You are on page 1of 71

5S Basics

5S

5S 1
8 WASTES
• Defect / Correction
• Overproduction
• Waiting
• Not utilizing employee talents
• Transportation / material movement
• Inventory
• Motion
• Excessive processing
5S 2
Visual Factory-Information Gathering/Organization
PAB = Process Analysis Board
COB = Certified Operation Board
PPB = Process Performance Board
PAB
(Hourly)
COB
(Daily) From
Each
PPB Department
(Monthly)

Department Reporting Information Center


(Plant-wide Reporting)

5S 3
Sort
Straighten
Shine
Standardize
Sustain

5S 4
5S 5
5S 6
5S 7
5S 8
5S 9
There are basically three
different types of workplaces...

5S 10
5S 11
5S 12
5S 13
5S 14
5S 15
5S 16
1S Sort

2S Straighten

3S Shine

4S Standardize

5S Sustain

5S 17
5S 18
5S 19
1S
Sort
• Segregate What Is Needed, Needed
Later, and Not Needed
• Discard What Is Not Needed
•Segregate Needed Items By Frequency
of Use

5S 20
Where to Perform

5S 21
5S 22
5S 23
Item Name
&/or Description:

Department: Value per Item:

Classification:
5S --- RED TAG . Raw Material . Machine / Equipment

. Work-in-Process . Mold / Jig

er #

box
Ent

in
. Component . Tool / Fitting

Reason: . Finished Product . Other______________


. Unnecessary . Unknown
er #
Ent

box
in . Defective . Other______________
Action: Completed:
. Leftover Material
. Eliminate

. Return
er #

box
Ent

in

. Move to Red Tag Storage

Tag Attached: . Action Taken:


Other_______________
G-

(--
E-
C

X
X
X
E

Year_____ Month_____ Day____ Year_____ Month_____ Day_____ File completed Tag at ____________

5S 24
Sort

5S 25
5S 26
5S 27
5S 28
2S
Straighten

5S 29
5S 30
Large
Large Claw Small Crescent
Small Claw Hammer Crescent Wrench
Hammer Wrench

Flat Tip
Screwdriver

5S 31
5S 32
5S 33
5S 34
Stage 1 Stage 2 Stage 3 Stage 4

5S 35
5S 36
Before

After

5S 37
Before

After

5S 38
Before

After

5S 39
Before

After

5S 40
5S 41
3S
Shine

5S 42
Why Shine?

5S 43
5S 44
5S 45
5S 46
Shine Targets

5S 47
5S 48
Location Being Audited:

5S Assessment
{Enter Location here}
(place cursor in red corner for INSTRUCTIONS)

5S To-Do Items Observed Condition Improvement Action


· Remove unneeded equipment, tools,
furniture, etc.
· Provide information on
department PPB Remove unnecessary items. All items not required for

Sort
· Review excess inventory, supplies, performing operations are removed from the work area. 0

Score Sheet
parts, or materials Only tools and products are present at workstation
· Identify existence of safety hazards
(water, oil, chemical, machines,
extension cords, etc.)
Storage of cleaning equipment: All cleaning equipment
stored in a neat manner; handy and readily available when 0
needed
Items on floor: Work-in-process, tools and any other
material are not left to sit directly on the floor. Large items
such as tote boxes are positioned on the floor in clearly 0
marked area, identified by painted or taped lines.
Storage and arrangement:: Boxes, containers, and
· Correct location for items are
materials are always stored neat and at correct work angles
identified
convenient to the operators where appropriate. When

Straighten
· Items are placed in their correct
items are stacked evenly or in a manner that would not
locations
· Aisle ways, workstations, equipment
cause them to toppling over. Storage areas are provided 0
for all necessary items at POUS (Point-Of-Use Storage).
locations are indicated
No items are placed on top of machines, cabinets, and
· Items are put away immediately
equipment. Unidentified items can not lean against walls
after use
or columns.
· Inventory or WIP height and quantity
Operating equipment/machinery: Each piece of
limits are obvious
equipment/machinery has guards and deflectors that 0
prevent debris from falling uncontained to the floor.
Document storage: Only documents necessary to the
operation are stored at the workstations and are stored in a 0
neat and orderly manner.
Tool and gauges arrangement: Tools, gages and fixtures
are arranged neatly and stored, kept clean and free of any 0
risk of damage.
· Floors, walls, stairs, and surfaces are Aisle ways maintenance: Aisles are always free of
materials and obstructions; nothing is placed on the lines
free of dirt, oil and grease
· Equipment is kept clean and free of and objects are always placed at right angles to the aisles 0
dirt, oil, and grease where appropriate.

Shine
· Cleaning materials are easily Equipment painting: All machines and equipment are
accessible neatly painted; equipment cleaning schedule developed 0
· Lines, labels, signs, etc. are clean and posted for each major piece of equipment.
and not damaged Workbench and desk control: Kept free of objects
· No other cleaning problems
(of any kind) are present
including records and documents (unless in use). Tools and 0
fixtures are clean and placed in their proper location.
Information boards: PPB, COBs, and PABs are arranged
in a neat and orderly manner. No outdated, torn, or soiled 0
documents are displayed
Emergency access: Fire hoses and emergency
equipment are unobstructed and stored in a prominent easy-
to-locate area with proper identification. E-Stop switches 0
and breakers are marked or color-coded for immediate
· Necessary information is visible visibility.
Standardize

· All standards are known and visible Aisle ways marking: Aisles and walkways are clearly
· Checklists exist for all cleaning and marked and can be identified at a glance; lines are straight
TPM maintenance jobs and at right angles where appropriate with no chipped, worn 0
· All quantities and limits are easily floor marking.
recognizable Equipment maintenance: Controls of machines are
· All necessary items can be located properly labeled. Critical points for daily maintenance
in 30 seconds checks are clearly marked. Equipment check sheets are 0
clean, neatly displayed and completed daily.
Tool and gauges convenience: Tools, gages and fixtures
are arranged so they can be easily accessed when needed. 0
Shelves and benches arrangement: Arranged, divided and
clearly labeled it is obvious where things are stored; status 0
and condition is recorded
Document control: All documents are labeled clearly as to
content and responsibility for control and revision. Obsolete
0
· All team members have had
Equipment cleanliness: All machines and equipment are
5S training
kept clean by routine daily care. 0
· Daily 5S actions performed
Floor cleaning: All floors are clean and free of debris, oil
Sustain

· Place all personal belongings


stored in a neatly maintained
and dirt. Cleaning of floors is done routinely -- daily at a 0
minimum—posted schedule.
location
· Job aids are current and readily 5S control and maintenance: There is a disciplined
system of control and it is maintained at the highest
accessible
possible level. It is the responsibility of every one to
· Routine 5S Implementation Audit
maintain this system and environment. Documentation exist 0
is performed until sustained
indicating cleaning responsibility for each team member in
the work area.

Legend: <2 (RED) 2 to 4.75 >4.75 (GREEN) 5S Implementation Audit Score = 0.00

5S 49
5S 50
5S 51
It is important that we
establish the first 3S
before we progress to
the next 2S.

5S 52
5S 53
4S
Standardize

5S 54
5S 55
5S 56
5S 57
5S
Sustain

5S 58
5S 59
January 2007 June 2007

5S 60
5S 61
5S 62
?
5S 63
5S 64
Now, what would you do?

5S 65
5S 66
5S 67
5S 68
5S 69
Remember
5S
1S Sort
2S Straighten
3S Shine
4S Standardize

5S Sustain

5S 70
5S 71

You might also like