You are on page 1of 3

NAME :KRISHIA LYNNE M.

NUÑEZ
DIVISION : ENGINEERING

DAILY ACCOMPLISHMENT REPORT

PROJECT 20-006 MAHI ACCOMPLISHMENT (FILE) DESC


(1) MAHI-RFI-ST-010 RESPONSE TO MAHI-RFI-ST-010 JOINT
(2) MAHI-RFI-ST-011 RESPONSE TO MAHI-RFI-ST-011 EMBEDM
(3) MAHI-RFI-ST-012 RESPONSE TO MAHI-RFI-ST-012 COLUMN
(4) MAHI-RFI-ST-013 RESPONSE TO MAHI-RFI-ST-013 FOOTING
(5) FRAMING PLAN ETABS FRAMING PLAN PRINT TO PDF INITIAL FR

TASKS FOR THE FOLLOWING DAY (IF SAME WORK WILL BE DONE THE FOLLOWING DAY)

(1) CONCERNS IF ANY


(2) CONCERNS IF ANY
(3 CONCERNS IF ANY

PROJECT 15-041 GRC 4 ACCOMPLISHMENT (FILE) DESC


(1) RFI-GRCNT-ASEEC-ST-080 15-041 GRC T4-2020-03(MAR)-11 REVISED RD.$ET
REVISED THE SIZES OF THE
WHICH WAS THE PREVIOU
FLOOR. COORDINATEDWITH
RENEE RE
(2) 35TH FLOOR CONS. BULLETIN 15-041 GRC T4-2020-03(MAR)-11 REVISED RD.$ET CONTINUED THE REVISION
STILL C
TASKS FOR THE FOLLOWING DAY (IF SAME WORK WILL BE DONE THE FOLLOWING DAY)
(1) RUN THE ETABS MODEL

CONCERNS IF ANY:
(1) WE HAVE YET TO RECEIVE THE SECTION OF THE REVISED 35TH FLOOR ROOFS THAT WAS REQUESTED TO AGI SINCE LAST
AND REVISED ROOFING COVERAGE FOR CERTAIN AREAS ON THE 35TH FL

PROJECT 19-035 SOLTANA TOWER 3 ACCOMPLISHMENT (FILE) DESC


(1) CHECK TOP ROOF STAAD MODEL CHECKED .STD
(2) RIGHT WING FRAMING PLAN PRINT TO PDF INITIAL FR

(3) CHECKED NARD'S AND XAVIER'S


CHECKED IF THEIR EX
CONCENTRIC ISOLATED FOOTING EXCEL

TASKS FOR THE FOLLOWING DAY (IF SAME WORK WILL BE DONE THE FOLLOWING DAY)
(1) CHECKED JOY'S FINISHED MODEL FOR LEFT WING

(1) CONCERNS IF ANY


(2) CONCERNS IF ANY
(3 CONCERNS IF ANY
DATE SUBMITTED : MARCH 25 2020

DESCRIPTION OF ACCOMPLISHMENT
JOINT FOR RETAINING WALL AND FOOTING
EMBEDMENT OF SHEARWALL FOOTING DETAIL
COLUMN RETROFITTING DETAIL CLARIFICATION
FOOTING RETROFITTING DETAIL CLARIFICATION
PRINT TO PDF INITIAL FRAMING PLANS OF MAHI FOR SIR EMMAN'S DRAFTING

DESCRIPTION OF ACCOMPLISHMENT

REVISED THE SIZES OF THE BEAMS AND GIRDERS IN CONCERN TO 350MMX350MM


WHICH WAS THE PREVIOUS SOLUTION TO SAME WING WALL ISSUES ON THE 24TH
FLOOR. COORDINATEDWITH ARCH. RENEE IF SAME SOLUTION CAN BE APPLIED. ARCH
RENEE RESPONDED THAT HE WILL CHECK IT FIRST.
CONTINUED THE REVISION ON THE MODEL. RECHECK LOADINGS ON THE MODEL IF
STILL CONSISTENT WITH LATEST AR PLANS

REQUESTED TO AGI SINCE LAST WEEK. THIS IS TO VERIFY THE ADDITIONAL ROOF SLABS
RTAIN AREAS ON THE 35TH FLOOR.

DESCRIPTION OF ACCOMPLISHMENT
CHECKED .STD MODEL, COMMENTED CORRECTIONS SEEN
PRINT TO PDF INITIAL FRAMING PLANS OF SOLTANA RIGHT WING FOR LIANNE'S
DRAFTING
CHECKED IF THEIR EXCEL IS CORRECT, COMMENTED CORRECTIONS SEEN