ANJANI PORTLAND CEMENT LIMITED
ENVIRONMENT MANAGEMENT SYSTEM PROCEDURES MANUAL
(ISO-14001:2015)
EMPR/01
Copy No. : Issued to:
Version No. : 02
Issue Dt. : 01.03.2018
CONTROL!aS
ANJANI PORTLAND CEMENT LIMITED
ZEESS, [Rete rien [pee MR
PEPAEIE | supersedes [00/0104 2015 Page: 01 of O1
resinneme Jorysesans Jrenoyos | oopoz018 [rortoieroe [zune [S| aw
INDEX
PRO.No, Title ae Page Nos,
“ Status ei
. Index. 01.03.2018 01
01.03.2018 02
Identification and evaluation of 01.03.2018 03
EMS/MR/PRO/01_| environmental aspects, Risks &
Opportunities 01.03.2018 oF
01.03.2018 05
EMS/MR/PRO/02 _| Regulatory Tracking and compliance | 01.03.2018 06
EMS/MR/PRO/03__| Internal and External Communication 01.03.2018 07
EMS/MR/PRO/04 Monitoring & Measurement 01.03.2018 08
Emergency Preparedness and
Eus/mnyproyos_ | pmerBen 01.03.2018 09
EMS/MR/PRO/06_ | Operatiofal Control 01.03.2018, 10
Prepared by ‘Approved by
CONTROLLEANJANI PORTLAND CEMENT LIMITED
Ref No. EMS/MR/PRO/01 [Dept: [MR
Supersedes | 00/01.04.2015 | Page: 01 of 04
Yessonern Toston [aero |onmustane [rst os [reese [E* [ovmana
Title Identification and evaluation of Environmental Aspects, Risks & Opportunities
1.0 Purpose:
To define the method for identifying the environmental aspects and impacts associated with
the activities, products and services taking into account planned or new developments, or new
or modified activities, products and services considering life cycle perspective.
To, define a method for determining the significance of the identified environmental aspects
and impacts.
To, define the method for maintaining a register of environmental aspects and impacts to
demonstrate compliance with the requirements of ISO 14001-2015.
2.0 Scope:
21 The aspects arising from activities, products and services at Manufacturing facility
2.2 Activities including planned or new developments, or new or modified activities,
Products and services considering life cycle perspective,
3.0 Definitions:
Environment- surroundings, if which an organization operates, including air, water, land,
natural resources, flora, fauna, humans and their interrelation,
Environmental Aspect - element of an organization's activities, products or services that can
interact with the environment
Significant Environmental Aspect - an environmental aspect, that has or can have a
significant environmental impact. The parameter to classify into Significant environmental
aspect defined in the procedure.
Environmental Impact - any change to the environment, whether adverse or beneficial,
wholly or partially resulting from an organization's activities, products or services,
A direct aspect is an interaction with the environment over which the organization has control
and over which it can be expected to apply influence.
An indirect aspect is an interaction with the environment over which the organization does not
have control and cannot be expected to apply influence.
Scale : The extent of area it spreads.
Severity: The extent to which it impacts the environment
Probability : The chance of happening.
Duration: The extent it remains impacting the environment. 0
Prepared by - ‘Approved by
CONTROL?ANJANI PORTLAND CEMENT LIMITED
= | RefNo. EMS/MR/PRO/01 | Dept: MR _|
PES ns [Supersedes | 00/01.042015 | Page: [02 of 04 |
Neseoners [eemsenats |rewnoroe [owns [rontenwne Tascam [5 [oxmane |
Title Identification and evaluation of Environmental Aspects, Risks & Opportunities
4.0 Responsibilities:
The Management Representative and HODs of various Departments are responsible for the
establishing and maintaining the register of environmental aspects and impacts. The MR, in
consultation with other relevant HODs, is responsible for evaluating the significance of the
identified environmental aspects and impacts.
All employees are responsible for notifying the MRthrough their HODs,
to their activities, products or services that are likely to affect the r
impacts, and their significance evaluation,
5.0 Procedure
of any known changes
egister of aspects and
‘Activity — Description Responsibility |
1. Prepare product life cycle diagram which includes raw
material acquisition, production,
peneon ot transportation/delivery, use, end-of lifetreatment and
oe final disposal. MR& HODs
Ee 2. Consult different HODs and list out / identify the
activities, products and services, department wise
across the organization.
1. Identify different aspects of activities, products and
services, considering life cycle perspective, that can
interact with the environment at different conditions
like normal, abnormal and emergency and which can
Mestification ot be cronvoiod influenced / eliminated as per
re 2, Also consider change, including planned or new| MR&HODs
communication | 4evelopments, or new or modified activities, products
and services.
3. Maintain Environmental aspects register and keep it
up-to-date, communicate significant environmental
aspects among the various levels and functions of the
organization, as appropriate .
, 1. Evaluate the significance of the above Identified
Seance aspects as per the guidelines given at the end of this
Ree aeate Procedure. Determine the risks and opportunities of | MR & HODs
i significant environment aspects and compliance
Opportunites obligations,
Significant | Identify / List out the aspects that are having score more
environmental | than 50 as ‘significant environmental aspects”. The | MR& HODs
aspects __| score is determined by multiplication of S18S24PxD
ee ule
Prepared by “Approved by
CONTROLLEIANJANI PORTLAND CEMENT LIMITED
Aipaies | RefNo. TEMS/MR/PROVOI [Dep [mR
PEEPS [supersedes 100/01,04.2018 [Page : 03 of OF
Yesenneyoe w/aisaois | reino/o [ovooaane | raxtounn [mono |B Toca
Title Identification and evaluation of Environmental Aspects, Risks & Opportunities
Activity Description esponstl
Handle the significant environmental aspects and risks based
on their degree of significance and take necessary steps like
Handling elimination, control, Training etc. as per the guideline given at
significant | the end of this procedure. Utilize the opportunities for better
environmental | EMS performance. HODs
aspects, risks& | Business concern aspects are prioritized based on the
Opportunities | management decision.
Interested Party concern aspects are given priority even
though they are below the threshold limit decided.
‘The Aspects register will be reviewed, updated and maintained as follows,
* As part of the management review ‘process.
> Asaconsequence of any changes to the organization's activities, products or services,
+ ASaconsequence of any relevant changes to the register of applicable legislation,
* Asa consequence of feedback from environmental incidents, complaints and/or non-
conformances identified during the internal or external audit process,
~ __ Inresponse to stakeholders’ reports and documented concerns
~ Identify the Aspect register as given below:
DEPT-ASPECT&HIRA Register-00.00.0000
DEPT = Name ofthe department in three letters :: 00.00.0000 = Date Month Year
During each review, consideration will be given to the direct and indirect aspects of normal,
abnormal and emergency operating conditions.
Aspects should have linkage to the legal and other requirements;
Significant aspects should have linkages to, objectives, training and operational controls,
Qu uly
Prepared by “Approved by
CONTROLLEDANJANI PORTLAND CEMENT LIMITED
Ref No. EMS/MR/PRO/01_| Dept: [MR
Supersedes _| 00/01.04.2015 Page : 04 of 04
Nesonvoyoe | yros20ie [icine | eooimzoie Trottevewoe [zatza1 [ateciwe [oionioa
Title Identification and evaluation of Environmental Aspects, Risks & Opportunities
EFOR IR
1, Alllegal concern aspects are significant and first priority.
2. The aspects which get more than 80 score are significant
‘The significance of the environmental aspects is determined following the guidelines given
below:
a UI ANI
ISAS GIVEN BELOW:
Weightage Spread Foor onal a a er
‘+ Few times ina
Restricted to part .
1 of operational area | Reuse /Recycle | Lessthanashift | year but not
monthly
i Few times ina |
4
2 eee Reversible More thana shift | month but not
a daily
Restricted within : :
a the plant Irreversible Morethanday | Continuous
A Spread outside the
boundary
XS
Qe vy
Prepared by ‘Approved by
CONTROLLE!ANJANI PORTLAND CEMENT LIMITED
GSES, [Rett Tas jnrro 702 [Dep we
FREE EES [Supersedes [00/01.042018 [Pages 01 of Oi
Version No/ot | 02/01.032018 | Rev.No/t | 00701032018 | NexcReview Dt | za0zz021 | Etecive
De
01032018
Title Regulatory Tracking and Compliance Obligations
1.0 Purpose
To, specify the procedure to be followed for identifi
obligations applicable to the organization.
with these requirements,
2.0 Scope
Covers applicable regulatory and legal laws, rules and regulations,
their compliance.
3.0 Responsibilities:
‘The Management Representative and HODs of vario\
ication of Legal and other requirements /
Check compliance; specify methodology to comply
other requirements and
nus Departments where legal requirements
/ obligations are applicable are responsible for the establishing and maintaining the legal
register. The MR, in consultation with other relevant H
and other requirements / obligations and compliance.
|ODs, is responsible for evaluating legal
4.0 Procedure
Activity Description Responsibility
1. Identify regulatory/legal and other requirements/
obligations that are applicable to the organization's
Identification of | *ctivities, products and services with respect to
Environment as per LEG/F/01.
eee 2. Identify/List out the applicable regulations/| _ MR&HODs
obligations as per LEG/F/02.
3. Identify and act on risks and opportunities related to
compliance obligations.
Keep track of changes and update the requirements once
a month by visiting websites like ha ane
Access the Legal : -in/legi eee
Requirements +2¢0rd(LEG/R/01) of checking and updation.
1. Review and understand the legal and other
requirements, MR& HODs
2. Apply the legal requirements to the related aspects.
Information Gather the information related to compliance within the MR& HODs
gathering _| organization,
Compliance status | 1. Analyze the requirements isa vis compliance. NRW HODS
report 2. Prepare the compliance status using monitoring plan.
oe Identify the gaps / non-compliances. MR& HODs
1. Comply the gaps.
Compliance / EMPs | 2. If more time and actions are required address the MR& HODs
non-compliance with an EMP.
; Periodically collect the data, review the status of
Gece EMPs/objectives accomplishment and submit report to| MR& HODs
a—_—™ wt
Prepared by _ ee by
CONTROLLE!ANJANI PORTLAND CEMENT LIMITED
Ref No. EMS/MR/PRO/03_| Dept: MR
Supersedes | 00/01.04.2015 Page : 01 of 01
Versonvoroe [e2/oroazose [ax oye [o7onen20se | vexttevewo [70022021 Biestve Toxoszo18
Title Internal and External Communication
1.0 Purpose
‘To specify the mechanism for internal & external communication at various stages and to
different interested parties.
2.0 Scope
Covers different activities, products and services of the organization. Also to satisfy the
requirements of ISO - 14001:2015.
3.0 Procedure
Identify the communication requirements for relevant internal and external parties and define
what to communicate, when to communicate, with whom to communicate and how to
communicate as per EMS/MR/F/06.
IN’ /MMUNICATIO!
1, Information on significant environmental aspects, compliance obligation to
employees, wherever required.
Changes that could impact EMS performance
Information on emergency situations and preparedness to all employees.
Information on objectives and targets to all sectional / departmental heads.
Internal complaints due to breach of safety & environmental aspects.
Communication to rélevant section / departmental heads, regarding external
complaints.
EXTERNAL COMMUNICATION:
1, Interacting with Suppliers & Contractors on environmental aspects, policy etc,
wherever required.
2, Discussions with public & other interested parties regarding policy, significant
aspects and impacts in general meetings wherever relevant.
3. Different communications received from applicable regulatory and statutory
authorities are registered as per List of Records and answered.
4, The environmental policy is made available at Security for external interested
oa een
parties.
5. On request from external parties, information on significant environmental aspects,
Environmental policy and decisions taken shall be provided,
EXTERNAL COMPLAINTS
1, Registration as per LEG/R/02
2, Communication to relevant HOD
3. Corrective action as per EMS/MR/F/12
4. __ Information to interested parties, as required.
Maintain documented information for the above.
The responsibility for this procedure is with HOD - HR, relevant HODs and ae
"epee
Prepared by ‘Approved by
CONTROLLEI ANJANI PORTLAND CEMENT LIMITED
BSPEE [Sena [sonny Ie
veseniyoe [ejsonane | mvseim | oyeimate | secteewte [zacam [Toomer
Title Monitoring , Measurement, analysis and evaluation
1.0 Purpose
The purpose of this procedure is to specify methodology for monitoring, measurement,
analysis and evaluation of environmental management system.
2.0 Scope
All the processes / activities / compliance obligations involved in significant aspects in
environment Management.
3.0 Procedure
‘Activity Description Responsibility |
Identify the Key operational controls/data
associated with significant environmental
aspects, risks, compliance obligations.
Set the periodicity and formats to be used for MR& HODs
data collection
Consider environmental objectives and targets
for Monitoring and measurement process.
Prepare calibration plan for the equipments /
Calibration plan | instruments that are used for the monitoring of| MR &HODs
above identified key operational controls.
Collect data in the prescribed formats as per
Data collection EMS/MR/F/07 on environmental performance | MR & HODs
of the organization,
Identification of Key
characteristics
Evaluate the performance as per the frequency
set and take necessary corrective actions for
Evaluation & Corrective | environmental performance and effectiveness,
actions Communicate the environmental performance | MR&HODs
to relevant internal and external parties as
required.
Records File all records as per List of Records. MR& HODs
Qe whe
Prepared by ‘Approved byANJANI PORTLAND CEMENT LIMITED
IS RefNo. EMS/MR/PRO/0S [Dept: [MR
Snene Supersedes | 00/01.04.2015 | Page: 01 of 01
Versonvoyoe [oxoxoazoie | re.Na/oe | oyon0aznie [Nentevewor [e02201 |S" [oxasane
Title Emergency Preparedness & Response
1.0 Purpose
The purpose of this procedure is to identify potential areas of emergency occurrence and
development of procedures / instructions to handle emergencies.
2.0 Scope
All the identified emergencies like Fire / spillage, incidents, accidents etc.
2.0 Responsibility:
AL HODs.
4.0 Procedure
Activity
Description
Responsibility
List of emergencies
Prepare list of emergencies department wise and
consolidated for the unit.
MR and HODs
ERP
Prepare Emergency response procedures to
respond to emergency situations and accidents.
Use Emergency response procedures to respond
to actual emergency situation and accidents and
Prevent or mitigate associated adverse
environmental impacts.
MRand HODs
‘Training
Train all the employees in responding/ handling
emergencies and on Emergency response
procedures.
MR and HODs
Testing of ERP
Periodically conduct tests like Mock Drills to keep
the employees on alert and to train on handling
emergencies as per Mock drill schedule
IMS/MR/F/10. Maintain records of mock drill as
per list of records-dept wise.
Inform relevant emergency response procedures
to relevant interested parties and persons
working under its control
MR and HODs
Monitoring
Monitor the implementation of ERP and alertness
of employees by questioning periodically and by
mock drills.
HODs
Updation
Based on the mock drills and actual emergencies
update the Emergency Response procedure.
MR
Qe
Prepared by
CONTROLI
whe
‘Approved by10
‘ANJANI PORTLAND CEMENT LIMITED
Ref No. EMS/MR/PRO/06 | Dept: MR
=e me nw +_| Supersedes | 00/01.04.2015 | Page: 01 of 01
Version vo/oe | c2/0L022018 | nex. No/ox | oyonssa0i8 [WetevewDe [2e0z201 | He | oxaaaoie
Title | Operational Control
1.0 Purpose
To specify the procedure to be followed for preparati
implementation,
mn of Operational Controls and
2.0 Scope
Covers different significant environmental aspects which can be controlled by adopting
Operational Controls.
3.0 Responsi
All HODs.
4.0 Procedure
Activity Description Responsibility |
List out Significant Environmental Aspects that
List of Significant need operational control procedures.
( Aspects Idéntify relevant controls like elimination,] MR&HODs
substitution, administrative or combination
considering life cycle perspective.
¥
Prepare Operational Control Procedures.
ocrs Stipulate the operating criteria, eee
Train the people involved in using Operational
; Controls. Use the operations control
Training & Usage procedures for carrying out the activities} MR&HODs
related to Significant Environmental Aspects.
Ge— ul
Prepared by CONTROLLE ‘Approved by