ANJANI PORTLAND CEMENT LIMITED
IMS PROCEDURES MANUAL
(1SO-9001:2015, IS0-14001:2015 & ISO-45001:2018)
(IMSPRM/01)ANJANI PORTLAND CEMENT LIMITED
Ref No, TMSPR Manual_| Dept: MR
| Ariat nt [Supersedes | 00/01.03.2018 | Page: 01 of OF
Versounaroe | onyouaaanie | ternaym. | o1onor2019 [NenRevewoe | 2e0zz01 [HT oimnzoie
INDEX
PRON Title Page Nos. Rev.
Se e Status
Index o1 (00/01.03.2018
02 01/01.02.2019
IMS/MR/PRO/01 | Document & Data Control 03 (00/01.03.2018
piceislescteseees oan Ee Ee
04 00/01.03.2018
IMS/MR/PRO/02_ | Internal Audit 05 00/01.03.2018
IMS/MR/PRO/03_| Control of Records 06 00/01.03.2018
Performance Measurement &
IMs/MR/PRO/04 | sronitoring 07 00/01.03.2018
por wally
Prepared by “Approved by
CONTROLLEDANJANI PORTLAND CEMENT LIMITED
Tafa [ WSR PROTOT | Bape, —— [WR a
| =e me mit _| Supersedes | 00/01.03.2018 | Page: 01 of 03
Tesco anaraazns | retame_[evaranaiy [nentevewds | zamrz0er [B*™* [oeums
Title Document & Data Control
1.0 Purpose
To control all documents and data required for the QMS according to ISO-9001:2015, EMS
according to ISO-14001:2015 and ISO 45001:2018.
2.0 Scope
This procedure is applicable to QMS, EMS and OHSAS management systems.
3.0 Procedure
3.1 Definitions
QMSM : Quality Management System Manual. This is first level document.
SMSM: Occupational Health and Safety management system manual. This is first level
document.
EMSM: Environment Management System manual. This is first level document.
PRO: Procedure comprehensively details out the activities performed by the respective
department. This is a second level document.
Standard Operating Procedure (SOP): SOP is a detailed document followed for different
activities to keep the operational results of Quality. Level - 3 documents,
Operational Control Procedure (OCP): OCP is a detailed document followed for control of
operations to address Hazards / Aspects. Level-3 documents.
Levels of Documentation:
‘The documentation is of four levels:
Level = 1
High level manuals describing the compliance to the international standards like 10-9001.
Prepared by MR and approved by VP-Operations
Level - 2
Procedures / guidelines / Process maps meant to be followed for various processes. Prepared
by respective HOD and approved by MR
Level ~ 3 - SOPs/OCPs
Detailed documents used for execution / control of activities.
Prepared by Respective HOD and approved by MR
he
Prepared by ‘Approved by
CONTROLLEDANJANI PORTLAND CEMENT LIMITED
Ref No. IMS/MR/PRO/O1 Dept: MR
cement Supersedes | 00/01.04.2015 Page: 02 of 03
Versonne/oe[oavoieaaose | ner voy | oyo.aszni0 [SF | aanzanz | areivene [0.03200
Title | Document & Data Control
Level -4
Formats and Records
Master list of documents is being maintained.
Inter-linkage of documentation:
Level ~ 2 documents wherever required are cross referenced in Level ~ 1 documents and level
- 3 documents are cross referenced in level - 2 documents wherever needed.
All documents are released by MR.
‘These documents are reviewed once in three years/as and when required, for adequacy and
revised and re-approved.
‘The Management Representative shall ensure that relevant versions of documents are
available at point of use.
Documents shall remain legible, dated and readily identifiable,
Management Representative is responsible to maintain the confidentiality, integrity and
availability of the documented information,
Documents of external origin are maintained by respective department.
Master copies are maintained by Management Representative. Master copies, when printed
are stamped as Master copy. When a hardcopy is issued, itis stamped as Controlled Copy and
distributed.
‘The obsolete copies of hard copies are stamped as obsolete copy and preserved.
Revisions/Amendments
The originator of the document may revise the documents as and when needed. The
originator need to raise a request along with the modified documents. The Management
Representative shall distribute the documents
‘The hardcopies that are distributed shall be taken back and destroyed by Management
Representative.
Retain the documented information for future reference for minimum 3 years. Destroy
the documented information after approval from the concerned HOD and after
discussion in management review. i
See
Prepared by “Approved by
GaTTONLNODANJANI PORTLAND CEMENT LIMITED
RefNo. IMS/MR/PRO/OX | Dept: MR
Supersedes | 00/01.04.2015 | Page: 03 of 03,
Veronnaoe [envorwaaoie | oxime | on/o.aszoin | Wet tevewse | ovate: [= | oxaaaoie
Title
Document & Data Control
Control features of the revisions:
Nature of the revisions from the earlier version shall be recorded on the superseded
master copy.
Before distributing the revisions, Management Representative shall
Enter the revision in the master list.
Ensure the required knowledge is imparted
File the master copy of the revised document in the master copy file, if
printed
Destroy all superseded controlled copies immediately after receiving
from the respective recipient except Master copy.
If superseded version is maintained, stamp master copy as
“SUPERSEDED” and retain.
Revision Control:
All the documents start with version number 1.0. The version changes as progressive with 0.1.
Document numbering is followed as per IMS/MR/SOP/01
Que ul
Prepared by “Approved by
CONTPOLLEDI ANJANI PORTLAND CEMENT LIMITED
ye Ref No. IMS/MR/PRO/02_| Dept: MR
| AM2arst [Supersedes | 00/01.04.2015 _| Page: 01 of Ot
Venioana/De [oayaroszns [exo | ooouaszois | N=" Taeozaoe | | oxamante
Title | Internal Audit
1.0 Purpose
‘To ensure the adequacy and effective implementation of QMS, EMS & OH&SMS.
2.0 Scope
Planning, organization and conducting of Internal Audits.
3.0__ Procedure:
Activity Description Responsibility
ee Select audit team having minimum graduation MR
can qualification and revise the team as and when
required.
- ‘Organize training for the Audit team on planning MR
Ko Tanne and conducting Management system Audits for
minimum two days.
Prepare annual audit Plan based on the MR
importance of the operations. Revise the program
based on the audit results to ensure the effective
implementation of the system.
Audits to be conducted once in three months
‘Audit Progeam
aes Prepare audit schedule with criteria” and MR
intimation based on the Audit Plan and circulate,
Based on the audit schedule, distribute MR
Resource allocation independent auditors for conducting audit
different operations /Activities.
‘Audit Raise Non-conformities if required, formulate MR&Audit
ct _-} correction and corrective action in consultation Team
with Auditee. Get the Auditee's signature on the
NC and provide a copy to him.
1. Compile NCRs. Evaluate correction/corrective MR
action, if any modifications are required,
inform immediately to Auditee.
2. Arrange for follow-up audit.
‘Conduct follow-up audit within 15 days to see] Auditteam
whether NCs are closed properly or not. Submit
report to MR.
File all NCRs in IMS/MR/R/O01. MR
Prepare Internal audit report and submit for
Management Review Meeting.
hy
Qa up
Prepared by “Approved by
CONTROLLEDAR Ref No. IMS/MR/PRO/03_| Dept: MR
ANJANI PORTLAND CEMENT LIMITED
SSeeet [Supersedes [00/01.042015 Page: [01 of01
Versione [ox/oues20rs [er osm | ooouexane [RO Taeoaaoes |S | ormaaoie
Title | Control of Records
1.0
Purpose
To ensure proper maintenance/retaining of records for demonstrating conformance to
specified requirements and effective operation of Quality Management System, Environment
Management System and OH & S Management System.
3.0
Bl
32
33
34
35
36
37
38
Procedure
Identify all documents with a unique identification number.
Each department will maintain a document called as List of Records.
File all the relevant documents appropriately.
Store and maintain all the documents properly.
Dispose off suitably all documents after retention period duly taking the permission of
MR.
All records shall be legible and shall be stored and maintained to retrieve easily.
Periodically get pest control activity done and ensure cupboards are clean and free from
insects.
Never leave any documents unattended.
we ul
Prepared by “Approved by
CONTROLLEDANJANI PORTLAND CEMENT LIMITED
Ref No. IMS/MR/PRO/04_| Dept: MR
Supersedes | 00/01.04.2015 Page : OL of 01
Vesomnoyo [erwiazoe [renrarme — [ooynmz [Ne [anarn [Ee | onmanie
‘Title | Performance Measurement & Monitoring
1.0 Purpose
To specify the procedure to be followed for monitoring the performance of Integrated
‘Management system comprising of QMS, EMS and SMS.
2.0 Scope
Covers the products and activities at Anjani Cement.
3.0 Procedure
34
32
3.3.
34
35,
3.6
Identify critical parameters related to the performance of Quality management
system, Environment management system and Safety management system.
Set the periodicity to collect the data,
Communicate the monitoring/data collection plan to all concerned HODs.
Collect the data as per the frequency.
Monitor the data against the legal requirements wherever applicable.
‘Take necessary actions wherever required.
Prepared by “Approved by