EMPLOYEE NAME KRISHIA LYNNE M. NUÑEZ


DEPARTMENT ENGINEERING
Period APRIL 26 - MAY 10

BILLABLE HOURS

Working Hours Working Hours Overtime Hours


Day 830am -12pm 1:00pm -5:30pm 6:30-10:00pm
(max 3.5 hrs)6 (max 4.5 hrs) (max 3.5 hrs)

1 4 4
2 4
3
4 4 4
5 4 4
6 0 0
7 0 0
8 0 0
9 4
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27 4 4
28 4 4
29 4 4
30 4 4
31

36.00 28.00 0.00


64.00
0.00
Notes :
1. Report Billable Hours or time spent working during the morning, afternoon and overti
2. Indicate project code and project name for the task performed. Please ask Admin for
3. Report in detail percentage of work done based on schedule and assignment made by
4. All overtime work without prior authorization shall not be allowed, unless, otherwise
5. Attach work done or signed approval of the accomplishment by the Supevisor.
6. For Saturdays, maximum hours is 4 hours.
7. Admin staff project code is ADMIN.
8. Submit the accomplished form in excel format to the admin on on the cut-off day.

Special notes during the EQC:


1. No overtime work is allowed.
2. Report billable hours based on actual work performed at home.(WFH)
MORNING

Project Codes Project Names

20-006 MAHI

20-006 MAHI
20-006 MAHI

20-006 MAHI

20-006 MAHI
20-006 MAHI
20-006 MAHI
20-006 MAHI

TOTAL BILLABLE HOURS


Total Billable Hours (Regular)
Total Billable Hours (Overtime)
ng during the morning, afternoon and overtime periods.
r the task performed. Please ask Admin for the code and name.
based on schedule and assignment made by the supervisor. Attach bar chart schedule approved by RSI.
tion shall not be allowed, unless, otherwise recommended by Supervisor and approved by RSI.
he accomplishment by the Supevisor.

rmat to the admin on on the cut-off day.

k performed at home.(WFH)
MORNING

%
Task Performed s Accomplishment
s

REVISED LOAD PATH, BULK HEAD DESIGN

SPLICE PLATE DETAIL


STEEL CONNECTION DESIGN, TRANSFER GIRDER

RESPONSE TO RFI (EPOXY AND BM1 BEAMS AND GIRDERS CUTTING LIST)

DESIGN OF BEAMS AND GIRDER 3RD FLOOR


DESIGN OF BEAMS AND GIRDER GROUND FLOOR
SCHEDULE OF BEAMS AND GIRDERS BPO (5TH-9TH)
CHECKPRINT
ode and name.
upervisor. Attach bar chart schedule approved by RSI.
mmended by Supervisor and approved by RSI.
AFTERNOON

Project Code Project Name

20-006 MAHI
20-006 MAHI

20-006 MAHI
20-006 MAHI
20-006 MAHI
20-006 MAHI
AFTERNOON

Task Performed % Accomplishment

REDESIGN OF GRID J-L/6-7 BASED ON RSI COMMENTS


REVISION FOR 2ND FLOOR BASED ON AGI COMMENTS

DROP-OFF SECTION
DESIGN OF SHEARWALL EW3
GRIDLINE A'' SECTION AND DESIGN
CHECKPRINT
FOR ADMIN:

Project Code
Project A
Project B
Project C
OVERTIME

Project Code Project Name Task Performed


I attest that all information I have submitted are true and correct.

KRISHIA LYNNE M. NUÑEZ


Employee Name and Signature
Date 11-May-20

No. of Hours Spent


% Accomplishment

You might also like