 SQM 5230 4160 79.54% 357 0 0.00% 1070 0 0.00% 357 1070 4160 79.54% 1070 Jan-14 357 Kaefer

Unit-04 SQM 650 650 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 650 100.00% 0 Dec-13 0 kaefer

Unit-05 SQM 120 120 100.00% 0 0 #DIV/0! 0 0 #DIV/0! 0 0 120 100.00% 0 Nov-13 0 kaefer

Unit-06 SQM 100 60 60.00% 13 0 0.00% 40 0 0.00% 13 40 60 60.00% 40 Jan-14 13 Kaefer

Insulation Unit-07 SQM 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Unit-08 SQM 3460 230 6.65% 1077 0 0.00% 3230 0 0.00% 1077 3230 230 6.65% 3230 Jan-14 1077 Lloyd

Unit-09 SQM 650 140 21.54% 40 15 170 55 32.35% 510 55 10.78% 152 510 195 30.00% 455 Jan-14 152 Lloyd

Unit-91 SQM 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Equipments SQM 0 0 #DIV/0! 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 #DIV/0! 0 0 NA

Total SQM 10210 5360 52.50% 40 0 15 0 0 0 1617 55 3.40% 4850 55 1.13% 1598 4850 0 5415 53.04% 4795 1598

Print Date: 10.01.2014


Summary (ISBL & OSBL)
Cumm. Prog on Weekly Progress (10.01.2014 Plan for Next
- 16.01.2014) Monthly Prog.(Jan'14) Plan for Month Cumm. Cumm. Target Asking
Discipline Activities UOM Total Comp. % Prog on 11.01.14 Prog on Prog on Prog on Prog on next Prog. till % Balance for rate per Remarks
Scope Till last 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14
Plan Act % Plan Act % week Jan'14 Feb'14 date till date Compl. week
week 12.01.14

Civil (Bldg & Equipment) Cum 89882 89882 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 89882 100.00% 0 Jul-13 0 Completed

Cable Trench Cum 1175 1175 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 1175 100.00% 0 Jul-13 0 Completed

CIVIL Slop Channel Cum 2727 2727 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 2727 100.00% 0 Jul-13 0 Completed

Paving Cum 9220 9220 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 9220 100.00% 0 Jul-13 0 Completed

Misc (Road, Drain etc.) Cum 12050 12050 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 12050 100.00% 0 Oct-13 0 Completed

Structure Fabrication MT 10558 10558 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 10558 100.00% 0 Jul-13 0 Completed
STRUCTURE
Structure Erection MT 10558 10558 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 10558 100.00% 0 Nov-13 0 Completed

EQUIPMENT Erection of Equipment MT 8928 8825 98.85% 0 25 0 0 0 0 34 25 73.10% 103 25 24.37% 26 103 0 8850 99.13% 78 Jan-14 26

Tankage Fabrication MT 4180 4180 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 4180 100.00% 0 Aug-13 0 Completed
TANKAGE
Tankage Erection MT 4239 4239 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 4239 100.00% 0 Sep-13 0 Completed

Piping Fabrication ID 487465 487465 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 487465 100.00% 0 Dec-13 0 Completed

Piping Erection IM 1100758 1100676 99.99% 0 0 0 0 0 0 27 0 0.00% 382 300 78.53% 27 382 0 1100676 99.99% 82 Jan-14 27
PIPING
Piping Erection (Field ID 235528 235489 99.98% 0 0 0 0 0 0 13 0 0.00% 336 297 88.39% 13 336 0 235489 99.98% 39 Jan-14 13
Joints)

Hydro/Pneumatic Test Nos 1798 1778 98.89% 1 0 0 0 0 0 7 1 15.00% 21 2 9.52% 6 21 0 1779 98.94% 19 Jan-14 6

Electrical Transformer Nos 41 41 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 41 100.00% 0 May-13 0 Completed


installation
Electrical Cable Tray Mtr 51240 51196 99.91% 0 0 0 0 0 0 15 0 0.00% 44 0 0.00% 15 44 0 51196 99.91% 44 Jan-14 15
Laying

Electrical Cable Laying Mtr 727100 726993 99.99% 0 0 0 0 0 0 36 0 0.00% 259 152 58.69% 36 259 0 726993 99.99% 107 Jan-14 36

Electrical Earth Pits


Installation Nos 393 393 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 393 100.00% 0 Dec-13 0 Completed

ELECTRICAL Electrical Earth Strips Mtr 44200 44179 99.95% 0 0 0 0 0 0 7 0 0.00% 21 0 0.00% 7 21 0 44179 99.95% 21 Jan-14 7
Laying
Electrical Pannel Nos 543 543 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 543 100.00% 0 Dec-13 0 Completed
Installation

Junction Boxes Fixing Nos 636 586 92.14% 0 0 0 0 0 0 17 0 0.00% 50 0 0.00% 17 50 0 586 92.14% 50 Jan-14 17

Light Fixtures Fixing Nos 4881 4350 89.12% 0 0 0 0 0 0 177 0 0.00% 537 6 1.12% 177 537 0 4350 89.12% 531 Jan-14 177

Glanding & Termination Nos 7378 7291 98.82% 0 0 0 0 0 0 29 0 0.00% 93 6 6.45% 29 93 0 7291 98.82% 87 Jan-14 29

Instrumentation Pannel Nos 172 172 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 172 100.00% 0 Dec-13 0 Completed
Installation

Inst. Cable Tray Laying Mtr 48350 48185 99.66% 20 10 10 5 0 0 57 45 78.49% 212 92 43.40% 40 212 0 48230 99.75% 120 Jan-14 40

Inst. Cable Laying Mtr 813000 809241 99.54% 158 0 414 400 0 0 1253 972 77.57% 4085 1298 31.77% 929 4085 0 810213 99.66% 2787 Jan-14 929
INSTRUMENTATION

Inst. Cable Duct Erection Mtr 4700 4700 100.00% 0 0 0 0 0 0 0 0 #DIV/0! 0 0 #DIV/0! 0 0 0 4700 100.00% 0 May-13 0 Completed

Junction Boxes Fixing Nos 1204 1198 99.50% 0 1 0 0 0 0 2 1 50.00% 6 1 16.67% 2 6 0 1199 99.58% 5 Jan-14 2

Stanchions Installation Nos 2295 2208 96.21% 0 0 1 0 0 0 29 1 3.45% 88 2 2.27% 29 88 0 2209 96.25% 86 Jan-14 29

Instruments Installation Nos 5644 5171 91.62% 3 9 11 23 0 0 158 46 29.18% 540 113 20.93% 142 540 0 5217 92.43% 427 Jan-14 142

Loop Checking (Cold) Nos 9374 8516 90.85% 0 0 0 0 0 0 286 0 0.00% 1707 849 49.74% 286 1707 0 8516 90.85% 858 Jan-14 286

Inst. Impulse Tubing Nos 1238 1234 99.68% 0 0 0 0 0 0 1 0 0.00% 4 0 0.00% 1 4 0 1234 99.68% 4 Jan-14 1

Print Date: 10.01.2014


Unit Wise Civil Status 28-Jul-20
Cumm. Comp. Cumm. Bal Till
Area Activities UOM Total Scope % % Remarks
Till Today Today
SS-1 Civil (Bldg & Equipment) Cum 2950 2950.00 100.00% 0.00 0.00% Mar-13
SS-2 Civil (Bldg & Equipment) Cum 1823 1823.00 100.00% 0.00 0.00% Mar-12
CR-1 Civil (Bldg & Equipment) Cum 5920 5920.00 100.00% 0.00 0.00% Jan-13
CR-2 Civil (Bldg & Equipment) Cum 3500 3500.00 100.00% 0.00 0.00% Jul-13
Civil (Bldg & Equipment) Cum 3465 3465.00 100.00% 0.00 0.00% Apr-13
Cable Trench Cum 0 0.00 #DIV/0! 0.00 #DIV/0! NA
Unit-00 Slop Channel Cum 102 102.00 100.00% 0.00 0.00% Apr-13
Paving Cum 415 415.00 100.00% 0.00 0.00% May-13
Misc (Road, Drain etc.) Cum 8650 8650.00 100.00% 0.00 0.00% Oct-13
Civil (Bldg & Equipment) Cum 5840 5840.00 100.00% 0.00 0.00% Jul-13
Cable Trench Cum 210 210.00 100.00% 0.00 0.00% Mar-13
Unit-03 Slop Channel Cum 840 840.00 100.00% 0.00 0.00% Mar-13
Paving Cum 680 680.00 100.00% 0.00 0.00% Apr-13
Misc (Road, Drain etc.) Cum 230 230.00 100.00% 0.00 0.00% May-13
Civil (Bldg & Equipment) Cum 2155 2155.00 100.00% 0.00 0.00% Mar-13
Cable Trench Cum 70 70.00 100.00% 0.00 0.00% Jan-13
Unit-04 Slop Channel Cum 200 200.00 100.00% 0.00 0.00% Mar-13
Paving Cum 400 400.00 100.00% 0.00 0.00% May-13
Misc (Road, Drain etc.) Cum 100 100.00 100.00% 0.00 0.00% May-13
Civil (Bldg & Equipment) Cum 5705 5705.00 100.00% 0.00 0.00% Apr-13
Cable Trench Cum 55 55.00 100.00% 0.00 0.00% Apr-13
Unit-05 Slop Channel Cum 810 810.00 100.00% 0.00 0.00% Jun-13
Paving Cum 1070 1070.00 100.00% 0.00 0.00% Jun-13
Misc (Road, Drain etc.) Cum 400 400.00 100.00% 0.00 0.00% Jun-13
Civil (Bldg & Equipment) Cum 5323 5323.00 100.00% 0.00 0.00% Apr-13
Cable Trench Cum 70 70.00 100.00% 0.00 0.00% Apr-13
Unit-06 Slop Channel Cum 370 370.00 100.00% 0.00 0.00% Apr-13
Paving Cum 1280 1280.00 100.00% 0.00 0.00% Jul-13
Misc (Road, Drain etc.) Cum 830 830.00 100.00% 0.00 0.00% Jul-13
Civil (Bldg & Equipment) Cum 1420 1420.00 100.00% 0.00 0.00% Sep-12
Cable Trench Cum 300 300.00 100.00% 0.00 0.00% Jul-13
Unit-07 Slop Channel Cum 190 190.00 100.00% 0.00 0.00% May-13
Paving Cum 720 720.00 100.00% 0.00 0.00% Jul-13
Misc (Road, Drain etc.) Cum 360 360.00 100.00% 0.00 0.00% Oct-13
Civil (Bldg & Equipment) Cum 8148 8148.00 100.00% 0.00 0.00% Apr-13
Cable Trench Cum 400 400.00 100.00% 0.00 0.00% Jul-13
Unit-08 Slop Channel Cum 150 150.00 100.00% 0.00 0.00% Jul-13
Paving Cum 1000 1000.00 100.00% 0.00 0.00% Jul-13
Misc (Road, Drain etc.) Cum 260 260.00 100.00% 0.00 0.00% Aug-13
Civil (Bldg & Equipment) Cum 2230 2230.00 100.00% 0.00 0.00% Jan-12
Cable Trench Cum 5 5.00 100.00% 0.00 0.00% Jan-12
Unit-09 Slop Channel Cum 65 65.00 100.00% 0.00 0.00% Sep-12
Paving Cum 750 750.00 100.00% 0.00 0.00% Mar-13
Misc (Road, Drain etc.) Cum 200 200.00 100.00% 0.00 0.00% Mar-13
Civil (Bldg & Equipment) Cum 5825.5 5825.50 100.00% 0.00 0.00% Mar-13
Cable Trench Cum 44.5 44.50 100.00% 0.00 0.00% Mar-13
Unit-91 Slop Channel Cum 0 0.00 #DIV/0! 0.00 #DIV/0! NA
Paving Cum 2905 2905.00 100.00% 0.00 0.00% Jul-13
Misc (Road, Drain etc.) Cum 1020 1020.00 100.00% 0.00 0.00% Oct-13
Civil (Bldg & Equipment) Cum 1050 1050.00 100.00% 0.00 0.00% Jul-13
Cable Trench Cum 20 20.00 100.00% 0.00 0.00% Jul-13
Unit-92 Slop Channel Cum 0 0.00 #DIV/0! 0.00 #DIV/0! NA
Paving Cum 0 0.00 #DIV/0! 0.00 #DIV/0! NA
Misc (Road, Drain etc.) Cum 0 0.00 #DIV/0! 0.00 #DIV/0! NA
Ash Handling System Cum 7216 7216.00 100.00% 0.00 0.00% May-13
Cooling Tower Cum 3867 3867.00 100.00% 0.00 0.00% May-13
Circulating Pump House Cum 2535 2535.00 100.00% 0.00 0.00% Apr-13
Side Stream Filter Cum 300 300.00 100.00% 0.00 0.00% Mar-13
OSBL FWHS & Compressor Foundation Cum 1446 1446.00 100.00% 0.00 0.00% Apr-13
Bio ETP Cum 16440 16440.00 100.00% 0.00 0.00% Mar-13
Chemical House (ETP) Cum 230 230.00 100.00% 0.00 0.00% Mar-13
MCC Control Room (ETP) Cum 590 590.00 100.00% 0.00 0.00% Feb-13
Utility Sub Station Cum 1060 1060.00 100.00% 0.00 0.00% Apr-13
Office Building Cum 360 360.00 100.00% 0.00 0.00% May-13
Misc
Work Shop Building Cum 483 483.00 100.00% 0.00 0.00% Jul-13
Total Cum 115053 115053 100.00% 0 0.00%
Unit Wise Structure Status 28-Jul-20
Cumm. Comp. Cumm. Bal Till
Area Activities UOM Total Scope % % Remarks
Till Today Today

Structure Fabrication MT 40 40 100.00% 0 0.00% Dec-11


SS-1
Structure Erection MT 40 40 100.00% 0 0.00% Feb-12

Structure Fabrication MT 40 40 100.00% 0 0.00% Dec-11


SS-2
Structure Erection MT 40 40 100.00% 0 0.00% Feb-12

Structure Fabrication MT 1578 1578 100.00% 0 0.00% Sep-12


Unit-00
Structure Erection MT 1578 1578 100.00% 0 0.00% Nov-13

Structure Fabrication MT 2920 2920 100.00% 0 0.00% Jul-13


Unit-03
Structure Erection MT 2920 2920 100.00% 0 0.00% Sep-13

Structure Fabrication MT 631 631 100.00% 0 0.00% Apr-13


Unit-04
Structure Erection MT 631 631 100.00% 0 0.00% Nov-13

Structure Fabrication MT 845 845 100.00% 0 0.00% Sep-12


Unit-05
Structure Erection MT 845 845 100.00% 0 0.00% Nov-13

Structure Fabrication MT 750 750 100.00% 0 0.00% Jan-12


Unit-06
Structure Erection MT 750 750 100.00% 0 0.00% Sep-13

Structure Fabrication MT 398 398 100.00% 0 0.00% May-13


Unit-07
Structure Erection MT 398 398 100.00% 0 0.00% Jul-13

Structure Fabrication MT 400 400 100.00% 0 0.00% Jun-12


Unit-08
Structure Erection MT 400 400 100.00% 0 0.00% Sep-13

Structure Fabrication MT 454 454 100.00% 0 0.00% Apr-12


Unit-09
Structure Erection MT 454 454 100.00% 0 0.00% May-12

Structure Fabrication MT 1141 1141 100.00% 0 0.00% Mar-12


Unit-91
Structure Erection MT 1141 1141 100.00% 0 0.00% Apr-13

Structure Fabrication MT 408 408 100.00% 0 0.00% May-13


Unit-92
Structure Erection MT 408 408 100.00% 0 0.00% Sep-13

Structure Fabrication MT 953 953 100.00% 0 0.00% Mar-13


OSBL
Structure Erection MT 953 953 100.00% 0 0.00% Mar-13

Total Fabrication MT 10558 10558 100.00% 0 0.00%


Total Erection MT 10558 10558 100.00% 0 0.00%
Unit Wise Equipment Status 28-Jul-20

Cumm. Comp. Cumm. Bal Till


Area Activities UOM Total Scope % % Remarks
Till Today Today

Unit-03 Equipment Erection MT 2513 2435.4 96.91% 77.6 3.09% Jan-14

Unit-04 Equipment Erection MT 1053 1053 100.00% 0 0.00% Jun-13

Unit-05 Equipment Erection MT 330 330 100.00% 0 0.00% Oct-13

Unit-06 Equipment Erection MT 869 869 100.00% 0 0.00% Oct-13

Unit-07 Equipment Erection MT 460 460 100.00% 0 0.00% Apr-13

Unit-08 Equipment Erection MT 2947 2947 100.00% 0 0.00% Oct-13

Unit-09 Equipment Erection MT 416 416 100.00% 0 0.00% Oct-13

Unit-91 Equipment Erection MT 46 46 100.00% 0 0.00% Oct-13

Unit-92 Equipment Erection MT 111 111 100.00% 0 0.00% Oct-13

OSBL Erection of Equipments (FWHS) Nos 25 25 100.00% 0 0.00% May-13

OSBL Erection of Equipments (CWPH) Nos 24 24 100.00% 0 0.00% Sep-13

Erection of Equipments (Side


OSBL Nos 12 12 100.00% 0 0.00% Sep-13
Stream Filter)

OSBL Erection of Equipments (Bio-ETP) Nos 108 108 100.00% 0 0.00% Sep-13

Erection of Equipments (Ash


OSBL Handling) Nos 14 14 100.00% 0 0.00% Aug-13

Total MT 8928 8850.4 99.13% 77.6 0.87%


Unit Wise Tankage Status 28-Jul-20

Cumm. Comp. Cumm. Bal Till


Area Activities UOM Total Scope % % Remarks
Till Today Today

Coal Bunker Fabrication MT 385 385 100.00% 0 0.00% Mar-13


Unit-03
Coal Bunker Erection MT 385 385 100.00% 0 0.00% Apr-13

Tankage Fabrication MT 956 956 100.00% 0 0.00% Aug-13


Unit-05
Tankage Erection MT 972 972 100.00% 0 0.00% Sep-13

Tankage Fabrication MT 897 897 100.00% 0 0.00% Apr-13


Unit-06
Tankage Erection MT 912 912 100.00% 0 0.00% Sep-13

Tankage Fabrication MT 1942 1942 100.00% 0 0.00% Aug-13


Unit-91
Tankage Erection MT 1970 1970 100.00% 0 0.00% Sep-13

Total Fabrication MT 4180 4180 100.00% 0 0.00%

Total Erection MT 4239 4239 100.00% 0 0.00%


Unit Wise Piping Status 28-Jul-20
Cumm. Comp. Cumm. Bal Till
Area Activities UOM Total Scope Till Today % Today % Remarks

Piping Fabrication ID 38675 38675 100.00% 0 0.00% Sep-13


Piping Erection IM 189302 189302 100.00% 0 0.00% Oct-13
Unit-00
Piping Erection (Field Joints) ID 26784 26784 100.00% 0 0.00% Oct-13
Hydro/Pneumatic Test Nos 83 83 100.00% 0 0.00% Dec-13
Piping Fabrication ID 56077 56077 100.00% 0 0.00% Oct-13
Piping Erection IM 67832 67750 99.88% 82 0.12% Jan-14
Unit-03
Piping Erection (Field Joints) ID 39800 39761 99.90% 39 0.10% Jan-14
Hydro/Pneumatic Test Nos 302 284 94.04% 18 5.96% Jan-14
Piping Fabrication ID 22742 22742 100.00% 0 0.00% Sep-13
Piping Erection IM 28008 28008 100.00% 0 0.00% Sep-13
Unit-04
Piping Erection (Field Joints) ID 12328 12328 100.00% 0 0.00% Sep-13
Hydro/Pneumatic Test Nos 84 84 100.00% 0 0.00% Sep-13
Piping Fabrication ID 46959 46959 100.00% 0 0.00% Oct-13
Piping Erection IM 78590 78590 100.00% 0 0.00% Nov-13
Unit-05
Piping Erection (Field Joints) ID 31000 31000 100.00% 0 0.00% Nov-13
Hydro/Pneumatic Test Nos 327 327 100.00% 0 0.00% Nov-13
Piping Fabrication ID 44960 44960 100.00% 0 0.00% Oct-13
Piping Erection IM 95975 95975 100.00% 0 0.00% Nov-13
Unit-06
Piping Erection (Field Joints) ID 29725 29725 100.00% 0 0.00% Nov-13
Hydro/Pneumatic Test Nos 253 253 100.00% 0 0.00% Nov-13
Piping Fabrication ID 35214 35214 100.00% 0 0.00% Sep-13
Piping Erection IM 62568 62568 100.00% 0 0.00% Oct-13
Unit-07
Piping Erection (Field Joints) ID 23643 23643 100.00% 0 0.00% Oct-13
Hydro/Pneumatic Test Nos 246 246 100.00% 0 0.00% Dec-13
Piping Fabrication ID 53099 53099 100.00% 0 0.00% Oct-13
Piping Erection IM 106016 106016 100.00% 0 0.00% Jan-14
Unit-08
Piping Erection (Field Joints) ID 35000 35000 100.00% 0 0.00% Jan-14
Hydro/Pneumatic Test Nos 239 238 99.58% 1 0.42% Jan-14
Piping Fabrication ID 31731 31731 100.00% 0 0.00% Oct-13
Piping Erection IM 45078 45078 100.00% 0 0.00% Nov-13
Unit-09
Piping Erection (Field Joints) ID 20488 20488 100.00% 0 0.00% Nov-13
Hydro/Pneumatic Test Nos 195 195 100.00% 0 0.00% Dec-13
Piping Fabrication ID 23640 23640 100.00% 0 0.00% Nov-13
Piping Erection IM 54344 54344 100.00% 0 0.00% Nov-13
Unit-91
Piping Erection (Field Joints) ID 15760 15760 100.00% 0 0.00% Nov-13
Hydro/Pneumatic Test Nos 69 69 100.00% 0 0.00% Nov-13
Piping Fabrication ID 6000 6000 100.00% 0 0.00% Sep-13
Piping Erection IM 9040 9040 100.00% 0 0.00% Oct-13
Unit-92
Piping Erection (Field Joints) ID 1000 1000 100.00% 0 0.00% Dec-13
Hydro/Pneumatic Test Nos 0 0 #DIV/0! 0 #DIV/0! Dec-13
Piping Fabrication ID 62748 62748 100.00% 0 0.00% Sep-13
UG Piping Piping Erection IM 190385 190385 100.00% 0 0.00% Sep-13
Hydro/Pneumatic Test Nos 0 0 #DIV/0! 0 #DIV/0! Sep-13
Piping Fabrication ID 24270 24270 100.00% 0 0.00% Nov-13
FW Piping Piping Erection IM 55620 55620 100.00% 0 0.00% Nov-13
Hydro/Pneumatic Test Nos 0 0 #DIV/0! 0 #DIV/0! Nov-13
Piping Fabrication ID 41350 41350 100.00% 0 0.00% Aug-13
OSBL Piping Erection IM 118000 118000 100.00% 0 0.00% Aug-13
Hydro/Pneumatic Test Nos 0 0 #DIV/0! 0 #DIV/0! Sep-13
Total Piping Fabrication ID 487465 487465 100.00% 0 0.00%
Total Piping Erection IM 1100758 1100676 99.99% 82 0.01%
Total Piping Erection (Field Joints) ID 235528 235489 99.98% 39 0.02%
Total Hydro/Pneumatic Test Nos 1798 1779 98.94% 19 1.06%
Page 33 of 38
Tank Wise Status
Cumm. Prog on Weekly Progress Monthly Prog.(Jan'14) Plan for next
(10.01.2014 - 16.01.2014) Plan for month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Unit Tank No Activities UOM Scope Till last % 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14 next Prog. till % Balance for rate per
Plan Act % Plan Act % week L4 Feasible date till date Compl. week
week 12.01.14

05-TK-104 (LOW Fabrication MT 13.70 24.05 175.55% 0 #DIV/0! 0 #DIV/0! 24.05 175.55% -10.35 0
AMMONIA HOT
GAS LIQUORN
TANK) Erection MT 13.70 22.43 163.72% 0 #DIV/0! 0 #DIV/0! 22.43 163.72% -8.73 0

Fabrication MT 475.00 394.37 83.03% 0 #DIV/0! 0 #DIV/0! 394.37 83.03% 80.63 0


05-TK-106
(Teritary Tar
Seperator)
Erection MT 500.00 331.93 66.39% 0 #DIV/0! 0 #DIV/0! 331.925 66.39% 168.075 0

Fabrication MT 13.00 19.95 153.46% 0 #DIV/0! 0 #DIV/0! 19.95 153.46% -6.95 0


05-TK- 107
(PHENOSOLVAN
SURGE TANK)
Erection MT 13.00 18.32 140.92% 0 #DIV/0! 0 #DIV/0! 18.32 140.92% -5.32 0

Fabrication MT 86.50 113.82 131.58% 0 #DIV/0! 0 #DIV/0! 113.82 131.58% -27.32 0


05-TK -108 (TAR
SLOP TANK)
Erection MT 91.50 113.83 124.40% 0 #DIV/0! 0 #DIV/0! 113.826 124.40% -22.326 0
Unit-05
Fabrication MT 44.00 42.290 96.11% 0 #DIV/0! 0 #DIV/0! 42.29 96.11% 1.71 0
05-TK -109 (OIL
SURGE TANK)
Erection MT 39.17 44.63 113.93% 0 #DIV/0! 0 #DIV/0! 44.631 113.93% -5.457 0

Fabrication MT 42.10 43.825 104.10% 0 #DIV/0! 0 #DIV/0! 43.825 104.10% -1.725 0


05-TK -110 (OIL
SURGE TANK)
Erection MT 39.17 47.86 122.16% 0 #DIV/0! 0 #DIV/0! 47.855 122.16% -8.681 0

Fabrication MT 44.10 43.21 97.98% 0 #DIV/0! 0 #DIV/0! 43.208 97.98% 0.892 0


05-TK-111 (CLEAR
TAR TANK)
Erection MT 39.17 41.20 105.17% 0 #DIV/0! 0 #DIV/0! 41.2 105.17% -2.026 0

Fabrication MT 42.00 41.18 98.05% 0 #DIV/0! 0 #DIV/0! 41.18 98.05% 0.82 0


05-TK -112 (CLEAR
TAR TANK)
Erection MT 39.17 42.59 108.71% 0 #DIV/0! 0 #DIV/0! 42.588 108.71% -3.414 0

Fabrication 415.26 416.72 100.35% 0 #DIV/0! 0 #DIV/0! 416.722 100.35% -1.462 0


06-TK- 100 (GAS
LIQUOR STORAGE
TANK)
Erection 421.17 415.48 98.65% 0 #DIV/0! 0 #DIV/0! 415.483 98.65% 5.687 0

Fabrication MT 414.00 422.73 102.11% 0 #DIV/0! 0 #DIV/0! 422.73 102.11% -8.73 0


06-TK -101 (GAS
LIQUOR STORAGE
TANK)
Erection MT 422.17 393.73 93.26% 0 #DIV/0! 0 #DIV/0! 393.734 93.26% 28.436 0

Fabrication MT 30.12 29.58 98.21% 0 #DIV/0! 0 #DIV/0! 29.58 98.21% 0.54 0


06-TK 102 (FLUSH
Unit-06 LIQUOR TANK)
Erection MT 33.03 32.03 96.97% 0 #DIV/0! 0 #DIV/0! 32.03 96.97% 1 0

Fabrication MT 32.31 35.07 108.54% 0 #DIV/0! 0 #DIV/0! 35.07 108.54% -2.758 0


06-TK 103 (MUD
LIQUOR TANK)
Erection MT 33.13 34.27 103.44% 0 #DIV/0! 0 #DIV/0! 34.27 103.44% -1.139 0

Fabrication MT 13.75 12.61 91.71% 0 #DIV/0! 0 #DIV/0! 12.61 91.71% 1.14 0


06-TK 104 (CTA
BUFFER TANK)
Erection MT 15.49 13.48 87.00% 0 #DIV/0! 0 #DIV/0! 13.48 87.00% 2.014 0

Fabrication MT 537.01 536.159 99.84% 0 #DIV/0! 0 #DIV/0! 536.159 99.84% 0.849 0


91-TK -106 (LIQUID
AMMONIA
STORAGE TANK)
Erection MT 564.02 552.81 98.01% 0 #DIV/0! 0 #DIV/0! 552.81 98.01% 11.21 0

Fabrication MT 559.17 561.12 100.35% 0 #DIV/0! 0 #DIV/0! 561.12 100.35% -1.95 0


91-TK -107 (LIQUID
AMMONIA
STORAGE TANK)
Erection MT 564.02 554.82 98.37% 0 #DIV/0! 0 #DIV/0! 554.82 98.37% 9.2 0

Fabrication MT 84.00 82.77 98.54% 0 #DIV/0! 0 #DIV/0! 82.77 98.54% 1.23 0


91-TK -113 (Liquid
Propylene storage
vessel)
Erection MT 88.86 0.00 0.00% 0 #DIV/0! 0 #DIV/0! 0 0.00% 88.86 0
Page 34 of 38
Tank Wise Status
Cumm. Prog on Weekly Progress Monthly Prog.(Jan'14) Plan for next
(10.01.2014 - 16.01.2014) Plan for month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Unit Tank No Activities UOM Scope Till last % 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14 next Prog. till % Balance for rate per
Plan Act % Plan Act % week L4 Feasible date till date Compl. week
week 12.01.14

Fabrication MT 89.00 92.89 104.37% 0 #DIV/0! 0 #DIV/0! 92.887 104.37% -3.887 0


91-TK -100
(GASIFICATION OIL
STORAGE TANK)
Erection MT 92.67 94.93 102.44% 0 #DIV/0! 0 #DIV/0! 94.927 102.44% -2.257 0

Fabrication MT 89.00 90.60 101.80% 0 #DIV/0! 0 #DIV/0! 90.601 101.80% -1.601 0


91-TK-101
(GASIFICATION OIL
STORAGE TANK)
Erection MT 92.67 85.43 92.18% 0 #DIV/0! 0 #DIV/0! 85.427 92.18% 7.245 0

Fabrication MT 89.00 91.08 102.33% 0 #DIV/0! 0 #DIV/0! 91.078 102.33% -2.078 0


91-TK- 102
(GASIFICATION OIL
STORAGE TANK)
Erection MT 92.67 72.62 78.37% 0 #DIV/0! 0 #DIV/0! 72.624 78.37% 20.048 0

91-TK 103 Fabrication MT 36.85 37.85 102.72% 0 #DIV/0! 0 #DIV/0! 37.854 102.72% -1.004 0
(DEPITCHED TAR
ACID STORAGE
TANK) Erection MT 39.37 38.62 98.09% 0 #DIV/0! 0 #DIV/0! 38.615 98.09% 0.75 0

Fabrication MT 20.15 22.02 109.26% 0 #DIV/0! 0 #DIV/0! 22.016 109.26% -1.866 0


91-TK 104
(PHENOLICH PITCH
STORAGE TANK)
Erection MT 23.18 24.82 107.09% 0 #DIV/0! 0 #DIV/0! 24.82 107.09% -1.643 0

Fabrication MT 14.71 15.48 105.20% 0 #DIV/0! 0 #DIV/0! 15.477 105.20% -0.765 0


91-TK 105 (CTA
STOARAGE TANK)
Erection MT 15.06 15.62 103.69% 0 #DIV/0! 0 #DIV/0! 15.615 103.69% -0.555 0

Fabrication MT 83.45 82.97 99.42% 0 #DIV/0! 0 #DIV/0! 82.97 99.42% 0.48 0


91-TK-108
Unit-91 (RECTISOL NAPHTA
STORAGE TANK)
Erection MT 88.84 78.325 88.16% 0 #DIV/0! 0 #DIV/0! 78.325 88.16% 10.515 0

Fabrication MT 81.45 76.48 93.90% 0 #DIV/0! 0 #DIV/0! 76.48 93.90% 4.97 0


91-TK-109
(RECTISOL NAPHTA
STORAGE TANK)
Erection MT 88.84 78.09 87.90% 0 #DIV/0! 0 #DIV/0! 78.091 87.90% 10.749 0

Fabrication MT 81.45 78.86 96.82% 0 #DIV/0! 0 #DIV/0! 78.86 96.82% 2.59 0


91-TK-121
(RECTISOL NAPHTA
STORAGE TANK)
Erection MT 88.84 74.80 84.20% 0 #DIV/0! 0 #DIV/0! 74.799 84.20% 14.041 0

Fabrication MT 43.31 47.62 109.95% 0 #DIV/0! 0 #DIV/0! 47.623 109.95% -4.311 0


91-TK-110 (DIPE
STORAGE TANK)
Erection MT 46.54 52.85 113.56% 0 #DIV/0! 0 #DIV/0! 52.85 113.56% -6.31 0

Fabrication MT 43.45 45.05 103.68% 0 #DIV/0! 0 #DIV/0! 45.05 103.68% -1.6 0


91-TK-111 (SOUR
METHENOL
STORAGE TANK)
Erection MT 44.51 53.07 119.23% 0 #DIV/0! 0 #DIV/0! 53.07 119.23% -8.56 0

Fabrication MT 44.00 45.57 103.57% 0 #DIV/0! 0 #DIV/0! 45.57 103.57% -1.57 0


91-TK -112 (SOUR
METHENOL
STORAGE TANK)
Erection MT 44.51 47.53 106.78% 0 #DIV/0! 0 #DIV/0! 47.53 106.78% -3.02 0

91-TK 115 Fabrication MT 3.50 3.35 95.71% 0 #DIV/0! 0 #DIV/0! 3.35 95.71% 0.15 0
(CAUSTIC SODA (50
WT.%) STORAGE
TANK) Erection MT 4.61 4.03 87.43% 0 #DIV/0! 0 #DIV/0! 4.034 87.43% 0.58 0

Fabrication MT 21.76 20.76 95.40% 0 #DIV/0! 0 #DIV/0! 20.76 95.40% 1 0


91-TK 116 (MDEA
STOARGE TANK)
Erection MT 22.61 23.03 101.86% 0 #DIV/0! 0 #DIV/0! 23.03 101.86% -0.42 0

91-TK 117 Fabrication MT 1.67 2.18 130.77% 0 #DIV/0! 0 #DIV/0! 2.18 130.77% -0.513 0
(CAUSTIC
SOLUTION (20 WT.
%) PREPARETION
TANK) Erection MT 2.03 2.18 107.34% 0 #DIV/0! 0 #DIV/0! 2.18 107.34% -0.149 0

Fabrication MT 16.44 16.16 98.30% 0 #DIV/0! 0 #DIV/0! 16.16 98.30% 0.28 0


91-TK 118 (PURE
METHENOL
STORAGE TANK)
Erection MT 18.00 17.49 97.16% 0 #DIV/0! 0 #DIV/0! 17.489 97.16% 0.511 0
Page 35 of 38
Tank Wise Status
Cumm. Prog on Weekly Progress Monthly Prog.(Jan'14) Plan for next
(10.01.2014 - 16.01.2014) Plan for month Cumm. Cumm. Target Asking
Total Comp. Prog on 11.01.14 Prog on Prog on Prog on Prog on
Unit Tank No Activities UOM Scope Till last % 10.01.14 & 13.01.14 14.01.14 15.01.14 16.01.14 next Prog. till % Balance for rate per
Plan Act % Plan Act % week L4 Feasible date till date Compl. week
week 12.01.14

Fabrication MT 3605.21 3588.37 99.53% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 0.00 3588.37 99.53% 16.841 0
Total
Erection MT 3721.74 3422.83 91.97% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00 0.00 3422.828 91.97% 298.914 0

Print Date: 10.01.2014


ISBL Summary Till date
Cumm. Achieved Balance Till
Total Plan for Till Target for
Activity UOM Date Date Mech.
Scope Oct'13
Qty % Qty % Comp.

Civil CuM 80526 0 80526 100.00% 0 0.00% Oct-13

Structural Fabrication MT 9605 0 9605 100.00% 0 0.00% Jul-13

Structural Erection MT 9605 0 9605 100.00% 0 0.00% Nov-13

Equiment Supply MT 8685 100 8617 99.22% 68 0.78% Jan-14

Equipment Erection MT 8745 103 8667 99.11% 78 0.89% Jan-14

Tankage Fabrication MT 4180 0 4180 100.00% 0 0.00% Aug-13

Tankage Erection MT 4239 0 4239 100.00% 0 0.00% Sep-13

Piping Fabrication ID 446115 0 446115 100.00% 0 0.00% Nov-13

Piping Erection IM 982758 382 982676 99.99% 82 0.01% Jan-14


Piping Erection (Field ID 235528 336 235489 99.98% 39 0.02% Jan-14
Joints)
Piping Loop Test Nos 1798 21 1779 98.94% 19 1.06% Jan-14
Elect. Transformer Nos 28 0 28 100.00% 0 0.00% May-12
Installation
Elect. Tray Installation Mtrs 44740 44 44696 99.90% 44 0.10% Jan-14

Elect. Cable Laying Mtrs 526100 259 525993 99.98% 107 0.02% Jan-14
Elect. Glanding & Nos 6328 93 6241 98.63% 87 1.37% Jan-14
Termination
Inst. Tray Installation Mtrs 47450 212 47330 99.75% 120 0.25% Jan-14

Inst. Cable Laying Mtrs 807000 4085 804213 99.65% 2787 0.35% Jan-14

Inst. Duct Installation Mtrs 4700 0 4700 100.00% 0 0.00% May-13


Inst. Loop Checking
(Cold) Nos 9374 1707 8516 90.85% 858 9.15% Jan-14

Fire Proofing CuM 1280 83 1216 95.00% 64 5.00% Jan-14

Equipment Insulation SQM 15785 1142 15513 98.28% 272 1.72% Jan-14

Piping Insulation SQM 44647 8150 39152 87.69% 5495 12.31% Jan-14
Packages & Tier-II SQM 10210 4850 5415 53.04% 4795 46.96% Jan-14
Equipment Insulation
OSBL Summary Till date
Cumm. Achieved Till Balance Till Target for
Total Plan for
Activity UOM Date Date Mech.
Scope Oct'13 Comp.
Qty % Qty %

CIVIL CuM 34527 0 34527 100.00% 0 0.00% Jul-13

Structural
Fabrication MT 953 0 953 100.00% 0 0.00% Jul-13

Structural
MT 953 0 953 100.00% 0 0.00% Aug-13
Erection

Equipment-
Erection (Pakage Nos 183 0 183 100.00% 0 0.00% Sep-13
Items)

Piping Fabrication ID 41350 0 41350 100.00% 0 0.00% Sep-13

Piping Erection IM 118000 0 118000 100.00% 0 0.00% Oct-13

Elect. Tray
Installation Mtrs 6500 0 6500 100.00% 0 0.00% Dec-13

Elect. Cable
Mtrs 201000 0 201000 100.00% 0 0.00% Dec-13
Laying

Elect. Glanding & Nos 1050 0 1050 100.00% 0 0.00% Dec-13


Termination

Inst. Tray
Installation Mtrs 900 0 900 100.00% 0 0.00% Dec-13

Inst. Cable Laying Mtrs 6000 0 6000 100.00% 0 0.00% Dec-13

Inst. Loop Nos 0 0 0 #DIV/0! 0 #DIV/0! Dec-13


Checking