Professional Documents
Culture Documents
Preparatory Steps
Repair
Finishing Steps
Preparatory Steps
Remove the engine brake solenoid valve wiring harness.
Remove the rocker lever cover. Refer to Procedure 003-011 in
Section 3
Remove the engine brake wiring harness. Refer to Procedure
020-015 in Section 20
Next
It is
adjacent
to the
center
cam
journal
on the
valve
cover
gasket
surface.
Previous Next
8:56:16 AM 9/27/2012
Page 2 of 4
8:56:16 AM 9/27/2012
Page 3 of 4
Previous Next
Previous Next
Place a
second Flat
Washer on top
8:56:16 AM 9/27/2012
Page 4 of 4
of the P-clip.
Apply medium
strength
Thread Locker
to the
M8x1.25x16
Capscrew.
Install the
Capscrew
through the
Washers and
P-Clip and into
the newly
threaded hole.
SMALL | MEDIUM | LARGE
Torque the
Capscrew to
17 ft-lbs (23
nm).
Be sure that
the second
wiring harness
support leg is
fully installed
into its locating
hole.
Previous Next
Finishing Steps
Previous
8:56:16 AM 9/27/2012