Professional Documents
Culture Documents
NUÑEZ
DIVISION : ENGINEERING
TASKS FOR THE FOLLOWING DAY (IF SAME WORK WILL BE DONE THE FOLLOWING DAY)
CONCERNS IF ANY:
(1) WE HAVE YET TO RECEIVE THE SECTION OF THE REVISED 35TH FLOOR ROOFS THAT WAS REQUESTED TO AGI SINCE LAST
AND REVISED ROOFING COVERAGE FOR CERTAIN AREAS ON THE 35TH FL
TASKS FOR THE FOLLOWING DAY (IF SAME WORK WILL BE DONE THE FOLLOWING DAY)
(1) CHECKED JOY'S FINISHED MODEL FOR LEFT WING
DESCRIPTION OF ACCOMPLISHMENT
JOINT FOR RETAINING WALL AND FOOTING
EMBEDMENT OF SHEARWALL FOOTING DETAIL
COLUMN RETROFITTING DETAIL CLARIFICATION
FOOTING RETROFITTING DETAIL CLARIFICATION
PRINT TO PDF INITIAL FRAMING PLANS OF MAHI FOR SIR EMMAN'S DRAFTING
DESCRIPTION OF ACCOMPLISHMENT
REQUESTED TO AGI SINCE LAST WEEK. THIS IS TO VERIFY THE ADDITIONAL ROOF SLABS
RTAIN AREAS ON THE 35TH FLOOR.
DESCRIPTION OF ACCOMPLISHMENT
CHECKED .STD MODEL, COMMENTED CORRECTIONS SEEN
PRINT TO PDF INITIAL FRAMING PLANS OF SOLTANA RIGHT WING FOR LIANNE'S
DRAFTING
CHECKED IF THEIR EXCEL IS CORRECT, COMMENTED CORRECTIONS SEEN